Tacoma Water Seismic Planning
Tacoma Public UtilitiesPublic Utility Board Study SessionMay 22, 2019
![Page 2: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/2.jpg)
Presentation Overview
2
• Overview of seismic planning work
• Current-state findings: Damage and restoration estimates
• Level of Service discussion: policy & implications
• Key work ahead
![Page 3: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/3.jpg)
3
DOCUMENT DRIVER
1996Seismic Assessment
Post Northridge Earthquake
2003Vulnerability Assessment
Bioterrorism Preparedness and Response Act of 2002(Post 9/11 – Malevolent Threats only)
2015All Hazards Vulnerability Assessment
Proactive, with all-hazards perspective
2016-2018Phase 1 & 2 ForumResilience Plans
Proactive Regional Resilience Planning
2019-2020New All Hazards Vulnerability Assessment requirement
America’s Water Infrastructure Act (AWIA) of 2018(New all hazards vulnerability assessment requirement)
Modern Resilience Planning
![Page 4: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/4.jpg)
4
2015 All-Hazards Vulnerability Assessment
• Malevolent Threats – Diversion/Theft– Product
contamination – Process Sabotage– Human Error– Aircraft / Marine /
Automobile Attack– Assailant
• Natural Hazards– Earthquake– Flood– Ice Storm/ Snow– Wildfire / Plant Fire– Lahar– Volcano– Drought– Tsunami
• Proximity Threat– Rail– Other Targets
• Dependency Threat– Loss of Utilities– Loss of Suppliers– Loss of Employees
![Page 5: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/5.jpg)
2015 All-Hazards Vulnerability AssessmentMajor risk categories
Total Seismic Risk 57%
Total Natural Hazard (Excluding Seismic)
34%
Total Malevolent
Risk 7%
Total Dependency
2%
Total Accidental<1%
![Page 6: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/6.jpg)
Water Supply Forum Resiliency Project
.
Preparing for Water Supply Disruption
EARTHQUAKE WATER QUALITY CLIMATE CHANGE DROUGHT
![Page 7: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/7.jpg)
Cascadia Subduction Zone
Earthquake Resiliency
![Page 8: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/8.jpg)
Surface (Crustal) Faults:
• South Whidbey Island Fault
• Seattle Fault
• Tacoma Fault
Earthquake Resiliency
![Page 9: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/9.jpg)
Extensive damage to water system
facilities,
Over 100 transmission
pipeline breaks/ leaks
Up to 6,000 distribution system
breaks/ leaks
Up to 60 days to restore water
Cost of water system damage could
exceed $2 billion.
14 percent chance of Mw9.0
Cascadia Subduction event in next 50 years
15 percent chance of Mw6.5 or larger surface
fault event in next 50 years
Physical Damage Restoration Time Economic Impact Likelihood
Earthquake Resiliency
![Page 10: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/10.jpg)
Alaska 1964
2015 All-Hazards Vulnerability AssessmentSeismic System Performance
10
Mw 9.2Duration 4 minutes$2.3 Billion in DamageSubduction – type EQ
![Page 11: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/11.jpg)
11
Pipeline 5 (2005)
Green River Supply
1913 & 2005
Groundwater Supplies
(1902 – 2010)
Administration & Operations
Buildings
Pipeline 1 (1913)
![Page 12: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/12.jpg)
Service restoration time(4 seismic scenarios – Tacoma Water)
12
The outage times were based on the expected damage, and the estimated restoration times of critical components required to restore service. Source: Tacoma Water Seismic Vulnerability Assessment
![Page 13: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/13.jpg)
13
Level of Service (Customer Experience)
Post-Event (Earthquake)Level of Service
-Expected (Acceptable) restoration time?
- Expected (Acceptable) quality (initially, ultimately)
Routine operational Level of Service
Pressure, reliability, quality
Level of Service
![Page 14: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/14.jpg)
Conceptual Level of Service Goals
![Page 15: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/15.jpg)
15
Conceptual Level of Service Goals
![Page 16: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/16.jpg)
16
Conceptual Level of Service Goals
![Page 17: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/17.jpg)
17
The Policy Discussion: Establishing a Post-Event Level of Service Goal
• Considerations– Time span to achieve the identified service level
• 50-70 years may be a realistic goal
– Preferred evaluation and goal development process• Board, Council, Public
– Needed information• Relationship between service level goal and cost to achieve• Priority order of work
![Page 18: Tacoma Water Seismic Planning - Tacoma Public Utilities · Presentation Overview 2 • Overview of seismic planning work • Current-state findings: Damage and ... – Wildfire](https://reader034.vdocument.in/reader034/viewer/2022043021/5f3ce8681c8c8d6ce7537a98/html5/thumbnails/18.jpg)
18
Key work aheadInfrastructure• Focused hardening of groundwater supply and operations center
components.• Continued development and policymaker adoption of target Post-
Earthquake Levels of Service, and a seismic resiliency investment plan to achieve those targets over a period of time.
• Priority decisions with respect to hardening supply to hospitals.• Build seismic resilience more directly into infrastructure renewal.Programmatic• Continued Development of a robust Emergency Management
capability.• Continued and sustained relationships with Emergency Managers &
Responders at all levels of government.• Conversations with customers and employees about realistic
expectations and personal preparedness.