Download - Trg Promotion Cd
The Richardson Group
35 Years of Building Excellence
Quality
Commitment
Integrity
Office
Institutional
Retail
Medical
Industrial
Public Works
Facilities Expansion
Tenant Improvements
Commercial Construction
Anticipating the Challenges of the Future and Providing the Solutions
In 1976 Kimm A. Richardson founded The Richardson Group, laying the foundation for a diversified general contracting firm distinguished by quality, integrity, and commitment. TRG is proactive in finding solutions for our clients that best achieve their goals, helping to foster lasting relationships that have become the lifeblood of our business. TRG’s practice of being client focused is why 90% of our business is repeat business. We approach each new project with a cooperative mindset, working with clients, architects and subcontractors toward the common goal – successful project delivery. Through our technical skill and construction know-how, we anticipate project challenges, develop solutions that meet or exceed our client’s objectives. Our work continues to meet the stringent standards of quality and integrity set by Mr. Richardson 35 years ago.
History
Since its beginning as a contractor in 1973, The Richardson Group has been a name associated with construction excellence in the Southern California building industry. The Richardson Group is a Commercial General Contractor providing construction services to our clients in Office, Industrial, Retail, Institutional, and Medical facilities. Our commitment to service and principal involvement in all company operations is the key to maintaining the high level of quality that is evident in all of our projects.
About Us
Our Mission is based on our philosophy that we should add value to our clients’ projects; that we should assure the project meets or exceeds our clients’ expectations; that we are proactive in order to anticipate and avoid difficulties; that we deliver the highest level of service.
Mission
For more than 30 years, clients have come to The Richardson Group because we provide consistently competitive, quality facilities construction that is delivered on time, within budget and with a smooth transition/occupancy. The most important reason we're able to do so is because of the integrity and commitment of our people. Quality is doing things right, Integrity is doing the right things.
The Richardson Group is a respected General Contractor in the Orange County business community; some of our notable clients include Nordstrom, Good Samaritan Hospital, Morgan Stanley, J.H. Snyder Co., Cedars-Sinai, Lee & Associates Commercial Real Estate, Princeland Properties, Smith Barney, Starwood Resort & Hotels, C.J. Segrestrom & Sons, to name a few.
ServicesSome of our services include:
1. Initial Team Meeting(s)
2. Drawing Review
3. Site Examination and Evaluation
4. Conceptual Estimating and Preliminary Budget Information
5. Permit and Entitlement Agency Reporting
6. Value Engineering
7. Constructability Review
8. Scheduling and Phasing Plans
9. Subcontracting
10. Quality Control
11. Safety Program
12. Meeting Management
13. Reporting
14. Document Control
15. Continuous Expediting
16. Close-out and Hand-Off
“The Richardson Group has been my “go to” general contractor since the mid 1980s. The reasons are
simple, professionalism, timely quotations, and a keen adherence to deadlines.
My company recently engaged the Richardson Group to complete a rather complex seven-figure
tenant improvement. The Richardson Group brought the job in on time and under budget. My firm of
35 owners was overwhelmed by the results!” Allen C. Buchanan, Principal, Lee & Associates,
Commercial Real Estate Services, Orange, California 92865
“ Please allow this correspondence to serve as a letter of recommendation for your organization. I have had the
opportunity of working with your staff for over two years and in that time have completed numerous fast track
projects. The majority of these projects have either been occupied or been adjacent to occupied areas. The three
superintendents that I have had the pleasure of working with have been extremely sensitive to the unique
requirements of a medical center renovation.
These Accomplishments are a credit to your dedicated field and office staff. It is a pleasure to work with such a
fine group of professionals and I look forward to our mutually rewarding relationship.” Scott A. Giannattasio,
Director, Plant Operations, Cedars-Sinai Medical Center
What they are saying about us…..
Voted into the Orange County Business Journal’s Top 20 Contractors List, Tenant Improvement, multiple years in succession.
The Book of Lists contains definitive listings of the top companies and major players that make up Orange County’s economy.
Some of our Current Projects
Nordstrom Rack, Beverly Connection Architect: Callison Architecture
The Richardson Group is completing an interior build-out of a 28,000 SF existing shell. Interior demolition and build-out including the construction of a new security area with surveillance cameras, and holding area. Construction of 4 offices with varying size windows to house regional and store managers and supporting personnel. Sapcious break room with wood cabinetry, dining table and chairs, vending machines and flat screen T.V. Men's and Women's fitting rooms and restrooms with decorative tile. Warehouse receiving area with storage racks for all hanging items, and stacked items. Fully equiped Alterations room with stations set up for personnel.
Morgan StanleyArchitects: IA, Klawitter
Various projects throughout Southern California. Projects include a phased remodel, 18,000 SF tenant build-out, a 3,000 SF build-out on the 19th floor, and interior tenant improvements. Some of our recent project:
Laguna Woods Rancho Santa FeSan Diego Torrance La Jolla Santa Monica
Some of our Current Projects…continued
J.h Snyder Gateway CenterArchitect: Rossetti
New retail construction of two buildings totaling 11,000 SF which includes a 3,000 SF of restaurant space.
Argosy UniversityCommercial Interior Planner: Fraser McClellan & Associates
Tenant Improvement project; consisting of a complete three (3) FL build-out of a 31,000 SF existing office to accommodate the university's move from Santa Ana facility to Orange. Administration, classrooms, multi-purpose room, requiring complete demolition and build-out of the space.
Manhattan Beach Country ClubInterior Planning & Design: Fisher Design Company, Inc.
Various Tenant Improvement projects; consisting of a complete remodel of the multi-purpose room, requiring complete demolition and build-out of the space. Ceiling was finished in decorative nine-wood to resemble teak Other projects included improvements to an office, moving of the athletic desk and components, carpet, paint, cabinets, and installation of hard surface countertops.
Some of our Past Projects
No Ho CommonsArchitect: Jerde
The Richardson Group finished the second phase of the Commons Project in North Hollywood, which included rental units and retail space, including a supermarket, bank and restaurants for the J.h Snyder Co. & the city’s Community Redevelopment Agency.
Bella TerraArchitect: Jerde
Retail Stores “Vanilla Shell” Construction of a pad building and site that had the Corner Bakery, Pei Wei, and Sprint/Nextel as tenants. J.h Snyder Co. development; Huntington Beach, CA
The River at Rancho Mirage The River offers 125,000 S.F. of retail space, an additional 35,000 S.F for restaurants and an additional 19,000 S.F. of second story office space. TRG was responsible for “Vanilla Shell” interior construction of 28 tenant spaces and a retail interior build-out of Borders Books & Cafe. J.h Snyder Co. development, Rancho Mirage.
reta
il
Some of our Past Projects…continued
Nordstrom Department Store
Tenant Improvements to Multiple Departments at various locations:
Riverside, South Coast Plaza, Cerritos, Mission Viejo, South Bay, Santa Ana, Brea
Vintage Design CentersArchitect: Datum Architects
Full Service New Home Design Center. Interior Remodeling
Torrance, Yorba Linda, Palm Desert, San Diego
Some of our Past Projectsoffi
ce
Morgan Stanley-Dean Witter-Dean Witter Reynolds The Richardson Group has finished many projects over the course of a decade for the Morgan Stanley Group of Companies. These projects range from high-end office remodels, improvements, renovations, expansions, and build-outs. Many were phased projects over multiple floors and conducted during regular business hours
Salomon Smith Barney
Over 15 offices throughout Southern California. Projects consisted of Build-out of tenant spaces with high end finishes; office expansion and remodel, multiple phases completed during business hours; phased remodel of multiple floors, including the addition of stairs between floors.
UBS/Paine Webber Interior Office work: build-outs, remodels, and expansions; some with additions to existing offices which required the work being done in phases. Some of the locations: Beverly Hills, Santa Barbara, Long Beach, Palm Desert
Some of our Past Projects…continued
office
Princeland Properties Acero Office Building
8,000 Square Foot Corporate Office in a Campus Setting.
Princeland Properties Office Building
Two-Story Office Building, 18,000 Square Feet.
Seven Gables Real Estate Office Building
A complete interior build-out of a Two-Story, 4,500 Square Foot Office Building in Southern California
Some of our Past ProjectsRancho Santiago Canyon School
Architect: LPA
2006 CMACN Design Award Sustainable Building
New 30,000 SF Student Services Center featuring ten classrooms and a number of faculty offices. The building also simplifies student services by housing many of the college’s core functions including admissions and records, financial aid, the cashier’s office and disabled students programs and services (DSPS) under one roof.
Chapman University – Bertea Hall (Music Department) The Richardson Group performed an extensive high-end renovation on Bertea Hall to bring the facility to new levels and to allow Bertea to continue to serve the students and faculty in the best way possible. Bertea Hall contains faculty offices and teaching studios interspersed with student practice areas as well as Salmon Recital Hall. Salmon Recital Hall often houses the esteemed guest artists and master teachers who present special performances, workshops and master classes for the Conservatory of Music at Chapman University.
educational
perform
anceProfessional Musician’s Local 47 Concert HallArchitect: Epstein ~ ISI
Interior remodel of the exisitng Professional Musician’s Concert Hall; built in Los Angeles between 1941-1942. The project included the complete demolition of the exisiting interior and build-out with ADA upgrades and new core to basement. The floor of the Hall was hand-inlaid with a musician’s note (see above).
Some of our Past Projects
industrial
Parkridge Business ParkArchitect: Himes Peter Jepson
5 Buildings totaling 120,900 Square Feet of Tilt-Up Concrete Construction within an Industrial Park in Corona, California.Princeland Properties
Alcoa Business Park 73,000 Square Feet of Tilt-Up Concrete Construction within an Industrial Business Park in Corona, CaliforniaPrinceland Properties
Irvine Spectrum 5 Parcel 15 Industrial Building
32,115 Square Foot Tilt-Up Concrete Industrial Building.
Some of our Past Projects
medical
Cedars – Sinai Medical Center, Los Angeles, CA Cedars – Sinai serves the greater Los Angeles Community and is one of the most preferred hospitals in the region. The Richardson Group renovated a Four Patient Intensive Care Unit, a 6th Floor Dialysis Unit, and Infant Intensive Care Unit, Patient Rooms, Pathology, and HLA Lab.
Good Samaritan Hospital, Los Angeles, CA
The Richardson Group was responsible for many projects over the course of two (2) years, some of the projects included: Lab Remodel, O.B. Wing, Radiological Mammogram Remodel, Omni-cell Installation, Admitting, Operating Rooms, Relocation & Expansion of In-Hospital Pharmacy, Multi-Phased Interior Hospital Project, completed while ER Department remained fully operational, NICU and Nurses Stations demolition and build-out, CCU Nurse Station, Linear Acceleration Addition, Gamma Knife Reload
Daniel Freeman Marina Hospital, Marina Del Rey, CA Hospital Interior Remodel of Isolation Room, including complete new HVAC equipment
The Richardson Group
Orange, California 92866-1905Phone: 714-997-3970
Fax: 714-997-5784
413 South Glassell
If you have a current need for construction services or are planning for a future facility, please contact us and we would be pleased to discuss how we
can best assist you.
www.therichardsongroup.com