Step 6
![Page 2: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/2.jpg)
Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath.
Check orientation.
Step 8
![Page 3: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/3.jpg)
Roll out back and front, inflation point must be on the front side. Quickly check condition of gate sides to ensure there
are no sharps or other issues.
![Page 4: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/4.jpg)
One person at each end, pull the Ventstop so it is as flat as possible, Un-fold top fabric from centre out to side wall
and repeat other side. Ensure you end up with an even square shape.
![Page 5: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/5.jpg)
When the unfolding is complete, re-check orientation.
Step 9
![Page 6: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/6.jpg)
Blow out your Air line, check to ensure you have Safety clips. Clamp the Venturi to the inflation flange with air flow
pointing towards the Ventstop. Keep open end of Venturi off the ground.
Step 15
![Page 7: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/7.jpg)
Attach the air line to the quick connect fitting on the venturi, Keep the tap on the Venturi turned off.
![Page 8: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/8.jpg)
Place the control box in a suitable location, and check that all taps inside the box are turned off before connecting.
![Page 9: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/9.jpg)
Connect the first hose from mine air to the “AIR IN” side of the control box.
Step17
![Page 10: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/10.jpg)
Connect the second hose between the “AIR OUT” and the air fitting on the venturi.
![Page 11: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/11.jpg)
Connect the blue sensor hose to the hose tail on the “AIR OUT” side of the box and fix in place with a hose clamp
Step 16
![Page 12: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/12.jpg)
Insert the other end of the sensor hose about 400mm into the flange located next to the inflation point and tighten.
![Page 13: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/13.jpg)
Check the control box, make sure bypass valve is open and Regulator valve is closed. Turn on air commence inflation,
keep open end of Venturi of the ground.
![Page 14: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/14.jpg)
During inflation process, check for snagging or hook-ups e.g. Ventstop caught on side-wall, Excessive fabric caught
under the front of the Ventstop.
Step 31
![Page 15: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/15.jpg)
You can assist the Ventstop by pulling down on the pulley ropes if these are available, or by pulling top corners away
from the side wall.
![Page 16: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/16.jpg)
Before full inflation is achieved check the orientation of the Ventstop Adjust top corners if required.
Step 33
![Page 17: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/17.jpg)
With Ventstop fully inflated and in the desired position, you have 2 choices, To operate directly from the Venturi, or
operate via the control box.
Step 34-35
![Page 18: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/18.jpg)
If you are running directly from the Venturi, check that the Venturi has equalised, place hand over open end of
Venturi, air should not be blowing or sucking.
Step 36
![Page 19: VentStop V.C.U Step 6. Lower down all 4 sides, make sure they are as flat as possible and there are no large rocks underneath. Check orientation. Step](https://reader035.vdocument.in/reader035/viewer/2022070308/551bce4c550346b4588b5305/html5/thumbnails/19.jpg)
Job done in 15 minutes