Page 1: UNC 425 Re-establishment of Shipperless Sites

© British Gas Trading Limited 2011

Slide 1

UNC 425 Re-establishment of Shipperless Sites

Mod 424 Process

Shipper notifies of Meter Removal

Transporter GSR Visit undertaken

Meter Point capable of

passing gas?

Transporter removes ServiceMeter Point set to

Dead

UKLink Updated with Meter

Removal, Isolation Flag set to Y

Within 12 months

N

Meter in situ same as

previously held

Y

Transporter notifies Last Reg.

Shipper

Transporter Invoicing back to Meter Removal

Date

Y

Transporters notify Last Previous Registered

User of outcome (Transporter Notification

Date (TN Date))

Last Reg. Shipper investigation

Identify alternative Shipper supplying

Meter Point within 6 months

YLast Reg. Shipper

informs Alt. Shipper to Confirm

Site

Alt. Shipper confirms within

6 months

Y

Transporter Invoicing back to

Date of Reconnection (or

TNU date)

N

Transporter Invoicing Calculated (Last Reg.

Shipper) back to Date of Reconnection (or TNU

date)

Reconfirmation and Asset

Reinstall by Shipper

Transporter Reconfirmation

N

Y

Transporter Invoicing

Transporter Invoicing (Last Reg. Shipper) back to Date of Reconnection

(or TNU date)

N

N

For ‘Different Meter’ Scenarios, data required: · Date of Visit· [Meter Fit Sticker Details (if present) – incl.

Date+Fix Read]· Asset Details (MSN, Dials, Model, etc)

Shipper withdrawn from

Site

N

Y

Shipper withdrawn from

Site

Transporter checks no SPA Activity by

any Shipper

Transporter Reconfirmation of Last Reg. Shipper

N

Transporter Reconfirmation of Last Reg. Shipper

Y Successful Confirmation by Shipper within 1

month?

N

Y

Transporter Duplicate

Check

Duplicate Identified

No Duplicate Identified

Refer to Duplicate Process