Introduction
The objectives set out in the Management Plan will be achieved by the implementation of a wide range of projects carried out by a variety of agencies, as presented in this Action Plan. Although projects may stand alone, each will contribute to the underpinning of the primary aims of the conservation of the nominated World Heritage Site and the economic regeneration of the area. Projects will be monitored and where appropriate managed by the Slate Landscape Partnership to ensure consistency with the objectives of the Management Plan.
Resourcing of this action plan will include individual projects run by stakeholders and collective initiatives. Some actions will also involve entering into agreements with organisations outside the Slate Landscape Partnership, such as tourism agencies and education authorities, in pursuit of shared objectives. It is recognised that the resources for wider strategic actions will in many cases require funding to be sourced from multiple organisations and sources. The Partnership will establish a preferred priority order for implementation of these actions, recognising that delivery will inevitably depend to some extent on the provision of resources by outside organisations. Annual and medium term budget plans for the resourcing of such central actions will be drawn up to guide fundraising efforts.
The Slate Landscape of Northwest Wales Steering GroupThe World Heritage Nomination is led by Gwynedd Council
Other organisations committed to The Slate Landscape of Northwest Wales nomination for World Heritage Status are:
![Page 3: The Slate Landscape of Northwest Wales...The Slate Landscape of Northwest Wales NOMINATION AS A WORLD HERITAGE SITE ACTION PLAN, AUGUST 2019 Introduction The objectives set out in](https://reader033.vdocument.in/reader033/viewer/2022043004/5f87acb12618ed30f422dfb9/html5/thumbnails/3.jpg)
ACTION TIMESCALEshort-term1-2years
medium-term3-5yearslong-term 5 years +
RESPONSIBILITY(resources arewithin existing
budgetsoforganisations unlessotherwisestated)
MEASURABLEOUTCOMES OUTPUTS
ObjecLve1 ToensureaneffecLve,openandtransparentsystemofgovernanceandmanagementforTheSlateLandscapeofNorthwestWalesintheeventofasuccesfulinscripLon
Policy1.1 TheManagementPlanforTheSlateLandscapeofNorthwestWaleswillbedeliveredthroughanaccountableandeffecLveWalesSlatePartnership(ThePartnership)withclearresponsibiliLes,inordertoachievetheVisionandAims
HoldregularBoard,SteeringGroupandSub-groupmeeLngstooverseeimplementaLonofmanagementplan
shortterm/ongoing WHSBoard NumberofmeeLngsheldandminutesofthemeeLngs
Transparent,clearandopenmanagementoftheWHS
EstablishanappropriatecoordinaLormodeltomanagetheproposedWHS
shortterm WHSSteeringGroup Co-ordinatorinplace ProfessionalmanagementoftheWHS
Policy1.2 ThePartnershipwillbeproacLveinensuringcommunityandbusinessrepresentaLon
HoldregularmeeLngswithcommunityandbusinesrepresentaLon
ongoing WHSCoordinator NumberofmeeLngsheldandminutesofthemeeLngs
Ensurecommunityandbusinessbuy-intotheWHS
ObjecLve2 EmbeddingtheManagementPlan
Policy2.1ThePartnershipwillensurethatallrelevantstrategicdocumentsandprogrammeshaveregardfortheNominatedPropertyanditsVisionandAims
PostinscripLonpartnerorganisaLonswillformallyadopttheManagementPlanandensureitisintegratedininternalpoliciesanddocuments
shortterm WHSSteeringGroup NumberofpartnerorganisaLonswhohaveformallyadoptedthe
ManagementPlan
Cross-organisaLonaladopLonofagreeedmanagementmethodswillensureconsistentapproachaccross
thearea
Policy2.2ThePartnershipwilldevelopandmaintainaRiskManagementPlantosupportmanagementoftheNominatedWorldHeritageSite
DevelopRiskManagementPlanandRiskRegister
ongoing WHSCoordinator Riskmanagementplanandriskregisterdeveloped
MiLgaLonofidenLfiedrisksinordertoreduceimpact
RiskManagementPlanwillbereviewedregularlybySteeringGroupandacLonstakenwhererequired
ongoing WHS Steering Group MinutesofmeeLngs Coordinatedapproachtoriskmanagementwithresponsibilitysharedamongstallpartners
Theme 1: Governance and Management
![Page 4: The Slate Landscape of Northwest Wales...The Slate Landscape of Northwest Wales NOMINATION AS A WORLD HERITAGE SITE ACTION PLAN, AUGUST 2019 Introduction The objectives set out in](https://reader033.vdocument.in/reader033/viewer/2022043004/5f87acb12618ed30f422dfb9/html5/thumbnails/4.jpg)
ACTION MEASURABLEOUTCOMES OUTPUTS
ObjecLve3 FulfiltheobligaLonsoftheWorldHeritageConvenLontoprotectandpreservetheproposedOutstandingUniversalValueofTheSlateLandscapeofNorthwestWalesanditstransmissionforthebenefitoffuturegeneraLons.
Policy3.1 PromoteawarenessandunderstandingofthereasonswhyTheSlateLandscapeofNorthwestWalesneedstobeprotectedandacLvelymanagedtosustainitsproposedOutstandingUniversalValue
CaringforSlateLandscapesguidancewillbepublished
short-term Cadw Numberofguidancenotespublished
improvedmanagementandawareness
SupplimentaryPlanningGuidancewillbepreparedtosupportstatutoryundertakerstotakeaccountoftheOUVoftheWHS
short-term LPAs SPGproduced Improveddecisionmaking
Undertaketrainingfordecisionmakersincludingplanningofficersandlocalplanningcommideemembers
ongoing LPAs Numberoftrainingsessionsheld Asabove
Policy3.2 ProtecttheproposedOutstandingUniversalValue,integrityandauthenLcityofTheSlateLandscapeofNorthwestWalesanditsseengfrominappropriatedevelopmentbyeffecLveuseofthespaLalplanningsystem
Provisionofpre-planningapplicaLonadviceaspartofexisLngplanningpolicyservice
ongoing LPAs/Cadw Numberofpre-applicaLonmeeLngsheld
Improveddesignandpurposeofdevelopments
Policy3.3 ApplytheConservaLonPrinciplesforthesustainablemanagementofthehistoricenvironmentinWalestoinformalldevelopmentproposalsandplanningapplicaLonsthroughouttheNominatedProperty
Undertaketrainingfordecisionmakersincludinglocalplanningcommideemembers.
short-term LPAs NumberoftrainingsessionsheldImproveddesignandpurposeof
developments
DeveloperswillbeencouragedtoapplytheConservaLonPrinciples
ongoing LPAs NumberofplanningapplicaLonsreceived
ProtecLonoftheOUV
Policy3.4 ProtecttheproposedOutstandingUniversalValue,integrityandauthenLcityofTheSlateLandscapeofNorthwestWalesbyemployingstatutorydesignaLonforspecifichistoricelementsthatmeetthenaLonalcriteria
HistoricmonumentsdemonstraLngWHSadributesandmeeLngthecriteriaforschedulingwithintheWHSboundarywillbedesignated
short-term Cadw Numberofdesignatedassets StatutoryprotecLonforalleligiblehistoricassets
BuildingsdemonstraLngWHSadributesandmeeLngthecriteriaforlisLngwithintheWHSboundarywillbedesignated
short-term Cadw Numberofdesignatedbuildings StatutoryprotecLonforalleligiblehistoricassets
AllhistoricgardenswithintheWHSboundarywillbeevaluatedagainstthecriteriaforregistraLon
short-term Cadw Numberofdesignatedhistoricgardens
StatutoryprotecLonforalleligiblehistoricassets
ConsideraLonwillbegivenfortheestablishmentofConservaLonareasintheappropriatesedlements
medium-term LocalPlanningAuthoriLes NumberofConservaLonareasestablished
ImprovedprotecLonofcharacterofsedlements
ObjecLve4ImprovethestateofconservaLonandmanagementoftheNominatedWorldHeritageSitetosustainitsOutstandingUniversalValue
Policy4.1 ThePartnershipwillsupportsite-ownerstodevelopandimplementlocalConservaLonManagementPlans
Localmanagementplanswillbepreparedforallkeyelements
short-term WHSPartnership&SiteOwners Numberofplanscompleted acceptedmanagementofkeyelementswillensureprotecLonof
OUVAllkeyelementswillbesubjecttoastructuredprogrammeofcondiLonmonitoring
ongoing Cadw,LPAs&SiteOwners Numberofassessmentsundertaken
RegularassessmentswillinformmanagementandidenLfyanyrisks
Policy4.2AcLonwillbetakentoimprovethecondiLonoflistedbuildingsandmonumentsatriskwithintheproposedWorldHeritageSite.
ConservaLonprioriLeswillbeidenLfiedandprioriLsed
short-term SteeringGroup&SiteOwners NumberofconservaLonprioriLesidenLfied
coordinatedapproachtoconservaLonwillmakebederuse
ofresources
ConservaLonprojectswillbeundertakentoaddressprioriLes
short-mediumterm SteeringGroup&SiteOwners NumberofconservaLonprojectscompleted/Numberofhistoric
assetsconserved
ConservaLonofkeyelementswillensureprotecLonofOUV
FundingopportuniLeswillbesoughttodeveloplarge-scaleconservaLonprojects
medium-term SteeringGroup Fundingsecured StrategicapproachtoconservaLonwillhavethegreatestimpact
Policy4.3 SympatheLcadapLvere-useofhistoricassetswillbeencouragedWorkwillconLnuetofindnewusesforkeyhistoricassetsincludingMaenofferenMill
medium-term SteeringGroup&SiteOwners Numberofkeyhistoricassetswithnewuses
reuseofkeyhistoricassetswillensuretheirlongtermviability,andconservaLonforthefuture,and
willinturnprotectOUV
Policy4.4thePartnershipwillencouragesustainableconservaLonoftheNominatedPropertyandpromotepublicparLcipaLoninconservaLonprogrammes
CommunitydesignguidesandinformaLonsharingresourceswillbedeveloped
short-term LPAs Numberofcommunitydesignguidelinesdeveloped
communityownershipofmanagementofWHS
Voluntarygroupswillbeencouragedto"adoptamonument"andparLcipateinmonitoring,clearingvegetaLonandconservingkeyassets
ongoing WHSCoordinator&CommunityGroups
Numberofcommunityprojectsundertaken
Asabove
ObjecLve5 TheseengoftheproposedWorldHeritageSitewillbesafeguardedforthebenefitforfuturegeneraLons
Policy5.1BufferzonesdefinedaroundeachcomponentpartwillbeusedtoprotectandsustaintheOutstandingUniversalValueofthenominatedWorldHeritageSiteandWorldHeritageSitePartnerswillworktogethertomakefulluseofavailableplanningtoolstoprotectandenhancetheseengoftheproposedWorldHeritageSite
IdenLfydevelopmentstakingplacewithinthebufferandessenLalseengandassesstheirimpactonOUV
ongoing LPA's/Cadw NumberofplanningapplicaLons(includingappealdecisions)and
outcomes
theimpactofnewdevelopmentontheseengofWHSisconsidered,
asessedandmonitoredappropriately
Policy5.2 Newdevelopmentistobeofappropriatedesign,scaleandmassingsothatitpreservesandenhancestheseengoftheproposedWorldHeritageSite,respectssignificantviewsandreinforcesasenseofarrival
Encouragepre-applicaLonmeeLngswhereaproposalfallswithintheessenLalseengorlinesofsignificantviews,ormighthaveanimpactonthesenseofarrival
ongoing LPA's Numbersofpre-applicaLonmeeLngsheldbetweenLPAsandapplicants,andtheiroutcomes
TheWHSanditsseengareprotectedandnewdevelopmentis
sensiLveandappropriate
FollowICOMOSguidanceforheritageimpactassessmentsforsignificantdevelopmentproposals
ongoing LPA's NumberofheritageimpactstatementsreceivedbyLPAs
Asabove
Ensuredesignsandaccesssstatementsincludefullcontextappraisal
ongoing LPA's Numberofdesignandaccessstatementswithfullcontext
appraisal
Asabove
ConsultICOMOS-UKoverlargedevelopmentswiththepotenLaltoaffecttheOUVoftheWHS
ongoing LPA's/Cadw DocumentedconsultaLonswithICOMOS-UK
Asabove
ProvideregularprogrammesoftrainingforelectedmembersonPlanningCommideestoassistintheirconsideraLonofplanningapplicaLons
ongoing LPA's Numberoftrainingsessionsheldforelectedmembers
Asabove
RESPONSIBILITY(resources arewithin existing
budgetsoforganisations unlessotherwisestated)
TIMESCALEshort-term1-2years
medium-term3-5yearslong-term 5 years +
Theme 2: Caring for The Slate Landscape of Northwest Wales
![Page 5: The Slate Landscape of Northwest Wales...The Slate Landscape of Northwest Wales NOMINATION AS A WORLD HERITAGE SITE ACTION PLAN, AUGUST 2019 Introduction The objectives set out in](https://reader033.vdocument.in/reader033/viewer/2022043004/5f87acb12618ed30f422dfb9/html5/thumbnails/5.jpg)
ACTION MEASURABLEOUTCOMES OUTPUTS
ObjecLve6 ToensurethattheNominaLonProcessandasuccessfulinscripLonsustainalivinglandscapeandthrivingcommuniLes.
Policy6.1 SupportcommuniLestoidenLfyandimplementlocalregeneraLonprioriLesthatsupportthesuccessfulmanagementoftheproposedWorldHeritageSite
Fundingwillbesoughttodevelopheritage-basedregeneraLonacLviLes
Medium-term LPAs/Siteowners/CommunityGroups
NumberoffundingapplicaLonssubmided
CommunityregeneraLonleadstoimprovedsenselocalownership
CynlluniauCynefin(place-basedregeneraLonstrategies)willbedevelopedforthekeycommuniLeswithcommunity-ledregeneraLonatitscore
Short-term GwyneddCouncil/CommunityGroups
Numberofstrategiescompleted Asabove
Policy6.2 TheproposedWHSwillbeusedtoinsLlasenseofprideandambiLonwithinlocalcommuniLesAmbassadorschemeswillbedevelopedforarangeofages/sectors
Short-term LleCHIproject/partners/CommunityGroups/Schools
NumberofAmbassadorscreated Greatersenseofprideandambitonlocally
Policy6.3 ToensurethatslateheritageremainsaprioritywithintheGwyneddCouncilstrategicplanasakeyelementintheeconomicregeneraLonoftheCounty
Heritage-ledregeneraLontobeproriLsedwithintheStrategicPlan
Medium-term GwyneddCouncilElectedMembers Strategicplannotesheritage-ledregeneraLonasaprioritypost
2023
HeritageisidenLfedasacoreprincipleintheprosperityof
Gwyneddinthefuture
ObjecLve7 AsustainableslateindustryPolicy7.1 QuarryingwillnottakeplacewithintheboundaryoftheNominatedPropertyAllextantmineralpermissionswithintheboundarywillbeformallyrevoked
short-term GwyneddLocalAuthorityPlanningService
Numberofrevokedpermissionscompleted
ProtecLonoftheproposedWHSfromquarryingacLvityin
perpetuity
Nonewmineralplanningpermissionswillbegrantedwithintheboundary
ongoing GwyneddLocalAuthorityPlanningService
Nopermissiongranted Asabove
Policy7.2QuarryingforslatewithintheBufferZonesofthenominatedproperty,willbemanagedthroughtheexisLngmineralplanningprocess
AllpermissionswillbesubjecttoperiodicreviewsandberequiredtoadheretothecondiLonsoftheirpermission
ongoing NorthWalesMineralsandWastePlanningService
Numberofperiodicreviewsundertaken
ManagementofquarryingwithintheBufferZoneinorderto
strengthenOUVandretainkeyindustryinGwynedd
Policy7.3 SlatecramandconservaLonskillswillbepromotedTradiLonalskillstraining/provision/promoLonwillbeundertakeninpartnershipwithbusinessesandcommunityorganisaLons
medium-term WHSCo-ordinator/Partners NumberofintervenLonsundertaken
EnsuringtradiLonalskillsaretransferredtothenextgeneraLon
andpreservedforthefuture
Policy7.4 AsustainablesupplyofconservaLonmaterialswillbemaintainedEnsurethatexisLngslatequarryingindustryissupportedinordertoensureconLnuedsupplyofmaterials
ongoing NorthWalesMineralsandWastePlanningService
TotalannualproducLonintonnesofroofingandarchitecturalslate
products
SupplyofmaterialsforconservaLonworkandnew
developmentsinordertoensurelocalcharacterisretained
ObjecLve8 EnsurerenewableenergyambiLonsaredevelopedinharmonywiththeslatelandscapesPolicy8.1 ProposalsthatareunobtrusiveandmakeuseofnaturalresourceswithoutimpacLngonOutstandingUniversalValuewillbesupportedsubjectto
therequirementsoftheEryriLocalDevelopmentPlan:DevelopmentPolicy3(July2017)andAngleseyandGwyneddJointLocalDevelopmentPlan
Encouragepre-applicaLonmeeLngsforallprojectswithintheboundaryorbufferzone
ongoing LocalPlanningAuthoriLes Numberofpre-applicaLonmeeLngsheldbetweenLPA'sandapplicants,andtheiroutcomes
TheWHSanditsseengareprotectedandnewdevelopmentis
sensiLveandappropriate
FollowICOMOSguidanceforheritageimpactasessmentforsignificantdevelopmentproposals
ongoing LocalPlanningAuthoriLes NumberofheritageimpactassesmentsreceivedbyLPA's
Asabove
ConsultICOMOS-UKoverlargedevelopmentswiththepotenLaltoaffecttheOUVoftheWHS
ongoing LocalPlanningAuthoriLes/SteeringGroup
DocumentedconsultaLonswithICOMOS-UK
Asabove
ObjecLve9ThePartnershipwillpromotetheSlateLandscapeofNorthwestWalestosupporteconomicdiversityandheritage-ledregeneraLon
Policy9.1EconomicDevelopmentandRegeneraLonopportuniLesthatcomplementorenhancetheWorldHeritageSitewillbeencouraged.
RegeneraLonopportuniLeswillbeidenLfiedandprioriLsedwithintheCynlluniauCynefin(heritage-ledregeneraLonstrategies)
ongoing LleCHIproject/partners/SteeringGroup
NumberofregeneraLonprojectsdeveloped
RegeneraLonprojectsleadtoimprovedcommuniLes
WiderEconomicDevelopmentopportuniLeswhichcorrespondtolocalspaLalplanningpoliciesandcontributetoOuVorseengwillbeidenLfiedandprioriLsed
Ongoing Partners/Landowners/Investers Numberofwidereconomicdevelopmentprojectsdeveloped
Widereconomicdevelopmentprojectscreateemploymentand
improvecommuniLes
Policy9.2 ConservaLonofhistoricassetswillbeusedasacatalysttoencouragethedevelopmentandconLnuaLonoftradiLonalskillsandspecialistconservaLonwork.
Usehands-ontrainingtodeliverelementsofTradiLonalSkillsprovision
ongoing WHSCo-ordinator/Partners Numberofhistoricassetsconserved
ConservaLonofassetswillprotectOUV
Policy9.3 TherewillbecollaboraLveworkingwithotherrelevantiniLaLvestobuildandenhanceeconomiccondiLons(theCastlesofEdwardIWorldHeritageSite,SnowdoniaNaLonalParkAuthoritymanagementPlan).
CoordinatedapproachtodevelopingregeneraLonplans/projects
ongoing WHSCo-ordinator/Partners NumberofcollaboraLveprojects CoordinatedapproachtoregeneraLonwillleadtobederuse
ofresourcesandanimprovedvisitorexperience
TakeforwardindividualregeneraLonopportuniLesthroughdeliveryofcollaboraLveprojects
ongoing WHSCo-ordinator/Partners Totalinvestmentvalue NewregeneraLonopportuniLesareidenLfiedandkeyheritage
projectsaredelivered
ObjecLve10 SustainablecommuniLesPolicy10.1
AllnewhousingwithinoradjacenttotheNominatedPropertywilltakeacountoftheneedtoprotecttheOUVofthenominatedWHSUseexisLngplanningpolicytoensurealldevelopmentisappropriateandtakesaccountoftheOUVoftheWHS
ongoing LPA's Numberofhousingdevelopments MaintaincharacterandprotectOUV
Policy10.2
ThePartnershipwillencourageinformedconservaLonofdisLncitveelementsofthebuiltenvironmentthatcontributetohistoriccharacterEncouragetheconservaLonofbuiltassetswithinandadjacenttotheWHS
ongoing WHSCo-ordinator/Partners Numberofprojectsundertaken ConservaLonofassetswillprotectOUV
Encouragecommunitygroupsandsocialenterprisestoconsiderhistoriccharacterwhendevelopingprojectsinvolvingthebuilthistoricenvironment
ongoing WHSCo-ordinator/Partners Numberofprojectsundertaken Asabove
Policy10.3ThePartnershipwillseeksoluLonsandacLvelyencourageappropriateadapLveresueofredundanthistoricbuildingsincludingplacesofworship
WorkwithlocalcommunityandprivateownerstoidenLfyanddeliversustainablere-useprojectsforredundanthistoricbuildings
ongoing WHSCo-ordinator/Partners numberofbuildingsidenLfied ConservaLonofassetswillprotectOUV
WorkwithpartnerstoidenLfyanddeliversustainablere-usesforredundantplacesofworshipwithintheWHS
ongoing WHSCo-ordinator/Partners Numberofprojectsundertaken Asabove
ObjecLve11 SustainableagricultureandforestryPolicy11.1
ThePartnershipwillwelcomeagriculturaldiversificaLoninwaysthatcontributetoaccessandconservaLonoftheNominatedPropertyEncouragelandownerstoincorporateinterpretaLonandaccesstotheWHSintodevelopmentswhereappropriate
ongoing WHSCo-ordinator/Partners Numberofprojectsundertaken facilitateabederunderstandingoftheWHS
Policy11.2 ThePartnershipwilladvocateforpost-BrexitsustainablelandmanagementschemestoapplytoWorldHeritageSitesMaintaindialoguewithPoliLcalrepresentaLveswhohaveavoiceinthepost-Brexitarrangements
ongoing SteeringGroup Numberofdiscussionsheld smoothtransiLonbetweenpreandpostBrexitarrangementsfor
landowners
ObjecLve12 ThePartnershipwillencourageandpromotesustainablemodesoftravelasameansofvisiLngdesLnaLonswithinthenominatedWorldHeritageSite
Policy12.1TheuseofsustainablemethodsoftraveltovisitthecomponentpartsofthethenominatedWorldHeritageSitewillbeencouraged
DevelopiLnerariestoenablepeopletotravelaroundtheareasustainably
medium-term WHSCo-ordinator NumberofiLnerariesdeveloped EncouragesustainablevisitaLonoftheWHS
WorkwithpartnerstopromoteexisLngsustainablemethodsoftravelwithinandaroundtheWHS
ongoing WHSCo-ordinator Numberofprojectssupported Asabove
PromotesustainabletransportwithdesLnaLonmanagementpartners
ongoing WHSCo-ordinator/siteowners AgreedmethodofpromoLon Asabove
Policy12.2 ThePartnershipwillacLvelyencourageintegraLonofsustainablemodesoftransportWorkwithpartnerstoidenLfyanddeliverprojectstointegrateexisLngmodesofsustainabletransport
ongoing WHSCo-ordinator/Partners Numberofpartnersworkingtogether
Partnershipworkingwillsucceedinreachingawideraudience
Policy12.3
ThePartnershipwillseektointegrateheritageinterestwithsustainabletransportwithintheNominatedProperty,theBufferZonesandtheregionWorkwithpartnerstoidenLfyopportuniLestocreatenewlinks,orstrengthenexisLnglinksbetweenheriitageassetsusingsustainabletransport
ongoing WHSCo-ordinator/Partners NumberofinitaLvesdeveloped Fosterstrongerlinksbetweenareasandencouragesustainable
movementofvisitorsbetweendesLnaLons
RESPONSIBILITY(resources arewithin existing
budgetsoforganisations unlessotherwisestated)
TIMESCALEshort-term1-2years
medium-term3-5yearslong-term 5 years +
Theme 3: Sustainable Development of The Slate Landscape of Northwest Wales
![Page 6: The Slate Landscape of Northwest Wales...The Slate Landscape of Northwest Wales NOMINATION AS A WORLD HERITAGE SITE ACTION PLAN, AUGUST 2019 Introduction The objectives set out in](https://reader033.vdocument.in/reader033/viewer/2022043004/5f87acb12618ed30f422dfb9/html5/thumbnails/6.jpg)
ACTION MEASURABLEOUTCOMES OUTPUTS
ObjecLve13 ToensurethattheproposedOutstandingUniversalValueoftheNominatedPropertycanbeenjoyed,experiencedandunderstood,byGwyneddresidentsandbyfuturegeneraLons
Policy13.1 ThePartnershipwillfacilitateunderstandingandappreciaLonoftheNominatedPropertyandwillfosterpublicawearenessandengagementintheneedforprotecLonandconservaLon
CynlluniauCynefin(place-basedregeneraLonstrategies)willbedevelopedforthekeycommuniLeswithcommunity-ledregeneraLonatitscore
Short-term GwyneddCouncil/CommunityGroups
Numberofstrategiescompleted Communityownershipwillensurelongevityofstrategiesandthat
strategiesareintegraltocommunityregeneraLonaccross
thearea
AWalesSlateInterpretaLonPlanwillbedevelopedinordertotellthestoryoftheslatelandscape
Short-term InterpretaLonandTransmissionSub-Group
InterpretaLonPlancompleted CoordinatedapproachtointerpretaLonwillesnurea
coherentandauthenLcexperienceforvisitors
Policy13.2
ThePartnershipwillcommunicatethemeaningofculturalheritagesitestoarangeofmethodsaswellasfromlivingculturaltradiLonsHosteventsinordertotransmitinformaLonandalsotoencouragesharingofexperiencesbetweenstakeholders
Medium-term WHSCoodinator Numberofeventsheld Fosteringlinksbetweenstakeholderswillstrengthenthe'offer'oftheregiontobothlocal
communiLesandvisitors
Ambassadorswillbespokespeoplefortheslatelandscapeandcommunicatekeymessages
Short-term LleCHI NumberofAmbassadorsinplace AmbassadorswillofferauthenLcandgenuineexperiencesfor
peopletofindoutmoreabouttheWHS
CynlluniauCynefin(place-basedregeneraLonstrategies)willidenLfyculturalprojectstoimplementthatwillconveymeaning
Short-term LleCHI Numberofculturalprojectssupported
strengthentheculturalidenLtyoftheslateareasbyreinforcingtradiLonsandmoderncultural
acLviLes
TheWalesSlateInterpretaLonPlantoidenLfymethodsofconveyinginformaLontovisitors
Medium-term LleCHI NumberofinterpretaLonprojects differentmethodsofinterpretaLonwillensurethatkeymessagesaretransmidedtoawideaudience
Policy13.3
ThePartnershipwillsafeguardthetangibleandintangiblevaluesofculturalheritagesitesintheirnaturalandculturalseengsandsocialcontextsTheWalesSlateInterpretaLonPlanwillinformvisitorsofthesignificanceofseengwithintheWHSwhilstconveyingtangibaleandintangibleheritageassets
Medium-term LleCHI NumberofinterpretaLonprojects differentmethodsofinterpretaLonwillensurethatkeymessagesaretransmidedtoawideaudience
ExplorefundingopportuniLesforsafeguarding/promoLngassetsandtradiLons
Medium-term WHSCoodinator Amountoffundingsecured projectspromoLngthetangibaleandintangibleheritageoftheWHS
willstrengthenunderstanding
Policy13.4ThePartnershipwillrespecttheauthenLcityofculturalheritagesites,bycommunicaLngthesignificanceoftheirhistoricfabricandculturalvaluesandprotecLngthemfromtheadverseimpactofintrusiveinterpretaLveinfrastructure,visitorpressure,inaccurateorinnappropriateinterpretaLon
WorkingwithcommuniLestocreateCynlluniauCynefin(place-basedregeneraLonstrategies)whichwillinformlocalpeopleofsignificanceandalsoidenLfyintervenLonsforsafeguardinghistoricandculturalvalues
Short-term LleCHI Numberofstrategiescompleted Communityownershipwillensurelongevityofstrategiesandthat
strategiesareintegraltocommunityregeneraLonaccross
thearea
EncouragelocalownershipthroughcommunityengagementacLviLes
ongoing LleCHI/WHSCoordinator Numberofcommunityengagementevents
Improvedcommunityunderstandingandsenseof
ownership
EncourageparLcipaLoninheritageandculturaltourism
ongoing DMP HeritageandculturaltourismidenLfiedasprioriLesinDMP
IdenLfyculturalandheritagetourismasastrategicpriorityforDesLnaLonManagementaccross
theregion
Createlocaldesignguidelinesinordertoraiseawarenessandprotecthistoricfabric
Medium-term WHSCoodinator Numberofdesignguidelinesproduced
communityownershipofmanagementofWHS
CollaboratewithlocalFEcolleges/trainingproviderstoprovidetrainingintradiLonalskills
Medium-term WHSCoodinator Numberoftrainingsessionsprovided
EnsuringtradiLonalskillsaretransferredtothenextgeneraLon
andpreservedforthefuture
Policy13.5 ThePartnershipwillencourageinclusivenessintheinterpretaLonofculturalheritgaesites,byfacilitaLngtheinvolvementofstakeholdersandassociatedcommuniLesinthedevelopmentandimplementaLonofinterpretaLveprogrammes
CynlluniauCynefin(place-basedregeneraLonstrategies)basedoncommunityaspiraLonswillidenLfyinterpretaLonprojects
Short-term LleCHI NumberofpriorityprojectsidenLfied
CoordinatedapproachtointerpretaLonwillensurea
coherentandauthenLcexperienceforvisitors
Encourageandsupportcommunitytourismprojectsthatfocusonculturalheritage
ongoing WHSCoodinator Numberofcommunitytourismprojectsupported
CommunitybasedtourismprojectswillensureauthenLcityand
sustainability
ObjecLve14 Tocreateavisitorexperiencethatisuniqueandofthehighestquality
Policy14.1 ThePartnershipwillencourageinclusivenessintheinterpretaLonofculturalheritagesites,byfacilitaLngtheinvolvementofstakeholdersandassociatedcommuniLesinthedevelopmentandimplementaLonofinterpretaLveprogrammes.
WalesSlateAmbassadorswillundertaketheroleoffront-lineinformaLonforvisitorsprovidingauthenLcexperiences
ongoing LleCHI/WHSCoordinator NumberofAmbassadorscreated Greatersenseofprideandambitonlocally
TheWalesSlateInterpretaLonPlanwillconveylocalstoriesalongsidetheglobalstoryinordertoensurecommunityownershipandauthenLcinterpretaLon
Short-term LleCHI CreaLonofInterpretaLonPlan CoordinatedapproachtointerpretaLonwillensurea
coherentandauthenLcexperienceforvisitors
Policy14.2 ThePartnershipwilldeveloptechnicalandprofessionalguidelinesforheritageinterpretaLonandpresentaLon,includingtechnologies,researchandtraining
DevelopaSustainableVisitorManagementPlan
Short-term LleCHI CreaLonofSustainableVisitorManagementPlan
ensurethesustainablemanagementofvisitorswithinand
wroundtheWHSinordertoprotectkeyassets
Policy14.3 ThePartnershipwilldevelopclearandconsistentsignageandinformaLonprovisionaccrossthenominatedpropertyDevelopaSustainableVisitorManagementPlan
Short-term LleCHI CreaLonofSustainableVisitorManagementPlan
ensurethesustainablemanagementofvisitorswithinand
wroundtheWHSinordertoprotectkeyassets
DevelopaGatewaySignageStrategy
Medium-term WHSCoodinator CreaLonofaGatewaySignageStrategy
adopLngCadw'followthestory'strategyinordertoencourage
visitorsaroundaccessibleassetsinordertoexperiencethefullstory
oftheWHS
Policy14.4 ThePartnershipwillensureuniquesenseofplaceandhigh-qualityauthenLcexperiencesforvisitorsSupportexisLnghighqualityadracLons,infrastructureandexperiences,andencouragenewprovision
ongoing SteeringGroup Numberofbusinesses/organisaLonssupported
Coordinatedapproachtovisitorenjoymentthroughprovidinghigh
quality,desirableadracLons
AmbassadorswillbeencouragedtotelltheirownstoryinordertoprovideuniqueandauthenLcexperiences
ongoing LleCHI/WHSCoodinator NumberofAmbassadorsinplace AmbassadorswillofferauthenLcandgenuineexperiencesfor
peopletofindoutmoreabouttheWHS
Supportandencouragecommunitytourismprojects
ongoing LleCHI/WHSCoordinator/DMP Numberofcommunitytourismprojectsupported
CommunitybasedtourismprojectswillensureauthenLcityand
sustainability
Policy14.5 The7ComponentPartsoftheNominatedPropertywillbemarketedandcommunicatedasonePropertyEnsuresynergywithdesLnaLonbrand(SnowdoniaMountainsandCoast)markeLngefforts
ongoing DMP/WHSCoordinator/GwyneddCouncil
WHSinformaLononSMCdigitalplaporms
WHSplacedonanaLonalandinternaLonalmarkeLngplapormthorughsynergywithSnowdoniaMountainsandCoastprioriLes
WorkwithVisitWalesonThemaLcYearsandWalesWayStrategicProjects
long-term DMP/WHSCoordinator/GwyneddCouncil
NumberofprojectsdevelopedtocoordinatewithVisitWales
prioriLes
WHSplacedonanaLonalandinternaLonalmarkeLngplapormthorughsynergywithVisitWales
prioriLes
ObjecLve15 ToendeavourtocreateasafeenvironmentfortheenjoymentoftheSlateLandscapeofNorthwestWales
Policy15.1 ThePartnershipwilldevelopclearandrobustquarryandhistoricmonuments'safetypoliciesDevelopasafetycampaignfortheslatelandscape
short-term LandownerForum Campaignlaunchedandsupported ensuresafetyofvisitorstoWHSandensureprivacyofinaccessible
sites
RESPONSIBILITY(resources arewithin existing
budgetsoforganisations unlessotherwisestated)
TIMESCALEshort-term1-2years
medium-term3-5yearslong-term 5 years +
Theme 4: Enjoying The Slate Landscape of Northwest Wales
![Page 7: The Slate Landscape of Northwest Wales...The Slate Landscape of Northwest Wales NOMINATION AS A WORLD HERITAGE SITE ACTION PLAN, AUGUST 2019 Introduction The objectives set out in](https://reader033.vdocument.in/reader033/viewer/2022043004/5f87acb12618ed30f422dfb9/html5/thumbnails/7.jpg)
ACTION MEASURABLEOUTCOMES OUTPUTS
ObjecLve16TheNominatedPropertyisafocusforsharedlearningandresearchfosteringunderstandingandappreciaLonofitsvaluesandadribtutes
Policy16.1LinkswillbeestablishedwitheducaLon-providerstofosteropportuniLesforinclusivelearningprogrammesrelevanttotheNominatedProperty
MaintainlinkswithindustrialarchaeologycourseatPlasTanyBwlch
ongoing WHSCoordinator Numberofadendeesoncourses IncreasedskillslevelinpracLcalindustrialarchaeologytechniques
DevelopfurtherlinkswithBangorUniversity
short-term SteeringGroup Numberofseminars,PhDsundertaken
Increasedunderstandingatacademiclevelofslateindustryandindustrialhistory
Policy16.2 LinkswillbeestablishedwithinternaLonalbodiestopromoteacademicresearch,educaLonalprogrammesandprofessionalexchangesrelevanttotheNominatedProperty
DevelopstrongerlinkswithTICCIHandEuropeanQuarryLandscapeProject
medium-term WHSCoordinator Numberofconferencesandexchangevisits
IncreasedunderstandingofcontextofstoneworkingandindustrialisaLonworld-wide
BuildonlinkswithAssociaLonArdenneWallonneandotherinterestedparLes
medium-term WHSCoordinator NumberofmeeLngs/exchangesheld
Asabove
BuildonlinksbetweenFfesLniogRailwayandIndianRailways(MountainRailwaysofIndiaWHS)
long-term WHSCoordinator NumberofmeeLngs/exchangesheld
OpportunitytosharebestpracLceandinformaLon
WorkwithEuropeanQuarryLandscapeProject
long-term WHSCoordinator NumberofmeeLngs/exchangesheld
Increasedunderstandingofcontextofstoneworkingworld-wide
Policy16.3Visitorswillbeencouragedtoexploreandlearnaboutthephysical,socialandculturalaspectsoftheSlateLandscapeofNorthwestWales
LinksbetweenacademicresearchandinterpretaLon
medium-term BangorUniversity/WHSCoordinator
NumberofprojectscombininginterpretaLonandacademic
researchcompleted
Increased/evolvingunderstandingofTheSlateLandscapeofNorthwestWales
Policy16.4 ResearcherswillbeencouragedtosharetheirknowledgeandresearchfindingsEncouragesharinginformaLonbetweenacademicresearchers
medium-term BangorUniversity/WHSCoordinator
NumberofseminarsandpublicaLons
Increased/evolvingunderstandingofTheSlateLandscapeofNorthwestWales
RESPONSIBILITY(resources arewithin existing
budgetsoforganisations unlessotherwisestated)
TIMESCALEshort-term1-2years
medium-term3-5yearslong-term 5 years +
Theme 5: Learning about The Slate Landscape of Northwest Wales