MANUFACTURING MANUFACTURING PROCESS / TECHNOLOGYPROCESS / TECHNOLOGY Choice of TechnologyChoice of Technology
Plant CapacityPlant Capacity Principal InputsPrincipal Inputs Investment Outlay and Production CostInvestment Outlay and Production Cost Use by Other UnitsUse by Other Units Product MixProduct Mix Latest DevelopmentsLatest Developments Ease of AbsorptionEase of Absorption
22
MANUFACTURING MANUFACTURING PROCESS / TECHNOLOGYPROCESS / TECHNOLOGY Appropriateness of TechnologyAppropriateness of Technology
Whether the Technology Utilizes Local Raw Whether the Technology Utilizes Local Raw Materials?Materials?
Whether the Technology Utilizes Local Man Whether the Technology Utilizes Local Man Power?Power?
Whether the Goods and Services Produced Whether the Goods and Services Produced Cater to the Basic Needs?Cater to the Basic Needs?
Whether the Technology Protects Ecological Whether the Technology Protects Ecological Balance?Balance?
Whether the Technology is Harmonious with Whether the Technology is Harmonious with Social and Cultural Conditions?Social and Cultural Conditions? 33
TECHNICAL TECHNICAL ARRANGEMENTSARRANGEMENTS
The nature of the support provided by collaboratorsThe nature of the support provided by collaborators Process and performance guaranteesProcess and performance guarantees The price of technologyThe price of technology The continuing benefit of R&D workThe continuing benefit of R&D work The period of the collaboration agreementThe period of the collaboration agreement The assistance to be provided and restrictions to be The assistance to be provided and restrictions to be
imposedimposed The level of equity participation and the manner of The level of equity participation and the manner of
sharing management control.sharing management control. In case of change of ownership.In case of change of ownership. Fails to meet obligationsFails to meet obligations Force majeure situationsForce majeure situations 44
MATERIAL INPUTS MATERIAL INPUTS AND UTILITIESAND UTILITIES
Raw MaterialsRaw Materials Agricultural ProductsAgricultural Products Mineral ProductsMineral Products Livestock and Forest ProductsLivestock and Forest Products Marine ProductsMarine Products
Processed Industrial Materials and Processed Industrial Materials and ComponentsComponents
Auxiliary Material and SuppliesAuxiliary Material and Supplies UtilitiesUtilities
55
PRODUCT MIXPRODUCT MIX
Based on Market RequirementsBased on Market Requirements Variations in;Variations in;
Size Size QualityQuality
66
PLANT CAPACITYPLANT CAPACITY
Feasible Normal Capacity (FNC)Feasible Normal Capacity (FNC) Nominal Maximum Capacity (NMC)Nominal Maximum Capacity (NMC) Factors:Factors:
Technological RequirementTechnological Requirement Input ConstraintsInput Constraints Investment CostInvestment Cost Market ConditionsMarket Conditions Resources of the FirmResources of the Firm Government PolicyGovernment Policy 77
LOCATION AND SITELOCATION AND SITE
Proximity of Raw Materials and MarketsProximity of Raw Materials and Markets Availability of InfrastructureAvailability of Infrastructure Labor SituationLabor Situation Governmental PoliciesGovernmental Policies Other FactorsOther Factors
Climate ConditionsClimate Conditions General Living ConditionsGeneral Living Conditions Proximity to Ancillary UnitsProximity to Ancillary Units Ease in Coping with Environmental PollutionEase in Coping with Environmental Pollution
Site SelectionSite Selection 88
MACHINERIES AND MACHINERIES AND EQUIPMENTEQUIPMENT
Selection ProcedureSelection Procedure1.1. Estimate the likely levels of production over Estimate the likely levels of production over
time.time.
2.2. Define the various machining and other Define the various machining and other operationsoperations
3.3. Calculate the machine hours required for Calculate the machine hours required for each type of operationeach type of operation
4.4. Select machines and equipment required Select machines and equipment required for each functionfor each function
99
MACHINERIES AND MACHINERIES AND EQUIPMENTEQUIPMENT
Equipment ClassificationEquipment Classification Plant (process) equipmentPlant (process) equipment Mechanical equipmentMechanical equipment Electrical equipmentElectrical equipment InstrumentsInstruments Controls Controls Internal transportation systemInternal transportation system othersothers
1010
MACHINERIES AND MACHINERIES AND EQUIPMENTEQUIPMENT
Spare Parts & ToolsSpare Parts & Tools Spare parts and tools to be purchased with Spare parts and tools to be purchased with
the original equipment.the original equipment. Spare parts and tools to be required for Spare parts and tools to be required for
operational wear and tear.operational wear and tear.
1111
MACHINERIES AND MACHINERIES AND EQUIPMENTEQUIPMENT
Constraints in selecting machineries Constraints in selecting machineries and equipmentand equipment
1.1. Limited availability of powerLimited availability of power
2.2. Difficulty in transporting heavy equipmentDifficulty in transporting heavy equipment
3.3. Unavailability of trained workersUnavailability of trained workers
4.4. Import policy of the governmentImport policy of the government
Procurement of plant and machineryProcurement of plant and machinery
1212
STRUCTURES AND STRUCTURES AND CIVIL WORKSCIVIL WORKS
Site Preparation and DevelopmentSite Preparation and Development Buildings and StructuresBuildings and Structures Outdoor WorksOutdoor Works
1313
ENVIRONMENTAL ASPECTSENVIRONMENTAL ASPECTS
Key IssuesKey Issues What are the types of effluents and What are the types of effluents and
emissions generated?emissions generated? What needs to be done for proper disposal What needs to be done for proper disposal
of effluents and treatment of emissions?of effluents and treatment of emissions? Will the project be able to secure all Will the project be able to secure all
environmental clearness and comply with all environmental clearness and comply with all statutory requirements?statutory requirements?
1414
PROJECT CHARTS PROJECT CHARTS AND LAYOUTSAND LAYOUTS
General Functional LayoutGeneral Functional Layout Material Flow DiagramMaterial Flow Diagram Production Line DiagramsProduction Line Diagrams Transport LayoutTransport Layout Utility Consumption LayoutUtility Consumption Layout Communication LayoutCommunication Layout Organizational LayoutOrganizational Layout Plant LayoutPlant Layout 1515
SCHEDULE OF PROJECT SCHEDULE OF PROJECT IMPLEMENTATIONIMPLEMENTATION
Critical Path Method (CPM)Critical Path Method (CPM) Program Evaluation Review Technique Program Evaluation Review Technique
(PERT)(PERT) Work ScheduleWork Schedule
1616
NEED FOR CONSIDERING NEED FOR CONSIDERING ALTERNATIVESALTERNATIVES
Nature of ProjectNature of Project Production ProcessProduction Process Product QualityProduct Quality Scale of Operation and Time PhasingScale of Operation and Time Phasing LocationLocation