Download - Total q'ty
-
7/28/2019 Total q'ty
1/32
Total Q'ty Up to nowPercentage
completed (%)
1 Bored pile, SCM pile (nos) 263 263 100%
2 Excavation of foundation (m3) 19,161 19161 100%
3 Concrete of foundation(m3) 2,740 890 32%
4 Pipe installation (D2420) - - -
5 Back filling - - -
No Description
Boiler 3
-
7/28/2019 Total q'ty
2/32
Bored pile (nos)
Excavation (m3)
Concrete (m3)
-
7/28/2019 Total q'ty
3/32
Summary Qua
Total Q'ty Up to nowPercentage
completed (%)Total Q'ty Up to now
Percentage
completed (%)
139 139 100% 263 263 100%
11,556 0% 19,161 0%
1,101 0% 2,740 0%
- - - - - -
- - - - - -
Back of boiler 3 Boiler 4
-
7/28/2019 Total q'ty
4/32
Total Up to now
263 Completed
19,161 17,245
2,740 385
-
7/28/2019 Total q'ty
5/32
tity
As of
Total Q'ty Up to nowPercentage
completed (%)Total Q'ty Up to now
Percentage
completed (%)
139 139 100% 792 792 100%
11,556 0% 85,379 0%
1,101 0% 11,186 0%
- - - - - -
- - - - - -
Turbine Building & deaerator bay &Back of boiler 4
-
7/28/2019 Total q'ty
6/32
-
7/28/2019 Total q'ty
7/32
7/9/2013
Total Q'ty Up to nowPercentage
completed (%)Total Q'ty Up to now
Percentage
completed (%)
106 106 100% 4970 4395 88%
9,785 50 1% 66,931 15,111 23%
911 0% - - -
- - - 1063 180 17%
- - - 57,157 9,679 17%
Central Control Building Main Cooling Water Piping
-
7/28/2019 Total q'ty
8/32
-
7/28/2019 Total q'ty
9/32
Remarks
-
7/28/2019 Total q'ty
10/32
-
7/28/2019 Total q'ty
11/32
4.77
-
7/28/2019 Total q'ty
12/32
-
7/28/2019 Total q'ty
13/32
-
7/28/2019 Total q'ty
14/32
-
7/28/2019 Total q'ty
15/32
-
7/28/2019 Total q'ty
16/32
-
7/28/2019 Total q'ty
17/32
-
7/28/2019 Total q'ty
18/32
-
7/28/2019 Total q'ty
19/32
-
7/28/2019 Total q'ty
20/32
HAI PHONG 2 - 2 x 300 MW - THERMAL POWER PROJECT
PROGRESS OF CONCRETE PILING WORKS
Sl No AREA SCOPEUP TO LAST
MONTH
DURING THIS
MONTHCUMULATIVE BALANCE
Percentage
Completed
1 Coal Handling System: - -
a Transfer Tower A 36 - 24 24 12 66.67%
h Coal Handling Trestle 2 48 22 10 32 16 66.67%
o Coal Sampling room 18 1 14 15 3 83.33%
p Coal Storage shed 325 50 74 124 201 38.15%
2 ESP / Ash handling / FGD control building 36 12 18 30 6 83.33%
3 Turbine building, deaerator & Bunker Bay 792 534 213 747 45 94.32%
4 FGD absorber 50 25 18 43 7 86.00%
5 Water Treatment Plant Building 92 76 16 92 - 100.00%
6
air flue rack & circling pumping house (FGD
area) 244 - 244 0.00%
3,120 1,950 402 2,352 768 75.38%
PROGRESS OF SOIL & CEMENT MIX PILING WORKS
Sl No AREA SCOPEUP TO LAST
MONTH
DURING THIS
MONTHCUMULATIVE BALANCE
Percentage
Completed
1 Main Cooling Water Piping 4,970 4,395 - 4,395 575 88.43%
2 Coal Storage yard 53,323 10,100 10,119 20,219 33,104 37.92%
3 Waste Water Treatment Plant 189 - 34 34 155 17.99%
4 Clarifier Tanks 399 - 399 399 - 100.00%
5 Filter Water Storage Tanks 1,170 - 210 210 960 17.95%
6 Chemical Dosing Room 441 - 115 115 326 26.08%
7 Boiler make up water treatment 780 453 453 327 58.08%
8 Sewage water treatment plant 87 - 87 0.00%
- -
- -
- -
TOTAL
-
7/28/2019 Total q'ty
21/32
- -
- -
-
7/28/2019 Total q'ty
22/32
Remarks
start from 30/05/2011
start from 09/05/2011
start on 24/May
start from 01/05/2011
start on 14/April
start on 6/Feb & finished on
20/6 and 5/July
start on 30/March
finished on 3/May
Remarks
start from 16/06
start from 11/06 and finish on 23/06/2011
start from 4/06
start from 17/06
start from 14/06
-
7/28/2019 Total q'ty
23/32
Area of foundation
Area Remarks
CT 1 6.42 10.471
3 10.471
4 6.4
5 10.471
6 2.56
7 10.471
8 10.471 20.942
9 6.4
10 10.471 20.942
11 16 32
12 12.8
13 10.471 20.942
14 10.471
15 6.4
16 6.4
17 10.471
18 2.56
19 6.4
20 6.4
21 6.4
22 6.423 6.4
24 6.4
25 6.4
26 6.4
SJ 1 46.4
2 10.98
3 14.4
SJ a 1 46.4
2 10.98
3 14.4
CT a 1 6.4
2 10.471
4 6.4
5 10.471
6 2.56
7 10.471
8 10.471
Back of Boiler 3 (4)
-
7/28/2019 Total q'ty
24/32
9 6.4
10 10.471
11 10.471
12 12.8
13 10.471
14 10.47115 6.4
16 6.4
17 10.471
18 2.56
19 6.4
20 6.4
21 6.4
22 6.4
23 6.4
24 6.4
25 6.4
26 6.4
Total (m2) 550
h (m) 2
Volume (m3) 1,101
CT 1 25.6
2 132.0
3 21.2
4 16
4 165 25.6
6 140.8 281.6
7 25.6
8 64.4 128.8
9 34.32
10 6.4 12.8
10 6.4
11 19.2 38.4
12 25.6
13 102.4 204.814 34.32
SJ 1 34.9
1 34.9
3 16.0
Cta 1 39.7
2 132.0
4 16
Boiler 3(4)
-
7/28/2019 Total q'ty
25/32
4 16
5 25.6
6 140.8
7 25.6
8 64.4
10 6.411 19.2
13 102.4
Total (m2) 1370
h (m) 2
Volume (m3) 2,740
CT 1 23.2
2 25.6
3 25.6
4 23.25 25
6 25
7 25
8 25
9 10.5
10 10.5
11 10.5
12 10.5
13 10.5
14 10.5
15 10.515 10.5
16 10.5
16 10.5
17 10.5
18 10.5
21 16
22 25
23 25
24 16
25 2526 25
Total (m2) 455.252
h (m) 2
Volume (m3) 911
No Item
1 JA8 32.2
Turbine
Central control house
-
7/28/2019 Total q'ty
26/32
2 JA2 25.76
3 JX1 195.946
4 JA12 34.4
5 J1/A-2/11 6.4
6 J1/A-5/12 6.4
7 JA13 25.768 J1/A-13 6.4
9 J1/A-2/13 6.4
10 JA14 25.76
11 J1/A-14 6.4
12 J2/A-14 10.469
13 J2A-2/13 6.4
14 J2/A-13 6.4
15 J2/A-4/12 6.4
16 J2/A-12 6.4
17 JJ2 461.64
18 J1/A-8 6.4
19 J1/A-1/8 6.4
20 J2/A-8 6.4
21 J2/A-1/8 6.4
22 J3/A-8 6.4
23 J3/A-1/8 6.4
24 JB8 43.459
25 J4/A-9 6.4
26 JB9 25.76
27 JN2 25.44
28 JB10 25.7629 JB11 25.76
30 JB12 25.76
31 JB13 25.76
32 JB14 25.76
33 JC8 85.6
34 JC9 64
35 JC10 64
36 JC11 64
37 JC12 64
38 JC13 64
39 JC14 64
40 JM5 98.977
41 JM6 97.92
42 JM7 97.92
43 JM8 97.92
44 JD8 85.6
45 JD9 64
-
7/28/2019 Total q'ty
27/32
46 JD10 64
47 JD11 64
48 JD12 64
49 JD13 64
50 JD14 64
51 JE8 60.4852 JE14 25.76
53 J1/A-2/4 6.4
54 JA5 34.4
55 J1A-5/5 6.4
56 J1/A-6 6.4
57 JA6 25.76
58 J1/A-2/6 6.4
59 J1/A-7 6.4
60 JA7 25.76
61 J2/A-5 6.4
62 J2/A-4/5 6.4
63 J2/A-? 6.4
64 J2/A-2/6 6.4
65 J2/A-7 6.4
66 J3A-4/5 6.4
67 J3A-5 6.4
68 J3A-7 6.4
69 J4A-5 6.4
70 J4A-4/5 6.4
71 J4A-??? 6.4
72 J4A-2/6 6.473 J4A-7 6.4
74 JB5 43.459
75 JB6 43.459
76 JB7 43.459
77 JC5 64
78 JC6 64
79 JC7 64
80 JM3 97.92
81 JM4 97.92
82 JD5 64
83 JD6 64
84 JD7 64
85 JE7 32.2
86 JA1 25.76
87 JA2 25.76
88 JX1 195.946
89 J1/A-1 6.4
-
7/28/2019 Total q'ty
28/32
90 J1/A-1/1 6.4
91 J2/A-1 10.469
92 J2A-1/1 6.4
93 JJ1 461.64
94 J3/A-1 10.469
95 J3/A-1/1 6.496 J4A-1 6.4
97 J4/A-2 6.4
98 JB1 43.459
99 JB2 43.459
100 JB3 43.459
101 JN1 25.44
102 JB4 43.459
103 JC01 66.78
104 JC1 64
105 JC2 64
106 JC3 64
107 JC4 64
108 JM1 97.92
109 JM2 97.92
110 JD01 66.78
111 JD1 64
112 JD2 64
113 JD3 64
114 JD4 64
115 JE1a 25.76
116 JE1 25.76117 JDB1 31.954
118 JDB1 31.954
119 JDB1 31.954
120 J3A6 2.832
121 J3A2/6 2.832
122 JDB1 31.954
123 JDB1 31.954
124 JDB1 31.954
125 J3A6 2.832
126 J3A2/6 2.832
127 J3A-12 6.4
128 J3A-4/12 6.4
129 J3A-14 10.469
130 J3A8 6.4
Total (m2) 5,593
h (m) 2
-
7/28/2019 Total q'ty
29/32
Volume (m3) 11,186
-
7/28/2019 Total q'ty
30/32
-
7/28/2019 Total q'ty
31/32
204.8
34.32384.8 12.8
38.4
25.6
128.8
444.72
889.44
64.4
-
7/28/2019 Total q'ty
32/32
6.4
140.8
211.6
423.2