Download - System Preparation Configuration
8/18/2019 System Preparation Configuration
http://slidepdf.com/reader/full/system-preparation-configuration 1/13
Getting Started Newsletters Store
Products Services & Support About SCN Downloads
Industries Training & Education Partnership Developer Center
Lines of Business University Alliances Events & Webinars Innovation
Log On Join UsHi, Guest Search the Community
Activity Communications Actions
Browse
Tweet
created by Anitha J on Jul 24, 2014 9:47 AM, last modified by Anitha J on Jul 24, 2014 10:53 AM
Few Post Installation activities once the installation is completed are:
1. SICK - Consistency Check
2. SE06 - Post Installation Action
3. STMS - Configure Transport Management System
4. SLICENSE - Apply License
5. SGEN - SAP Load GenerationThese are few general activities as soon as the system is installed. There are other activities along with this,
depending on the requirement. Go through the Guides for further information.
System Preparation :
Why we perform system preparation?
System preparation prepares the solution manager system for basic configuration.
Needs to be performed fully after a new installation or upgrade.
Partially after upgrades and patches to update dialog and system users, and assign the
appropriate default roles.
During this step, the Central Correction Note (CCN) that contains the latest correction is
implemented.
Pre-Steps for System Preparation:
Few parameters are to be added to the profile as a prerequisi te for the system preparation step.
Refer Note 1582842 : Profile Parameters for Solution Manager 7.1
Make sure that these parameters are added as described in the note, and restart the system. Once this is done, start
with System Preparation step
Solman_setup --> system preparation
Create all the users in the Step 1.
Create all the users, give a common password (Preferably, master password given during installation).
System Preparation Configuration,issuesfaced and solution for Solution Manager 7.1,Linux:DB2
Share 0Like
Version 2
8/18/2019 System Preparation Configuration
http://slidepdf.com/reader/full/system-preparation-configuration 2/13
Step 2 : Check all the installations done within the system (viz., TMS configuration, profile
parameters, license key, service connections etc.,)
Click on execute all, the check is performed automatically
If any step is not executed automatically, then in the navigation column, click on start transaction to perform it manually.
Step 3 : Implement SNOTE. This can be done in 2 ways.
1: Download the SNOTE Simply click on the start download button to download the required note
OR
2: Manually download the Snote using the transaction code SNOTE
SNOTE->GOTO->Download sap note
Simply click on start download button to download the note.
8/18/2019 System Preparation Configuration
http://slidepdf.com/reader/full/system-preparation-configuration 3/13
You can also go back to transaction SNOTE to check if the note has been downloaded.
Import and implement the note Assistant
Simply click on the start SAP Note Assistant button
OR
Manually follow the procedure
SNOTE->
Click on execute in the next screen, post processing
8/18/2019 System Preparation Configuration
http://slidepdf.com/reader/full/system-preparation-configuration 4/13
Step 4 : Configure ABAP.
Here the configuration of ABAP is made automatically on the click of the execute button.
Once successfully completed, it will appear on the log
Step 5.1 :Configure Web Dispatcher. (Automatically performed)
Step 5.2 :Configure Authentication.
Follow the wizard steps
1. Click on display
2. start webdynpro
3. Select performed once done
8/18/2019 System Preparation Configuration
http://slidepdf.com/reader/full/system-preparation-configuration 5/13
When clicked on start webdynpro, the following screen appears. click on save.
status performed.
Step 5.3: Creation of Logical ports
Follow the wizard steps
1. Click on display
2. start webdynpro
3. Select Execute once done
Step 6. Prepare Landscape
Step 6.1 : Preparation of Landscape
Select SLD
Follow the wizard steps
8/18/2019 System Preparation Configuration
http://slidepdf.com/reader/full/system-preparation-configuration 6/13
Once the server is added as told by the wizard, Click on setup local SLD for confirmation
Click ok, netweaver window is displayed,
Provide user id and password and login.
8/18/2019 System Preparation Configuration
http://slidepdf.com/reader/full/system-preparation-configuration 7/13
Provide the passwords
Solman_Admin password for ABAP and J2EE
SLDDSUSER and SLDAPI passwords
once completed, you get the following screen.
8/18/2019 System Preparation Configuration
http://slidepdf.com/reader/full/system-preparation-configuration 8/13
Step 6.2 : Prepare outside discovery
Prepare the connection of third party or standalone databases to SAP Solution Manager
(Manually perform the steps following the wizard)
8/18/2019 System Preparation Configuration
http://slidepdf.com/reader/full/system-preparation-configuration 9/13
For install diagnostic agent :
Step 6.3: Connect Diagnostic agent
Follow the steps in the wizard
Get Agents
8/18/2019 System Preparation Configuration
http://slidepdf.com/reader/full/system-preparation-configuration 10/13
Connect to the DAA agent and wait for some time for it to connect .
Step 6.4 : Configure LMDB
Configure Object Server.
Before this step, perform CIM and CR models update.
Download the latest version from the marketplace.
Note : Whenever you update the CIM models and CR contents, always update the CIM
models first and then the CR contents.
link: http://<hostname>:5<instance>00/sld/admin/index.jsp)
To update the CIM details and module
8/18/2019 System Preparation Configuration
http://slidepdf.com/reader/full/system-preparation-configuration 11/13
Go to Home --> import.
check the details in Details--> data.
Once Completed, continue with configure object server,
Click on check, when no errors, save & activate.
ait for LMDB job to complete.
Once the job is completed, Perform the last step.
Step 7: Complete.
8/18/2019 System Preparation Configuration
http://slidepdf.com/reader/full/system-preparation-configuration 12/13
Average User Rating
(0 ratings)
Tweet
Finish .
Few Issues that were faced by me during system preparation, with solution.
Roadmap is not visible when we run Solman_setup
Solution : 1547441 - Flash roadmap for Solution Manager Setup
Error while calling Diagnostic Agents In step Configure automatically
Solution : Run the SMDAGENT Script
The Script is :
smdsetup sldconf hostname:"<SLD_HOSTNAME>" port:"<SLD_PORT>" user:"
<SLDDSUSER>" pwd:"<SLDDSUSER_PWD>"
After the script, restart the DAA server through Management console.
Note: The System preparation steps should be performed only by the user SOLMAN_ADMIN for
the operation to be successful.
SOAP:1,007 SRT :Unsupported xstream found ("HTTP Code 401: "Unauthorized")
Solution : 1663549 - Web service invocation problem caused by Unsupported xstream found ("HTTP Code 401 :
Unauthorized") during SOLMAN_SETUP
Also, make sure that the user SAP_J2EE_ADMIN has the followi ng roles present.
- SM_INTERN_WS and
- SMD_ADMIN
Thank you
2735 Views
Share 0Like
0 Comments
8/18/2019 System Preparation Configuration
http://slidepdf.com/reader/full/system-preparation-configuration 13/13
Follow SCNSite Index Contact Us SAP Help Portal
Privacy Terms of Use Legal Disclosur e Copyr ight
There are no comments on this document.