![Page 1: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/1.jpg)
International Civil Aviation Organization
Trajectory-Based Operations(TBO)
ASBU/SIP/Mexico/2012-WP/26
Workshop on preparations for ANConf/12 − ASBU methodology(Mexico City, 27 February-2 March 2012)
![Page 2: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/2.jpg)
2
OVERVIEW
• Context
• Baseline
• Concept
• Applicability
• Capabilities
• Why TBO
• Procedures
• Checklist
• Dependencies
ICAO SIP 2012 - ASBU workshops
![Page 3: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/3.jpg)
3
Context
• Traffic Synchronisation
• CM and DCB integrated
• Organized flow of traffic
• Flexible capacity management
• Adjustments in capacity to variations in demand
• Delegation of separation to flight deck reducing ground systemworkload
• Information rich environment.
ICAO SIP 2012 - ASBU workshops
![Page 4: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/4.jpg)
4
Baseline
People Systems
Concept components
Management
ATMService provider
Aircraft operations
Maintenance Engineering
ATM service deliverymanagement
Communications
Navigation
Surveillance
Airspace User
AerodromeOperator
Conflict Management
Information rich environment
Traffic synchronisation
Aerodromeoperations
Airspace useroperations
Demand capacitybalancing
Airspaceorganization
and Management
ICAO SIP 2012 - ASBU workshops
![Page 5: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/5.jpg)
5
Baseline
• Shared four-dimensional trajectory
• Up-to-date information system wide
• Decision support tools
• Global ATM decision-making
• Procedures and automation capabilities, both ground-based
and aircraft-based
• Accurate trajectories to benefit the system.
ICAO SIP 2012 - ASBU workshops
![Page 6: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/6.jpg)
6
Concept
ICAO SIP 2012 - ASBU workshops
![Page 7: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/7.jpg)
7
Concept
ICAO SIP 2012 - ASBU workshops
• 4 dimensional continuum flight path based on points in time from gate-to-gate
• Ability of cockpit automation to fly the aircraft more precisely and predictably reduces routine tasks of controllers.
![Page 8: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/8.jpg)
8
Applicability
ICAO SIP 2012 - ASBU workshops
• Air traffic flow planning
• En-route operations
• Terminal operations (arrival/departure)
• aircraft equipage is assumed in theareas of:• ADS-B/CDTI• data communication and advancednavigation capabilities.
![Page 9: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/9.jpg)
9
Capabilities
ICAO SIP 2012 - ASBU workshops
• Advance Aircraft Capabilities
• Problem Detection and Resolution
• Traffic Flow Management and Time-Based Metering
![Page 10: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/10.jpg)
10
Capabilities
ICAO SIP 2012 - ASBU workshops
![Page 11: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/11.jpg)
11
Why TBO
ICAO SIP 2012 - ASBU workshops
• Greater capacity
• Better efficiency
• Improved safety
• Reduced fuel burn and CO2 emissions
![Page 12: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/12.jpg)
12
Why TBO
ICAO SIP 2012 - ASBU workshops
• Increased flexibility
• Better predictability
• Leverages the best of the ground automation and the performance of the aircraft.
![Page 13: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/13.jpg)
13
• Use of ADS-B/CDTI
• Other cockpit capabilities to support aircraft avoidance
• Is still a research topic and will necessitate procedures
development
• Including the roles of ANSPs
Procedures
ICAO SIP 2012 - ASBU workshops
![Page 14: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/14.jpg)
14
• Decision support automation
• Automation-to-automation negotiation
• Information on accurate trajectory
Procedures
ICAO SIP 2012 - ASBU workshops
![Page 15: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/15.jpg)
15
• Human Factor Considerations
• Training and Qualifications Requirements
• Regulatory/Standardisation needs and
Approval Plan (Air & Ground).
Procedures
ICAO SIP 2012 - ASBU workshops
![Page 16: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/16.jpg)
16
Checklist
ICAO SIP 2012 - ASBU workshops
• Standards Readiness - 2025
• Avionics Availability - 2028
• Ground Systems Availability - 2028
• Procedures available - 2028
• Operations Approval - 2028
![Page 17: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/17.jpg)
17
Main dependencies
ICAO SIP 2012 - ASBU workshops
• Data Link En-Route
• Free routing
• FF-ICE
• Traffic Synchronization..
![Page 18: Trajectory-Based Operations(TBO) · 3. Context • Traffic Synchronisation • CM and DCB integrated • Organized flow of traffic • Flexible capacity management • Adjustments](https://reader030.vdocument.in/reader030/viewer/2022041212/5dd14220d6be591ccb64fb1f/html5/thumbnails/18.jpg)
18ICAO SIP 2012 - ASBU workshops