FOREMOSTON THE FORESHORE PAGE 2
WalltoWallF R A N K L I N H A R R I S O N K I N G S TO N N A R R AG U N DA H Q U E A N B E YA N R E I D D E C E M B E R 2 0 1 5
![Page 2: Wall to Wall December 2015](https://reader033.vdocument.in/reader033/viewer/2022050823/579071c61a28ab6874a3afc4/html5/thumbnails/2.jpg)
2
KINGSTON146UNITS
6 + 1HEIGHT
4,641m2
LOGICWALL®
AFS LOGICWALL® 162MM PARTY WALLS
Element Apartments
AFS LOGICWALL® buildingmulti-residential apartmentssmarter, faster, better
![Page 3: Wall to Wall December 2015](https://reader033.vdocument.in/reader033/viewer/2022050823/579071c61a28ab6874a3afc4/html5/thumbnails/3.jpg)
3
HARBOUR
![Page 4: Wall to Wall December 2015](https://reader033.vdocument.in/reader033/viewer/2022050823/579071c61a28ab6874a3afc4/html5/thumbnails/4.jpg)
REID43 Constitution Avenue
4
91UNITS
9 + 5HEIGHT
2,612m2
LOGICWALL®
AFS LOGICWALL® 120MM PARTY WALLS
AFS LOGICWALL® 120MM BLADE WALLS
AFS LOGICWALL® 200MM BLADE WALLS
AFS LOGICWALL® 200MM EXTERNAL WALLS
AFS LOGICWALL® 200MM PARTY WALLS
AFS LOGICWALL® 200MM LIFT & STAIR WALLS
AFS LOGICWALL®
for speed of construction,materials handling andcost efficiencies.
![Page 5: Wall to Wall December 2015](https://reader033.vdocument.in/reader033/viewer/2022050823/579071c61a28ab6874a3afc4/html5/thumbnails/5.jpg)
5
![Page 6: Wall to Wall December 2015](https://reader033.vdocument.in/reader033/viewer/2022050823/579071c61a28ab6874a3afc4/html5/thumbnails/6.jpg)
NARRABUNDAHCnr Jerrabomberra and Hindmarsh Drive
78UNITS
2HEIGHT
5,074m2
LOGICWALL®
AFS LOGICWALL® 120MM EXTERNAL WALLS
AFS LOGICWALL® 120MM INTERNAL WALLS
AFS LOGICWALL® 120MM PARTY WALLS
AFS LOGICWALL® 150MM LIFT & STAIR WALLS
AFS LOGICWALL® 200MM BLADE WALLS
6
![Page 7: Wall to Wall December 2015](https://reader033.vdocument.in/reader033/viewer/2022050823/579071c61a28ab6874a3afc4/html5/thumbnails/7.jpg)
7
![Page 8: Wall to Wall December 2015](https://reader033.vdocument.in/reader033/viewer/2022050823/579071c61a28ab6874a3afc4/html5/thumbnails/8.jpg)
8
QUEANBEYAN6 High Street
32UNITS
4 + 1HEIGHT
4,126m2
LOGICWALL®
AFS LOGICWALL® 120MM EXTERNAL WALLS
AFS LOGICWALL® 150MM EXTERNAL WALLS
AFS LOGICWALL® 150MM CORRIDOR WALLS
AFS LOGICWALL® 150MM PARTY WALLS
AFS LOGICWALL® 150MM LIFT & STAIR WALLS
AFS LOGICWALL® 1 50MM PARAPET WALLS
![Page 9: Wall to Wall December 2015](https://reader033.vdocument.in/reader033/viewer/2022050823/579071c61a28ab6874a3afc4/html5/thumbnails/9.jpg)
9
AFS ticked many boxes for this project and could be incorporated into various components of thebuilding. It offered a structural solution, formed part of the external façade system, provided
the necessary fire separation and was also a cost effective system within very tight siteparameters.” NICK PELLE, DIRECTOR, OZTAL ARCHITECTS”
“
![Page 10: Wall to Wall December 2015](https://reader033.vdocument.in/reader033/viewer/2022050823/579071c61a28ab6874a3afc4/html5/thumbnails/10.jpg)
FRANKLINZest Apartments
10
78UNITS
3 + 1HEIGHT
6,190m2
LOGICWALL®
AFS REDIWALL® 200MM BASEMENT RETAINING WALLS
AFS REDIWALL® 200MM LIFT & STAIR WALLS
AFS LOGICWALL® 120MM EXTERNAL WALLS
AFS LOGICWALL® 120MM INTERNAL WALLS
AFS LOGICWALL® 120MM BLADE COLUMNS
AFS LOGICWALL® 120MM LIFT & STAIR WALLS
AFS LOGICWALL® 200MM BLADE COLUMNS
1,386m2
REDIWALL®P V C P E R M A N E N T F O R M W O R K
![Page 11: Wall to Wall December 2015](https://reader033.vdocument.in/reader033/viewer/2022050823/579071c61a28ab6874a3afc4/html5/thumbnails/11.jpg)
11
“We used AFS LOGICWALL® for external walls and internalpartition walls and the REDIWALL®product for the basements walls onthe Zest Apartments Project. Theproject comprised 2 and 3 storeybuildings, totalling 78 units with atotal build duration of 9½ months. We can contribute the ease andspeed of construction duringstructure to the use of the AFS andREDIWALL® Systems. AFS alwaysmet their delivery dates and werealways very helpful, from detailingshop drawings to delivery on site.”
DAMIAN RUMBALL, PROJECT COORDINATOR, GEOCON
![Page 12: Wall to Wall December 2015](https://reader033.vdocument.in/reader033/viewer/2022050823/579071c61a28ab6874a3afc4/html5/thumbnails/12.jpg)
HARRISON Sapling Street
12
AFS LOGICWALL® and REDIWALL®
the perfect combination for above and below ground applications.
![Page 13: Wall to Wall December 2015](https://reader033.vdocument.in/reader033/viewer/2022050823/579071c61a28ab6874a3afc4/html5/thumbnails/13.jpg)
76UNITS
4 + 1HEIGHT
2,161m2
LOGICWALL®
AFS REDIWALL® 200MM BASEMENT RETAINING WALLS
AFS LOGICWALL® 150MM BLADE COLUMNS
AFS LOGICWALL® LIFT & STAIR WALLS
1,496m2
REDIWALL®
P V C P E R M A N E N T F O R M W O R K
13
![Page 14: Wall to Wall December 2015](https://reader033.vdocument.in/reader033/viewer/2022050823/579071c61a28ab6874a3afc4/html5/thumbnails/14.jpg)
14
Certified resistant to fire and waterIdeal for basements, columns, party walls, retention tanks, foundation and retaining walls, service and stormwater pits, stair and lift walls.
P V C P E R M A N E N T F O R M W O R K
![Page 15: Wall to Wall December 2015](https://reader033.vdocument.in/reader033/viewer/2022050823/579071c61a28ab6874a3afc4/html5/thumbnails/15.jpg)
A three-man team can erect one hundred square metres of LOGICWALL® in just one day
This information is copyright protected and may not be copied, rebroadcast or redistributedin any way, in whole or in part without the written permission of AFS Systems Pty Ltd.This newsletter is copyright© of AFS Systems Pty Ltd ABN 455 760 727 88.
Document No: COR 00011 AUG15
3 men+1 day=100m2
AFS can help you designand build your next project,
contact us at:
1300 727 237 or visit: afswall.com.auP V C P E R M A N E N T F O R M W O R K