TDC2/TCC2 Réunion de chantier 3
08.11.2013In sharepoint:
https://espace.cern.ch/sba-workspace/tcc2wg/LS1%20worksite%20meeting/
![Page 2: TDC2/TCC2 Réunion de chantier 3 08.11.2013 In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting](https://reader035.vdocument.in/reader035/viewer/2022081518/551d9db5497959293b8da18c/html5/thumbnails/2.jpg)
Agenda• TCSC– Fuite vide– Statut démontage– Cellule stockage TCSC au B.955
• Echange QNL de TT20 • Proposition blindage plomb• Préparation retrait splitter• Planning
![Page 3: TDC2/TCC2 Réunion de chantier 3 08.11.2013 In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting](https://reader035.vdocument.in/reader035/viewer/2022081518/551d9db5497959293b8da18c/html5/thumbnails/3.jpg)
Fuite vide
Fuite non détectée, retour à d bonnes conditions de vide
![Page 4: TDC2/TCC2 Réunion de chantier 3 08.11.2013 In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting](https://reader035.vdocument.in/reader035/viewer/2022081518/551d9db5497959293b8da18c/html5/thumbnails/4.jpg)
Cellule blindage TCSC
![Page 5: TDC2/TCC2 Réunion de chantier 3 08.11.2013 In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting](https://reader035.vdocument.in/reader035/viewer/2022081518/551d9db5497959293b8da18c/html5/thumbnails/5.jpg)
Aimants QNL a remplacer dans le TT20
Aimant QNL a remplacer
PPG.21161 porte interzone à franchir maintenir ouverte durant l’opération
Roulage coté Jura dans le TT20
Transfert coté Jura à coté Salève.Chambre à vide à démonter.
Réinstallation de l’aimant neuf dans la foulée. Temps total de l’opération: 2-3joursPlanification: Apres le retrait du TCSC (environ fin novembre)
![Page 6: TDC2/TCC2 Réunion de chantier 3 08.11.2013 In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting](https://reader035.vdocument.in/reader035/viewer/2022081518/551d9db5497959293b8da18c/html5/thumbnails/6.jpg)
Proposition blindage plomb (F. Loprete, EN-STI)
![Page 7: TDC2/TCC2 Réunion de chantier 3 08.11.2013 In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting](https://reader035.vdocument.in/reader035/viewer/2022081518/551d9db5497959293b8da18c/html5/thumbnails/7.jpg)
Proposition blindage plomb (F. Loprete, EN-STI)
![Page 8: TDC2/TCC2 Réunion de chantier 3 08.11.2013 In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting](https://reader035.vdocument.in/reader035/viewer/2022081518/551d9db5497959293b8da18c/html5/thumbnails/8.jpg)
Préparation retrait splitters
• Impacts– Retrait TCSC : 37401– Retrait 5 aimants (3 splitter et 2 MDLV) : 37405– Vacuum : 37404SVP rajouter les intervenants !
• EDH transport et stockage QNL, splitters et MDLV
• VIC (pour tous les aimants le jeudi 14 AM)• Impact
![Page 9: TDC2/TCC2 Réunion de chantier 3 08.11.2013 In sharepoint: workspace/tcc2wg/LS1%20worksite%20meeting](https://reader035.vdocument.in/reader035/viewer/2022081518/551d9db5497959293b8da18c/html5/thumbnails/9.jpg)
Planning (proposition)Jour Activité Groupe
Lundi 11/11 Transfert TCSC vers B.955Transfert matériel vide vers zone QNL par le SPSConsignations
Transport, GS, RP.Vide
TE-MSCMardi 12/11 Préparation vide Vide, RP
Mercredi 13/11 Préparation videPréparation transport
Vide, RP
Jeudi 14/11 VIC + Retrait du QNL Transport, TE-MSC, RP.