![Page 1: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/1.jpg)
The Mass Wasting Prescription-Scale Effectiveness Monitoring Project
Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips, MS. Matt O’Connor, Ph.D., LEG. Curt Veldhuisen, LEG.
An examination of the landslide response to the December 2007 storm in Southwestern Washington
CMER Publication 08-802 May 2013
![Page 2: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/2.jpg)
Developed by the Upslope Processes Scientific Advisory Group (UPSAG)
- Scoped in 2005
- Study Design in 2006
- CMER and ISPR approval completed in 2007
Mass Wasting Effectiveness Project
![Page 3: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/3.jpg)
Objectives
1. Evaluate the effectiveness of Forest Practices Rules at reducing sediment delivery to public resources.
2. Identify prescription-scale management-related factors that might be used to improve unstable slope identification and mitigation efforts.
![Page 4: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/4.jpg)
Compare landslide rates under different management scenarios. - Did not evaluate administrative
components: FPA classification, geotech reports, SEPA, etc.
Requirement: A population of
landslides in an area subject to Forest Practices Rules
Study Outline
![Page 5: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/5.jpg)
December 2007 Chehalis storm
Elaine Thompson The Associated Press Source: http://blog.oregonlive.com/oregonianextra/2008/11/remembering_the_big_storm.html
![Page 6: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/6.jpg)
Aerial reconnaissance
Mass Wasting Effectiveness study area
* WDNR aerial reconnaissance
Study required at least one landslide per sq. mile.
![Page 7: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/7.jpg)
Range of rainfall intensities
Snow followed by 4 – 11 inches of rain in 24 hours.
![Page 8: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/8.jpg)
Factors affecting slope stability
• Slope
• Precipitation
• Lithology/Soil
• Management / Vegetation
• Others
Why we used a block design
Source: http://www.geology.enr.state.nc.us/Landslide_Info/Landslides_background.htm
![Page 9: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/9.jpg)
Comparisons within randomly selected blocks
Random block
![Page 10: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/10.jpg)
Field survey of all landslides in the sample areas that delivered to streams, and all road-related landslides.
Other landslide initiation points were counted when encountered.
Landslide detection
![Page 11: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/11.jpg)
• 91 sq. miles of managed forest and 555 miles of road.
• Most of the landslides (96%) were debris slides or debris flows.
- No glacial deep-seated landslides.
Landslide Inventory
0
200
400
600
800
1000
1200
Road Non-road
No delivery
Delivery
![Page 12: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/12.jpg)
Harvest Treatments
Full Buffer (more stable?)
Submature (more stable?)
Mature (more stable?)
Partial Buffer (less stable?)
No Buffer (least stable?)
Age 40+ Age 0-20 Age 20-40
1987 1967
![Page 13: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/13.jpg)
Convergent headwallBedrock hollows
Inner gorge
Slope > 70%
Drawing: Jack Powell, DNR, 2003
0-20 treatment based on buffering of RIL
![Page 14: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/14.jpg)
Harvest units in which trees on RIL (if present) were not harvested
Full Buffer (FB 0-20)
![Page 15: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/15.jpg)
Harvest units where some harvest
Partial Buffer (PB 0-20)
and some buffering of RIL occurred
![Page 16: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/16.jpg)
All RIL, if present, were clearcut
No Buffer (NB 0-20)
![Page 17: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/17.jpg)
Forest stands between 21 and 40 years old
Submature 21-40 (SM)
![Page 18: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/18.jpg)
Forest stands greater than 40 years old
Mature 41+ (M)
![Page 19: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/19.jpg)
0
2
4
6
8
10
12
14
FB 0-20 PB 0-20 NB 0-20 SM 21-40 M 41+
Harvest treatment results
Letters indicate statistically significant differences at α=0.1 . Error bars are 90% CI.
�̅�𝑥 = 5.7 �̅�𝑥 = 9.6 �̅�𝑥 = 7.7 �̅�𝑥 = 6.2 �̅�𝑥 = 5.0
B,C A A,B B,C C
𝑎𝑎𝑎𝑎𝑎𝑎 = 3.3 𝑎𝑎𝑎𝑎𝑎𝑎 = 5.8 𝑎𝑎𝑎𝑎𝑎𝑎 = 12.7 𝑎𝑎𝑎𝑎𝑎𝑎 = 36.8 𝑎𝑎𝑎𝑎𝑎𝑎 = 75
![Page 20: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/20.jpg)
Did we get as many landslides in Full Buffer (FB) as we would have expected?
No
Conclusion
“Results support the hypothesis that the avoidance of clearcut harvest on unstable terrain reduces the density and volume of landslides.”
![Page 21: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/21.jpg)
Road results were largely inconclusive.
Roads
![Page 22: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/22.jpg)
Road abandonment did appear to be effective at reducing landslide volume.
Formal abandonment
![Page 23: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/23.jpg)
• A sizable proportion of delivering landslides originated from terrain that did not fit the definition of any named RIL.
Other notable findings
![Page 24: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/24.jpg)
• Field crews identified contributing factors at only a few landslide initiation sites.
• Landslides originating in buffers delivered
significantly more LWD than landslides outside of buffers.
Other notable findings
![Page 25: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/25.jpg)
Study blocks were largely commercial forest.
Note: Public Resource vs Public Safety
• Low potential for public safety issues.
• Study focused
on initiation, not run-out.
![Page 26: The Mass Wasting Prescription-Scale Effectiveness ... · The Mass Wasting Prescription-Scale Effectiveness Monitoring Project Gregory Stewart, Ph.D. Julie Dieu, Ph.D., LEG. Jeff Phillips,](https://reader031.vdocument.in/reader031/viewer/2022041017/5eca71aba863027c1628dada/html5/thumbnails/26.jpg)
There are better data for evaluating the effect of landslides on public safety.
Public Safety