BUILDING A BETTER I-4
© Florida Department of Transportation I4Ultimate.com2356-20160721 Last Updated 07/21/2016
Stay Informed: » Project Hotline: 844-ULT-INFO (858-4636) » Sign up for email and text alerts at I4Ultimate.com » For real-time traffic conditions call 511, download
Florida 511 mobile apps or visit FL511.com » Follow @i4ultimate on Twitter
Sign up for I-4 Construction Updates and Alerts at I4Ultimate.comGet real-time traffic and incident alerts at FL511.com
I-4 Ultimate improvements at the Fairbanks Avenue (State Road 426) interchange will improve motorist safety.
REDESIGNED I-4 INTERCHANGE IMPROVEMENTS AT FAIRBANKS AVENUE
Adding eastbound I-4 auxiliary
lane between Princeton Street
and Fairbanks Avenue to improve
capacity.
Lengthening the Fairbanks Avenue
ramp to and from eastbound and
westbound Interstate 4 (I-4).
Realigning I-4 near Fairbanks
Avenue (see reverse side)
KillarneyElementary School
KillarneyElementary School
1
1E
W
2
Princeton St
3
Wym
ore
Rd
Roxbury Rd
Sailsbury BlvdSailsbury Blvd
Gra
nad
a D
r
Granada Dr
Cam
brid
ge B
lvd
Kill
arne
y D
r
Wellington Blvd
Minnesota Ave
Ora
nge
Terr
ace
Dr
Ove
rsp
in D
r
Cradon Ave
Dri
ver
Ave
W Fairbanks Ave
W Fairbanks Ave
Wym
ore
Rd
Roxbury Rd
Cam
brid
ge B
lvd
Ora
nge
Terr
ace
Dr
Sailsbury BlvdSailsbury Blvd
Gra
nad
a D
r
Granada Dr
Kill
arne
y D
r
Wellington Blvd
Minnesota Ave
Ove
rsp
in D
r
Cradon Ave
Dri
ver
Ave
2
1
3
I-4 East/West I-4 Express Lanes
KEY
PROJECT INFOThe $2.3 billion I-4 Ultimate project is reconstructing 21 miles of interstate from west of Kirkman Road to east of State Road 434 in Longwood. For more information about I-4 Ultimate, contact David Parks, I-4 Ultimate Public Information Officer, at 844-ULT-INFO (844-858-4636) or [email protected].
BUILDING A BETTER I-4
© Florida Department of Transportation i4Ultimate.com2224-20160721 Last Updated 07/21/2016
Sign up for I-4 Construction Updates and Alerts at I4Ultimate.comGet real-time tra� c and incident alerts at FL511.com
Stay Informed: » Project Hotline: 844-ULT-INFO (858-4636) » Sign up for email and text alerts at I4Ultimate.com » For real-time traffi c conditions call 511, download
Florida 511 mobile apps or visit FL511.com » Follow @i4ultimate on Twitter
PROPOSED CHANGES TO THE FAIRBANKS CURVE AREA
The I-4 Ultimate project will realign Interstate 4 near Fairbanks Avenue, commonly referred to as the “Fairbanks Curve.” Smoothing out the curve will increase sight distance for motorists and improve overall safety of this stretch of I-4. As a result of the realignment, several local roads in the area will be a� ected. The future confi guration of this area illustrates fi ve major changes to local roads:
Future Confi guration
1
2
3
4
5
Wellington Boulevard realigned to make room for I-4 expansion
Realignment of Wymore Road and Salisbury Boulevard intersection
Roxbury Road to dead end at previous Wymore Road intersection
Riddle Drive new connection under I-4 to Granada Drive
Wymore Road realigned under I-4 because of the alignment of I-4
KillarneyElementary School
KillarneyElementary School
1
3
4
5
2
Old Fairbanks Curve
E
WW
ymo
re R
d
Wym
ore
Rd
Roxbury Rd
Riddle Dr
Sailsbury BlvdSailsbury Blvd
Euston Rd
Lotafun Ave
Granada Dr
W Fairbanks Ave
Gra
nad
a D
r
Cam
brid
ge B
lvd
Pel
ham
Rd
Kill
arne
y D
r
Wellington Blvd
W Fairbanks Ave
Wym
ore
Rd
Wym
ore
Rd
Roxbury Rd
Cam
brid
ge B
lvd
Riddle Dr
Sailsbury BlvdSailsbury Blvd
Euston Rd
Pel
ham
Rd
Lotafun Ave
Granada Dr
W Fairbanks Ave
Gra
nad
a D
r
Kill
arne
y D
r
Wellington Blvd
W Fairbanks Ave
Closure subject to change. Construction progress, roadway conditions and weather may require schedule adjustments.Please check i4ultimate.com/alertsmap for the most up-to-date information.