Transcript
Page 1: TILE ROOF COVERING - irp-cdn.multiscreensite.com LO… · tile roof covering a1 a2 a3 a4 a5 a6 a7 0 a 0 cj1 cj3a cj5a cj1 cj3a cj5a cj5 cj3 cj1 cj1 cj3 cj5 b1 b2 b3 j 8 h j 8 cj1

12'-4" TRAY

11'-4" CEILING

11'-4"

CE

ILIN

G

11'-4"

CE

ILIN

G

11'-4" CEILING

10'-4" TRAY

10'-0" TRAY

10'-0" TRAY

OV

ER

HAN

GS

BY

BU

ILD

ER

24" RECESSED A/H

10'-4"

COFFERED

CLG

TILE ROOF COVERING

A1

A2

A3

A4

A5

A6

A7

HJ10A H

J10

CJ1

CJ3A

CJ5A

CJ1

CJ3A

CJ5A

CJ1

CJ3

CJ5

CJ1

CJ3

CJ5

B1

B2

B3

HJ8

HJ8

CJ1

CJ3

CJ5

CJ1

CJ3

CJ5

CJ1

CJ3

CJ5

CJ1

CJ3

CJ5C1

HJ6

HJ6

CJ1

CJ3

CJ1

CJ3

CJ1

CJ3

CJ1

CJ3

B4

B5

A16

E1

HJ4

CJ1

CJ1

HJ4

CJ1

CJ1

E2C3

C4

A15

A14

A13

A12

A8

V2

V4

V6

V7

V2

V4

V5

EJ7A(3) EJ7(11)

A9(4

)

C2(2

)

EJ3(3)

EJ4(3)EJ5(6)

A11(6

)A

10(2

)

70-00-00

10-00

59-10-00

9-04-00

70-00-00

21-02-00 5-10-00 13-00-00

40-00-00

15-04-00 24-08-00

40-00-00

5-06-00

1-06-00

7-00-00

4-06-00

2-02-00

1-06-00

2-08-00 10-00-00 2-08-00

2-08-00

11-00-00

2-04-00

7-00-00

6-08-00

4-02-00 6-00-00 4-10-00 12-08-00 12-04-00

6-08-00

15-00-00

1-06-00

9-02-00

10-00

5-06-00

5-06-00

3-00-00

12-08-006-06-0020-10-00

6-00-00

6-02-00 8-00-00 2-04-00

1-04-00

12-04-00

3-04-00

12'-4" BEARING

14'-0" BEARING

9'-4" BEARING

Hatch Legend

UPLIFT

HGUS26-2

HGUS28-3

0E

BOLTS

MODEL

7460

MODEL

0 3485

E

0

4095

D

QTY

ACCESSORIES

4680

665

J

SDS 1/4" x 6"

0

MODEL

1/2" WASHERS

MISCELLANEOUS

SYMBOL

HHUS46

0

QTY

2175

C

ROOF TRUSS

1/2" x 8" CARR. BOLTS

FLOOR

2175

0

0

H

SDS 1/4" x 4-1/2"

1/2" NUTS

4355

3x8 NAIL ON PLATES

K

SCREWS

895

C

QTY

2790

HGUS210-4

C

QTY

3x8 NAIL ON PLATES

2 PLY TYP.

HTU26-2 L

HTU26-2

HGUS26-2

B

SPECIAL

1 PLY TYP.

N 535

ID

HTU28

0

THA422

G

HTU26

SIMPSON CONNECTOR SCHEDULE

UPLIFT

E

SDS 1/4" x 3"

1550

MODEL

B

0

0

M

ID

3235

1/2" WASHERS

FLOOR TRUSS

C

L

M

0

1/2" NUTS

0

QTY

H

QTY

2940

SDS 1/4" x 3"

A

L

SYMBOLMODEL

G

HGUS28-2

1/2" x 8" CARR. BOLTS

MODEL

0

2140

HTU28-2

MODEL

1555

HGUS26-3

HHUS46

0

2155

1855

QTY

2155

THA426

F

JHGUS210-4

490

2155

3600

1855

2940

0

3600

LUS24 1555A*

BOLTS

4355

O

A

G

3695

0

9100

QTY

0 5320

0

MODEL

A

A

45505230

A

ROOF TRUSS

SDS 1/4" x 4-1/2"

4095

C

N

J

7460

9100

SEAT PLATES

JHTU26-2

HTU26

A*

D

3235

G OHGUS26-3

ROOF

HTU26

SPECIAL

FLOOR TRUSS

0

THAC422F

2155

SCREWS

FLOOR TYP.

P

ACCESSORIES

E

4680

SDS 1/4" x 6"

SEAT PLATES

CAUTION!!!

DO NOT ATTEMPT TO ERECTTRUSSES WITHOUT REFERRING TOTHE ENGINEERING DRAWINGS ANDBSCI-B1 SUMMARY SHEETS.

ALL PERMANENT BRACING MUST BEIN PLACE PRIOR TO LOADINGTRUSSES. (ie. SHEATHING,SHINGLES, ETC.)

ALL INTERIOR BEARING WALLSMUST BE IN PLACE PRIOR TOINSTALLING TRUSSES.

REFER TO FINAL ENGINEERINGSHEETS FOR THE FOLLOWING.

1) NUMBER OF GIRDER PLIES ANDNAILING SCHEDULE.

2) BEARING BLOCK REQUIREMENTS.

3) SCAB DETAILS (IF REQUIRED)

4) UPLIFT AND GRAVITY REACTIONS.

WARNINGBackcharges Will Not Be AcceptedRegardless of Fault Without PriorNotification By Customer Within 48

Hours And Investigation ByProBuild.

NO EXECPTIONS.

The General Contractor Is ResponsibleFor All Connections Other Than Truss

to Truss, Gable Shear Wall, AndConnections. Temporary and

Permanent Bracing, And Ceiling AndRoof Diaphragm Connections.

BEARING HEIGHT SCHEDULE

4408 Airport RoadPlant City, FL 33563Ph. (813) 305-1300Fax (813) 305-1301

IMPORTANT

This Drawing Must Be Approved AndReturned Before Fabrication Will

Begin. For Your Protection Check AllDimensions And Conditions Prior To

Approval Of Plan.SIGNATURE BELOW INDICATES ALLNOTES AND DIMENSIONS HAVE

BEEN ACCEPTED.

By __________________Date_______

ROOF LOADING

TCLL:

TCDL:

BCDL:

TOTAL:

DURATION:

PSF

PSF

PSF

PSF

FLOOR LOADING

TCLL:

TCDL:

BCDL:

TOTAL:

DURATION:

PSF

PSF

PSF

PSF

VERIFY ALL DIMENSIONS AND CEILING CONDITIONS PRIOR TO APPROVALSOME CEILING FRAMING REQUIRED IN FIELD BY BUILDER

25

55

20

1.25

10

2.

REVISIONS:

4.

3.

1.Add AHU Recess (extend BearingWall), Add Second Coffer ceiling inFoyer 11/04/15

MAIN WIND FORCE RESISTING SYSTEM/C-C HYBRID WIND ASCE7-10ENCLOSEDEXPOSURE CATEGORY COCCUPANCY CATEGORY IIWIND LOAD 160 MPHWIND IMPORTANCE FACTOR 1.00TRUSSES HAVE BEEN DESIGNED FOR A 10.0 PSF BOTTOM CHORD LIVE LOADNONCONCURRENT WITH ANY OTHER LIVE LOADS

ROOF PITCH: 5/12

CEILING PITCH: 0/12

TOP CHORD SIZE: 2 X 4

BOTTOM CHORD SIZE: 2 X 4

OVERHANG LENGTH: 16"

END CUT: Plumb

CANTILEVER: --

TRUSS SPACING: 24"

BUILDING CODE: FRC2014

55

5

40

1.00

10

---

CITY: ---

---

SCALE:

MODEL:

ADDRESS:

PLAN DATE:

SUBDIVISION:

JOB # :

1983 - Elev C LH

1/4"=1'-0"Arch D

DRAWN BY:

BUILDER:

DATE:

MASTER

PROJECT:

D. Allen

12/23/15

LOT / BLOCK:

1983 C

---

10/28/14

DR. Horton

Page 2: TILE ROOF COVERING - irp-cdn.multiscreensite.com LO… · tile roof covering a1 a2 a3 a4 a5 a6 a7 0 a 0 cj1 cj3a cj5a cj1 cj3a cj5a cj5 cj3 cj1 cj1 cj3 cj5 b1 b2 b3 j 8 h j 8 cj1

Th

is s

ign

atu

re a

nd

sea

l is

fo

r w

ork

per

form

ed b

y t

he

Str

uct

ura

l E

ng

inee

r o

f R

eco

rd

(SE

R)

rela

ted

to

Str

uct

ura

l E

ng

inee

rin

g o

nly

. N

o w

ork

was

per

form

ed b

y t

he

SE

R i

n

oth

er d

isci

pli

nes

su

ch a

s ar

chit

ectu

ral,

mec

han

ical

, p

lum

bin

g,

elec

tric

al,

fire

, li

fe

safe

ty,

acce

ssib

ilit

y,

ener

gy

, si

te w

ork

, ci

vil

, o

r g

eote

chn

ical

.

ST

RU

CT

UR

AL

EN

GIN

EE

RIN

G

Page 3: TILE ROOF COVERING - irp-cdn.multiscreensite.com LO… · tile roof covering a1 a2 a3 a4 a5 a6 a7 0 a 0 cj1 cj3a cj5a cj1 cj3a cj5a cj5 cj3 cj1 cj1 cj3 cj5 b1 b2 b3 j 8 h j 8 cj1

Th

is s

ign

atu

re a

nd

sea

l is

fo

r w

ork

per

form

ed b

y t

he

Str

uct

ura

l E

ng

inee

r o

f R

eco

rd

(SE

R)

rela

ted

to

Str

uct

ura

l E

ng

inee

rin

g o

nly

. N

o w

ork

was

per

form

ed b

y t

he

SE

R i

n

oth

er d

isci

pli

nes

su

ch a

s ar

chit

ectu

ral,

mec

han

ical

, p

lum

bin

g,

elec

tric

al,

fire

, li

fe

safe

ty,

acce

ssib

ilit

y,

ener

gy

, si

te w

ork

, ci

vil

, o

r g

eote

chn

ical

.

ST

RU

CT

UR

AL

EN

GIN

EE

RIN

G

Page 4: TILE ROOF COVERING - irp-cdn.multiscreensite.com LO… · tile roof covering a1 a2 a3 a4 a5 a6 a7 0 a 0 cj1 cj3a cj5a cj1 cj3a cj5a cj5 cj3 cj1 cj1 cj3 cj5 b1 b2 b3 j 8 h j 8 cj1

Th

is s

ign

atu

re a

nd

sea

l is

fo

r w

ork

per

form

ed b

y t

he

Str

uct

ura

l E

ng

inee

r o

f R

eco

rd

(SE

R)

rela

ted

to

Str

uct

ura

l E

ng

inee

rin

g o

nly

. N

o w

ork

was

per

form

ed b

y t

he

SE

R i

n

oth

er d

isci

pli

nes

su

ch a

s ar

chit

ectu

ral,

mec

han

ical

, p

lum

bin

g,

elec

tric

al,

fire

, li

fe

safe

ty,

acce

ssib

ilit

y,

ener

gy

, si

te w

ork

, ci

vil

, o

r g

eote

chn

ical

.

ST

RU

CT

UR

AL

EN

GIN

EE

RIN

G

Page 5: TILE ROOF COVERING - irp-cdn.multiscreensite.com LO… · tile roof covering a1 a2 a3 a4 a5 a6 a7 0 a 0 cj1 cj3a cj5a cj1 cj3a cj5a cj5 cj3 cj1 cj1 cj3 cj5 b1 b2 b3 j 8 h j 8 cj1

Th

is s

ign

atu

re a

nd

sea

l is

fo

r w

ork

per

form

ed b

y t

he

Str

uct

ura

l E

ng

inee

r o

f R

eco

rd

(SE

R)

rela

ted

to

Str

uct

ura

l E

ng

inee

rin

g o

nly

. N

o w

ork

was

per

form

ed b

y t

he

SE

R i

n

oth

er d

isci

pli

nes

su

ch a

s ar

chit

ectu

ral,

mec

han

ical

, p

lum

bin

g,

elec

tric

al,

fire

, li

fe

safe

ty,

acce

ssib

ilit

y,

ener

gy

, si

te w

ork

, ci

vil

, o

r g

eote

chn

ical

.

ST

RU

CT

UR

AL

EN

GIN

EE

RIN

G

Page 6: TILE ROOF COVERING - irp-cdn.multiscreensite.com LO… · tile roof covering a1 a2 a3 a4 a5 a6 a7 0 a 0 cj1 cj3a cj5a cj1 cj3a cj5a cj5 cj3 cj1 cj1 cj3 cj5 b1 b2 b3 j 8 h j 8 cj1
Page 7: TILE ROOF COVERING - irp-cdn.multiscreensite.com LO… · tile roof covering a1 a2 a3 a4 a5 a6 a7 0 a 0 cj1 cj3a cj5a cj1 cj3a cj5a cj5 cj3 cj1 cj1 cj3 cj5 b1 b2 b3 j 8 h j 8 cj1

Th

is s

ign

atu

re a

nd

sea

l is

fo

r w

ork

per

form

ed b

y t

he

Str

uct

ura

l E

ng

inee

r o

f R

eco

rd

(SE

R)

rela

ted

to

Str

uct

ura

l E

ng

inee

rin

g o

nly

. N

o w

ork

was

per

form

ed b

y t

he

SE

R i

n

oth

er d

isci

pli

nes

su

ch a

s ar

chit

ectu

ral,

mec

han

ical

, p

lum

bin

g,

elec

tric

al,

fire

, li

fe

safe

ty,

acce

ssib

ilit

y,

ener

gy

, si

te w

ork

, ci

vil

, o

r g

eote

chn

ical

.

ST

RU

CT

UR

AL

EN

GIN

EE

RIN

G

Page 8: TILE ROOF COVERING - irp-cdn.multiscreensite.com LO… · tile roof covering a1 a2 a3 a4 a5 a6 a7 0 a 0 cj1 cj3a cj5a cj1 cj3a cj5a cj5 cj3 cj1 cj1 cj3 cj5 b1 b2 b3 j 8 h j 8 cj1
Page 9: TILE ROOF COVERING - irp-cdn.multiscreensite.com LO… · tile roof covering a1 a2 a3 a4 a5 a6 a7 0 a 0 cj1 cj3a cj5a cj1 cj3a cj5a cj5 cj3 cj1 cj1 cj3 cj5 b1 b2 b3 j 8 h j 8 cj1
Page 10: TILE ROOF COVERING - irp-cdn.multiscreensite.com LO… · tile roof covering a1 a2 a3 a4 a5 a6 a7 0 a 0 cj1 cj3a cj5a cj1 cj3a cj5a cj5 cj3 cj1 cj1 cj3 cj5 b1 b2 b3 j 8 h j 8 cj1

Top Related