TRACK RECORD
ingenious simplicity
Proserv has an established track record in the delivery of diamond wire cutting saw services for clients globally. Below is a summary highlighting some major projects completed to demonstrate our capability and expertise in this specialist field.
DIAMOND WIRE CUTTING SAW SERVICES
Year Client Work Scope Location
2018 Shore Offshore108’ platform removal (1) 24”, (2) 39”, (1) 40” cuts
USA
2018 Alliance 103’ conductor removal (1) 13 3/8” x 30” USA
2018 Ranger 100’ platform removal (2) 36” (4) 48” x 52” USA
2017 DeepOceanCutting of 4” flowlines and two umbilicals, chain cut with disc cutter
Norway
2017 Subsea 7 Åsgard, topside cutting of 9” flexible riser Norway
2017 JAB 85’ platform removal (8) 36” cuts USA
2017 JAB 220’ platform removal (7) 24” and (2) 36” USA
2017 JAB 220’ platform removal (4) 24” and (2) 36” USA
2016 Montco 160’ riser removal (2) 12” USA
2016 Subsea 7 Cutting of 9” flexible riser, topside Norway
2016 Subsea 7 cutting of 6” pipe Norway
2016 Subsea 7 Cutting of flowlines and umbilical Norway
2015 Helix Well OpsContingency cutting option for multi-string well conductor
UK, North Sea
2015 Aker Subsea Cutting of 16” riser Norway
2015 Technip Contingency for cutting 16” casing Norway
2015 Subsea 7 Cutting of 9”, 10” and 15.5” flexible riser Norway
2015 Subsea 7Rose decommissioning – cutting of 400 mm x 400 mm box section on wellhead protection frame
UK, North Sea
2015 Subsea 7Stamford decommissioning - contingency cutting on 6” legs of wellhead protection
UK, North Sea
2015 Subsea 7 Frame cutting of 12” pipeline at 91msw UK, North Sea
Rev 004
TRACK RECORD
ingenious simplicity
Year Client Work Scope Location
2014 Technip Cutting of 22” pipe at Huldra/Valemon Norway
2014 Helix Well OpsContingency cutting option for multi-string well conductor
UK, North Sea
2014 Bibby OffshoreContingency cutting on 24” pipeline and 70” pile
Solan Field - UK, North Sea
2013 Subsea 7Cutting of several pipelines on the Eldfisk field
Norway
2013 Bibby OffshoreGryphon field – cutting of 5” flexi riser at 112 msw
UK, North Sea
2013 Technip
Schiehallion flexible risers – contingency cutting for three umbilical risers and 15 flexible risers between 7” and 19” in 10 to 300 msw
UK, North Sea
2013 Subsea 7Foinaven integrated pipelines project – cutting of 10” riser at 500 msw
UK, West of Shetland
2013 Subsea 7 Gannet – cutting of 16” pipeline UK, North Sea
2013 Harkand ISSBanff and Kyle reinstatement - cutting of 6”, 8” and 12” pipelines at 90 msw
UK, North Sea
2012 Dynamic Offshore Stub removal (1) 30” stub USA
2012 Subsea 7 Cutting of 20” flexible riser Norway
2012 ICM Cutting of 17” hexagonal piles at 16 mswFremantle Harbour, Australia
2012 DOF Subsea Cutting of 30” riser at 100 msw New Zealand
2012 DOF SubseaCutting of 6” pipeline and anchor chains at 70 msw
Tasmania, Australia
2012 Greatship GlobalCutting of various subsea pin piles and chains
NW Shelf, Australia
2011 Veolia Pipeline removal (8) cuts on 10” pipeline USA
2011 EMAS Cutting of risers and chains Gulf of Thailand
Rev 004
TRACK RECORD
ingenious simplicity
Year Client Work Scope Location
2011 Subsea 7 Contingency for cutting 16” casingNW Shelf, Australia
2011 FugroContingency for cutting 30” riser at 100 msw
New Zealand
2010 McDermottContingency for cutting flow line at 100 msw
Bass Straight, Australia
2010 TS Marine Cutting of 15” pipeline at 100 mswNW Shelf, Australia
2010 PTTEP West Atlas wreck removal Timor Sea
2010 TS Marine Cutting of wellhead at 78 mswBass Straight, Australia
2010 SWG Offshore Turret removal at 30 msw Timor Sea
2010 SMIT Cutting jack-up rig legsUnited Arab Emirates
2010 Sapura AcergyPlatform decommissioning, largest cut 80” at 90 msw
Iwaki, Japan
2010 Anglo SuisseSkim pile modification - cut 42” in two places
USA
2010 ApacheDowned platform section removal - 52 -54” cuts and 33-16” guillotine contingency
USA
2010 Dynamic OffshoreConductor removal - 20” conductor with two inner strings that are unknown
USA
2010 Global Industries Conductor removal - 48” conductor USA
2010 Global Industries Conductor removal - (2) 24” conductors USA
2009 Fugro Cutting jack-up rig legsUnited Arab Emirates
2009 Global Industries Cutting of 28” pipeline at 50 msw Indonesia
2009 Anglo SuissePile removal (downer) (8) 30” piles continue on D2 leg
USA
2009 Technip Pipeline severance 10” x 50” pipeline USA
2009 TechnipContingency cutting operations - pipe ID 5.76”, WT 0.93”, steel pipe OD 7.62”, overall OD with coating 11.62”
USA
2009 Technip 2 cuts on 6.625” OD with FBE coating USA
2009 Subsea 710” riser with 2” of Noblastic coating on BP Thunder Horse
USA
Rev 004