Download - TOP RANKED EPC CONTRACTOR - REFERENCE LIST -
1 of 117
AS OF MAY 2014
TOP RANKED EPC CONTRACTOR
- REFERENCE LIST -
STEEL PLANTS
Total Solution Provider
POSCO E&C AT A GLANCE
• Quality ISO 9001
• Environment ISO 14001
• Safety OHSAS 18001, KOSHA 18001
• Energy KEPIC, ASME Section 1&3
SOURCE: ENR 2013
BSL Sinter Plant
Asia Special Steel
PT.KP Integrated Steelworks
CSP Integrated Steelworks
POSCO-Mexico No.1&2 CGL
IISCO Blast Furnace
POSCO Maharashtra CRM, CGL
HADEED CCL
POSCO Assan TST
Assan CCLESCO B/F, Sinter Plant
ZPSS Hot Strip Mill
POSCO Guangdong CGL
Formosa HRM
POSCO CRM
Total Solution Provider
BUSINESS AREA
WORK
SCOPE
PROCESS
MOCPEPPlanning Engineering Procurement Construction Operation Maintenance
Project Execution Commercial OperationPlanning
IRON MAKING PLANT PROCESS LINE
MINE PROCESS PLANT TRANSPORTATION PORT FACILITIES
STEEL MAKING PLANT ROLLING MILL PLANT
• PICKLING LINE
• ANNEALING LINE
• GALVANIZING LINE
• COLOR COATING LINE
• SLITTING LINE
• PACKING LINE
MINING PLANTS
STEEL PLANTS
Total Solution Provider
OUR VALUABLE CLIENTS
DOMESTIC
OVERSEAS
Total Solution Provider
INTEGRATED STEEL WORKS
POSCO POHANG WORKS, KOREA POSCO GWANGYANG WORKS, KOREA
CSP INTEGRATED STEELWORKS, BRAZIL
CAPACITY : 12.3MTPY (4 BF, 3 FINEX)PRODUCT : CR, HR, PLATE, WIRE ROD, STS, GO, ETC.
CAPACITY : 20MTPY (5 BF)PRODUCT : CR, HR, PLATE
CAPACITY : 3MTPY (1 BF)PRODUCT : STEEL SLAB
PT.KP INTEGRATED STEELWORKS, INDONESIA
CAPACITY : 3MTPY (1 BF)PRODUCT : STEEL SLAB, HEAVY PLATE
Total Solution Provider
IRON MAKING PLANT - RAW MATERIAL HANDLING
MAJOR PROJECTS
PROJECT POSCO, NEW SILO PLANT
CAPACITY 50,000 TON, 15 SET
STORAGE MATERIAL COAL
LOCATION GWANGYANG, KOREA
PERIOD DEC. 2010 ~ SEP. 2012
WORK SCOPE EPC
*) ON-GOING PROJECT
PROJECT SCOPE CAPACITY COMPLETION
FORMOSA, RMHF, HA TINH, VIETNAM
ECEMAX 6,000 T/H
220 BC LINE2016*
CSP, RMHF,PECEM, BRAZIL
EPCMAX 2,400 T/H
50 BC LINE2015*
SNG, SILO PLANT,GWANGYANG, KOREA
EPC50,000 TON
4 SET2014
POSCO, SILO PLANT,GWANGYANG, KOREA
EPC50,000 TON
15 SET2012
POSCO, RMHF (WHARF BELT
CONVEYOR), POHANG, KOREAEPC
6,000 T/H2 SET
2012
POSCO, RMHF (WHARF BELT
CONVEYOR) GWANGYANG, KOREA
EPC6,000 T/H
22 SET2012
POSCO, RAW MATERIAL SILO, POHANG, KOREA
EPC60,000 TON
6 SET2011
INTERNATIONAL AIRPORT
RECLAMATION, KOREA
EPC,O&M
4,000 T/H3 BC LINE
2010
SNNC, FE-NI RMHF,GWANGYANG, KOREA
EPCMAX 6,000 T/H
10 BC LINE2010
Raw material handling facilities including Ore and Coal handling with material treatment capacity of 68 and 35 million tons respectively are in operation in POSCO steel works. POSCO E&C has supplied Silos each of 50 thousand tons of capacity in Gwangyang.
Total Solution Provider
IRON MAKING PLANT - RAW MATERIAL HANDLING
MAJOR PROJECTS
PROJECT SCOPE CAPACITY COMPLETION
POSCO, NO.2 FINEX RMHF, POHANG, KOREA EPCMAX 6,000 T/H
56 BC LINE2006
POSCO, FINEX RMHF, POHANG, KOREA EPC 4,000,000 T/Y 2006
POSCO, CTS RMHF, GWANGYANG, KOREA EPCMAX 6,000 T/H
18 BC LINE2005
POSVEN CA, RMHF(HBI PLANT), BOLIVAR, VENEZUELA EPC 1,500,000 T/Y 1999
CVRD, RMHF(PELLETIZING PLANT), TUBARAO, BRAZIL EPC 4,000,000 T/Y 1998
Total Solution Provider
IRON MAKING PLANT - COKE PLANT
MAJOR PROJECTS
PROJECT PT.KP, COKE PLANT
CAPACITY 1,320,000 T/Y
CHAMBER HEIGHT 7.6 M
LOCATION CILEGON, INDONESIA
PERIOD JUL. 2011 ~ DEC. 2013
WORK SCOPE EPC
The Coke Plant comprise 84 ovens (42 Chamber x 2 Batteries) and is operated at 98% on the basis of annual average operating ratio. It consists of Coal Preparation and Coke Treatment Plant , Coke Oven, Gas Treatment Plant, and Coke Moving Machine.
PROJECT SCOPE CAPACITY COMPLETION
CSP, COKE PLANT,PECEM, BRAZIL
EPC 1,320,000 T/Y 2015*
FORMOSA, BY-PRODUCT
PLANT, HA TINH, VIETNAMC 175,000N㎥/H 2015*
PT.KP, COKE PLANT, CILEGON, INDONESIA
EPC 1,320,000 T/Y 2013
NO.5 COKE PLANT, GWANGYANG, KOREA
(OVEN & BY-PRODUCT) EPC 2,850,000 T/Y 2011
NO.5 COKE PLANT, GWANGYANG, KOREA (CDQ)
EPC360 T/H
(DRY COKE)2011
EXTENSION OF THE COKE
PLANT STAGE 5, POHANG, KOREA
EPC 620,000 T/Y 2007
DESULFURIZATION PLANT FOR
GAS REFINERY PLANT, POHANG, KOREA
EPC 6,800 N㎥/H 2007
COKE PLANT STAGE 4, POHANG, KOREA (CDQ)
EPC180 T/H
(DRY COKE)2005
*) ON-GOING PROJECT
Total Solution Provider
IRON MAKING PLANT - SINTER PLANT
MAJOR PROJECTS
PROJECT POSCO, NO.5 SINTER PLANT
CAPACITY 600 M2
PRODUCTIVITY 40.3 T/D/M2 (8,825,700 T/Y)
LOCATION GWANGYANG, KOREA
PERIOD AUG. 2009 ~ FEB. 2011
WORK SCOPE EPC
Specialized in technology of large-scale sinter plantwhich provides high productivity & availability with lowoperating costs to client.
Below is one of the largest sinter plant in the world.
PROJECT SCOPE CAPACITY COMPLETION
CSP, SINTER PLANT, PECEM, BRAZIL
EPC 400 M2 2015*
PT.KP, SINTER PLANT, CILEGON, INDONESIA
EPC 450 M2 2013
POSCO, NO. 2 SINTERING PLANT
REVAMPING, GWANGYANG, KOREAEPC 450 M2 2012
ESCO, TAVAZON SINTER PLANT, ESFAHAN, IRAN
EP 204 M2 2011
NO.5 SINTER PLANT, GWANGYANG, KOREA
EPC 600 M2 2011
NO.4 SINTER PLANT 2ND REVAMPING, POHANG, KOREA
EPC 518 M2 2010
NO. 3 & 4 SINTER PLANT 2ND
REVAMPING, GWANGYANG, KOREAEPC
470 M2
497 M2 2009
BSL, NO.3 SINTER PLANT
REVAMPING, AUSTRALIAEP 420 M2 2009
*) ON-GOING PROJECT
Total Solution Provider
IRON MAKING PLANT - SINTER PLANT
MAJOR PROJECTS
PROJECT SCOPE CAPACITY COMPLETION
NO.2 SINTER PLANT 2ND REVAMPING, GWANGYANG, KOREA EPC 450 M2 2007
POSCO, NO. 3 SINTERING PLANT REVAMPING, POHANG, KOREA EPC 504 M2 2006
POSCO, NO. 2&4 SINTERING PLANT REVAMPING PALLET WIDTH EXTENSION, GWANGYANG, KOREA
EPCNO.2: 450 M2
NO.4: 477 M2 2004
POSCO, NO. 1&3 SINTERING PLANT REVAMPING PALLET WIDTH EXTENSION, GWANGYANG, KOREA
EPC 400 M2 2002
Total Solution Provider
IRON MAKING PLANT - BLAST FURNACE
MAJOR PROJECTS
PROJECT PT.KP, NEW BLAST FURNACE
CAPACITY 3,000,000 T/Y
INNER VOLUME 3,800 M3
LOCATION CILEGON, INDONESIA
PERIOD MAR. 2011 ~ DEC. 2013
WORK SCOPE EPC
Specialized in technology of large-scale blast furnacewhich provides high productivity & availability with lowoperating costs to client.Below is the first integrated steelworks in Southeast Asia and its blast furnace that has officially begun operations.
PROJECT SCOPEINNER
VOLUMECOMPLETION
CSP, BLAST FURNACE, PECEM, BRAZIL
EPC 3,800 M3 2015*
POSCO, NO.5 BF 2ND REVAMPING, POHANG, KOREA
EPC 5,220 M3 2014
PT.KP, BLAST FURNACE,CILEGON, INDONESIA
EPC 3,800 M3 2013
POSCO, NO.1 BF 2ND REVAMPING, GWANGYANG, KOREA
EPC 6,000 M3 2013
POSCO, NO.4 BF 2ND REVAMPING, POHANG, KOREA
EPC 5,600 M3 2011
SAIL-IISCO, BLAST FURNACE,BURNPUR, INDIA
EPC 4,150 M3 2010
POSCO, NO.4 BF 1ST REVAMPING,GWANGYANG, KOREA
EPC 5,500 M3 2009
ESCO, TAVAZON BLAST FURNACE, ESFAHAN, IRAN
EPC 2,020 M3 2009
*) ON-GOING PROJECT
Total Solution Provider
IRON MAKING PLANT - BLAST FURNACE
MAJOR PROJECTS
PROJECT SCOPE CAPACITY COMPLETION
POSCO, NO.2 & 3 BF GRANULATION, GWANGYANG, KOREA EPC - 2008
POSCO, NO.3 BF 1ST REVAMPING, GWANGYANG, KOREA EPC 4,600 M3 2007
POSCO, NO.3 BF 2ND REVAMPING, POHANG, KOREA EPC 4,350 M3 2006
POSCO, NO.2 BF 1ST REVAMPING, GWANGYANG, KOREA EPC 4,350 M3 2005
POSCO, NO.1 BF 1ST REVAMPING, GWANGYANG, KOREA EPC 3,820 M3 2002
POSCO, NO. 5 BF, GWANGYANG, KOREA EPC 4,020 M3 1999
POSCO, NO.2 BF 2ND REVAMPING, POHANG, KOREA EPC 2,550 M3 1997
POSCO, NO.4 BF 1ST REVAMPING, POHANG, KOREA EPC 3,000 M3 1994
Total Solution Provider
STEEL MAKING PLANT - BOF
PROJECT SCOPE CAPACITY COMPLETION
CSP, SMP BOF, PECEM, BRAZIL
EPC300 TON/CH
KR (2)/BOF (2)2015*
POSCO, NO.4 HRM BOF, GWANGYANG, KOREA
EPC280 TON/CH
BOF(1)2014
PT.KP, SMP BOF, CILEGON, KOREA
EPC300 TON/CH
KR(1) / BOF(1)2013
POSCO, STS BOF,POHANG, KOREA
EPC100 TON/CH
BOF(2) K-OBM2013
POSCO, ALLOTHERMAL
CONVERTER, POHANG, KOREAEPC
100 TON/CHBOF(1) OBM
2013
POSCO, NEW SMP BOF, POHANG, KOREA
EPC330 TON/CH
KR(2) / BOF(2)2011
POSCO, PLATE MILL BOF, GWANGYANG, KOREA
EPC280 TON/CH
KR(2) / BOF(1)2010
POSCO, NO.2 SMP DE-P CONVERTER , GWANGYANG, KOREA
EPC280 TON/CH
KR(3) / BOF(1)2007
POSCO, NO.2 SMP DE-P CONVERTER , POHANG, KOREA
EPC BOF(1) 2007
MAJOR PROJECTS
PROJECT POSCO, NEW SMP BOF
CAPACITY 330 TON/CH (KR(2), BOF(2), RH(1), LF(2))
LOCATION POHANG, KOREA
PERIOD DEC.2007 ~ MAR 2011
WORK SCOPE EPC
*) ON-GOING PROJECTBy increasing the annual capacity to 4.65 million tons at Pohang Steel Works, the compatibility, competitiveness and the quality of the converter furnace operation was enhanced.
Total Solution Provider
STEEL MAKING PLANT - EAF
PROJECT SCOPE CAPACITY COMPLETION
POSCO SS, SCRAP MINI MILL, VIETNAM
EPC 120 TON/CH 2014
POSCO STS STEEL MAKING
PLANT, POHANG, KOREAEPC 065 TON/CH 2012
POSCO SS, EAF OFF-GAS
SYSTEM, CHANGWON, KOREAEPC 100 TON/CH 2009
ASIA SPECIAL STEEL, MELT SHOP,JAPAN
EPC 060 TON/CH 2009
POSCO SS, EAF OFF-GAS
SYSTEM, CHANGWON, KOREAEPC 150 TON/CH 2009
POSCO SS, STS STEEL MAKING
PLANT, CHANGWON, KOREAEPC 065 TON/CH 2006
POSCO, NO.3 STS SMP, POHANG, KOREA
EPC 090 TON/CH 2003
ARAB STEEL, ARCO SPECIAL
STEEL-MILL, EGYPTEPC 040 TON/CH 2003
POSCO, NO. 1 MINI MILL,GWANGYANG, KOREA
EPC 130 TON/CH 1996
MAJOR PROJECTS
PROJECTPOSCO SPECIALTY STEEL
STEEL MELTSHOP PLANT
CAPACITY 447,000 T/Y
LOCATION CHANGWON, KOREA
PERIOD JUN. 2010 ~ MAR 2013
WORK SCOPE EPC
Specialized in standardized operation with easy maintenance and low project cost, POSCO E&C can provide total solution from process engineering to commissioning based on experiences in Korea and Vietnam.
Total Solution Provider
STEEL MAKING PLANT - SECONDARY REFINERY
MAJOR PROJECTSSecondary refining facilities consisting RH and LF (Ladle Furnace) in PT.KP Integrated steelworks, can refine 300 tons of hot metal per charge respectively.
PROJECT SCOPE CAPACITY COMPLETION
CSP, SMP RH,LF,PECEM, BRAZIL
EPC300 TON/CHRH (1)/LF (1)
2015*
NO.4 HRM RH,LF, GWANGYANG, KOREA
EPC280 TON/CHRH (1)/LF (1)
2014
PT.KP, SMP RH,LF, CILEGON, INDONESIA
EPC300 TON/CHRH (1)/LF (1)
2013
POSCO, NEW STS VOD(2), POHANG, KOREA
EPC100 TON/CH
VOD(2)2013
POSCO,NO.1 SMP RH, LF, POHANG, KOREA
EPC100 TON/CHRH(1)/LF(1)
2013
POSCO, NEW SMP RH,LF, POHANG, KOREA
EPC330 TON/CHRH (1)/LF (2)
2011
POSCO, PLATE MILL RH, VTD GWANGYANG, KOREA
EPC280 TON/CH
RH (1)/ VTD (1)2010
POSCO, NO.1 SMP RH, GWANGYANG, KOREA
EPC275 TON/CH
RH(1)2009
POSCO, NO.2 SMP RH, POHANG, KOREA
EPC280 TON/CH
RH(1)2007
*) ON-GOING PROJECT
PROJECT PT.KP, STEEL MAKING PLANT
CAPACITY 300 TON/CH
LOCATION CILEGON, INDONESIA
PERIOD 2011.03 ~ 2013.12
WORK SCOPE EPC
Total Solution Provider
CONTINUOUS CASTING MACHINE - SLAB
MAJOR PROJECTSPOSCO E&C recently designed No.4 Continuous Casting inGwangyang steelworks with its accumulated know-howand technology inherited from POSCO. This, as a result, reduced costs and enabled POSCO E&C to successfully enter into the continuous casting market.
PROJECTNO.4 HRM SLAB CASTER
(NO.3 SMP IN GWANGYANG STEELWORKS)
CAPACITY 3,400,000 T/Y
PRODUCT SLAB FOR HR COIL
LOCATION GWANGYANG, KOREA
PERIOD JUN.2011 ~ JUN. 2014
WORK SCOPE EPC
*) ON-GOING PROJECT
PROJECT SCOPE CAPACITY COMPLETION
CSP, SLAB CASTER,PECEM, BRAZIL
EPC 3,000,000 T/Y 2015*
NO.4 HRM SLAB CASTER, GWANGYANG, KOREA
EPC 3,400,000 T/Y 2014*
NO.4 SMP STS SLAB CASTER, POHANG, KOREA
EPC 3,400,000 T/Y 2013
PT.KP, SLAB CASTER, CILEGON, INDONESIA
EPC 3,000,000 T/Y 2013
NO.2 SMP SLAB CASTER
MODERNIZATION,POHANG, KOREA
EPC 2,800,000 T/Y 2010
SMP PLANT SLAB CASTER, POHANG, KOREA
EPC 1,300,000 T/Y 2010
NO.3 SLAB CASTER, GWANGYANG, KOREA
EPC 3,200,000 T/Y 2010
PLATE MILL PLANT SLAB
CASTER, GWANGYANG, KOREAEPC 3,200,000 T/Y 2009
Total Solution Provider
CONTINUOUS CASTING MACHINE - SLAB
MAJOR PROJECTS
PROJECT SCOPE CAPACITY COMPLETION
POSCO, NO.2,3 CONTINUOUS CASTING MACHINE, GWANGYANG, KOREA EPC 3,500,000 T/Y 2007
POSCO, POSTRIP DEMO PLANT, POHANG, KOREA EPC 00,600,000 T/Y 2006
POSCO, NO.3 CONTINUOUS CASTING MACHINE, GWANGYANG, KOREA EPC 2,500,000 T/Y 2003
POSCO, NO.2 CONTINUOUS CASTING MACHINE REVAMPING,GWANGYANG, KOREA
PC 1,500,000 T/Y 1999
POSCO, NO.1 CONTINUOUS CASTING MACHINE REVAMPING,GWANGYANG, KOREA
EPC 2,200,000 T/Y 1997
Total Solution Provider
CONTINUOUS CASTING MACHINE - BLOOM / BILLET
MAJOR PROJECTS
PROJECT NEW SMP BLOOM CASTER
CAPACITY 2,400,000 T/Y
PRODUCT BLOOM : 400 X 500MM
LOCATION POHANG, KOREA
PERIOD JAN.2008 ~ MAR.2011
WORK SCOPE EPC
PROJECT SCOPE CAPACITY COMPLETION
NO.2 BILLET CASTER
REVAMPING IN NO.1 CONTINUOUS CASTING, POHANG
EPC 0,750,000 T/Y 2013
BLOOM CASTER IN NEW SMP,POHANG, KOREA
EPC 2,400,000 T/Y 2011
NO.2 BLOOM CASTER
REVAMPING IN NO.1 CONTINUOUS CASTING, POHANG
EPC 1,100,000 T/Y 2008
NO.1 BLOOM CASTER
REVAMPING IN NO.3 CONTINUOUS CASTING, POHANG
EPC 0,800,000 T/Y 2002
NO.1 BLOOM CASTER IN NO.1 CONTINUOUS CASTING, POHANG
EPC 0,800,000 T/Y 2002
POSCO E&C offers advanced technology for bloom andbillet continuous casting machines. Based on experience and technical expertise we are ready to supply to the clients the best bloom & billet caster with maximized performance, highest operational flexibility and lowest operational and maintenance costs.
Total Solution Provider
HOT ROLLING MILL - HOT COIL
MAJOR PROJECTS
PROJECT POSCO-NO.4 HRM
CAPACITY 3,300,000 T/Y
PRODUCTTHICKNESS : 1.2 MM ~ 25.4 MM
WIDTH : 700 MM ~ 1950 MM
LOCATION GWANGYANG, KOREA
PERIOD DEC. 2010 ~ JUL. 2014
WORK SCOPE EPC
PROJECT SCOPE CAPACITY COMPLETION
CSS, NO.1 HRM, BRAZIL EPC 800,000 T/Y 2017*
FORMOSA NO.1 HRM, HA TINH, VIETNAM
C 5,300,000 T/Y 2015*
POSCO, NO.4 HRM. GWANGYANG, KOREA
EPC 3,300,000 T/Y 2014*
ZPSS, STAINLESS STECKEL MILL, CHINA
EP 800,000 T/Y 2006
POSCO, NO.2 HRM REVAMPING, POHANG, KOREA
EPC 4,700,000 T/Y 2005
POSCO, NO.3 HRM REVAMPING, POHANG, KOREA
EPC 1,674,000 T/Y 2003
POSCO, NO.3 STS HRM, POHANG, KOREA
EPC 1,674,000 T/Y 2003
POSCO E&C demonstrates its own technology by performing No.4 HRM project with capacity of 3.3 million tons per annum including Roughing Mill and 4 Hi-7stands work roll shifting type Finishing Mill.
*) ON-GOING PROJECT
Total Solution Provider
HOT ROLLING MILL - HOT COIL
MAJOR PROJECTS
PROJECT SCOPE CAPACITY COMPLETION
POSCO NO.1 HRM (COIL CONVEYOR), GWANGYANG, KOREA EPC - 2009
POSCO NO.1 HRM (DOWN COILER), GWANGYANG, KOREA EPC - 2009
POSCO NO.1 HRM REVAMPING, POHANG, KOREA EPC 3,240,000 T/Y 2003
POSCO NO.2 HRM REVAMPING, GWANGYANG, KOREA EPC 4,050,000 T/Y 2001
POSCO NO.1 HRM REVAMPING, POHANG, KOREA EPC 2,640,000 T/Y 2000
POSCO NO.1 HRM REVAMPING, GWANGYANG, KOREA EPC 4,800,000 T/Y 1999
POSCO NO.1 HRM REVAMPING, POHANG, KOREA EPC 2,400,000 T/Y 1997
Total Solution Provider
HOT ROLLING MILL - PLATE
PROJECT SCOPE CAPACITY COMPLETION
PT.KP, PLATE MILL
CILEGON, INDONESIAEPC 1,500,000 T/Y 2013
POSCO NO.1 PLATE MILL, GWANGYANG, KOREA
EPC 2,000,000 T/Y 2010
POSCO NO.2 PLATE MILL, REVAMPING, POHANG, KOREA
EPC 1,800,000 T/Y 2005
POSCO NO.3 PLATE MILL
REVAMPING, POHANG, KOREAEPC 1,674,000 T/Y 2003
POSCO NO.2 PLATE MILL
REVAMPING, POHANG, KOREAEPC 1,674,000 T/Y 2001
POSCO NO.3 PLATE MILL,POHANG, KOREA
EPC 2,400,000 T/Y 1997
POSCO NO.1 PLATE MILL
REVAMPING, POHANG, KOREAEPC 1,674,000 T/Y 1996
MAJOR PROJECTS
PROJECT PT.KP - PLATE MILL
CAPACITY 1,500,000 T/Y
PRODUCTTHICKNESS : 6MM ~ 120MM
WIDTH : 1,250MM ~ 4,500MM
LOCATION CILEGON, INDONESIA
PERIOD JUL. 2011 ~ DEC. 2013
WORK SCOPE EPC
PT. KP Plate Mill project with capacity of 1.5 million tons per annum comprised with 4 Hi-1 stands work roll type Finishing Mill. Accelerated cooling and heat treatment are core technologies applied to the plate mills engineered by POSCO E&C.
*) ON-GOING PROJECT
Total Solution Provider
HOT ROLLING MILL - LONG PRODUCTS
PROJECT SCOPE CAPACITY COMPLETION
POSCO NO.4 WIRE-ROD
MILL, POHANG, KOREAEPC 700,000 T/Y 2013
POSCO NO.1 WIRE-ROD
MILL REVAMPING, POHANG, KOREA
EPC 680,000 T/Y 2006
BAR & WIRE-ROD MILL, ARAB SPECIAL STEEL/SADAT
CITY, EGYPT
EP 140,000 T/Y 2003
NO.3 WIRE-ROD MILL
(REVAMPING), POSCO/POHANG, KOREA
EPC 820,000 T/Y 2002
BAR & WIRE-ROD MILL, VPS/HAIPHONG, VIETNAM
EPC 200,000 T/Y 1995
BAR & WIRE-ROD MILL, DAEKYOUNG/POHANG, KOREA
EC 200,000 T/Y 1994
HYUNDAI STEEL BAR & SELECTION MILL, POHANG, KOREA
EC 700,000 T/Y 1990
MAJOR PROJECTS
PROJECT POSCO NO.4 WIRE-ROD MILL
CAPACITY 700,000 T/Y
PRODUCT WIRE ROD
LOCATION POHANG, KOREA
PERIOD JUL. 2011 ~ MAY. 2013
WORK SCOPE EPC
POSCO E&C offers a single window solution from planning, engineering, procurement, construction, operation & maintenance of Mini-Mill process consisting of EAF, casting machine and rolling mills keeping the project cost under budget while fulfilling the objectives of the project under secured and environment friendly surroundings.
Total Solution Provider
PROCESS LINE - PICKLING LINE
PROJECT SCOPE CAPACITY COMPLETION
POSCO NO.1 STAINLESS
HAPL, POHANG, KOREA
(REVAMPING)EPC 600,000 T/Y 2014*
POSCO NO.1 STAINLESS
CAPL, POHANG, KOREA
(REVAMPING)EPC 175,000 T/Y 2014*
POSCO-ASSAN TST, STAINLESS CAPL, IZMIT, TURKEY
EP 300,000 T/Y 2013
POSCO VST, STAINLESS
CAPL, HOCHIMIN, VIETNAMEP 220,000 T/Y 2012
POSCO, STAINLESS CAPL, POHANG, KOREA
EPC 400,000 T/Y 2009
ZPSS, STAINLESS HAPL, ZHANGJIAGANG, CHINA
EPCM 695,000 T/Y 2006
POSCO NO.3 STAINLESS
HAPL, POHANG, KOREAEPC 474,000 T/Y 2003
MAJOR PROJECTS
PROJECT POSCO-ASSAN TST STS CAPL
CAPACITY 300,000 T/Y
PRODUCT STAINLESS COLD COIL
LOCATION IZMIT, TURKEY
PERIOD SEP. 2011 ~ JUL. 2013
WORK SCOPE EP
POSCO E&C demonstrates its own technology by performing POSCO-ASSAN TST STS CAPL project with capacity of 300 thousand tons per annum including high speed jet pickling technology reaching 120 mpm.
*) ON-GOING PROJECT
Total Solution Provider
PROCESS LINE - ANNEALING LINE
PROJECT SCOPE CAPACITY COMPLETION
POSCO MAHARASHTRA
NO.1 CAL,MAHARASHTRA, INDIA
EPC 1,000,000 T/Y 2014
POSCO-VIETNAM
NO.1 CAL,VUNGTAO, VIETNAM
EPC 700,000 T/Y 2009
POSCO NO.1 CAL (REVAMPING),POHANG, KOREA
EPC 300,000 T/Y 2005
POSCO NO.2 CAL (REVAMPING),POHANG, KOREA
EPC 300,000 T/Y 2005
POSCO NO.3 CAL (REVAMPING),POHANG, KOREA
EPC 1,000,000 T/Y 2003
POSCO NO.1,2 CAL KWANGYANG, KOREA
EPC 1,800,000 T/Y 1997
MAJOR PROJECTS
PROJECT POSCO MAHARASHTR CAL
CAPACITY 1,000,000 T/Y
PRODUCT ANNEALED COIL COIL
LOCATION MAHARASHTRA, INDIA
PERIOD MAY. 2011 ~ FEB. 2014
WORK SCOPE EPC
POSCO E&C capable of providing high quality annealing line facility through it’s home grown technology providing energy saving, efficiency , heat balance & speed map advantages as value addition.
Total Solution Provider
MAJOR PROJECTS
PROJECT POSCO MAHARASHTRA-NO.1 CRM
CAPACITY 1,800,000 T/Y
PRODUCT COLD ROLLED PRODUCTS
LOCATION MAHARASHTRA, INDIA
PERIOD MAY. 2011 ~ JUN. 2014
WORK SCOPE EPC
Successful experience from Cold Rolling Mill complex project in Korea as well as Vietnam and India has enhanced the reliability of its stable operation through POSCO E&C’s optimized engineering.
PROCESS LINE - COLD ROLLING MILL
*) ON-GOING PROJECT
PROJECT SCOPE CAPACITY COMPLETION
CSS, NO.1 CRM, BRAZIL EPC 600,000 T/Y 2017*
POSCO MAHARASHTRA, NO.1 CRM, INDIA
EPC 1,800,000 T/Y 2014*
ASSAN TST, STAINLESS
ZRM, TURKEYEP 300,000 T/Y 2013
POSCO VST, STS CRM, VIETNAM
EPC 100,000 T/Y 2012
POSCO VIETNAM CRM, VIETNAM
EPC 1,200,000 T/Y 2009
QPSS, STAINLESS ZRM, QINGDAO, CHINA
EPCM 150,000 T/Y 2004
NO.2 STAINLESS ZRM, ZPSS ZHANGJIAGANG, CHINA
EPCM 140,000 T/Y 2003
POSCO NO.2 CRM(CAL,CAL REVAMPING), POHANG, KOREA
EP 1,225,000 T/Y 2003
Total Solution Provider
PROCESS LINE - COLD ROLLING MILL
MAJOR PROJECTS
PROJECT SCOPE CAPACITY COMPLETION
ZPSS NO.1 STAINLESS CR PLANT, ZHANGJIAGANG, CHINA EPCM 140,000 T/Y 1999
POSCO NO.1 CR MILL (REVAMPING), POHANG, KOREA EPC 1,100,000 T/Y 1999
POSCO NO.2 CR MILL (POL), GWANGYANG, KOREA EPC 500,000 T/Y 1997
POSCO NO.4 CR MILL, GWANGYANG, KOREA EPC 1,800,000 T/Y 1997
Total Solution Provider
PROCESS LINE - GALVANIZING LINE
PROJECT SCOPE CAPACITY COMPLETION
POSCO NO.2 CGL,ALTAMIRA, MEXICO
EPC 500,000 T/Y 2013
POSCO CGL,GUANGDONG, CHINA
EPC 450,000 T/Y 2012
POSCO CGL,MAHARASHTRA, INDIA
EPC 450,000 T/Y 2012
UNION STEEL, NO.5 CGL, BUSAN, KOREA
EP 370,000 T/Y 2009
PROSPERITY PGL, KAOSHIUNG, TAIWAN
EP 500,000 T/Y 2009
POSCO NO.2 CGL REVAMPING, GWANGYANG, KOREA
EPC 430,000 T/Y 2008
POSCO NO.6 CGL, GWANGYANG, KOREA
EPC 400,000 T/Y 2006
POSCO NO.1 CGL REVAMPING
GWANGYANG, KOREAEPC 300,000 T/Y 2006
MAJOR PROJECTS
PROJECT POSCO MAHARASHTRA CGL
CAPACITY 450,000 T/Y
PRODUCT EXTERIOR PANEL OF HIGH END AUTOMOBILES
LOCATION MAHARASHTRA, INDIA
PERIOD JAN. 2010 ~ MAY. 2012
WORK SCOPE EPC
Our history of galvanizing in POSCO group and abroad, more than 20 hot dip galvanizing lines are operational throughout the world with satisfied customers successfully producing galvanized sheets, galvannealsheets, 55%Al-Zn coated sheets and 90%Al coated sheets.
Total Solution Provider
PROCESS LINE - GALVANIZING LINE
MAJOR PROJECTS
PROJECT SCOPE CAPACITY COMPLETION
GENERAL TRADE CGL, THAI BINH, VIETNAM EP 30,000 T/Y 2005
POSCO NO.5 CGL, GWANGYANG, KOREA EPC 450,000 T/Y 2005
PROSPERITY CGL, KAOSHIUNG, TAIWAN EP 200,000 T/Y 2005
SINO LEADING NO.1&2 CGL, CHANGSHU, CHINA EP250,000 T/Y
X 2 LINES2005
POSCO NO.2 CGL, POHANG, KOREA EPC 300,000 T/Y 2004
KISCO CGL, KUNMING, CHINA EP 150,000 T/Y 2004
NAKISCO CGL, HOCHIMINH, VIETNAM EP 30,000 T/Y 2004
PCCS CGL (REVAMPING), DALIAN, CHINA EP 150,000 T/Y 2004
POSCO PGL (REVAMPING), GWANGYANG, KOREA EPC 580,000 T/Y 2002
POSCO NO.1 CGL (REVAMPING), POHANG, KOREA EPC 200,000 T/Y 2000
POSCO NO.4 CGL, GWANGYANG, KOREA EPC 450,000 T/Y 2000
MPSC CGL, YANGON, MYANMAR EP 30,000 T/Y 1998
ZPSS CGL, ZHANGJIAGANG, CHINA EPCM 100,000 T/Y 1998
DONGKUK HGL, POHANG, KOREA EP 150,000 T/Y 1997
Total Solution Provider
PROJECT SCOPE CAPACITY COMPLETION
ASSAN GALVANIZ, CCL, ISTANBUL, TURKEY
EP 120,000 T/Y 2014
PROSPERITY CCL, TAIWAN EP 200,000 T/Y 2009
HADEED CCL, KSA EPC 120,000 T/Y 2007
GENERAL TRADE CCL, VIETNAM
EP 50,000 T/Y 2005
POSCO C&C NO.2 CCL REVAMPING, KOREA
EPC 150,000 T/Y 2005
HANDAN NO.1, 2 CCL, CHINA
EP100,000 T/Y
X 2 LINE2005
KISCO CCL, CHINA EP 100,000 T/Y 2004
NAKISCO CCL, VIETNAM EP 20,000 T/Y 2004
PCCS NO.2 CCL, CHINA EP 100,000 T/Y 2003
MAJOR PROJECTS
PROJECT ASSAN COLOR COATING LINE
CAPACITY 120,000 T/Y
PRODUCT PCM (PRE-COATED METAL)
LOCATION TURKEY
PERIOD DEC. 2009 ~ MAY. 2013
WORK SCOPE EP
POSCO E&C has rich technology and experiences on CCL, propose to provide highly efficient equipment and services including design, manufacturing, supply and test run. We can give you increasing of productivity by eliminating time loss.
PROCESS LINE - COLOR COATING LINE
Total Solution Provider
PROCESS LINE - COLOR COATING LINE
MAJOR PROJECTS
PROJECT SCOPE CAPACITY COMPLETION
SHUNPO MULTI COATING LINE, SHUNDE, CHINA EPNO: 100,000 T/Y
COLOR: 50,000 T/Y2003
POSVINA CCL, HOCHIMINH, VIETNAM EP 22,000 T/Y 2002
HAIER CCL, CHINA EP 70,000 T/Y 2001
POSCO C&C NO.1 CCL REVAMPING, POHANG, KOREA EPCM 100,000 T/Y 1999
PCCS NO.1 CCL, DALIAN, CHINA EPCM 50,000 T/Y 1998
Total Solution Provider
PROJECT SCOPE CAPACITY COMPLETION
POSCO MAHARASHTRA
ACL,MAHARASHTRA, INDIA
EPC 300,000 T/Y 2013
SHUNPO ACL,SHUNDE, CHINA
EPC 1,500,000 T/Y 2010
POSCO NO.3 HCL,POHANG, KOREA
EPC 850,000 T/Y 2009
POSCO NO.3 DCNL,POHANG, KOREA
EPC 900,000 T/Y 2009
POSCO NO.3 COF,POHANG, KOREA
EPC 1,000,000 T/Y 2009
POSCO NO.3 APLPOHANG, KOREA
EPC 3,690,000 T/Y 2009
POSCO NO.2 COFPOHANG, KOREA
EPC 820,000 T/Y 2006
POSCO NO.2 HCL (REVAMPING),POHANG, KOREA
EPC 1,640,000 T/Y 2006
POSCO NO.3 ACL (REVAMPING)POHANG, KOREA
EPC 3,430,000 T/Y 2006
MAJOR PROJECTS
PROJECT POSCO MAHARASHTRA ACL
CAPACITY 300,000 T/Y
PRODUCT
NOTHICKNESS : 0.35MM ~ 0.70MM
WIDTH : 900MM ~ 1,280MM
LOCATION MAHARASHTRA, INDIA
PERIOD MAY. 2011 ~ AUG. 2013
WORK SCOPE EP
POSCO E&C, having rich technology and experiences on ESL, propose to provide highly efficient equipment and services including design, manufacturing, supply and test run. We can help you achieve higher productivity by eliminating time loss.
PROCESS LINE - ELECTRICAL STEEL LINE
Total Solution Provider
PROCESS LINE - ELECTRICAL STEEL LINE
MAJOR PROJECTS
PROJECT SCOPE CAPACITY COMPLETION
POSCO, NO.2 DCNL REVAMPING, POHANG, KOREA EPC 18,000 T/Y 2006
POSCO, APL, POHANG, KOREA EPC 341,000 T/Y 2005
POSCO, NO.1 COF, POHANG, KOREA EPC 82,000 T/Y 2004
POSCO, NO.1 ETL REVAMPING, POHANG, KOREA EPC 250,000 T/Y 2002
POSCO, NO.2 ACL, POHANG, KOREA EPC 220,000 T/Y 1998
Total Solution Provider
NEW TECHNOLOGIES - FINEX & CEM
FINEX, one of the most successful alternative iron-making technologies jointly developed with SIEMENS-VAI, is based on the direct use of ore fines and non-coking coal. The key technologies of FINEX are fluidized bed reduction of ore fines, hot DRI fines compaction to HCI(Hot Compacted Iron), briquetting of coal fines, and melting of HCI into hot metal. POSCO has been operating the world’s first commercial FINEX plant, with 1.5 MT of annual capacity, since April 2007 and has added up a new 2.0 MT in January 2014.
FINEX® (FINE ORE REDUCTION PROCESS)
No.3 FINEX Plant
NON-COKING
COAL
FLUIDIZING
BED REACTOR FINE ORE MELTING
FURNACE
MOLTEN
IRON
COAL
BRIQUETTEHCI
HIGH SPEED CASTING ENDLESS ROLLING LOWERED OPEX & CAPEX
In pursuit of eco-friendly and slim steelworks,POSCO has developed CEM process, a new down stream in the plant following successful development of FINEX®. Large portion among CRproducts can be replaced by thin HR productsutilizing the benefits of CEM coming from the direct linking of the caster to the rolling mill.Operational records of CEM will demonstrate itssuperiority to conventional processes.
CEM (COMPACT ENDLESS CASTING AND ROLLING MILL)