![Page 1: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/1.jpg)
Srubabati Goswami,
The Status of INO
The status of INO 1
Srubabati GoswamiPhysical Research Laboratory, Ahmedabad, India
(on behalf of India-based Neutrino Observatory collaboration)
![Page 2: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/2.jpg)
Srubabati Goswami
India-based Neutrino Observatory Proposal
The status of INO 2
Goal : To build an underground laboratory for science with neutrino
physics as the major activity
The detector: Magnetized Iron CALorimeter detector (ICAL) for
detecting atmospheric neutrinos
Detector choice based on Technological capabilities available in the country
Complementarity to planned/existing neutrino detectors in the world
Modularity and possibility of phasing
Compactness and ease of construction
Other Possibilities
Neutrinoless double beta decay, Dark Matter ………
![Page 3: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/3.jpg)
Srubabati Goswami
The INO Collaboration
The status of INO 3
![Page 4: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/4.jpg)
Srubabati Goswami
INO : Mandates
The status of INO 4
Construction of an underground laboratory
Construction of a 50 kiloton magnetized Iron calorimeter (ICAL) detector to
study properties of neutrinos
Construction of The Inter-Institutional Centre for High Energy Physics
(IICHEP) at Madurai
Human Resource Development (INO Graduate Training Program)
Detector and Instrumentation R & D
Development of simulation framework and consolidate the physics goals.
![Page 5: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/5.jpg)
Srubabati Goswami
INO: Location
The status of INO 5
Land area 26.8 Ha
Warm low rain-fall area, low humidity through out the year
Flat terrain with good access to major roads
![Page 6: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/6.jpg)
Srubabati Goswami
Inter Institutional Centre for High Energy Physics
The status of INO 6
13 Ha of land at Madurai city for IICHEP (Surface Lab)
It is planned to build an ICAL Engineering Module at IICHEP
To have facility for R & D activities (RPC detector etc. )
Academic activities, INO graduate training school
![Page 7: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/7.jpg)
Srubabati Goswami
INO@Theni
The status of INO 7
![Page 8: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/8.jpg)
Srubabati Goswami
Underground Laboraotory Layout
The status of INO 8
The Cavern-I is set under 1589m peak with vertical rock cover of 1289m
Accessible through a 1.9km long tunnel
Cavern-1 will host 50 kt ICAL detector. Space for a second 50 kt detector
Cavern-2 and 3 for other experiments ( NDBD, Dark Matter ….)
![Page 9: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/9.jpg)
Srubabati Goswami
Activities@the Theni site
The status of INO 9
![Page 10: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/10.jpg)
Srubabati Goswami
Activities at the IICHEP site
The status of INO 10
![Page 11: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/11.jpg)
Srubabati Goswami The status of INO 11
ICAL@INO
![Page 12: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/12.jpg)
Srubabati Goswami
ICAL@INO : Salient Features
The status of INO 12
Magnetized Iron Calorimeter Detector
![Page 13: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/13.jpg)
Srubabati Goswami
ICAL@INO : Physics Goals
The status of INO 13
Reconfirmation of atmospheric neutrino oscillations
using neutrinos and antineutrinos separately
Improved precision of atmospheric oscillation parameters
Neutrino mass hierarchy using matter effects via charge
discrimination
Measure the deviation of 2-3 mixing angle from maximal value
and determine its octant
Testing new physics scenarios like sterile neutrinos, CPT
violation, NSI, long range forces ……
Indirect searches of Dark matter, Magnetic Monopoles …
![Page 14: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/14.jpg)
Srubabati Goswami
ICAL detector
The status of INO 14
Rectangular detector
Modular structure
Active Detector Element : Resistive
Plate Chambers (RPC)
151 layers of iron plates interleaved
with RPCs
![Page 15: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/15.jpg)
Srubabati Goswami
Resistive Plate Chamber (RPC)
The status of INO 15
Schematic Diagram of a 30 cm X 30 cm RPC
Operated at a voltage of 10 kV in Avalanche mode
![Page 16: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/16.jpg)
Srubabati Goswami
Resistive Plate Chamber (RPC)
The status of INO 16
RPC dimension : 2m X 2m (approx.)
3 mm thick glass plates with 2 mm
spacers
Signals of a high energy charged
particle will be read by the orthogonal
X and Y pick up strips
![Page 17: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/17.jpg)
Srubabati Goswami
ICAL Magnet
The status of INO 17
Copper coils carrying direct currents are
used to magnetize the iron plates
Soft Iron Plates
Copper Coils
Power Supply
Coil Cooling
System
![Page 18: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/18.jpg)
Srubabati Goswami
ICAL Magnet
The status of INO 18
Magnetic field map generated
by MAGNET6 software
![Page 19: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/19.jpg)
Srubabati Goswami The status of INO 19
R&D Activities
![Page 20: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/20.jpg)
Srubabati Goswami
R&D work in various Institutions
The status of INO 20
![Page 21: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/21.jpg)
Srubabati Goswami
Prototype RPC stack at TIFR
The status of INO 21
12 layers of 2mX2m RPC stack
operational at Madurai
![Page 22: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/22.jpg)
Srubabati Goswami
A prototype Magnet and RPC setup@VECC
The status of INO 22
![Page 23: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/23.jpg)
Srubabati Goswami
ICAL Electronics
The status of INO 23
![Page 24: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/24.jpg)
Srubabati Goswami
ICAL Trigger System
The status of INO 24
![Page 25: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/25.jpg)
Srubabati Goswami
ICAL Electronics : Status
The status of INO 25
Analog/Digital Front End electronics developed, tested and ready to go
for limited/large scale production
ICAL TDC ASIC design finalized and limited production expected by
October 2016
Trigger scheme validated and all the boards produced. To be integrated
and tested in RPC stacks
High voltage module designed, produced, tested on 2mX2m RPC; will go
for limited production soon
Data quality monitors, data storage solutions under development, will
be frozen soon
![Page 26: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/26.jpg)
Srubabati Goswami
Engineering Module at IICHEP, Madurai
The status of INO 26
• 1 module 8mX8mX2m (16mX16mX14.5m)
• Number of layers 21 (150)
• Magnet weight 600 ton (50 kiloton)
• Iron plate thickness 56 mm (56mm)
• RPC dimension 2m X 2m (2mX2m)
• Total no, of RPC units 320 (28, 800)
168 soft iron plates
procured for 21 layers
![Page 27: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/27.jpg)
Srubabati Goswami The status of INO 27
Simulation and Physics Studies
![Page 28: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/28.jpg)
Srubabati Goswami
Simulation Framework
The status of INO 28
![Page 29: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/29.jpg)
Srubabati Goswami
A typical event display
The status of INO 29
![Page 30: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/30.jpg)
Srubabati Goswami
Muon Response
The status of INO 30
![Page 31: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/31.jpg)
Srubabati Goswami
Hadron Energy Resolution at ICAL
The status of INO 31
![Page 32: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/32.jpg)
Srubabati Goswami
Physics Results included in the White paper
The status of INO 32
Determination of mass hierarchy
Octant and precision of and 2
31| |m 23
Synergy with other experiments like T2K and NOVA
--- hierarchy, octant and
New Physics – CPT violation
Magnetic Monopole Search
CP
arXiv:1505.07380
![Page 33: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/33.jpg)
Srubabati Goswami
Mass Hierarchy Sensitivity with ICAL
The status of INO 33
σ
Median Sensitivity
2
23sin ( ) 0.5true
2
13sin 2 ( ) 0.1true
Inclusion of hadron information gives improved results
3σ sensitivity in 10 years for a 50 kiloton detector
![Page 34: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/34.jpg)
Srubabati Goswami
Mass Hierarchy sensitivity (ICAL+T2K+NOVA)
The status of INO 34
3σ sensitivity can be reached in six years
T2K/NOVA simulation using Globes software
2
13sin 2 ( ) 0.1true 2
23sin ( ) 0.5true
![Page 35: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/35.jpg)
Srubabati Goswami
CPV : Synergy with T2K and NOVA
The status of INO 35
Hierarchy information from INO-ICAL helps in the detection of
CP violation though ICAL itself is not sensitive to CP violation
2
13
23
sin 2 ( ) 0.1
( ) 39
true
true
NH
![Page 36: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/36.jpg)
Srubabati Goswami
Precision of and
The status of INO 36
2
32| |m23
Factor of two improvement in
precision with addition of hadron
information
Precision comparable to other
experiments
2
23| |m
NH
![Page 37: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/37.jpg)
Srubabati Goswami
Octant of
The status of INO 37
23
23
Determination of octant is possible for values
sufficiently away from the maximal value
232323
23
NH IH
![Page 38: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/38.jpg)
Srubabati Goswami
New results on precision and hierarchy sensitivity
The status of INO 38
Extension of the energy range
to 0.5 – 25 GeV
Improved hierarchy sensitivity
NH
3D
2D
/ Inclusion of an extra systematic
related to ratio
Improved precision of 2
23sin
arXiv 1605.04185 Also see P3.001
![Page 39: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/39.jpg)
Srubabati Goswami
New studies of new physics
The status of INO 39
Constraining NSI parameters
from ICAL
arXiv : 1507. 02211
Constraining sterile neutrinos
from ICAL
arXiv: 1605. 08607
![Page 40: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/40.jpg)
Srubabati Goswami
INO: Current Status
The status of INO 40
Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$)
Awaiting permission from TN Govt. for starting construction at IICHEP
Awaiting TN Pollution control board clearance for INO
Consultancy contract for tunnel, cavern, infrastructure on hold
Detector design finalized
Full size RPCs (2m X2m ) have been fabricated and characterization done
400 glass RPCs have been ordered from St. Gobain and delivery has begun
12 layer stack of 2m X 2m glass RPCs working at Madurai
600 tons of low carbon steel, OFHC copper conductor spools ( approx. 9.6 tons)
stored at Kalpakkam
8m high RPC handling trolley delivered
Electronics, DAQ, Trigger are in the final stage of prototyping
Simulation software developed ; Further improvement ongoing (see P3.001)
Physics white paper is online (arXiv:1505.07380)
Running 8th batch of INO graduate school
![Page 41: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/41.jpg)
Srubabati Goswami
Conclusions
The status of INO 41
Considerable progress in all fronts
while awaiting for approvals
INO science program ready to
contribute to the worldwide activities
in neutrino physics
Papyrus-form column
British Museaum
http://www.tifr.res.in/~ino
A strong and viable physics program
ready for ICAL@INO
![Page 42: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/42.jpg)
Srubabati Goswami The status of INO 42
Thank You
http://www.tifr.res.in/~ino
![Page 43: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/43.jpg)
Srubabati Goswami The status of INO 1
Backup Slides
![Page 44: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/44.jpg)
Srubabati Goswami
RPC development
The status of INO 2
![Page 45: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/45.jpg)
Srubabati Goswami
Progress in the development of RPC@TIFR
The status of INO 3
![Page 46: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/46.jpg)
Srubabati Goswami
Testing prototype RPC stack at TIFR
The status of INO 4
![Page 47: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/47.jpg)
Srubabati Goswami
ICAL Engineering Module@IICHEP
The status of INO 5
![Page 48: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/48.jpg)
Srubabati Goswami
Automation of RPC handling in ICAL magnet
The status of INO 6
![Page 49: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/49.jpg)
Srubabati Goswami
RPC handling Trolley for Engineering Module
The status of INO 7
![Page 50: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/50.jpg)
Srubabati Goswami
Number of Events
The status of INO 8
![Page 51: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/51.jpg)
Srubabati Goswami
Details of
The status of INO 9
2
![Page 52: The Status of INOINO: Current Status The status of INO 40 Financial approval by Govt. in 12/14 for Rs. 1583 Cr INR ( approx. 240 M$) Awaiting permission from TN Govt. for starting](https://reader035.vdocument.in/reader035/viewer/2022063016/5fd43fde9754927eea24270b/html5/thumbnails/52.jpg)
Srubabati Goswami
Other possibilities
The status of INO 10