In Virginia…
a highway crash occurs every 4 minutes
a person is injured in a highway crash every 8 minutes
An average of 2 people dieevery day in highway crashes
2
![Page 3: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/3.jpg)
Agenda
• VDOT’s Highway Safety Program• Virginia Crash Trends• Strategic Highway Safety Plan• Current VDOT Highway Safety Strategies
– Improve Access to Highway Safety Info– Deliver Highway Safety Six-Year Plan– Deploy Low-Cost/High Benefit Solutions– Implement Roadway Departure Plan
3
![Page 4: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/4.jpg)
VDOT’s Highway Safety Program
4
What we do:• Identify & prioritize crash locations• Determine safety improvement projects• Fund & Deliver safety projects• Track results/lessons learned• Work Zone safety
Teamwork is Critical!
![Page 5: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/5.jpg)
5
36% 35%37%
20%
38% 35%
![Page 6: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/6.jpg)
Virginia Highway Crashes (2010 – 2014)
115997 120487 123478 121601 120448
0
20000
40000
60000
80000
100000
120000
140000
2010
2011
2012
2013
2014
Year
VDOT Local Total Crashes Injuries 6
64%
36%
65%
35%
65%
37%
63%
20%
62%
38% 35%
![Page 7: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/7.jpg)
Virginia Highway Deaths & Serious Injuries2005 - 2014
7
22,489
7,572
11316 10328
5,0007,0009,000
11,00013,00015,00017,00019,00021,00023,00025,000
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
Serious Injuries SHSP Target
946
1,026
740775
700718
656600650700750800850900950
10001050
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
Deaths SHSP Target
![Page 8: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/8.jpg)
VDOT Maintained Road Crashes 2010-2014
8
23%
41%
36%
Total CrashesInterstate
Primary
Secondary
20%
44%
36%
ALL Injuries
17%
48%
35%
Deaths
21%
42%
37%
Severe Injuries
![Page 9: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/9.jpg)
2010 - 2014 Network Comparison
9
84%
16%
Lane MileageVDOTLocal
82%
18%
DVMT
81%
19%
Deaths
62%
37%
Injuries
64%
36%
Crashes
![Page 10: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/10.jpg)
2010 - 2014 Network ComparisonStatewide - Posted Speed Limit
10
20%
24%42%
14%
Fatal Crashes
40%
26%
24%
10%
Total Crashes
35 or Less 36 to 4546 to 55 Over 55
40%
28%
24%
8%
Injury Crashes
![Page 11: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/11.jpg)
Virginia Highway Crash Types
11
33
25
19
8.5
5
2.62.1 1.4
3.4
Total Crashes (%)
5.8
16.8
44.8
2.40.6
10
5.5
11
3.1
Fatal Crashes (%)
![Page 12: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/12.jpg)
Virginia Pedestrian & Bicycle Crashes2010-2014
12
2%
14%
17%
67%
Total Crashes (%)9%
34%
17%
40%
Fatalities (%)
2%
14%
16%68%
Injuries (%)
![Page 13: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/13.jpg)
Strategic Highway Safety Plan
VisionToward Zero Deaths
Mission• save lives and reduce crashes and injuries• data driven strategic approach• enforcement, education, engineering, and
emergency response strategies
Goalreduce deaths & severe injuries by half by 2030
Target –3 percent per year until 2016
13
![Page 14: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/14.jpg)
SHSP Emphasis Areas
1. Roadway Departure2. Intersections3. Speed4. Occupant Protection5. Impaired Drivers6. Young Drivers7. Data Collection, Management and Analysis
http://www.virginiadot.org/info/hwysafetyplan.asp
EngineeringStrategies
14
![Page 15: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/15.jpg)
Current VDOT HighwaySafety Strategies
15
![Page 16: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/16.jpg)
Improve Access to Safety Info
• NEW Highway Safety OutsideVDOT page• Worked with DMV to improve crash data timelinessØ 18 month lag in June of 2014Ø 2 month lag in June of 2015
• Developed Tableau Tools:Ø Crash Data ToolØ Highway Safety Project Tracking Tool
Go to: OutsideVDOTClick on: VDOT Highway Safety Info
16
![Page 17: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/17.jpg)
Deliver Highway Safety Six-Year Plan
17
Data-Driven Projects Focusing on:• Roadway Departure crashes• Intersection crashes• Bicycle and Pedestrian safety• Low-cost/high-benefit safety solutions
Flashing Yellow Arrows
Rumble Strips
Curve Delineation
![Page 18: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/18.jpg)
Highway Safety Project Inventory
1517
13
24
10
38
39
20
1310
Active Projects By District*
Bristol Culpeper FredericksburgHampton Roads Lynchburg Northern VARichmond Salem StauntonStatewide
199Total
*Active means in preliminary engineering, right-of-way, or construction phases as of June 12, 2015
77
13
109
Active Projects ByPhase*
PE Right-of-way Construction
138
61
Project Administration*
VDOT Local
![Page 19: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/19.jpg)
HSIP SYIP (FY2016-FY2021)
19
51.0
16.6
8.22.2
28.3
26.3
24.623.2 20.8
4.2
5.0
5.35.3
5.3
4.0
6.0
8.010.0
10.0
5.010.0
10.010.0
3.0 4.6 7.0
0
10
20
30
40
50
60
FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021
Fund
ing
($M
illio
ns)
Previously Allocated/Committed New District HSIP ProjectsStatewide Initiatives Local Safety ProjectsRoadway Departure Plan Future District Projects
53.4 53.153.153.1 53.153.1
* Available funding estimates provided by Infrastructure Investment Division in March, 2015.
2.6
![Page 20: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/20.jpg)
Open Container SYIP (FY2015-FY2021)
20
3.0
11.2
14.0 14.0 14.0 14.0 14.0 14.0
0
2
4
6
8
10
12
14
16
FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021
Fund
ing
($M
illio
ns)
Previously Allocated/Committed I-95/I-81 Safety Projects
14.2 141414 141414
* Estimated funding based on past years and VDOT/DMV split as of March, 2015. Subject to change.
![Page 21: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/21.jpg)
Before-and-after Results
21
Where 113 highway safety-funded projectshave been deployed since 2004…
92%
Fatal Crashes
55%
Injury Crashes
![Page 22: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/22.jpg)
Deploy Low-Cost/High-Benefit Solutions
What We Know:• Highway Safety Funding is very limited.• Severe crashes are spread out across our roadway network
As a result, we must:• Select projects based on data-driven approach• Take advantage of low cost solutions that can be deployed at
many locations (We call these SYSTEMIC projects)
For Example …
22
![Page 23: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/23.jpg)
Example
Traditional IntersectionProject
• Rebuild IntersectionØ Move curbØ Add capacityØ Rebuild/replace signalØ Some R/W required
• Typical Cost: $2-4 Million• Typical Schedule: 2-4 years
• Typical crash reductionØ 10-15 crashes/year
23
Systemic IntersectionProject
• Deploy flashing yellowarrow at 25 intersections
• Approximate Cost: $500K• Approx. Schedule: 1 year
• Expected crash ReductionØ 36% of all left turn angle
collisionsØ Approximately 90
crashes/year
![Page 24: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/24.jpg)
http://safety.fhwa.dot.gov/systemic/index.htm
FHWA Systemic Approach
![Page 25: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/25.jpg)
Systemic Projects – Curve Delineation
25
Estimated Cost:à $5K/location
Estimated Crash Reduction:à 30-50% of all crashes
Estimated Schedule:à less than 1 year
Other Notes:FHWA proven safety countermeasure
![Page 26: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/26.jpg)
Systemic Projects – Rumble Strips
26
Estimated Cost:à $7K/mile – center line RSà $12K/mile – shoulder RS
Estimated Crash Reduction:à 44-64% - center line RSà 36% - shoulder RS
Estimated Schedule:à less than 1 year
Other Notes:FHWA proven safety countermeasure
![Page 27: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/27.jpg)
Systemic Projects – Flashing Yellow Arrow
27
Estimated Cost:à $20K/intersection
Estimated Crash Reduction:à 36 % of left turn angle crashes
Estimated Schedule:à about a year
![Page 28: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/28.jpg)
Systemic Projects – Retroreflective TrafficSignal Backplates
28
Estimated Cost:à $5-7K/intersection
(much less if doing other work)
Estimated Crash Reduction:à 15 % of all intersection crashesà 28% of severe crashes
Estimated Schedule:à less than a year
Other Notes:FHWA’s proven safety countermeasure
![Page 29: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/29.jpg)
Systemic Projects –Signal Timing
29
Elements:• Cycle length, split, Offset, Yellow
and Red Clearance intervals,pedestrian clearance interval,pedestrian phase selection.
Estimated Cost:à $5K/intersection
Estimated Crash Reduction:à 20-33 % of all crashes
Estimated Schedule:à less than a year
![Page 30: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/30.jpg)
Systemic Projects – Road Diets
30
Estimated Cost:à $20-30K/mile for pavement
marking changes
Estimated Crash Reduction:à 20-47 % of all crashesà particularly rear end, angle, and
sideswipe crashesà risk reduction for peds and bikes
Estimated Schedule:à less than a year if coordinated
with resurfacing
Other Notes:FHWA proven safety countermeasure
![Page 31: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/31.jpg)
Systemic Projects – Ped Refuge Islands
31
Estimated Cost:à $20-30K/location if no R/W needed
Estimated Crash Reduction:à 40-45 % of all crashes
Estimated Schedule:à 1-2 years
Other Notes:FHWA proven safety countermeasure
![Page 32: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/32.jpg)
Systemic Projects – Other Ped/Bike Projects
32
Element w/ Estimated Cost:• Ped countdown SignalsØ $1200/Each
• Rectangular Rapid Flashing BeaconØ $30-40K per location
• HAWK SignalØ $90-120K per locationØ FHWA Proven Safety
Countermeasure• High-Visibility Crosswalk
Ø $5-10K/intersection
• Green Bike Lanes in conflict areasØ $20/square foot
![Page 33: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/33.jpg)
Roadway Departure Plan
33
![Page 34: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/34.jpg)
Roadway Departure Crash Definition
“A non-intersection crash which occurswhen a vehicle crosses an edge line or a
center line, or otherwise leaves thetraveled way.” (Source: FHWA)
34
![Page 35: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/35.jpg)
Roadway Departure Plan
35
• Completed by FHWA
• Recommends low-cost,systemic countermeasures
• Focus on keeping vehicles onthe road
• Plan, spreadsheet and GISmaps available onOutsideVDOT Page. Accessby clicking HERE.
Contact Stephen Read at:(804) 786-9094
![Page 36: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/36.jpg)
Roadway Departure Plan
TOP 3 Recommendations of Plan:
36
Deploy low cost treatments at targeted locations that havecrash history
RecommendedTreatment
EstimatedInvestment
EstimatedAnnual
Severe InjuryReduction
EstimatedAnnualFatality
ReductionCurve treatments $13M 150 18Centerline Rumble Strips $8M 185 6Shoulder Rumble Strips $10M 229 6
Total $35M 564/year 30/year
![Page 37: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/37.jpg)
VDOT Highway Safety Strategies Summary
• Improve Access to Highway Safety Info• Deliver Highway Safety Six-Year Plan• Deploy Low-Cost/High Benefit Solutions• Implement Roadway Departure Plan
37
![Page 38: Virginia’s Highway Safety Plan - VASITEvasite.org/images/meeting/062415/vasitevirginahwysafetyplan2015.pdf · Virginia’s Highway Safety Plan VASITE Summer Meeting June 25, 2015](https://reader031.vdocument.in/reader031/viewer/2022030410/5a9c1acd7f8b9a30358e6b9f/html5/thumbnails/38.jpg)
Questions?
Mark A. Cole, PEVDOT Assistant State Traffic Engineer
Highway Safety Program(804) 786-4196