Technical / Quality Audit of Diesel Shed
Ref: Letter No 2012/M(W)/814/5 dated 07.08.12 from Rly Bd.
CHECK SHEET
Item Description Reference Documents, Annexures, Further details on checksheet etc
General
Compliance of Schedule Maintenance Schedule of standard examinations: MP-Misc-140/141 (for Alco locos).
Schedule of standard examinations: MP-Misc-285 [for HHP (EMD) locos] Quality of major schedules:
M24 M48
-do-
Load Test/Load Box Test records: HP SFC EGT Peak Firing Pressure
Load Test MI No MP.MI-10 (Rev 0.02), Aug 2003. (for Alco locos).
Document No. Misc-195 on Test procedure for EMD diesel engine, 16 cyl. Vee model 710G3B (4000/4500HP) issued by DLW.
Methodology and analysis of failure investigation. Display of work instructions on shop floor Training of staff Status of record keeping Calibration of gauges/ instruments
Safety items
a. Speed recorder/Indicator Sectionb. Wheel (Wear adapted profile) profile & other
defects. c. Brake adjustment, release & and application
timings.d. Headlight focus adjustmente. Horn maintenancef. Undergear safety bracketsg. Gauging of Couplersh. Vertical offset between Side bearer and centre
pivot
a. OEM’s maintenance manual.b. Drg No SKDL-2561 Alt 8.
c. Standard test scheme as per MP.TP-029/87 (Rev 02) Oct 2008 for Air Brake, and, as per MP.TP-019/81 (Rev 02) Nov 08 for dual brake locos.
d. IB No MP.IB.EC.01.08.06 (Rev 0) December 06.
f. MI No MP.IB.BD.02.16.01 (Rev 01) December 09. g. CBC Manual No G 76 Sept 87. h. MI No MP.IB.VL.02.11.10 (Rev 00) February 10.
Page 1 of 60 Quality Audit of Diesel Shed
Quality of Subassembly repairs (important items)
a. Expressor/Compressorb. Air Brake Sectionc. Bogie sectiond. Rotating Machines Sectione. Turbo sectionf. Cylinder Head , Piston and Valve sectiong. Radiator section.h. FIP/Injector Sectioni. Governor Sectionj. Electrical Control Sectionk. Battery Section
a. Further details of check sheet covered in Annexure 1.b. -do-c. Further details of check sheet covered in Annexure 2.d. Further details of check sheet covered in Annexure 3.e. Further details of check sheet covered in Annexure 4.f. -do-g. -do-h. -do-i. Further details of check sheet covered in Annexure 5.j. -do-k. -do-
DM Plant and Spectrograph
General working condition MP Guide-6 (Rev 2) May 07 issued by RDSO in reference to spectrograph.
Material Availability of critical items Procurement from unapproved sources, if any.
Any other item
As decided by the auditing authority
---
Page 2 of 60 Quality Audit of Diesel Shed
Check List for quality audit of diesel loco sheds (Brake Items)
S.No. Item Parameter Observations1. Whether all the
prescribed schedules are being followed for brake equipment, compressor & air dryer or not
As per Schedule of standard examinations(No. MP.Misc.-140 & 141, Rev-01, September’2006)Trip Sch.
M-2
M-4
M-12
M-24
M-48
M-72
POH
1. Whether maintenance is done as per RDSO MIs or manufacturers MI mentioned in MP.Misc.-140 & 141. 2. Maintenance facilities are available or not.
2. Functioning of VCD Whether functioning of VCD is being checked in every trip schedule.
3. Test benches and rigs 1. Whether the required test bench and rigs are available or not viz. AB test rack for brake valves, air dryer test bench, compressor test bench etc.
2. Whether, testing is done on above test benches.3. Calibration of test benches and rigs is being done periodically
or not.4. Test on compressor Testing for checking capacity of compressors as per MP.TP-41,
2010.5. Infrastructure facilities (a) Whether dust proof and controlled temperature
environment for maintenance, assembly and testing of brake valves is available.
(b) Availability of compressed air ( in test benches.(c) Availability of compressor in air lines.(d) Whether air dryer provided in test benches/ air lines.(e) Reservoir pressure is being checked or not(f) Washing facilities(g) Painting facilities(h) Technical Cell(i) Metrology lab(j) Store(k) Tool room(l) Fire extinguishers(m) Material handling facilities for movement of material
and components.
Page 3 of 60 Quality Audit of Diesel Shed
6. Storage of material Whether dust/damp proof environment with controlled temperature is available for storage of brake equipment and rubber components. Whether rubber components are being stored as per guidelines mentioned in this office letter no. SD.DEV.RBC dated 28.02/07.03.2007 circulated to all Zonal Railways.
7. Availability of Material Any Chromic shortage of material for maintenance8. Human Resource
developmentWhether periodic training is being imparted to maintenance staff to make them conversant with the maintenance practices.
9. Any other observation
Page 4 of 60 Quality Audit of Diesel Shed
CHECK SHEET FOR
TECHNICAL AUDIT OF BOGIE (ALCO LOCOMOTIVE)
During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded.
Shed/Rly: Audited by: Date of audit:
SN Requirements Loco Type Make Of Subassembly
Reference Details Clause/Para/Item Details
Observations
1. Measurement / ActivityBogie frame & Bolster (if applicable)
Alco Series
WDM2, WDM3A, WDG3A,WDP3A & WDM3D/E/F
Maintenance Instruction noM&C Report MC – 44 & MC - 29 Cleaning of bogie frame
Crack detection and repair Welding of Manganese Steel Liners
at axle boxes and pedestal linersComplete Bogie MP.MISC – 141 Item No. 165
Longitudinal and lateral pedestal clearances
Wheel & Axle Assembly Wheel wear management Instruction Bulletin no.MP.IB.BD.0216.01 (Rev-1) &MP MI71/78MP.MISC – 141
Clause 4.3.8Item No. 110, 161, 198,
Wheel wear measurement i.e. Root wear, Tread wear, Flange wear, wheel flat, visual inspection for any defect like crack, wheel flat, shelling, spaling etc. as per MP.MI 71/78 in every trip.
Wheel gauge (1596+3/-0.5 mm) Deference in tread diameter of
wheels on same axle, same bogie & same loco
Page 5 of 60 Quality Audit of Diesel Shed
Ultrasonic testing of axles (interval of 06 months for passenger locos & 12 months for goods loco)
RDSO procedure MC-71
Brake rigging
WDM2, WDM3A
MP.IB.VL-03.11.01
MP.MISC – 141 Item No. 295 Piston travel Wear of Brake shoe Wear of Pins & Bushes Axle box & journal bearings
MP.MISC – 141 Item No. 47, 197
Inspection bearing components Grease condition Radial clearance Distance over liners (face and
lateral) Dimensional measurement of
bearing components
Centre Pivot & Loading PadsMP.MISC – 141
MP.IB.VL-02.11.10
Item No. 274 & 278,
Centre pivot castings and loading pads, liners Load Pad to Centre Pivot Height Difference,Suspension Spring ( As per MI )
Free height of spring As per relevant drawingsworking height of springGrouping / colour code of spring MP.IB.VL- 04.19.01 (Rev.01)Friction Snubber Assembly WDM2, WDM3A MP.MISC – 141 Item No. 116Height measurementEqualiser Beams MP.MISC – 141,
M&C MC - 43Item No. 52
Free roller movement, Wear of hard face zoneEqualiser Spring Seat SK.DL-3889
Side Bearer (Rubber spring) WDG3A, WDM3D
MP.IB.VL. 04.30.08 (Rev.01) Free Height of rubber springWorking height of rubber springPermanent set of rubber springRubber crack length/ de-bonding
Page 6 of 60 Quality Audit of Diesel Shed
Hydraulic damperCapacity / Rating of dampers As per relevant drawings
Damper overhauling MP.IB.VL. 05.39.10 (Rev.00)
2.
Availability of Tools And Test Stands
Surface table of measurement of springsHeight gauge for springs Spring load-deflection testing machineHydraulic damper testing machine Torque wrench, Go/No Go GaugesInside and Outside Calliper, Vernier Caliper, Height Gauge, Cleaning Tank,Wheel wear measuring gauge SK.DL-3592
3
Availability Of Instructions Etc3.1 Display Chart3.2 Training of staff3.3 Maintenance manual and check sheets3.4 Record keeping of tools and measuring instruments
4 Record Keeping For Traceability
5Material AvailabilityVital SparesMust Change items
CHECK SHEET FOR
TECHNICAL AUDIT OF HHP LOCOMOTIVE BOGIE
Page 7 of 60 Quality Audit of Diesel Shed
During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded.
Shed/Rly: Audited by: Date of audit:
SN Requirements Loco Type Make Of Subassembly
Reference Details Clause/Para/Item Details
Observations
1. Measurements / ActivitiesGeneral Maintenance HHP loco Maintenance Instruction no
MI 1517 (Rev. A) Para 2.1 Cleaning of bogie frame under locomotive
Tank immersion Lubrication Wheel and axle Inspection Journal Bearings Dampers Rubber secondary spring Brake rigging Slack adjusters, adjustment Hand brake
Page 8 of 60 Quality Audit of Diesel Shed
Wheel & Axle Assembly Minimum wheel diameter after last
truing operation. Maximum diameter mismatch of two
wheels on a common axle. Maximum diameter mismatch
between wheels on one axle compared to those of any other axle. These include wheels on the same bogie.
Minimum rim thickness. Axle longitudinal limits. Circumferential defects on or below
the axle surface. Axle Run-out. Wheel wear measurement i.e. Root
wear, Tread wear, Flange wear, wheel flat, visual inspection for any defect like crack, wheel flat, shelling, spaling etc.
Wheel gauge (1596+3/-0.5 mm) Deference in tread diameter of
wheels on same axle, same bogie & same loco
Ultrasonic testing of axles (interval of 06 months for passenger locos & 12 months for goods loco)
HHP loco Maintenance Instruction noMI 1517 (Rev. A)
As per latest Railway Board’s Instruction
Para 2.3
Journal bearings Checking of running temperature of
outside face of the adopter with a temperature indicating crayon/ direct pyrometer
Sign of overhearing (Temperature should not exceed more than 560C above ambient).
Excessive lubricant leakage from the grease seals.
HHP loco Maintenance Instruction noMI 1517 (Rev. A)
Para 2.4
Page 9 of 60 Quality Audit of Diesel Shed
Broken, loose or missing parts (such as loose cap screws, etc.)
Loose or defective seals. Cracked or broken cups, end caps or
adapters, etc.Dampers Check for leaking fluid. Make
certain that oil has not been deposited from some other source and check damper per Manual Qualification Procedures before condemning.
Perform manual qualification tests to detect gross loss of control.
Inspect bushing integrity. Bushings should not permit uncontrolled vertical or lateral movements of the damper.
If a failed vertical primary damper is detected, inspect journal springs, lateral thrust pads and wear plates at each journal bearing location as well.
If a failed yaw damper is detected, check the items noted in the above step as well as all traction rods and bushings, carbody pivot and rod assembly and bushings, and secondary springs (rubber pads).
steps to qualify vertical / yaw dampers (Refer instructions given in para 2.5)
HHP loco Maintenance Instruction noMI 1517 (Rev. A)
Para 2.5
Rubber Secondary Springs Free Height of rubber spring Working height of rubber spring Permanent set of rubber spring Rubber crack length/ de-bondingNote: Do not wash the spring in paraffin de-greasing agents (such as
HHP locoMaintenance Instruction noMI 1517 (Rev. A)
As per relevant drawings
MP.IB.VL-01.08.11 (Rev.0)
Para 2.6
Para 5.6.4
Page 10 of 60 Quality Audit of Diesel Shed
trichloro-ethylene), caustic soda, or diesel fuel oil.
Suspension Spring Inspect the coils for breaks or
surface cracks. Springs with any indication of surface cracks should be scrapped. Deep sharp surface nicks can cause failure of a spring, and their presence is cause for rejection.
Hand wash or shot blast the coil to remove surface rust. “Pickling” the spring is to be avoided. If the cleaning operation removes all indications of surface rust, and does not reveal corrosion pits, the spring is acceptable for qualification. If corrosion pits are visible after the cleaning operation, scrap the affected coil.
Smooth worn spots on a coil caused by rubbing - do not condemn the coil. However, it must still pass the other qualification criteria.
For spring identification and qualification, refer to M.I. 1512.
Maintenance Instruction noMI 1517 (Rev. A)
Para 3.2.6
Brake block guide (See instruction in relevant para)
Maintenance Instruction noMI 1517 (Rev. A)
Para 2.7
Slack adjusters This procedure must be conducted
with the locomotive parked on tangent track. If conducted with the locomotive in a curve, error in setting the piston travel will result.
It is recommended that a periodic visual inspection should be
Maintenance Instruction noMI 1517 (Rev. A)
Para 2.8.2 & 2.8.3
Page 11 of 60 Quality Audit of Diesel Shed
performed to find out if there is any damage, e.g. loose or missing lock pins or a bent or damaged assembly. Replace or repair the adjuster as required.
Hand brake The hand brake, chain, and lever
should be inspected on a periodic basis, to check for unusual wear. The hand brake chain should not rub against the wheel or bogie during operation. The HTSC-B1 bogie has a special spring pre-tensioning arrangement to prevent rubbing.Quarterly checked:
Check that all fasteners (nuts & bolts), clamps, and brackets are secure.
Verify condition of chain, shackles, and pins for corrosion, wear and damage. Replace as required.
Check that the pulley on the brake handle assembly is in good condition and properly secured. Replace if required.
Chain and other components should be lightly oiled to prevent corrosion.
Maintenance Instruction noMI 1517 (Rev. A)
Para 2.9.2
Para 2.9.4.1
Bogie removal Inspections before bogie removal
Yaw Dampers Primary Suspension Secondary Suspension
Springs Carbody pivot pin clearance Brake rigging Wheel condition, Wheels,
Axles, Axle Gears and Pinions
MI 1517 (Rev. A)
M.I. 1518 and 1519
Para 2.5Para 3.2.6Para 2.6
Para 3.2.4Para 3.2.2
Page 12 of 60 Quality Audit of Diesel Shed
Axle lateral clearances Vertical stop clearances Para 5.5.2
Para 5.5.2BOGIE ASSEMBLY REMOVAL It is required without exception that all appropriate discharge procedures be performed prior to commencing work on the trucks or related components (For figures refer relevant pages and para).
MI 1517 (Rev. A) Para 2.12.2
Bogie installation Jacks are used to raise the
locomotive, ensure that all jacks are raised simultaneously in equal amounts. Failure to keep the locomotive level may result in excessive stress on the underframe and carbody structure, or in a failure of the jacks.
Great care must be taken during this portion of the application process to prevent damage to the carbody pivot assembly and secondary suspension springs. The pivot pin and alignment dowels should slide into place easily. If this is not the case, slight movement of the bogie will be required to aid in assembly.
MI 1517 (Rev. A) Para 2.13.1
Vertical Stop Clearance to be ensured 16 mm +/- 3.2 mm
MI 1517 (Rev. A) Para 2.13.2
Final Installation MI 1517 (Rev. A) Para 2.13.3
Bogie Overhaul While the overhaul procedures are similar for the two types of bogies, it is imperative that the correct assembly drawing be used to ensure correct dimensions are achieved.
MI 1517 (Rev. A) Para 3.0 to 3.5
Page 13 of 60 Quality Audit of Diesel Shed
Detail instructions and guide lines for overhaul of bogie to be followed as per the para 3.0 to 3.5 of MI 1517 (Rev. A)Maintenance and wear limits MI 1517 (Rev. A) Para 5.5.1 and
Para 5.5.2
2.
Availability of Tools, Test Stands and special procedures
MI 1517 (Rev. A)
Work sketch 41089
Para 4.1
Lock bolt/ huck bolt installation machineWall mounted fixture to dampersSurface table of measurement of springsHeight gauge for springs Spring load-deflection testing machineHydraulic damper testing machine Torque wrench, Go/No Go GaugesInside and Outside Calliper, Vernier Caliper, Height Gauge, Cleaning Tank,Wheel wear measuring gauge SK.DL-3592
3
Availability, service data, special torque values and Instructions Etc
MI 1517 (Rev. A) Para 5.1.1 and Para 5.3
3.1 Display Chart3.2 Training of staff3.3 Maintenance manual and check sheets3.4 Record keeping of tools and measuring instruments
4 Record Keeping For Traceability
5
Material Availability and parts catalogues
HHP (MAC)HHP (PAC)
E26E35
Vital SparesMust Change items
Page 14 of 60 Quality Audit of Diesel Shed
CHECK SHEET FOR
QUALITY AUDIT OF TRACTION MOTOR PINION & GEAR ASSLY.
During the audit, activities should be checked with regard to the Clause/Para/Item of the reference documents. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded:
S.N REQUIREMENTS LOCO TYPE MAKE OF SUB-ASSEMBLY
REFERENCE DETAILS
CLAUSE/PARA/ITEM
DETAILS
OBSERVATION
1 MEASUREMENT
Alco (WDM2, WDM3A, WDM3D)
Traction Motor Pinion & Gear Assly. of Alco
Loco
MP-IB.EM.10.31.08
dated 24.10.2008
MP-MI 129/86 July 1986
MP-MI 5
1.1 TRACTION GEAR & PINIONGear Ratio 18 : 65
Pinion Drg. No. 18 teeth, SKDP3624
Pinion Bedding In Cold Condition
Not less than 95 %
Pinion Advance 2.25 TO 2.45MM
Heating Temperature 190ºC + AMB TEP.
Span Size On New Pinion Over 3 teeth 88.595 /88.722MM
Condmning Limit On Basis Of Span Size Of Pinion
Over 3 teeth 86.995MM
Gear Drg. No. 65 teeth SKDP3623 & SKDP3775
Span Size On New Gear Over 7 teeth 223.989/223.798MM
Condmning Limit On Basis Of Span Size Of Gear
Over 7 teeth 220.800MM
Permissible Backlsh With New Set
0.266 - 0.664MM
Condemning Limit On Basis Of Backlash
1.04MM
Crack detection MPMI or Zyglo test
1.2 TRACTION GEAR & PINIONGear Ratio 18 : 74
Page 15 of 60 Quality Audit of Diesel Shed
WDG3A
All ALCo locos MP-
IB.EM.01.02.10 dated 11.01.2010.
Pinion Drg. No. 18 teeth, SKDP3443
Pinion Bedding In Cold Condition
Not less than 95 %
Pinion Advance 2.30 TO 2.45MM
Heating Temperature 185ºC + AMB TEP.
Span Size On New Pinion Over 3 teeth 81.976 /82.093MM
Condmning Limit On Basis Of Span Size Of Pinion
Over 3 teeth 80.366MM
Gear Drg. No. 65 teeth SKDP3444 & SKDP3546
Span Size On New Gear Over 8 teeth 231.36/231.177
Condmning Limit On Basis Of Span Size Of Gear
Over 8 teeth 228.140
Permissible Backlsh With New Set
0.243 - 0.608MM
Condemning Limit On Basis Of Backlash
1.00MM
Crack detection MPMI or Zyglo test
1.3 TA FAN ASSEMBLY Outer diameter of TA fan 1387.25/1387mm
Bore diameter of TA stator 1392mm
Bore diameter of TA fan 600.00 / 600.03mm
Diameter of fan seating area on barrel.
600.03 / 600.06mm
Width of fan seating at bore 9+1 mm
Depth of counter sunk bolts hole 4.5 - 5.5 mm
Bolt head width 12.3mm
Bolt head height above fan plate after final assembly should not be more than
6- 7mm
Circumferentially Fan gap on TA 2.50 – 2.75mm
Tightening torque and wire locking process
28 – 30Kg-m
Tightening torque of M30 (coupling bolt)
170 – 180 kg-m.
Oil catcher thickness (at bottom side)
53.90 to 54.10mm
Bolts strength properties grade R8.8.
Page 16 of 60 Quality Audit of Diesel Shed
EMD locos (WDP4 & WDG4)
Traction Motor Gear Case of EMD Locos
MP.IB.EM.02.12.00dated 10-4-2000.
MP.IB.EM.03.12.10 dated 05-3-2010.
Sunk type M20 bolts can be used in place of fully threaded M20 bolts
M20 & M30 bolts should be replaced
After 4 – 5 years service of TA
Fan bore area should be heated (for shrink fit).
150 to 170 °С
Re-used or old bolts and barrel thread condition should be checked by
GO & NO GO thread ring or plug gauge
Threaded portion of barrel & bolts should be free from varnish or paint or dust deposits.
Visual inspection is required
TA fan should be mounted on the barrel by “shrink fit “
In place of (bolts) press fit.
TA fan bolts locking wire ends should not be come out of the bolt head(projected)
As shown in photo
Proper alignment of TA fan should be checked by inserting filler gauge circumferentially
Clearance between the fan (back side) and barrel of TA (as shown in attached photo)No clearance is allowed.
After Final assembly of TA fan, visual inspection is required on
Tightening torque, wire locking & fan back clearance with barrel(by filler gauge (circumferentially)
TA Gear train assembly Backlash at Steel plate
TA GEAR 102TAG/EG PINION 43T
PTU PINION - 43T
0.60mm to 1.40mm0.05mm to 0.12mm
on shaft
1.4 Traction Motor Gear Case of EMD LocosFollowing items must be checked before fitment/ assembly of top and bottom half gear caseThe Heli -coil insert should be checked for looseness. If loose, an oversized insert should be used or the same insert should be used with Loctite / araldite.The gear case must be cleaned thoroughly specially the mating surfaces.The same set i.e. the same top and bottom portions must be re-assembled together.Inter changeability of the two halves is not permitted.
Page 17 of 60 Quality Audit of Diesel Shed
As above
The 6mm hole must be kept clean.
The breather valve must be kept clean
The bolts must be tightened with the required torque of 35 ft and 990ft poundThe tightening sequence as described in the report must be followed.The pinion inspection hole must be properly plugged by weldingOil level should be checked as per Dip stick given in Annexure B of IB.OEM recommended sealants DOW Corning DC-3-0100 and (RTV) GE Sealmate TRV-1473 should be used. Expairy date should also be checked befor use & Dow corning sealant can be procured from M/s Dow Corning India Pvt Ltd. Mumbai.
2 AVAILABILITY OF TOOLS AND TEST STANDS2.1 Vernier Callipers2.2 Disc Mike2.3 Filler Gauge
3 INSTRUCTION3.1 Display Chart3.2 Training of Staff3.4Record keeping of tools and measuring instruments
4 TRACEABILITY5 MATERIAL AVAILABILITY
5.1 Vital Spare -NA5.2 Must change items -NA
Page 18 of 60 Quality Audit of Diesel Shed
CHECK SHEET FOR
QUALITY AUDIT OF TRACTION MOTORS
During the audit, activities should be checked with regard to the Clause/Para/Item of the reference documents. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded:
SN REQUIREMENTS LOCO TYPE MAKE OF SUB-ASSEMBLY
REFERENCE DETAILS
CLAUSE/PARA/ITEM
DETAILS
OBSERVATION
1 MEASUREMENT
AlcoTraction Motors
of Alco Loco
MP.MI-2 &MP.MI-6
Maintenance manual issued by OEMs viz. BHEL/CGL.
1.1 Insulation Resistance = 10 Mega ohm1.2 Carbon brushes for condemning sizes1.3 Clearance between commutator and brush holder1.4 Tension of brush holders springs.
2 AVAILABILITY OF TOOLS AND TEST STANDS2.1 1000V Megger2.2 Filler gauge
3 INSTRUCTION3.1 Display Chart3.2 Training of Staff3.3Record keeping of tools and measuring instruments
4 TRACEABILITY5 MATERIAL AVAILABILITY
5.1 Vital Spare5.2 Must change items
Page 19 of 60 Quality Audit of Diesel Shed
CHECK SHEET FOR
QUALITY AUDIT OF TRACTION MOTOR BEARING & ASSLY. COMPONENTS
During the audit, activities should be checked with regard to the Clause/Para/Item of the reference documents. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded:
S.N REQUIREMENTS LOCO TYPE MAKE OF SUB-ASSEMBLY
REFERENCE DETAILS
CLAUSE/PARA/ITEM
DETAILS
OBSERVATION
1 MEASUREMENT
All ALCo locos
Traction Motor Bearing & Assly. Components of
MP-IB.EM.14.50.08
dated 20.02.2009
1.1 Verticality of Outer race
1.2 Verticality of Inner race
1.3 Max. deviations allowed in above cases:Side Inner race Outer race
Pinion End 0.075 mm 0.25 mmCommutator End 0.065 mm 0.20 mm
1.4 Radial Clearances of bearings
a) For New BearingsBearing Radial clearance
before mounting (mm)
Radial clearance after mounting (mm)
NU 330 0.165 - 0.215 mm 0.100 – 0.170 mm
NH 320 0.105 – 0.140 mm 0.060 – 0.100 mm
b) In addition to above, max. service radial clearanceNU 330 0.300 max. 0.250 max.
NH 320 0.190 max. 0.150 max.
Page 20 of 60 Quality Audit of Diesel Shed
Alco LocoC) Flinger - PE
Bore Dia. 153.130 to 153.155
Total Width 12.65 to 12.70
d) Retaining collar - PE
Bore Dia. 146.015 to 146.040 mm
Total Width 12.65 to 12.70 mm
Outer Dia. 253.225 to 253.290 mm
Hub Outer dia. 177.040 to 177.090 mm
Outer dia. on 2nd Groove 210.610 to 210.670 mm
Groove width 8.00 to 8.05 mm
Total width 44.4 to 44.6 mm
e) End shield - PEBore dia. 319.975 to 319.995 mm
f) End shield - CEBore dia. 214.980 to 215.00 mm
g) Seat diameter on armature shaftFor brg.-PE, Bore dia. 150.035 to 150.055 mm
For brg.-CE, Bore dia. 100.025 to 100.040 mm
For retaining collar PE 146.130 to 146.150 mm
For bearing sleeve PE 153.220 to 153.240 mm
For inner brg wiper CE 101.600 to 101.620 mm
h) End Float on Traction motor (TM 4907) CELimit – 0.50 mm Aim – 0.42 mm
1.5 Fits & Clearances (BG TM)i) Pinion end bearing
Interferences (Diametrical) Clearances (DiametricalBrg. Sleeve to shaft
0.020 to 0.065 mm
Brg. Sleeve to inner brg. cap
0.635 to 0.750 mm
Flinger to shaft
0.065 to 0.110 mm
Retaining collar to outer brg. cap
0.25 mm (min.)
Page 21 of 60 Quality Audit of Diesel Shed
Inner race to shaft
0.035 to 0.080 mm
--------------- --------------
Retaining collar to shaft
0.090 to 0.135 mm
-------------- --------------
ii) Commutator end bearingInterferences (Diametrical) Clearances (DiametricalBrg. Sleeve to shaft
0.020 to 0.065 mm
Inner brg. Cap to sleeve
0.635 to 0.750 mm
Flinger to shaft
0.065 to 0.110 mm
--------------- --------------
Inner brg. Race to shaft
0.025 to 0.060 mm
-------------- --------------
1.6 Heating temp. of brg. & assly. componentsItem Heating temp.Bearing inner race PE 100 -110 ºCBearing inner race CE 100 -110 ºCSleeve (PE) 100 -130 ºCSleeve (CE) 100 -130 ºCFlinger (PE) 100 -120 ºCEnd shield (PE) 120 -130 ºCEnd shield (CE) 120 -130 ºCRetaining collar (wiper) 120 -130 ºC
2 AVAILABILITY OF TOOLS AND TEST STANDS2.1 Dial gauge
3 INSTRUCTION3.1 Display Chart3.2 Training of Staff3.3Record keeping of tools and measuring instruments
4 TRACEABILITY5 MATERIAL AVAILABILITY
5.1 Vital Spare -NA5.2 Must change items -NA
Page 22 of 60 Quality Audit of Diesel Shed
CHECK SHEET FOR
QUALITY AUDIT OF TRACTION ALTERNATOR
During the audit, activities should be checked with regard to the Clause/Para/Item of the reference documents. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded:
SN REQUIREMENTS LOCO TYPE MAKE OF SUB-ASSEMBLY
REFERENCE DETAILS
CLAUSE/PARA/ITEM
DETAILS
OBSERVATION
1 MEASUREMENT
EMD locos (WDP4 & WDG4)
Traction Alternator
of EMD loco
Maintenance Instruction for
Traction Alternator of
EMD loco
MI-3317-1and MI-3317-2
1.1(a) Check tightness of all mechanical and electrical connections. Check for open fuses (indicating pins protruding). Check collector rings and brushes for sparking.
(b) Collector Rings: -Maximum Ring Eccentricity = 0.15 mm (0.006"), -Maximum Lateral Ring Runout = 0.8 mm (1/32"),
-Condemning Limit on Ring Outside Diameter
Page 23 of 60 Quality Audit of Diesel Shed
= 260 mm (10-3/4") -Minimum spiral groove depth = 0.635 mm (0.025 inches). -Maximum lateral run-out = 0.8 mm
(1/32").
(c) Check that the slip ring 1 and 2 brush holders applied are centered on
the slip ring width, with a minimum 1.6 mm (1/16”) distance to the edge of the slip ring, and the trailing edge of the brush holder(s) are set at
.125”-140” from the surface of the slip ring.
(d) Check that large brush spring pressure is 1.5 kg (3.3 lbs) and small spring pressure is 0.68 kg(1.5 lbs.)
(e) Minimum length of bush = 3.81 cm. (1.5 in.) on the longest vertical side.
1.2 COLD RESISTANCE LIMITS (in Ohms at 75°C):
-Rotor Collector Ring to Collector Ring = 1.384(Nominal), 1.439(Max), 1.328(Min).
-Stator Line-to-Neutral (Per 5 Phase Group) = 0.00300(Nominal), 0.00306(Max),
Page 24 of 60 Quality Audit of Diesel Shed
0.00294(Min).
-Stator Line-to-Line (Per 5 Phase Group) = 0.00568(Nominal), 0.00579(Max), 0.00557(Min)
1.3(a) ROLLER BEARINGS:
-Outer diameter = 259.999 mm (+ 0.00 mm/ - 0.036 mm),
-Bearing Bore = 1200.00 mm (+ 0.00 mm/ - 0.020 mm),
-Width = 85.99 mm (+ 0.00 mm/ - 0.13 mm),
-Internal Clearance (before assembly) = 0.104 mm to 0.150 mm,
-Internal Clearance (after assembly) = 0.063 mm Min,
-Bearing Housing Bore Inside Diameter = 260.1152 mm (+0.102 mm/ -0.00 mm)
Page 25 of 60 Quality Audit of Diesel Shed
(b) Lubrication Capacity:
-Bearing Cap = 284 g (10 oz),
-Outer Bearing Cover = 284 g (10 oz),
-Bearing = 369 g (13 oz),
1.4RECTIFIER:(a) Checked for any loose connections, flash damage or damage caused by shorting to ground
(b) Continuity tester readings: 10 to 20 ohms in one direction and above 30,000 ohms when leads are reversed (for good diodes).
(c) Current limiting fuse resistence values (@75°F/23°C) = 0.000195 + - 0.000010 ohm
(d) All diodes in any paralleled group must be of the same polarity (ceramic cases or shrink tubing must be the same color), and the diodes must be applied to the proper heat-sink
bus.
(e) All diodes in any paralleled group should be of the same type (same impressed type
Page 26 of 60 Quality Audit of Diesel Shed
number and same type color band at the lower crimp).
2 AVAILABILITY OF TOOLS AND TEST STANDS2.1-Induction Heater,-Stone (1" x 1-1/2" x 5"),-Collector Ring Grinder,-Collector Ring Grinder Adapter,
-Hydraulic Pump,
-Collector Ring, Seals, and Bearing, -Puller Assembly,
2.2-Torque Wrench 0 – 50 ft/lbs. – 1/2” Drive,
-Multimeter,
-Megger, Insulation Resistance Test Set (500, 1000, 2500, 5000 volt),
-Digital Low Ohm Resistance Tester Kit,
(Range 0 to 1.999 miliohms)
3.3 3 INSTRUCTION
3.1 Display Chart3.2 Training of Staff
Page 27 of 60 Quality Audit of Diesel Shed
3.4Record keeping of tools & measuring instruments
4 TRACEBILITY5 MATERIAL AVAILABILITY
5.1 Vital Spare5.2 Must change items
Page 28 of 60 Quality Audit of Diesel Shed
CHECK SHEET FOR QUALITY AUDIT OF TURBO SECTION
During the audit, activities should be checked with regard to the Clause/Para/Item/chapter of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded.
Shed/Rly: Audited by: Date of audit:
SN Requirements Loco Type
Make Of Subassembly
Reference Details
Clause/Para/Item Details
Observations
1. Balancing, measurements etcBalancing:1.1 Bladed shaft, range 31-257 gmm.1.2 Rotor, range 157-470 gmm.
5.65.6.2.55.6.2.5
Rotor Shaft Dimensions:1.3 Bearing position OD A 39.98 – 40.00 mm
Para 5.2.4.13 &details in 5.4.2.1
1.4 Bearing position OD B 50.987--51.000 mm1.5 Bearing position OD C 56.10-56.20 mm1.6 Piston ring recess S 2.58-2.85 mmWheel Bush1.7 Compressor wheel set OD A 56.10 -56.20 mm
Para 5.2.4.13 &details in 5.4.2.2
1.8 Piston ring recess S 2.58-2.85 mm
1.9 Plain bearing (CE) ID A 54.00-54.06 mm Para 5.2.4.13 &details in 5.4.2.3
1.10 Bearing housing bore ID A 65.00-65.07 mm Para 5.2.4.13 &details in 5.4.2.4
1.11 Floating bush ID (CE) 40.011-40.05 mm Para 5.2.4.13 &details in 5.4.2.5
Floating bush OD (CE) 53.80-53.86 mm1.12 Floating bush OD (TE) 64.82-64.84 mm1.13 Floating bush ID (TE) 51.022-51.07 mm1.14 Thrust bearing width 10.39-10.50 mm Para 5.2.4.13
Page 29 of 60 Quality Audit of Diesel Shed
&details in 5.4.2.6
1.15 Axial bearing width 16.76-16.88 mm Para 5.2.4.13 &details in 5.4.2.7
1.16 Piston ring width 2.00 -2.49 mm Para 5.2.4.13 &details in 5.4.2.8
1.17 Thrust bearing press fit measure (K) 170.5 -170.63 Para 5.2.4.13 &details in 5.4.2.9
1.18 Axial clearance A 0.11-0.32 mm Para 5.2.4.13 &details in 5.7
1.19 Radial clearance B 0.47-0.93 mm
2.
Availability of Tools, Test Stands etc.
Alco do do
2.1 Balancing machine2.2 Zyglo testing machine2.3 Casing hydraulic test stand 2.4 Bearing puller (CE & TE)2.5 Torque wrench up to 250 psi2.6 micrometer 2”-3” & 0-4”2.7 Go-NoGo gauge for checking fix nozzle ring
3
Availability of instructions etc.3.1 Display Chart3.2 Training of staff3.3 Maintenance manual and check sheets3.4 Record keeping of tools and measuring instruments
4 Record Keeping For Traceability
5
Material Availability5.1 Vital Spares5.2 Must change items
Measurements etc
Page 30 of 60 Quality Audit of Diesel Shed
1
1.1 Nozzle ring and gas inlet casing 0.022-0.032” Dia Clearance (Cl)
Alco Alco 720Instruction
ManualALCO
ALCo MI 11126
1.2 Turbine blade and gas inlet casing 0.060-0.092”Dia CI1.3 Nozzle ring and turbine disc 0.124” cold CI1.4 Intermediate casing and impeller 0.017-0.065” longitudinal Clearance (long Cl)1.5 Impeller and Blower inlet 0.035-0.075” long CI1.6 Blower casing end blower inlet measure with bolt loose. Scatting with back of diffuser at lease to 80% (This is only in case when we apply a new diffuser) 0.005-0.020” Long CI (Gap)1.7 Turbine disc and intermediate casing 0.008-0.016” Long CI1.8 Bearing and thrust collar (Blower end) with surface by approx 0.003 less when oil. 0.007-0.018” Thrust CI1.9 Inducer and blower casing 0.091-0.101”Dia CI1.10 Thurst collar and oil seal Blower End 0.014-0.036” Dia CI1.11 Interference between bearing and intermediate casing (blower & Turbine end ) 0.0005-0.0015” Dia Cl1.12 Rotor shaft and oil seal (turbine end) 0.006-0.008” Dia CI1.13 Gas inlet casing and intermediate casing inside measurement 0.090-0.098” Dia CI1.14 Impeller and intermediate casing 0.125-0.127” Dia CI1.15 Max allowable clearance between Gas inlet casing & Nozzle ring 0.005” clearance
2Availability of tools, Test Stands etc.
AlcoAlco 720 Instruction
2.1 Balancing machine2.2 Zyglo machine2.3 Casing hydraulic test stand 2.4 Oil gallery flushing test stand2.5 Bearing puller (CE & TE)2.6 Sand blast machine for rotor cleaning2.7 Torque wrench up to 250 psi
Page 31 of 60 Quality Audit of Diesel Shed
ManualALCO
2.8 micrometer 2”-3” & 0-4”2.9 Go-NoGo gauge for checking fix nozzle ring
3
Availability of instructions etc .3.1 Display Chart3.2 Training of staff3.3 Maintenance manual and check sheets3.4 Record keeping of tools and measuring instruments
4 Record Keeping For Traceability
5Material Availability5.1 Vital Spares5.2 Must change items
Page 32 of 60 Quality Audit of Diesel Shed
CHECK SHEET FORTECHNICAL AUDIT OF CYLINDER HEAD SECTION
During the audit, activities should be checked with regard to the Clause/Para/Item/chapter of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded.
Shed/Rly: Audited by: Date of audit:
SN Requirements Loco Type
Make Of Subassembly
Reference Details Clause/Para/Item/chapter Details
Observations
1
Cleaning, measurements etc.1.1 Cleaning of cylinder head
ALCo --
DLW Maintenance
Instruction Manual
Chapter on cylinder head
1.2 Cy head leak test at 70 PSI with hot water1.3 Inspect head for cracks using Magnaflux1.4 Valve guide to head int 0.002” -0.0005”1.5 yoke to guide int 0.002” -0.0005”1.6 Yoke guide ( press in dim) 3.210” -3.272”1.7 Valve guide ( press in dim) 2.25”1.8 Valve to guide cl 0.003 – 0.0045”1.9 Cy head nuts torquing value 550ft/lbs
2
Availability of tools , Test Stands etc.2.1 Valve seat reconditioning machine2.2 Hydraulic test stand2.3 Feeler gauge2.4 Magna flux
3
Availability of instructions etc.3.1 Display Chart3.2 Training of staff3.3 Maintenance manual and check sheets3.4 Record keeping of tools and measuring instruments
4 Record Keeping For Traceability
5Material Availability5.1 Vital Spares5.2 Must change items
Page 33 of 60 Quality Audit of Diesel Shed
1
Cleaning, measurements etc.1.1 Cleaning of cylinder head
EMD --EMD Engine
Maintenance Manual
Chapter on cylinder head
1.2 Cy head leak test at 85 to 95 PSI air pressure1.3 Inspect head for cracks using Magnaflux1.4 Cy head valve seat angle 30º -30 º 15’1.5 Valve seat width 0.093” -0.125”1.6 Dia at top of valve seat 2.375”-2.437”1.5 Valve seat runout TIR max 0.008”1.6 Valve guide inside dia max 0.633” 1.7 Valve stem to guide clearance max 0.020”
2
Availability of tools ,Test Stands etc.2.1 Valve seat reconditioning machine2.2 Hydraulic test stand2.3 Feeler gauge2.4 Magna flux arrangement
3
Availability of instructions etc 3.1 Display Chart3.2 Training of staff3.3 Maintenance manual and check sheets3.4 Record keeping of tools and measuring instruments
4 Record Keeping For Traceability
5Material Availability5.1 Vital Spares5.2 Must change items
Page 34 of 60 Quality Audit of Diesel Shed
CHECK SHEET FORTECHNICAL AUDIT OF PISTON SECTION
During the audit, activities should be checked with regard to the Clause/Para/Item/chapter of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded.
SN Requirements Loco Type
Make Of Subassembly
Reference Details Clause/Para/Item/chapter Details
Observations
1
Cleaning, inspection, measurements etc.1.1 cleaning of piston ALCo -- DLW
Maintenance Instruction
Manual
Chapter on piston and con rod1.2 Inspect visually piston skirt and body for scoring or
scuffing 1.3 Inspect piston crack using Magnaflux1.4 Zyglo test for checking surface crack1.5 Groove width top ring, 2nd ring and 3rd ring 0.1902”- 0.1950”1.6 Side clearance in above rings 0.0052” -0.012”1.7 Groove width of oil scrapper ring 0.3140” – 0.3165”1.8 Side clearance in oil ring 0.002”- 0.006”1.9 Piston pin to bushing clearance running 0.003” – 0.0075”1.10 Piston pin to snap ring total clearance 0.076” – 0.118”
2.
Availability of tools , Test Stands etc.2.1 Feeler gauge2.2 Zyglo testing machine2.3 Magna flux2.4 Vernier caliper2.6 Piston ring groove gauge
3
Availability of instructions etc3.1 Display Chart3.2 Training of staff3.3 Maintenance manual and check sheets3.4 Record keeping of tools and measuring instruments
4 Record Keeping For Traceability
Page 35 of 60 Quality Audit of Diesel Shed
5Material Availability5.1 Vital Spares5.2 Must change items
1.
Cleaning, inspection, measurements etc.1.1 Inspect visually cylinder wall and top of piston for any scoring mark and water leak indication etc.
EMD -- EMD Engine Maintenance
Manual
Chapter on piston
1.2 Measure side clearance of no 1 compression ring.1.3 Inspect piston skirt for scoring or scuffing 1.4 cleaning of piston 1.5 Inspect piston crack using Magnaflux1.6 Piston skirt diameter min 9.0485”1.7 Out of round max 0.005”1.8 Piston to carrier pilot cl max 0.011”1.9 Piston platform to bottom of snap ring groove 6.626” -6.639”1.10 No 1 compression ring groove width max 0.201”1.11 Piston to Cy head cl 0.020”- 0.068”1.12 Compression ring to land clearance No 1 groove Max 0.012”1.13 Compression ring to land clearance No 2 & 3 groove Max 0.015”1.14 Compression ring to land clearance No 4 groove Max 0.015”1.15 Oil ring groove width 0.251- 0.2541.16 Oil ring to land clearance 0.002- 0.006”
2.
Availability of tools, Test Stands etc.2.1 Feeler gauge2.2 Zyglo testing machine2.3 Magna flux2.4 Vernier caliper2.5 Lead wire2.6 Piston ring groove gauge
3
Availability of instructions etc.3.1 Display Chart3.2 Training of staff3.3 Maintenance manual and check sheets
Page 36 of 60 Quality Audit of Diesel Shed
3.4 Record keeping of tools and measuring instruments 4 Record Keeping For Traceability
5
Material Availability5.1 Vital Spares5.2 Must change items
Page 37 of 60 Quality Audit of Diesel Shed
CHECK SHEET FOR QUALITY AUDIT OFAIR & EXHAUST VALVE MAINTENANCE
During the audit, activities should be checked with regard to the Clause/Para/Item/chapter of the reference documents. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded:
SN Requirements Loco Type Make of Subassembly
Reference Details
Clause/Para/Item details
Observations
1
Measurements etc:
Alco --Alco Instruction
Manual (MI-11020G)
Chapter on Cylinder Heads
1.1 Stem dia of valves 0.6205-0.6195 (New).1.2 Groove fillet radii 0.025-0.031R.1.3 Valve disk thickness: for C and F type valve of 450: (a) 0.1562” (new) and (b) 0.0625”(condemning Limit).1.4 Valve disk thickness (for E type valve 300) 0.1750”(new). And, 0.0937”(condemning Limit).
2Availability of tools, test stands etc:2.1 Depressor, Spring etc2.2 Grinder
3
Availability of instructions etc:3.1 Display Chart etc3.2 Training of Staff3.3 Record keeping of tools and measuring instruments
4 Record keeping for traceability:
5Material Availability:5.1 Vital Spare5.2 Must change items
1 Measurements etc:1.1 Stem diameter-measured within 12.7 mm (1/2”) of weld and 12.7 mm (1/2”) below P/N stencil on stem- Min. – 15.761mm (0.6205”).1.2 Valve face angle 30000’-29045’’.1.3 Valve seat runout-Max-0.06mm(0.0025’’).
Page 38 of 60 Quality Audit of Diesel Shed
EMD --EMD Engine Maintenance
Manual
Chapter on cylinder
heads and accessories
1.4 Valve rim thickness (measured at O.D.)- Min.- 2.77mm (0.109”); Valve face width-Max- 8.71mm(0.343”).1.5 Surface finish of valve stem roughened not beyond 0.635µmm(25µin)
2
Availability of tools, test stands etc.2.1 Single valve compressor (Part No 8033783)/Multiple valve spring compressor (Part No 9546582) 2.2 115V grinder for Grinding Valves
3
Availability of instructions etc.3.1 Display Chart etc3.2 Training of Staff3.3 Record keeping of tools and measuring instruments.
4 Record keeping for traceability.
5Material Availability5.1 Vital Spares5.2 Must change items
Page 39 of 60 Quality Audit of Diesel Shed
CHECK SHEET FOR TECHNICAL AUDIT OF RADIATOR SECTION
During the audit, activities should be checked with regard to the Clause/Para/Item/chapter of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded.
Shed/Rly: Audited by: Date of audit:
SN Requirements Loco Type
Make/class Of Subassembly
Reference Details
Clause/Para/Item/Chapter
Details
Observations
1
Cleaning etc
Alco Conventional Alco MI
Chapter on Maintenance,
Radiators.
1.1 cleaning details
2
Availability of tools, Test Stands etc. 2.1 Torque wrench up to 140 ft-lb.2.2 Hydraulic testing machine 0-10 Kg/Cm22.3 Radiator stand 2.4 Fin combing tool 2.5 Radiator immersion tank for cleaning
3
Availability of instructions etc.3.1 Display board etc3.2 Training of staff3.3 maintenance manual and check sheets3.4 Calibration facility for tools and measuring instruments
4 Record Keeping for Traceability
5.Material Availability:5.1 Vital spares 5.2 Must change Item
Page 40 of 60 Quality Audit of Diesel Shed
1. Cleaning etc
EMD Mechanical Bonded Radiator (MBRs)
EMD MI
Chapter on Maintenance,
Radiators.
Cleaning details
2.
Availability of Tools, Test Stands etc2.1 Torque wrench up to 140 Ft-lbs2.2 Hydraulic testing machine 0-10 Kg/Cm22.3 Radiator stand 2.4 Fin combing tool 2.5 Radiator immersion tank
3.
Availability of Instructions etc3.1 Display board – Cleaning and test procedure of the MBRs3.2 Training of staff3.3 All maintenance manual and check sheets3.4 Calibration facility for tools and measuring instruments
4.Record Keeping for Traceability
5.Material Availability:5.1 Vital spares – Gaskets and Radiator core panel 5.2 Must change Item – Gaskets during overhauling
Page 41 of 60 Quality Audit of Diesel Shed
CHECK SHEET FORQUALITY AUDIT OF FUEL INJECTION PUMP (FIP) MAINTENANCE
During the audit, activities should be checked with regard to the clause/Para/Item of the reference document. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded.
Shed/Rly: Audited by: Date of audit:
SN Requirements Loco type Make of subassembly
Reference details
Clause/Para/Item details Observation
1. Measurements etc
Alco Bosch 17 mm
Bosch manual
on repair and
testing
Para on Assembly
Para on Calibration ValuesPara on Inspection of Parts
Para on Inspection of Parts
1.1 Range control rack bush dia - 18.25 mm (0.7185”) - 18.27 mm (0.7192”).
1.2 BDC Dimension ‘a’ – 6.5 ± 0.05 mm.1.3 Clearance between control rack and
bushing – within 0.05 mm (0.020”).1.4 Control rack movement – within 0.38
mm (0.015”).2. Availability of Tools ,Test Stands etc.
1.1 Depth gauge for checking of BDC dimension ‘a’ on test bench.
1.2 Nut torque wrench , 450 lbs – 500 lbs.1.3 Bush reamer.1.4 Micrometer, 16 – 20 mm. 1.5 Assembly and dis-assembly fixture1.6 Pump calibration test stand 1.7 Calibration oil – Servo Calib-5
3. Availability of instructions etc.3.1 Display of charts etc 3.2 Training of staff.3.3 Maintenance manual and check sheet etc3.4 Record keeping of tools and measuring instruments.
4. Record keeping for traceability:5. Material availability:
5.1 Vital Spares5.2 Must change items
Page 42 of 60 Quality Audit of Diesel Shed
CHECK SHEET FORQUALITY AUDIT OF INJECTOR MAINTENANCE
During the audit, activities should be checked with regard to the clause/Para/Item of the reference document. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded.
SN Requirements Loco type
Make /Class/Name of subassembly
Reference details Clause/Para/Item details
Observations
1. Measurements etc
Alco Bosch Bosch repair and testing manual
Para on Assembly
1.1 Opening pressure - 3900 to 4050 psi (New nozzle )
1.2 Opening pressure - 3700 to 3800 psi (Overhauled nozzle )
1.3 Nozzle cap nut tightening torque 130-150 Nm (13-15 kgf.m or 94-109 lbs-ft)
1.4 Repetition (chatter) and spray pattern test (for new nozzle)
2. Availability of Tools, Test Stands etc:
List on Service Tools for Injector
2.1 Nozzle needle lift gauge2.2 Feeler gauge2.3 Dial gauge2.4 Nozzle centering sleeve2.5 True running gauge2.6 Nozzle tester2.7 Fixture for injector2.8 Socket wrench2.9 Test oil
3. Availability of instructions etc:3.1 Display of chart 3.2 Training of staff3.3 Maintenance manual and check sheet3.4 Record keeping of tools and measuring instruments
Page 43 of 60 Quality Audit of Diesel Shed
4. Record keeping for traceability:5. Material availability:
5.1 Vital Spares5.2 Must change items
1.
Cleaning, checking etc
EMD Ecotip Superstack Mechanical Unit Injector
(MUI)
Ecotip Superstack Injector Maintenance Instructions of Interstate McBee USA
Relevant para on cleaning etc.
1.1 Cleaning of injector components1.2 Checking of injector parts1.3 lapping
2.
Availability of tools, Test Stands etc.
Chapter on Tools and Fixture
requirements
2.1 EMD timing gauge2.2 Vise with adapter2.3 Calibration/Comparator Injector test stand.2.4 Control rack set length blocks2.5 Pop and Leak test stand2.6 Torque wrench2.7 Optical flat2.8 Monochromatic light source2.9 Soft wire buffng wheel2.10 12 mm dia. Soft wire brush2.11 Injector nut reamer2.12 Wrench for injector nut
3.
Availability of instructions etc.3.1 Display chart 3.2 Training of staff3.3 Maintenance manual and check sheet3.4 Record keeping of tools and measuring instruments
4. Record keeping for traceability:
5.
Material availability:5.1 Vital Spares5.2 Must change items
Page 44 of 60 Quality Audit of Diesel Shed
CHECK SHEET FOR
TECHNICAL AUDIT OF CONTROL ROOM
(Item: MBCS + MCBG +E type control)
During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded.
Shed/Rly: Audited by: Date of audit:SN Requirements Loco
TypeMake Of
Subassembly
Reference Details Clause/Para/Item Details
Obs
List of measuring equipments Calibration status Test bench set up facility Segregation of tested equipments
Check List of safety and critical items identified
ECS operation check GR operation check Eng. Stop button check OST open check MUSD stop switch check LWS check GFOLR operation check (E type loco) Governor dry run check Flasher light Head light Classification light Horn Sanders and direction
ALCo and EMD
Schedule inspection
Page 45 of 60 Quality Audit of Diesel Shed
Cab light and exterior lights Alerter, lamp, alarm and reset Flasher lights switch panel GR, DB cut out and B/B cut out seals Indication panels Attendant call bell Cab fan and air brake fan
Eng Temp switch setting at 68ºC, 74ºC, 90ºC, 95ºCProper closing of all covers and gaskets are intact in ECC1, ECC2 and ECC3
Practice for Handling of the electronic cards and storing
ALCo Doc No. :IM 53 for MBCS Medha
Availability of crimping tool & connector pin details
ALCo Doc No. :IM 53 for MBCS Medha
Load Box testing facility ALCo MP MI -10 (Rev.0.02)August, 2003 for ‘E’ type and MBCS
Micro Controller Based Governor (MCBG) MEG 601
Doc No:IM-11 Rev. 0.0 Date Jan 2009 of Medha
1. Measurement
Page 46 of 60 Quality Audit of Diesel Shed
Test procedure for MBCS loco 8th notch power curve
ALCo IM-59, MP MI -10 (Rev.0.02)August, 2003 for ‘E’ type and MBCS
2. Availability Of Tools And Test Stands
Alco3
Availability Of Instructions Etc3.1 Display Chart3.2 Training of staff3.3 Maintenance manual and check sheets3.4 Record keeping of tools and measuring instruments
4 Record Keeping For Traceability
5
Material Availability
5.1 Vital Spares
5.2 Must change items
7 Availability of Tools And Test Stands
8 Availability Of Instructions Etc
8.1 Display Chart
Page 47 of 60 Quality Audit of Diesel Shed
TA VoltsTA Amps.a. Amb. Temp.b. Corrected THP c. Fuel rack in mmd. NLV (Specified 1130VDC)e. 8th notch power curve f. Notch separation testIdle to full HP time (specified 40 sec)1st notch current limit (specified 32- 33.5mA)
8.2 Training of staff
8.3 Maintenance manual and check sheets
8.4 Record keeping of tools and measuring instruments
9 Record Keeping For Traceability
10 Material Availability
Page 48 of 60 Quality Audit of Diesel Shed
CHECK SHEET FOR
TECHNICAL AUDIT OF CONTROL GEAR SECTION FOR GENERATING FIELD CONTACTOR CONTACTOR CONTACTORS (ALCo LOCO)During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded.
Shed/Rly: Audited by: Date of audit:
SN Requirements Loco Type
Make Of Subassembly
Reference Details Clause/Para/Item Details
Observations
1. Measurement1.1 Control voltage 72+1 vdc, All Diesel
Electric Locomo tives (ALCo)
Drawing No. EL/PT/0640/ Altr
R3Part
No 12145439
Technical details given in the drawing
1.2 Max pick up volt 48v , 1.3 Main contact gap12-14.5mm, 1.4 Wipe 8-10 mm, 1.5 Contact pressure( kgf) initial 1.82-2.95,final 5.45-
7.25, 1.6 Operating coil resistance at 20 deg c 104 -116
ohm, (approx.),1.7 Interlock (gpr type : 9-41n, 3no+3nc) 1.8 Contact gap 9.5-10.5 mm, 1.9 Interlock contact pressure 220-300g.
1.10 Contact impression (should be min 80%) Spec No. MP.0.04.00.08
(Rev-01),May’10
3.10.e
1.11 IR Value between(i) Main contacts(ii) Coil and magnet frame(iii) Interlocks and coil shorted together and earth.(iv) Contacts of interlocks(v) Interlocks and coil shorted together and main
IEC 60571
as per clause 10.2.9
Page 49 of 60 Quality Audit of Diesel Shed
SN Requirements Loco Type
Make Of Subassembly
Reference Details Clause/Para/Item Details
Observations
contacts shorted together(vi) shorted main contacts and shorted interlocks, coil
and earth2.0 Availability of tools and stands
2.1 Multimeter with proper calibration2.2 Vernier calipers with valid calibration2.3 Go- No gauge suiting to different cantactors2.4 Dial gauge of different scale and resolution as
suited to respective contactor2.5 Source which can provide minimum current at
respective voltage (24 V – 72 V DC)2.6 Variac2.7 Meggar2.8 Oscilloscope
2.9 Screw Driver, Plier, Spanner Set, etc.3. Availability Of Instructions etc.
3.1 Display Chart3.2 Flow Chart 3.3 Training of staff3.4 Proper Display of Do’s and Don’t3.5 Maintenance manual and check sheets3.6 Record keeping of tools and measuring
instruments 3.7 Instruction Bulletin issued by RDSO3.8 Maintenance Manual of Manufacturer3.9 Specification
4. Compliance of Instruction Bulletin 5. Follow of Maintenance Manual of Manufacturer6 Record Keeping For Traceability
6.1 Proper Register is maintained for Contactors with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted.
Page 50 of 60 Quality Audit of Diesel Shed
SN Requirements Loco Type
Make Of Subassembly
Reference Details Clause/Para/Item Details
Observations
6.2 Proper record should be maintained for each contactor with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any.
7. Material Availability7.1 Vital Spares
7.2 Must change items7.3 Consumables
8. Disposal8.1 Segregation of Workable and Non-Workable
equipments and proper house keeping8.2 Proper Disposal of Materials including recycling
following relevant environmental norms
Page 51 of 60 Quality Audit of Diesel Shed
CHECK SHEET FOR
TECHNICAL AUDIT OF CONTROL GEAR SECTION FOR 6 M REVERSER (ALCo LOCO)
During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded.
Shed/Rly: Audited by: Date of audit:
SN Requirements Loco Type
Make Of Subassembly
Reference Details Clause/Para/Item Details
Observations
1. Measurement1.1 Auxiliary contacts 4, change over type, ALCo Drawing No.
EL/PT/0649/ Altr R5
Part No 12310372
Technical details given in the drawing1.2 Control voltage 72+1 V DC,
1.3 Operating air pressure 4.9 kg/cm2,1.4 Min operating air pressure 3.85 kg/cm2,1.5 Main contact gap19.05+1.6mm, 1.6 Main contact outside pressure (with lever) 4.0-
4.5kgf, inside pressure 5.8-6.5kgf,
1.7 Contact impression (should be min 80%)
1.8 Auxiliary contact pressure 0.68-2.0kgf, 1.9 Auxiliary contact gap 31.75mm (min), , 1.10 Magnet valve coil resistance at 20degC 615+5%
ohm.for BHELTYPE: 5027MV2 1.11 ROTEX TYPE: 3118AV1-3 coil resistance at
20degC-526 to 594 Ohms.
1.12 Contact impression (should be min 80%) Spec No. MP.0.04.00.08
(Rev-01),May’10
3.10.e
Page 52 of 60 Quality Audit of Diesel Shed
SN Requirements Loco Type
Make Of Subassembly
Reference Details Clause/Para/Item Details
Observations
1.13 IR Value between(i) Main contacts and frame (ii) Frame and all live parts connected
together (wth main cxontacts closed)(iii) Terminals of both side, terminals shorted
together on each side (Main contacts open)
(iv) All control and Aux. circuit
IEC 60571 as per clause 10.2.9
2.0 Availability of tools and stands2.10 Multimeter with proper calibration2.11 Vernier calipers with valid calibration2.12 Go- No gauge suiting to different cantactors2.13 Dial gauge of different scale and resolution as
suited to respective contactor2.14 Source which can provide minimum current at
respective voltage (24 V – 72 V DC)2.15 Variac2.16 Lever of 122.5 mm for measuring initial and final
pressure.2.17 Compresor with air reservoir2.18 Meggar2.19 Oscilloscope
2.20 Screw Driver, Plier, Spanner Set, etc.3. Availability Of Instructions etc.
3.10 Display Chart3.11 Flow Chart 3.12 Training of staff3.13 Proper Display of Do’s and Don’t3.14 Maintenance manual and check sheets3.15 Record keeping of tools and measuring
instruments 3.16 Instruction Bulletin issued by RDSO
Page 53 of 60 Quality Audit of Diesel Shed
SN Requirements Loco Type
Make Of Subassembly
Reference Details Clause/Para/Item Details
Observations
3.17 Maintenance Manual of Manufacturer3.18 Specification Spec No.
MP.0.04.00.08 (Rev-01),May’10
4. Compliance of Instruction Bulletin 5. Follow of Maintenance Manual of Manufacturer6 Record Keeping For Traceability
6.3 Proper Register is maintained for 6 M Reverser with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted.
6.4 Proper record should be maintained for each 6 M Reverser with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any.
7. Material Availability7.4 Vital Spares
7.5 Must change items7.6 Consumables
8. Disposal8.3 Segregation of Workable and Non-Workable
equipments and proper house keeping8.4 Proper Disposal of Materials including recycling
following relevant environmental norms
Page 54 of 60 Quality Audit of Diesel Shed
CHECK SHEET FOR
TECHNICAL AUDIT OF CONTROL GEAR SECTION FOR 6 M BKT CONTACTORS (ALCo LOCO)
During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded.
Shed/Rly: Audited by: Date of audit:
SN Requirements Loco Type
Make Of Subassembly
Reference Details Clause/Para/Item Details
Observations
1. Measurement1.1 Auxiliary contacts 4 change over type, All
Diesel Electric Locomotives (ALCo)
Drawing No. EL/PT/0648/ Altr
R5Part No 12310300
Technical details given in the drawing1.2 Control voltage 72+1 V DC,
1.3 operating air pressure 4.9 kg/cm2, 1.4 Min operating air pressure 3.85 kg/cm2 , 1.5 Main contact gap19.05+1.6mm, 1.6 Main contact - outside pressure (with lever) 1.7 4.0-4.5kgf, inside pressure 5.8-6.5kgf, 1.8 Auxiliary contact pressure 0.68-2.0 kgf, 1.9 Auxiliary contact gap 31.75mm (min), 1.10 Magnet valve coil resistance at 20degC 1.11 615+5% ohm. for BHELTYPE : M5027MV2 1.12 ROTEX TYPE: 3118AV1-3 coil resistance at
20degC 526 to 594 Ohms
1.13 Contact impression (should be min 80%) Spec No. MP.0.04.00.08
(Rev-01),May’10
3.10.e
1.14 IR value between(i) Main contacts and frame(ii) Frame and all live parts connected together
(wth main cxontacts closed)(iii) Terminals of both side, terminals shorted
together on each side (Main contacts open)
IEC 60571
a.
as per clause 10.2.9
Page 55 of 60 Quality Audit of Diesel Shed
(iv) All control and Aux. circuit
2.0 Availability of tools and stands2.21 Multimeter with proper calibration2.22 Vernier calipers with valid calibration2.23 Go- No gauge suiting to different cantactors2.24 Dial gauge of different scale and resolution as
suited to respective contactor2.25 Source which can provide minimum current at
respective voltage (24 V – 72 V DC)2.26 Variac2.27 Lever of 122.5 mm for measuring initial and final
pressure.2.28 Compresor with air reservoir2.29 Meggar2.30 Oscilloscope
2.31 Screw Driver, Plier, Spanner Set, etc.3. Availability Of Instructions etc.
3.19 Display Chart3.20 Flow Chart 3.21 Training of staff3.22 Proper Display of Do’s and Don’t3.23 Maintenance manual and check sheets3.24 Record keeping of tools and measuring
instruments 3.25 Instruction Bulletin issued by RDSO3.26 Maintenance Manual of Manufacturer3.27 Specification
4. Compliance of Instruction Bulletin 5. Follow of Maintenance Manual of Manufacturer6 Record Keeping For Traceability
6.5 Proper Register is maintained for Contactors with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted.
Page 56 of 60 Quality Audit of Diesel Shed
6.6 Proper record should be maintained for each contactor with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any.
7. Material Availability7.7 Vital Spares
7.8 Must change items7.9 Consumables
8. Disposal8.5 Segregation of Workable and Non-Workable
equipments and proper house keeping8.6 Proper Disposal of Materials including recycling
following relevant environmental norms
Page 57 of 60 Quality Audit of Diesel Shed
CHECK SHEET FOR
TECHNICAL AUDIT OF GOVERNOR SECTON(ALCo/EMD LOCO)
During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded.
Shed/Rly: Audited by: Date of audit:
SN Requirements Loco Type
Make Of Subassembly
Reference Details Clause/Para/Item Details
Observations
1. Dis Assembly and Assembly ALCo/EMD
Maintenance manual of
WoodWard
Section 5 of Maintenance Manual
2. Measurement :2.1 Physical Examination
ALCo/EMD
Wood Ward Governor Test
Record Format No. TSP/F8572-828
and Maintenance manual of
WoodWard
Section 6 of Maintenance Manual
2.2 Barometer Reading2.3 Pressure Test2.4 Hydraulic Seals, needle valve seat and buffer
piston bypass in both direction2.5 Needle Valve setting2.6 Speed Setting2.7 Normal Shut Down2.8 Pressure Requirement2.9 Speed Setting timing2.10 Lube Oil Shutdown2.11 Air Box Pressure Fuel Limiting2.12 Load Control2.13 Vane Servo Timing2.14 Excitation Resistor2.15 General
2.16 Verification with Cover Installed
3.
Availability Of Tools And Test Stands ALCo/EMD3.1 Test Stand for Wood Ward Governor
3.2 Multimeter with valid Calibration3.3 Screw Driver, Plier, Allen Key, Spanner, etc.3.4 Fire Extinguisher of proper class
4. Availability Of Instructions etc.
Page 58 of 60 Quality Audit of Diesel Shed
SN Requirements Loco Type
Make Of Subassembly
Reference Details Clause/Para/Item Details
Observations
3.28 Display Chart3.29 Flow Chart 3.30 Training of staff3.31 Proper Display of Do’s and Don’t
3.32 Display of Trouble Shooting Chart Maintenance Manual
Section 4
3.33 Maintenance manual and check sheets
3.34 Record keeping of tools and measuring instruments
3.35 Instruction Bulletin issued by RDSO NA
3.36 Maintenance Manual of Manufacturer
3.37 Specification NA
5.Compliance of Instruction Bulletin NA
6. Follow of Maintenance Manual of Manufacturer
7. Record Keeping For Traceability
6.7 Proper Register is maintained for Governor testing with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted.
6.8 Proper record should be maintained for each Governor with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any.
Page 59 of 60 Quality Audit of Diesel Shed
SN Requirements Loco Type
Make Of Subassembly
Reference Details Clause/Para/Item Details
Observations
8.
Material Availability
7.10 Vital Spares
7.11 Must change items7.12 Consumables like Lub Oil, Cotton wool,
etc.9. Disposal
9.1 Segregation of Working and Non-Working equipment and Proper House Keeping
9.2 Safe Disposal of scrap and waste including recycling following relevant environmental norms.
Page 60 of 60 Quality Audit of Diesel Shed