8
6
7
Mild steelgalvenised railingabove loadingbay wall
AdvertisementSignage
8
64
LOGO
7
6
AdvertisementSignage
AdvertisementSignage6
8
7
4
External Trolley Bay
Signage
Loading Bay
AdvertisementSignage Advertisement
Signage
LOGO
Material Key
1. Kingspan Composite Panel - Gull Grey2. Kingspan Composite Panel - Metallic Copper3. Blue/Grey Brick4. Curtain Walling5. Aluminium trim - Merlin Grey
Standard Details:
Unit 1
6. Wall through colour render White RAL 90107. Plinth through colour render Grey RAL 70388. Insulated metal panel RAL 9006
Unit 11
9. Through colour render White Ral 901010. British Western Red Cedar laid horizontally11. 2mm thick aluminium backed panels, powder coated to pantone 202C
drawn by checked by date scale @ A1
project number drawing number revision
revision date by chkAll dimensions to be verified on site, and the Architect informed of any discrepancy.All drawings and specifications should be read in conjunction with the Health andSafety Plan; all conflicts should be reported to the CDM Co-ordinator.
file
refe
renc
e:
cDO NOT SCALE THIS DRAWINGThis drawing is the copyright of Bowman Riley Architects Limited.
preliminary comment constructionplanning recordtender
Construction staff and operatives must ensure the principle contractor hasprovided thorough and accurate information on all health and safety aspectsrelating to the designs identified on this drawing include the review of:• Designers/contractors risk assessments• Method statement• Permit to work• Pre construction informationThe designers note that the following health and safety risk relating to thisdrawing have not been eliminated during the design process:
ref residual risk
Wellington House·Otley St·Skipton·N Yorkshire·BD23 1ELLEEDS | LONDON | SKIPTON01756 795611 · www.bowmanriley.com
1 : 100
D
G:\_
P\77
35.1
-Hat
ters
ley
Ret
ailP
ark\
7 735
.1-0
7R
evit\
WIP
\773
5 .1
-Site
Mod
el.rv
t
7735 010
Proposed Elevations - Unit 1
Hattersley, District CentreHattersley
BS 11/27/17AW
1 : 100Unit 1 - South Elevation
1 : 100Unit 1 - North Elevation
1 : 100Unit 1 - West Elevation
1 : 100Unit 1 - East Elevation
0
SCALE1:
543211
m100
A Minor amendments to Client Requirements 08.02.18 BS MFB Updated for S73 Application 22.03.19 CM BR
C Unit 1 roof to loading bay lifted to match mainstore
03.05.19 CM BR
D Unit 1 fl level raised as noted. Canopy columnsremoved
12.06.19 CM BR