Corporate OverviewCorporate OverviewppFounded in 1996HQs located in HoustonQProducts:
VP Link : Flexible Process SimulationDrivers and database management toolsDrivers and database management toolsRigorous modulesScoring engine etc…
Test Compiler : Automated Logic validation for SISLogic Validation
XP TrendCorderHigh Speed trending for Root cause analysis
What is VP Link ?What is VP Link ?
A dynamic representation of a chemical y pprocess to an offline control system.
VP Link components in a VP Link components in a client / server architectureclient / server architecture
VP Link components run seamlessly over the network
VVirtualirtual PProcessrocess : Overview: OverviewVVirtual irtual PProcess rocess : Overview: Overview
Windows based interface: intuitiveNo Changes to Logic programs: non-invasiveI/O board Hardware not required :cost advantage
Calculate
Read value of outputs
Calculate ProcessVariablesVPLink
Eng/Operator Station Write simulated inputs
Some of our customers...Some of our customers...
Supported SystemsSupported SystemsSupported SystemsSupported Systems
ABB 800 xA, Industrial ITABB 800 xA, Industrial ITABB Mod300, Advant, BaileyTriconex:Tricon/Trident Honeywell Experion PKS TDC,TPS , FSCHoneywell Plantscape / Rockwell ProcessLogixy p gGE Fanuc series 90A-B PLC5/SLC500,CLX, Modicon,Siemens-Ti 505Foxboro I/A,ArchestraSiemens APACS, PCS7, S7Yokogawa CS3000/R3/ ProSafeEtc...
Different Architectures for Different Architectures for ff fff fdifferent Applicationsdifferent Applications
Integrated Training Setup
Parallel Training Setup
Trainees each operate different units Trainees operate independent,Trainees each operate different units,interacting with each other
p p ,identical units, in parallel
TheThe VVirtual irtual PProcess for rocess for ABB System 6ABB System 6
VP Link 3.x Server
ABB System 6ABB System 6
VP Link/ABB Interface
Server
TCP/IP over Ethernet
ABB Composer Station
Trainer StationCo pose Stat owith VP3 driver
Ethernet
Operator consoles (conductor UX,NT or others)
DCU Controllers
VP Link Specifics :VP Link Specifics :VP Link Specifics : VP Link Specifics : ABB System 6 InterfaceABB System 6 Interface
Fast TCP-IP based interfaceNon-invasive driver runs on Unix or Windows based Composer stationAutomated extraction toolsInterface can work in parallel with pother simultaneous connections to Safety System(SIS/ESD) or PLCsy y ( )
Does the Does the type of process matter ?type of process matter ?
VP Link is a proven solution for :Batch (recipe / state control based strategy )Semi-continuousContinuous
How ?VP Link model is I/O based Hence isolated from control strategy
VP Link ApplicationsVP Link Applications
I - Logic Validationand
Test CompilerTest Compiler
Cost of changes over a typical Cost of changes over a typical project development cycle project development cycle
Incre Minimal to Maximal ementa
moderateimpact
cost impact
al Cost
Time IAT FAT SAT PSSR
VV--Approach methodology:Approach methodology:li ti t lid tili ti t lid tiapplication to validationapplication to validation
Safety R i t
Pre Start-Up S f tRequirement
Spec
Run manual
Safety Review
Narrative
C & D l
Run manualTests
Cause &Effect
Function
DevelopScenarios
Function Block
Design
Black BoxTesting
DeliverableFunctional
Logic
Deliverable
Verification
Logic Validation with VP LinkLogic Validation with VP LinkVP Link Allows:
Graphics verificationpLogic checkout at I/O / block / module / system levelInterlock schedule approval Integrated Testing : Mapping to DCS and interactionIntegrated Testing : Mapping to DCS and interaction between DCS/PLC logic ( gateway points tests)
How ?Automates repetitive testing task (ie resets etc…)Facilitates FAT with customized graphics Collaborative testing framework thru distributed garchitecture
Thoroughly debug prior to online download, ie, Management of Change and periodical testingManagement of Change and periodical testingTest Compiler complies with IEC61508/61511
Simulation Screen shotsSimulation Screen shotsSimulation Screen shotsSimulation Screen shotsAutomated Tag sheet
Input/Output sheets per ESD
HMI for advanced testingHMI for advanced testing or training
VP Link ApplicationsVP Link ApplicationsVP Link ApplicationsVP Link Applications
II- Operator Training Simulator (OTS)
IIII-- Goals of Operator TrainingGoals of Operator TrainingIIII Goals of Operator TrainingGoals of Operator Training
Knowledge Transfer
Assess trainees proficiency
Turnaroundproficiency
Refresher TrainingRe-certification Run
Train Operator’s for Emergency Response Faults / Malfunctions / Upsets (Real or Instrumentation)
Pre-StartupExercise Startup / Shutdown Procedures
Familiarize staff ith HMI O l N i ti FAT
Pre Startup
with HMI, Overlays, Navigation, Alarm Pages, Trend Displays
FAT
OOperator perator TTraining raining SSystem ystem pp gg yy(OTS) using VP Link(OTS) using VP Link
• Actual control program is solved in native environmentActual control program is solved in native environment for realistic control response
• Trainees operate the virtual plant using actual consoles, graphics and keyboardsgraphics and keyboards
• ESD (Emergency Shutdown Device) is fully integrated in the process model and OTS
• HMI graphics are imported in VP Link to offer an intuitive trainer interface
• High Quality process modeling tools, simulating theHigh Quality process modeling tools, simulating the most complex chemical processes (Rx,Dist,Compressors…)
• Scoring Engine for knowledge retention metrics• Scoring Engine for knowledge retention metrics• Experienced , in-house Chemical engineers to deliver
turnkey, customized training solutions for your process
Operator Knowledge Assessment :Operator Knowledge Assessment :Operator Knowledge Assessment :Operator Knowledge Assessment :the Scoring Enginethe Scoring Engine
Excel configuration Front EndScenario launched sequencesScenario launched sequences
Targets (timing, rate, value, tolerance window)Actions ( I/O activity)Actions ( I/O activity)Order (logical relationship between steps)
Independent trainees logs with:Independent trainees logs with:normalized scores relevant actions & timingrelevant actions & timing
High Level Schedule :High Level Schedule :OTS ProjectOTS Projectjj
Methodology and project Schedule Methodology and project Schedule for Typical OTS Projectfor Typical OTS Project
Customer Needs Identification
ProcessModeld l
ModelFine
i
ModelAcceptanceA d D liIdentification development Tuning And Delivery
• Gather plant Data• PFD & PIDs
• Operations Feedback• Final IO configurationEnd User
PFD & PIDs• IO configuration• HMI screens (first round)
Evaluate :
•Train the trainer• Start Operator Training
g• Final HMI screensControl
VendorEvaluate :•Scope•Fidelity•SIS comms•Scoring
• Database Extraction• Trainer Screens• LFN Layout• model development
• On-site connectivity test• Dynamics tuningU t/t i i S i
T=0 T=2 weeks T=2.5 month T=3 months
•Scoring •Upset/training Scenarios
What kind of processWhat kind of processWhat kind of process What kind of process simulation do you need ?simulation do you need ?
A closer look at the competition…
Marginal cost Analysis of Marginal cost Analysis of g y fg y fprocess model fidelityprocess model fidelity
• ~ 2,000 I/O• Oil Refining unit(FCC, HDC etc)
Simulation Investment Vs level of Fidelity
$800 000 00
$900,000.00
$400 000 00
$500,000.00
$600,000.00
$700,000.00
$800,000.00
Logic Validation OTS /
$0 00
$100,000.00
$200,000.00
$300,000.00
$400,000.00 EngineeringVP Link
$0.00
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Why is Hybrid modeling Why is Hybrid modeling more cost effective ?more cost effective ?
No compositional (I/O based) = more flexibilityp ( ) yAll dynamics CAN be capturedRigorous modules available:
Distillation modulesHeat Exchanger, Compressor & OPEN blocksReactor module ( catalytic,treating,cracking etc)Reactor module ( catalytic,treating,cracking etc)Liquid Flow Network / HxNGen (and documentation)Sequential and Simultaneous Matrix Solving schemes integrate seamlesslyseamlesslyApproximations compensated for by the control outputs
Layer Approach minimizes model upkeep costsVP Link allows exactly for desired model fidelityAccuracy: 99% quasi Steady State / 85% full transient
A note about “Fidelity”Fidelity is perceived by Operators ONLY through monitored process variables
Fidelity should reflect the overall accuracy of theSYSTEM= process simulator + “control environment”
ConclusionConclusionVP Link solves simulation needs from simple to sophisticated, rigorous modeling.OTS node can used as an engineering Test Bed system, for preventive / periodical logic validationU tt d d R l Ti t i f lUnattended Real Time trainee performance logsModeling environment is flexible, easy to learn and maintainAvailable New Version Service keeps VP Link components up to date, with included supportCost Effective simulation package for OTS,usingOff the Shelf components for process model and control or emulated controlCross platform functionalities makes VP Link an evolutive investment
Questions ???Q