TCC Budget Highlights
Capital Budget - $190.43M
Operating Budget - $384.9M
Total Budget – $575.33M
![Page 2: TCC Budget Highlights](https://reader036.vdocument.in/reader036/viewer/2022083006/568139c7550346895da17422/html5/thumbnails/2.jpg)
Major Projects
• Blakey’s Crossing completion (State Funding)
• TECC $5m upgrade (Federal Funding)
• $7m inner city water & sewer upgrades
• $6M Magnetic Island Waste Transfer Station• $3.14 onshore works for Townsville
Recreational Boat Park
![Page 3: TCC Budget Highlights](https://reader036.vdocument.in/reader036/viewer/2022083006/568139c7550346895da17422/html5/thumbnails/3.jpg)
Roads
• $35M for reconstruction, reseals & overlays of 129 streets
• $4.9M kerb & channel replacement
• $1.6M road safety measures
![Page 4: TCC Budget Highlights](https://reader036.vdocument.in/reader036/viewer/2022083006/568139c7550346895da17422/html5/thumbnails/4.jpg)
Maintenance
• $53.32M – Road & Transport Maintenance – potholes, footpaths, traffic signals, bridge repairs, etc.
• $42.3M – Parks & Open Space
• $10.3M Drain & Stormwater Management
• $815K – Coastal Facilities
![Page 5: TCC Budget Highlights](https://reader036.vdocument.in/reader036/viewer/2022083006/568139c7550346895da17422/html5/thumbnails/5.jpg)
Drainage
• $7M reconstruction of Howitt St stormwater
• $350K storage area Garbutt
• $350K table drains Rossmead Estate
• $150K refurbishing flood pump stations
• $120K replacing drainage pit grids/grates etc.
![Page 6: TCC Budget Highlights](https://reader036.vdocument.in/reader036/viewer/2022083006/568139c7550346895da17422/html5/thumbnails/6.jpg)
WATER
• $6.5M reservoir – Mt Louisa
• $3M Mt Kilburn booster pump – Northern
Beaches
• $4M rehab of water pipes
• $880K refurbishment of reservoirs
![Page 7: TCC Budget Highlights](https://reader036.vdocument.in/reader036/viewer/2022083006/568139c7550346895da17422/html5/thumbnails/7.jpg)
Waste Water
• $5.3M southern Suburbs Pump Station & pressure main
• $1.5M upgrade to Cleveland Bay STP
• $5M Construction & rehab of sewers
• $3M STP renewals
• $2M pump station upgrades & renewals