It is often said that if the project manager cannot control his own time, then he will control nothing else on the project.
2
Time Robbers
1. The most challenging problem facing the project manager is his inability to say no.
2. Poor communication
3. Lack of information
3
Time Robbers
Too many meetings Unclear objectives and project
scope Work overload Company politics
4
Time Robbers
Too many people involved in minor decision making
Lack of authorization Shifting priorities Failure to delegate, or unwise
delegation 5
Time Robbers
Changes without explanation Waiting for people Executive interference Excessive paperwork
6
The consequence of these robbers of time is a reduction in the working day for you and your team.
7
Consider the situation in which an employee comes into your office with a problem. The employee may be sincere when he says that he simply wants your advice but often the employee want to take the monkey off of his back and put it onto yours. The employee’s problem is now your your problem.
8
To handle such situations: FirstFirst, screen out the problems with
which you do not wish to get involved.
SecondSecond, if the situation does not necessitate your involvement, then you must make sure that when the employee leaves your office, he realizes that the problem is still his, not yours.
9
To handle such situations: ThirdThird, if you find that the problem
will require your continued attention, remind the employee that all future decisions will be joint decisions and the problem will still be on the employee’s shoulders. Once employees realize that they cannot put their problems on your shoulders, they learn how to make their own decisions. 10
Time Management Forms
There are two basic forms that managers can use for practicing better time management: ““To-do pad”To-do pad” ““Daily Calendar Log” Daily Calendar Log”
11
““To-do pad”To-do pad”
12
““Daily Calendar Log”Daily Calendar Log”
13
Time Management Forms
The manager or the secretary prepares the list of things to do.
The manager then decides which activities he must perform himself and assigns the appropriate priorities.
14
Time Management Forms
The activities with the highest priorities are then transformed to the “daily calendar log.”
The manager assigns the activities to the appropriate time blocks based on his own energy cycle. 15
Time Management Forms
Unfilled time blocks are then used for unexpected crises or for lower-priority activities.
16
Effective Time Management
Use your time effectively by:1. Allocating work clearly to
the team members2. Delegating some of your
authority where and when appropriate
17
Effective Time Management
3. Consulting as required, but taking decisions promptly and explaining them.
4. Avoiding unnecessary memos 5. Setting a fixed agenda for
meetings
18
Effective Time Management
6. Setting your own priorities and generally sticking to them.
7. Refusing to do the unimportant
8. Doing the difficult tasks first
9. Not holding meetings for the sake of getting together – having a clear purpose.
19
Stress and Burnout
Project managers are subject to stress due to different facets of their jobs: Being Tired.Being Tired. Being tired is a result of
being drained of strength and energy, perhaps through physical exertion, boredom, or impatience. • Typical causes : meetings, report
writing, and other forms of document preparation.
20
Stress and Burnout
Feeling depressed.Feeling depressed. Feeling depressed is an emotional condition due to discouragement or a feeling of inadequacy. • It is usually the result of a situation
that is beyond the control or capabilities of the project manager.
21
Stress and Burnout
• Management or client considers your report unacceptable, you are unable to get timely resources, the technology is not available, or the constraints of the project are unrealistic and may not be met.
22
Stress and Burnout
Feeling rejected. Feeling rejected can be the result of a poor working relationship with executives, line managers, or clients. • Rejection occurs when people with
authority feel that their options or opinions are better than those of the project manager. 23
Stress and Burnout
Feeling worthless.Feeling worthless. Feeling worthless implies that one is without worth, that is valueless. • This situation occurs when project mangers feel that they are managing project beneath their dignity.
24
Stress and Burnout
Feeling trapped.Feeling trapped. The most common situation where project manager feel trapped is when they have no control over the assigned resources on the project and feel as if they are at the mercy of line managers. • Employees favor the manager with
reward power, and that is usually line manager.
• Remedy is to provide project manager with reward power.
25
Stress and Burnout
Being physically and Being physically and emotionally exhausted.emotionally exhausted. Project mangers are both managers and doers. It is quite common for project managers to perform a great deal of the work themselves. • The most common cause of
emotional exhaustion is report writing. 26
Stress and Burnout
Burned out.Burned out. Being burned out implies that one is totally exhausted, both physically and emotionally, and that rest, recuperation, or vacation time may not remedy the situation. • The most common cause is
prolonged overtime, or inability to work under continuous pressure and stress. 27
Stress and Burnout
Stress is not always negative, however. Without certain amounts of stress, reports would never get written, deadlines would never be met, and no one would even get to work on time.
But stress can result in illness and even disease, and must be managed if it is to be controlled and utilized for constructive purposes. 28
Stress and Burnout
Stress become detrimental when it is prolonged beyond what an individual can comfortably handle.