Tools for Staying Ahead of the Curve Today’s Presenters

Eric Ross Esther Strawder

FHWA- Office of Infrastructure FHWA-Office of Safety

TPM Engineer Safety Specialist

[email protected] [email protected] Nathaniel Coley Michael Nesbitt FHWA- Office of Infrastructure FHWA- Office of Infrastructure Economist Stakeholder Engagement Liaison [email protected] [email protected]

FHWA Transportation Performance Management

Page 2: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Program Performance Management 2

Tools for Staying Ahead of the Curve

LCCA and RealCost in Map-21/TPM

TPM Exchange Office of Transportation Performance Management

March 25, 2013

Eric Ross [email protected]

Transportation Performance Management Engineer

Page 3: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

3

LCCA and RealCost in Map-21/TPM

• LCCA – Economic Analysis

– Compares Different Alternatives

– Discount Rates

• What Do you need? – Agency costs

Design, Activity timing,

Structural Life, Functional Life,

Analysis Period, ….

– User Costs

Activity Duration, Capacities,

Speeds, ADT, Operating Costs, …

FHWA Transportation Performance Management

Page 4: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

4

Life Cycle

Terminal Serviceability Index

Condit

ion

Initial

Activity Activity One Activity Two

Time

Service

Life

Analysis Period

When will the future maintenance and rehabilitation costs be incurred?

FHWA Transportation Performance Management

Page 5: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

Present Value =

of Costs

N

k = 0 Σ o(C

1

(1 + d)nk

tk) x

Present Value Factor

s

Cost = Cost of the activity

N = length of analysis period

d = discount rate

nk = year of expenditure

Computing Life-Cycle Costs

FHWA Transportation Performance Management 5

Page 6: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

Alternative A

Alternative B

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00

Fre

qu

en

cy,

%

Net Present Value (NPV), $Millions

Probabilistic Approach

FHWA Transportation Performance Management 6

Page 7: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

Net Present Value (NPV), $Millions

Cu

mu

lati

ve

Pro

ba

bilit

y, %

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

- 2.50 - 2.00 - 1.50 - 1.00 - 0.50 0.00 0.50 1.00 1.50 2.00 2.50

60% of the Time Alternative A will be Less than Alternative B.

Difference Distribution Curve

Alt A – Alt B

FHWA Transportation Performance Management 7

Page 8: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

LCCA Software - RealCostTM

FHWA Transportation Performance Management 8

Page 9: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Transportation Performance Management 9

Page 10: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Program Performance Management 10

Tools for Staying Ahead of the Curve

Benefit-Cost Analysis An Investment/Economic Analysis Tool

TPM Exchange Office of Transportation Performance Management

March 25, 2013

Nathaniel D. Coley, MBA

Structural Engineer/Economist Office of Transportation Performance Management

Page 11: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

Why Investment/Economic Analysis?

• System demands far outweigh available & expected resources

• Links accountability to decision making

• Proven process for evaluating alternatives

• MAP-21 Requirements “link investments to outcomes”

– Investment Plans

– Performance-Based Plans

– Financial Plans

11

Page 12: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

Bridge/Pavement Investments

Emissions Reductions

Congestion Reduction

Crash Modification

Factors

Other Areas

12

Analyzing Transportation Decisions

• We typically evaluate objectives individually but

program projects as a package of objectives

Page 13: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

13

Analyzing Transportation Decisions

Overall Project Merit

• We need to evaluate investment decisions on a

project by project bases considering all factors

Page 14: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

14

Analyzing Transportation Decisions

Building a Program or Plan

Overall Project Merit

Overall Project Merit

Overall Project Merit

Overall Project Merit

Benefit – Cost Ratio

Safety ROI Life-Cycle Costs

Environmental ROI

7.3 $2.3m -234 crashes

Avoided

5.1mil $3.1m Or

NOx

2.1 $2.3m -234 crashes

Avoided

7.1mil $7m Or CO

.03 $2.3m -234 crashes

Avoided

15.1mil $1.9m Or

NOx

-2 $2.3m -234 crashes

Avoided

22.1mil $5.3m Or

NOx

Page 15: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

For public agencies benefit‐cost analysis results describe ROI.  Traditional benefit cost analysis and ROI analysis for transportation includes user benefits (time, cost, safety) for travelers and select environmental effects (air, quality, noise) along with capital, operations, and maintenance(O&M) costs.

Economic/Investment Analysis

1

Page 16: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

Economic/Investment Analysis

16 17 18 19 20

Initial Capital

Cost

Dollars

Benefits

Costs

15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0

Year

Example Benefits

•Reduced Accident Costs

•Reductions in Delay Costs

•Reduced noise or emissions We monetize benefits & account for the changing value of a dollar over time

16

Page 17: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

17 FHWA Program Performance Management

Economic/Investment Analysis: Tools • BCA.NET: web-based project-level benefit-cost

analysis tool

Page 18: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

18 FHWA Program Performance Management

Economic/Investment Analysis: Tools • BCA.NET: web-based project-level benefit-cost

analysis tool

Page 19: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Program Performance Management 19 19

Economic/Investment Analysis: Tools • BCA.NET: web-based project-level benefit-cost

analysis tool

• Surface Transportation Efficiency Analysis Model: corridor-level benefit cost analysis tool for large transportation projects

Page 20: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Program Performance Management 20 20

Economic/Investment Analysis: Tools • BCA.NET: web-based project-level benefit-cost

analysis tool

• Surface Transportation Efficiency Analysis Model: corridor-level benefit cost analysis tool for large transportation projects

Page 21: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Program Performance Management 21

Economic/Investment Analysis: Tools • BCA.NET: web-based project-level benefit-cost

analysis tool

• Surface Transportation Efficiency Analysis Model: corridor-level benefit cost analysis tool for large transportation projects

• NBIAs: System level bridge needs assessment tool

Page 22: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Program Performance Management 22

Economic/Investment Analysis: Tools • BCA.NET: web-based project-level benefit-cost

analysis tool

• Surface Transportation Efficiency Analysis Model: corridor-level benefit cost analysis tool for large transportation projects

• NBIAs: System level bridge needs assessment tool

Page 23: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Program Performance Management 23

Economic/Investment Analysis: Tools • BCA.NET: web-based project-level benefit-cost

analysis tool

• Surface Transportation Efficiency Analysis Model: corridor-level benefit cost analysis tool for large transportation projects

• NBIAs: System level bridge needs assessment tool

Page 24: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Program Performance Management 24

Economic/Investment Analysis: Tools • BCA.NET: web-based project-level benefit-cost

analysis tool

• Surface Transportation Efficiency Analysis Model: corridor-level benefit cost analysis tool for large transportation projects

• NBIAs: System level bridge needs assessment tool

• BLCCA2:Bridge Life- Cycle Cost Analysis

Page 25: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Program Performance Management 25

Economic/Investment Analysis: Tools • BCA.NET: web-based project-level benefit-cost

analysis tool

• Surface Transportation Efficiency Analysis Model: corridor-level benefit cost analysis tool for large transportation projects

• NBIAs: System level bridge needs assessment tool

• BLCCA2:Bridge Life- Cycle Cost Analysis

Page 26: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

1

Nathaniel D. Coley Jr.Federal Highway Adm.Washington, [email protected]

http://www.fhwa.dot.gov/infrastructure/asstmgmt/economic.cfm

Page 27: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

Tools for Staying Ahead of the Curve

HSM and Related Analysis Tools

TPM Exchange Office of Transportation Performance Management

March 25, 2013

Esther Strawder Safety Specialist, FHWA- Office of Safety

Page 28: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

28

What is the HSM?

• The HSM is a tool for estimating safety performance of design and traffic control elements being evaluated in the project development process

• The HSM introduces a science-based approach that allows safety to be quantitatively evaluated alongside traffic operations, environmental impacts and construction costs

• Provides analytical tools and techniques for quantifying the potential effects on crashes as a result of decisions made in planning, design, operations, and maintenance

Page 29: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

29

HSM Related Analysis Tools

HSM Section Related Web links Tools

Part B: Roadway Safety Management Process

Safety Analyst www.safetyanalyst.org

Part C: Predictive Methods

IHSDM www.ihsdm.org

Part D: Crash Modification Factors (CMFs)

CMF

Clearinghouse

cmfclearinghouse.org

Page 30: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

30 FHWA Transportation Performance Management

How do the tools relate to HSM?

• Safety Analyst provides a set of

software tools used by state and local highway agencies for the highway safety management process documented in Part B of the HSM

• Safety Analyst can be used by highway agencies to improve their programming of site-specific highway safety improvements.

• The IHSDM Crash Prediction

Module (CPM) provides a faithful software implementation of the crash prediction methods documented in Part C of the HSM

• IHSDM is a suite of software analysis tools for evaluating safety and operational effects of geometric design decisions on highways

Page 31: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

31 FHWA Transportation Performance Management

CMF Clearinghouse

Page 32: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Transportation Performance Management 32

Ray Krammes – Data & Analysis Team Leader

[email protected]

(202) 366-2175

Mshadoni Smith – HSM & Analysis Tools POC

[email protected]

(202) 366-7105

Esther Strawder – Integration & Planning POC

[email protected]

(202) 366-6836

Karen Scurry – CMF Clearing House

[email protected]

(609) 637-4207

Clayton Chen – IHSDM

[email protected]

(202) 493-3054

QUESTIONS

Page 33: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

Tools for Staying Ahead of the Curve

MAP-21 Website

TPM Exchange Office of Transportation Performance Management

March 25, 2013

Michael Nesbitt Stakeholder Engagement Liaison

Page 34: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

34

www.fhwa.dot.gov/map21

FHWA Transportation Performance Management [email protected]

Page 35: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

www.fhwa.dot.gov/map21

FHWA Transportation Performance Management [email protected]

35

Page 36: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Transportation Performance Management [email protected]

36

Page 37: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Transportation Performance Management [email protected]

37

Page 38: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Transportation Performance Management [email protected]

38

Page 39: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Transportation Performance Management [email protected]

39

Page 40: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

FHWA Transportation Performance Management [email protected]

40

Page 41: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

41

www.fhwa.dot.gov/tpm

FHWA Transportation Performance Management [email protected]

Page 42: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

42 FHWA Transportation Performance Management

[email protected]

Page 43: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

43 FHWA Transportation Performance Management

[email protected]

Page 44: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

44 FHWA Transportation Performance Management

[email protected]

Page 45: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

45

www.fhwa.dot.gov/tpm

Do you want to learn more about collaborating on performance management with regional partners? Contact

Michael Nesbitt

202-366-1179

[email protected]

FHWA Transportation Performance Management [email protected]

Page 46: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

46

www.fhwa.dot.gov/tpm

Do you have a Noteworthy Practice or Upcoming Event to share?

Contact Eric Ross Tashia J. Clemons

202-366-3975 202-366-1569

[email protected] [email protected]

FHWA Transportation Performance Management [email protected]

Page 47: Tools for Staying Ahead of the Curve - Home | FHWA › tpm › resources › 130325 › 01_tools.pdfTools for Staying Ahead of the Curve . Benefit-Cost Analysis An Investment/Economic

Questions?

Thank You!