PORT AUTONOME D’ABIDJAN
Une référence internationale
PORT OF ABIDJAN
A TOOL IN SERVICE OF
SUB-REGIONAL INTEGRATION
PRESENTATION:
Mr Sery D. Leandre
Commercial and Marketing Director
![Page 2: The Port of Abidjan: A tool in service to sub-regional integration](https://reader034.vdocument.in/reader034/viewer/2022051820/552bf529550346910f8b463b/html5/thumbnails/2.jpg)
PORT AUTONOME D’ABIDJAN
Une référence internationale
Port of Abidjan Traffic (2008 - 2012)
![Page 3: The Port of Abidjan: A tool in service to sub-regional integration](https://reader034.vdocument.in/reader034/viewer/2022051820/552bf529550346910f8b463b/html5/thumbnails/3.jpg)
PORT AUTONOME D’ABIDJAN
Une référence internationale
At the Port:
o Time
o Cost
o Security
o Administration
o Storage space
Road access:
o State of the road network and means of transport
o State of the rail network and means of transport
o Transit corridor efficiency
CHALLENGES
![Page 4: The Port of Abidjan: A tool in service to sub-regional integration](https://reader034.vdocument.in/reader034/viewer/2022051820/552bf529550346910f8b463b/html5/thumbnails/4.jpg)
PORT AUTONOME D’ABIDJAN
Une référence internationale
PORT AUTONOME D’ABIDJAN
Une référence internationale
DES PROJETS POUR REPONDRE AUX ATTENTES DES PARTENAIRES
![Page 5: The Port of Abidjan: A tool in service to sub-regional integration](https://reader034.vdocument.in/reader034/viewer/2022051820/552bf529550346910f8b463b/html5/thumbnails/5.jpg)
PORT AUTONOME D’ABIDJAN
Une référence internationale
EXISTING INFRASTRUCTURE AT THE PORT OF ABIDJAN Commercial Port: 5 km of berthing quay 33 posts ; 16 berths ; 16 inner harbor moorings.
Fruit Terminal
1
1
Vridi Container Terminals
2
2
Fishing Port: 280 000 m2 of total space 1 520 mètres of berthing quay 3 berths on quay.
5
5
Petrol Posts
4
4
ROLO Terminal
3
3
Planned location of Container Terminal 2
6
6
![Page 6: The Port of Abidjan: A tool in service to sub-regional integration](https://reader034.vdocument.in/reader034/viewer/2022051820/552bf529550346910f8b463b/html5/thumbnails/6.jpg)
PORT AUTONOME D’ABIDJAN
Une référence internationale
CONSTRUCTION OF A SECOND CONTAINER TERMINAL
A second modern container terminal will allow access for large container ships
1
Will improve the competitiveness of the port by reducing dwell times
2
Will grow container traffic, particularly transhipment
3
EXPECTED RESULTS
![Page 7: The Port of Abidjan: A tool in service to sub-regional integration](https://reader034.vdocument.in/reader034/viewer/2022051820/552bf529550346910f8b463b/html5/thumbnails/7.jpg)
PORT AUTONOME D’ABIDJAN
Une référence internationale
MONDERNIZATION OF THE FISHING PORT
Very old infrastructure 1
Lack of space for industrials 4
Equipped with a modern fishing port 1
Able to welcome ships with 8 to 10 m draft 2
15 hectares of added industrial space 3
PROBLEMS
High maintenance costs (avg 350 million CFA anually) 2
Shallow draft (7m) 3
EXPECTED RESULTS
Creation of more than 1,000 direct jobs 4
![Page 8: The Port of Abidjan: A tool in service to sub-regional integration](https://reader034.vdocument.in/reader034/viewer/2022051820/552bf529550346910f8b463b/html5/thumbnails/8.jpg)
PORT AUTONOME D’ABIDJAN
Une référence internationale
CONSTRUCTION OF A CEREALS PORT
Construction of a 400 m quay 1
Allow berthing of large ships 1
Possibility for large ships (13.5 m draft) to berth 2
PROJECT DESCRIPTION
Creation of approximately 10 hectares of land by filling the lagoon
2
Construction of warehouses 3
PROJECT OBJECTIVES
![Page 9: The Port of Abidjan: A tool in service to sub-regional integration](https://reader034.vdocument.in/reader034/viewer/2022051820/552bf529550346910f8b463b/html5/thumbnails/9.jpg)
PORT AUTONOME D’ABIDJAN
Une référence internationale
CONSTRUCTION OF A MINERALS TERMINAL
Construction of 550 m quay 1
Allow reception of bulk carriers 1
2
PROJECT DESCRIPTION
Creation of approximately 23 hectares of land by filling the lagoon
2
PROJECT OBJECTIVES
Ability to accommodate vessels with a draft of 13.5 m
![Page 10: The Port of Abidjan: A tool in service to sub-regional integration](https://reader034.vdocument.in/reader034/viewer/2022051820/552bf529550346910f8b463b/html5/thumbnails/10.jpg)
PORT AUTONOME D’ABIDJAN
Une référence internationale
DEVELOPMENT OF THE VRIDI-BIETRY BAY: 1 COMPONENT : PONT VRIDI – BIÉTRY
Congestion of the port area and peri port 1
Decongest the port area and the peri port area 1
PROBLEMS
Circulation problem: transport costs, delivery delays, accidents, etc.
2
EXPECTED RESULTS
![Page 11: The Port of Abidjan: A tool in service to sub-regional integration](https://reader034.vdocument.in/reader034/viewer/2022051820/552bf529550346910f8b463b/html5/thumbnails/11.jpg)
PORT AUTONOME D’ABIDJAN
Une référence internationale
Loss of job creation investment
COMPONENT 2 : DEVELOPMENT OF THE HARBOR PORT – VRIDI-BIETRY
Lack of industrial port space 1
Availiability of more than 200 hectares of industrial port space
1
Welcome industry and investment to induce traffic and job creation
2
PROBLEMS
Lack of capacity to satisfy demand 2
EXPECTED RESULTS
3
![Page 12: The Port of Abidjan: A tool in service to sub-regional integration](https://reader034.vdocument.in/reader034/viewer/2022051820/552bf529550346910f8b463b/html5/thumbnails/12.jpg)
PORT AUTONOME D’ABIDJAN
Une référence internationale
Zones à remblayer
Traitement des déchets
Nouveau Terminal à
Conteneurs
Quais de pêche
Elargissement et
approfondissement du Canal
de Vridi
Quais Vrac solide
Pont de Vridi-Biétry
CARREFOUR
SOLIBRA
THE PORT OF TOMORROW
![Page 13: The Port of Abidjan: A tool in service to sub-regional integration](https://reader034.vdocument.in/reader034/viewer/2022051820/552bf529550346910f8b463b/html5/thumbnails/13.jpg)
PORT AUTONOME D’ABIDJAN
Une référence internationale
THANK YOU