1Submission Version – June 2016
WaltonNeighbourhoodPlan
ConsultationStatementJune2016
2SubmissionVersion–June2016
Contents:
Part1:Introduction(paragraphs1-4)Part2:TheworkoftheNeighbourhoodPlanWorkingGroup,September2013–2016(paragraphs5-54)Part3:ResponsesreceivedtotheconsultationontheproposedfinaldraftoftheNeighbourhoodPlan19thFebruary2016–1stApril2016&workontheFinalDraftofthePlan(paragraphs55–62)Part4:Appendices(1-10)
3Submission Version – June 2016
Part1:Introduction
1.ThisdocumentistheConsultationStatementthataccompaniestheWaltonNeighbourhoodPlan.ItsetsouttheconsultationandengagementcarriedoutbytheWaltonNeighbourhoodPlanWorkingGroup(NPWG)initsworkdrawinguptheNeighbourhoodPlan.ItcoverstheperiodfrominceptionoftheNPWGinJune2013theconsultationontheproposeddraftofthePlaninearly2016andworkonthefinaldraftofthePlanbeforeitssubmissiontoMiltonKeynesCouncil.FurtherinformationabouttheNPWG–anddocumentsthatarereferredtobelow–canbefoundonWaltonCommunityCouncil’swebsite:www.waltoncommunitycouncil.gov.uk2.ConcernhadbeenexpressedsinceJanuary2012byanumberofresidentsandcouncillorsaboutthescaleofdevelopmenttakingplaceneighbouringtheparish,whichwasinevitablygoingtohaveanimpactoninfrastructurewithinWaltonparisharea.Itwasfeltthatwhiletherewasconsiderationofindividualplanningapplicationswithintheparish,notenoughconsiderationwasbeinggivenbyplannersanddevelopersabouttheimpactofsuchdevelopmentsonthewiderarea.WiththeLocalismBillhavinggonethroughParliamentitwassuggestedthatneighbourhoodplanningmightprovideanopportunitytogiveresidentsachancetohaveasayinfuturedevelopmentandinthefutureshapeofthearea.3.TheissueofneighbourhoodplanningwasfirstputontheagendaofWaltonCommunityCouncil(WCC)on4April2012.Representativesfromalocalresidentsgroup,SR4-setuptorespondtoplansfortheneighbouringChurchFarmdevelopmentproposals,engagedwithWCCandafterfurtherresearchanddiscussion,resultedinameetingon14May2013whereapresentationandworkshopwasfacilitatedbyanexternalconsultant.AllWCCmeetingsarepublicandopentoallthoselivingorworkinginthearea.Themeetingexaminedapotentialprocessandtimetableforpreparingaplanalongsideidentifyingaseriesofissuesforconsiderationofaddressingthroughtheprocess.ItwasagreedtocommissionafeasibilitystudyofundertakinganeighbourhoodplaninWalton.4.TheFeasibilityStudywasconsideredbyWCCon18June2013anditwasagreedthatameetingshouldbecalledtosetupaNeighbourhoodPlanWorkingGroup(NPWG).ItwasdecidedthattheNPWGwouldreportbackonitsprogresstothePlanning&DevelopmentCommitteeofWCC. TheFeasibilityStudycanbeseenatAppendix1.
4SubmissionVersion–June2016
Part2:TheworkoftheNeighbourhoodPlanWorkingGroup,
(September2013-2016)5.ThefirstmeetingoftheNPWGtookplaceon11September2013inRoom2atMKSnap,BourtonLow.8people,includinglocalcouncillors,attendedthemeeting.AChairandViceChairwereelectedandtherewasdiscussionaboutthefutureshapeoftheNPWG,theFeasibilityStudypreviouslycommissionedbyWCC,alongwiththeresourcesrequired.ItwasagreedtogoaheadwiththeformationoftheNPWGandtoschedulemonthlymeetings.ItwasalsoagreedthattheNPWGshouldbeasopenandinclusiveaspossible–withmeetingsopentoallthoselivingandworkinginthearea.Termsofreferenceforthegroupwerereviewedandadoptedsubjecttoagreedamendments. DetailsoftheNeighbourhoodPlanWorkingGroupcanbefoundatAppendix2.6.ThesecondNPWGmeetingtookplaceon9October2013atMKSnap.ThemeetingwasattendedbyaSeniorPlanningOfficerfromMiltonKeynesCouncil.Apresentationonthepurposeofneighbourhoodplanningandtheprocessesinvolvedwasreceived.Discussiontookplacewithregardtheworkrequiredandallagreedtherewasvalueinproceeding,withreviewstobecarriedoutatkeypoints.ItwasalsoagreedthatanydatacollectedfromtheprocesswouldbenefitWCCasawhole.RecruitmentofadditionalrepresentativestothegroupwerediscussedandtoespeciallytargetrepresentativesforBrownsWoodandWalnutTree.7.TheNPWGmeetingheldon20November2013focussedonthequestionnairetogotoallresidentsandalsotobeusedasarecruitmenttoolforthegroup.Acommunicationstrategywasagreedincluding;WCCwebsite,Facebook,Twitter,parishnoticeboardsandtheparishnewsletter.Itwasagreedtocontactotherparisheslocallytoshareknowledgeandexperience.FundinghadbeensecuredfromLocalities,withanadditionalcommitmentfromtheWCC2013/14budgetandfurtherallocationfromtheWCC2014/15budget.AdefinitionstatementwasbroadlyadoptedfortheinitialphaseanditwasagreedthewholeparishshouldconstitutetheAreafortheplan–toberatifiedatFullCouncilon4December2013.Futuremeetingsweretobepublishedasthe2ndWednesdayofeverymonth.8.TheNPWGmeetingon15January2014wasattendedbythenewlyappointedProjectOfficertoWCC,whowouldsupporttheprogressanddevelopmentoftheplan.Detaileddiscussiontookplaceregardingtheformatofthequestionnaire,necessarypersonaldatatobeobtainedalongwithmandatoryquestions.Itwasagreedthefirststagesurveywouldcompriseabroadauditofcommunityneedtobedelivereddoortodoorsuppliedwithpre-paidenvelopesforreturn.TheCouncilTaxletterduetogooutwouldbeutilisedtoraiseawarenessofthesurveyandtheworkoftheNPWG.9.TheletterofapplicationtodesignatetheAreawasinitiallysenttoMiltonKeynesCouncilinJanuary2014.FollowingthistheNPWGarrangedaNeighbourhood
5Submission Version – June 2016
ChampionsForumon29January2014attendedbyrepresentativesfrom3otherparishcouncilsinMiltonKeynesprogressingneighbourhoodplans.Evidenceneededtosupportaplanwasdiscussedalongwithexperiencesharedofsuccessfulcommunityengagementmethods.10.AspartoftheworktopromotethesurveyandtheworkoftheNPWGaFacebookpageandemailaddressweresetup.ItwasagreedthattheWCCwebsitewouldpublishalldocumentsrelatedtotheworkoftheNPWG,includingminutes,agendasandpresentations.ThewebsiteandcontentwouldfurtherbepromotedviatheWCCFacebookpageandTwitteraccount.11.AroundthistimefurtherinformationwasgatheredabouttheemergingpictureofneighbourhoodplanningfromgroupssuchasPlanningAid,Localityandotherrelatedsources.ItwasagreedtoinviteTheChairoftheWoburnSandsNeighbourhoodPlanGroupandNeighbourhoodPlanChampion,toattendafuturemeetingoftheNPWG,togainfurtheradviceandguidanceonachievingsuccessthroughtoreferendumandadoption.WardCouncillorswerealsocontactedtorequestpromotionoftheproposedplanthroughtheirowncommunicationroutes.12.WCCheldaMeettheCouncilDayatHeronsbrookMeetingPlaceon29March2014.Thiswasusedasanopportunitytotalktoresidentsabouttheneighbourhoodplanandbegintoidentifypotentialissuesalongwithfutureinfrastructureneeds.13.InpreparationforthedistributionoftheStage1survey,anarticlewasincludedonthebackofWCC’sCouncilTaxlettertoresidents.Thearticleexplainedthebackgroundtoneighbourhoodplanning,theworkoftheNPWGandurgedresidentstocompletethesurveyduethroughtheirdoorsinMarch.TheCouncilTaxLettercanbeseenatAppendix3.14.TheStage1surveywascirculatedinMarch2014toeveryhouseholdintheparish,withreplypaidenvelopesissuedtoencouragereturns.Thesurveycoveredkeythemesaskingwhatresidentsconsideredmostimportantandalsohowtheyfeltwewereperformingagainsteachtheme.Thekeyissuescoveredintheinitialconsultationwereasfollows:
• Roads,RedwaysandPavements• PublicTransport• TrafficCongestion• AffordableDecentHousing• Parks,OpenSpaces&AccesstoNature• CommunityFacilities• FacilitiesforYoungPeople• ShoppingFacilities• EducationProvision• HealthServices• ActivitiesforYoungPeople• CommunityActivities• LocalJobProspects
6SubmissionVersion–June2016
• CleanlinessofArea• LevelofCrime• LevelofPollution• CommunityRelations
TheStage1SurveycanbefoundatAppendix4.Itwasfurtherrecognisedthatduringthispublicconsultationprocessotherissuesmightariseandthereforeaflexibleattitudewouldneedtobeadopted,withprioritieshavingthepotentialtochange.Posterswereproducedanddisplayedacrosstheparishtofurtherencouragecompletion.
15.AdecisionwastakenattheNPWGmeetingheldon9thApril2014toextendthedeadlineforthesurvey,followingconcernovertheinitialdistributiontohouseholds.Toensurearobustapproach,thedeliverywasrepeatedduringMaytotheareasofWalnutTreeandWavendonGatewiththereturndateextendeduntilendJune2014.16.TheNPWGmeetingon11June2014sawtheintroductionofnewmemberstothegroup,includinganexperiencedformerTownPlanner.Thesurveyreturnstodatenumbered694andadditionalresourcingwasagreedtoinputalldataonsurveymonkeytoaidanalysis.
Walton Community Council Needs Your Views !
Please complete the Neighbourhood Questionnaire
to help Walton Community Council plan for the future - your questionnaire will be
delivered with the Community Council Newsletter
or email the Clerk for a copy: [email protected] for further information please email: [email protected]
WIN £250
SHOPPING VOUCHERS !
7Submission Version – June 2016
17.AstandtopromotetheneighbourhoodplanandthesurveywasestablishedatWavendonGateSchoolFeteon26JuneandWCC’sTrimTraillauncheventson27&28June2014.
MembersoftheNPWGspoketopeopleabouttheneighbourhoodplanandremindedthemtocompletethesurvey.Sparesurveyswerehandedoutandpeoplewereinvitedtocommentonfutureneedsforthearea.
8SubmissionVersion–June2016
18.Followingapositiveresponsetothesurvey,havingreceivedatotalof710returnstheresultsanalysiswascompletedinJuly2014.Thisalongwith190verbatimresponseswassummarisedtoshowtheopinionsandstrengthsoffeelingagainsteachissue.ThepresentationoftheresultscanbeseeninAppendix5.TheNPWGalsousedthesurveytogatheremailaddressesforthegroup’smailinglisttofurtherwidenthenumberofpeopleengagedintheNPWGanditsworkgoingforward.19.Atameetingon9July2014MikeGeddes,NeighbourhoodPlanChampionwasinattendance.MikesharedtheexperienceofWoburnsandsTownCouncilbeingthefirsttoreachReferendumandhavetheirPlanformallyadoptedinMiltonKeynes.Themainlessonsdrawnfromthisdiscussionweretheneedforpositivelanguage,robustevidenceandtotakeadvantageoftheprofessionalhelpavailable.20.AttheSeptember2014NPWGmeeting,followingagreementatWCC’sFullCouncilmeetingon3September,itwasdecidedtopushtheprocessforwardandprogressthedraftplanthroughamoredetailedStage2survey.ResultsofthefirstsurveywerepublishedintheWaltonMattersSummerNewsletterwithfurtherpublicationintheDecembernewsletterdetailingactionsalreadytakeninresponsetosomeoftheissuesraised.
9Submission Version – June 2016
21.AttheNPWGmeetingon8October2014theStage2surveywasdiscussedandagreedshouldgainfurtherdetailagainstissuestheNPWGconceivedwouldrelatetofuturepolicieswithinthedraftplan.22.InOctober2014afurtherapplicationtodesignatetheAreawasmadetoMKCastheoriginalhadappearedtohavebeenmislaid.Theconsultationperiodtookplacebetween5November2014and17December2014.Theapplicationwasapprovedbydelegateddecisionon13January2015andtheAreaformallyaccepted.23.InearlyNovember2014theNPWGhadreneweddiscussionswithMiltonKeynesCouncil,havingnowbeenappointedadedicatedPlanningSupportOfficer.Thereweredetailedconversationsaboutengagementcarriedouttodatealongwithpotentialpolicythemescomingthroughfromtheconsultationprocess.Furtherdiscussionfocussedonthethreatsfromdevelopmentoutsideofbutborderingtheparishandhowimpactmightbemitigatedthroughpolicieswithintheplan.24.OverthefollowingweekstheanalysisofthekeyissuesandareasofconcernfromtheStage1questionnairewereagreed,fromwhichtheStage2Questionnairewassubsequentlydeveloped.Thequestionnairewaspreparedaskingforresidentsopinionsrelatingto58questionsunderthefollowingheadings: Parks,OpenSpaces&AccesstoNature GettingAround
10SubmissionVersion–June2016
HealthServices LocalJobProspects Housing Crime&CommunitySafety LevelofPollution CleanlinessofArea FutureNeedsAfreetextboxwasprovidedattheendofeachsectionforrespondentstowritecomments.
25.InJanuary2015aVisionforWaltonwasagreed,withAims&Objectivesfortheneighbourhoodplan.SubsequentmeetingsfurtherdevelopedthekeythemesandresultedinthefinalStage2Questionnaire.TheStage2SurveycanbefoundatAppendix6.26.AnalysisoftheStage1Questionnairehadhighlightedthefailuretoreachthoseagedlessthan19yearsofage.AYoungPeople’sQuestionnairewasdevelopedaskingforopinionsrelatingto20questionstakenfromtheStage2residents’questionnaire.ThesurveywasmadeavailableonlineandtargetedyoungpeopleattendingWaltonHighSchool.27.Theadultquestionnairewentliveonlineon2February2015atthesametimedeliveryofthehardcopycommencedacrosstheparish,thedeadlineforreturnsbeingendofMarch.AnemailwassenttoallthoseonthecommunicationslistalongwithpromotionthroughWaltonHighSchool’sintranetsystem.Thelinktoboththeadultandyoungpeople’ssurveywassharedonallformsofpromotionalmaterialsaswellasonthehardcopyquestionnaire.28.TheNPWGreceivedatotalof949responsesinMarch2015totheadultquestionnaire,whichequatesto21%ofallhouseholds.Theresultswereanalysedandsummarisedtohighlighttheopinionsoneachofthekeyissues.Withanaverageofapproximately190verbatimresponsesalsorecordedformostquestions,separatetimewastakentoanalysethecomments.TheresultsoftheStage2SurveycanbeseenatAppendices7&8.29.TheYoungPeople’sSurveywascompletedonlineby308youngpeople,whichequatesto20%ofallstudentseligibletorespond.Theresultswereanalysedandcomparedagainsttheadultviews.Thedatawasthenusedtoidentifykeyissuesandoptions,whichwouldformthebasisforthedraft,planpolicies.
11Submission Version – June 2016
TheYoungPeople’ssurveyresultscanbefoundatAppendix9.30.AdecisionhadbeentakenattheNPWGmeetinginJanuarytocommissionanexternalconsultanttofacilitatetwoworkshopstoensuretheIssuesandOptionsselectedwereatruereflectionofboththeareaandresidentsviews.Thefirstworkshoptookplaceon23April2015attendedbymembersoftheNPWGalongwiththePlanningSupportOfficerfromMiltonKeynesCouncilwiththeresultscompiledintoareportbytheconsultant.Theworkshopincludedafacilitateddiscussion,whichidentifiedsomeoftheemergingconclusionsandimplicationsfortheNeighbourhoodPlan.ThisdrewontechnicalexpertiseprovidedthePlanningOfficerfromMiltonKeynesCouncil.ThereportfromtheworkshopcanbefoundatAppendix1031.TheWCCAnnualParishMeetingon29April2015wasusedasafurtheropportunitytoengageresidents.Asummaryofthesurveyresultswasdisplayedalongsideamaphighlightingkeyissuesandareasofconcern.MembersoftheNPWGspokewithpublicinattendanceandfurtherencouragedinvolvementintheprocess.32.Thesecondfacilitatedworkshopwasheldon27May2015,membersoftheNPWGandwiderparishcouncillorsfurtherreviewedtheemergingissuesfromtheconsultationandagreedinprinciplethethemesforthedraftpolicies.
12SubmissionVersion–June2016
33.June2015wasspentworkingontheLocalIssuesStatementandmeetingwiththeconsultanttodiscussthecontentofthedraftplan,agreetimelinesandidentifyanygapswithintheevidencebase.34.Eventswereheldon8thJuly2015targetedateducationprovidersandbusinesseswithaneveningdrop-inheldforlocalCommunityGroups.Thisgaveanopportunityforthedifferentsectorstoviewresultsoftheconsultationandsharedetailedconcernsandissuestofeedintotheplanprocess.ItwasalsoagreedforfurtherdialoguewiththeschoolstotakeplaceregularlythroughtheHeadTeachersPartnershipofSchools.Specificconcernswereraisedwithregardparkingcongestionoutsideschools,lackofsafepedestrianroutestoschoolswithovergrownredwaysandthelackofasafecrossingacrossBrickhillStreet.
35.DuringJulyandAugusttheNPWGconcentratedonpreparingfurtherdetailsofdraftpolicythemesandpublicitytoshareattheupcomingAutumnFayrebeingpromotedbyWaltonCommunityCouncil.36.TheNPWGheldastandattheAutumnFayreon12September2015,wheremorethan200residentsattendedandwereabletoviewtheresultsoftheconsultationalongwiththeproposedheadingsandthemesforthedraftpolicies.Membersofthegroupdiscussedtheplanprogresswithresidentsandansweredquestionsonthesurveyresults.37.DuringOctober2015severalwalkaboutswerecarriedoutbymembersoftheNPWGandWCCCouncillors.ThisgaveafurtheropportunitytoreviewkeylocationswithintheplanareaandfurtherevidenceissuesrelatingtoOpenSpace,Access,Parkingandtrafficmanagementissuestosupportproposedpolicies.
13Submission Version – June 2016
38.AttheNPWGmeetingon14October2015theconsultantsharedthefirstdraftpoliciesanddiscussioncentredonmorespecificdetailrequiredtodeterminecharacteristics,designcodesetc.inrelationtospecificsites.ThegroupwerealsoinformedthatMiltonKeynesCouncil’sSiteAllocations-PreferredOptionsdocumentwasduetogoouttoconsultationon28thOctober.Therearefoursiteswithintheplanareaincludedwithinthedocument:
• BergamotGardens• CaldecotteC• HewlettPackardWestSite• WaltonManor
Followingfurtherdiscussionaroundadditionalevidenceanddetailedworktobecarriedout,itwasagreedtoreviewthetimelineandtheReferendumdatewasrevisedtoSeptember2016.39.BetweenOctober2015andJanuary2016severalmeetingstookplacewithlandownerstodiscussspecificsitesbothwithinandborderingtheareaandwhatthedraftplansaidaboutthem.AmeetingtookplacewithPhilBowsherfromTheParkstruston29OctoberandfocussedonretentionofformalOpenSpacewithintheparish,alongwithpotentialfordevelopmentofcommunityandleisurefacilitiesaroundCaldecotteLake.AconferencecallwithTonyCollins,representativeofHewlettPackardtookplaceon30OctoberdiscusseditsinclusionintheSiteAllocationsdocumentandtheneedforaholisticapproachtoplanningalongsidethesitesatTowergateandFairfields.Ameetingon6NovemberwithHCAsimilarlyfocussedontheneedforthesiteatTowergatetobeholisticallyplannedwithaneedforinfrastructureintheformofalocalcentre.AmeetingwithMiltonKeynesCommunityFoundationon17Novemberdiscussedthe7reservesiteswithintheareaandfutureplans,whichincludedthepotentialforsometobedisposedoffordevelopmentalternativetocommunityuse.AmeetingwithMiltonKeynesDevelopmentPartnershipon25NovemberfocussedonthetwositesatWaltonManorandCaldecotteC,bothofwhichhavebeenproposedformixed-usedevelopment.FurtherdiscussionalsocentredonsitesatWalnutTreeLocalCentreandopportunitiesforthepotentialexpansionofhealthprovisionandasiteforaparishoffice.40.DuringDecember2015andJanuary2016engagementalsotookplacewithlocalcommunityorganisations.Ameetingwasheldon21DecemberwithMKSailingClubatwhichtheysharedplansforfutureexpansion.41.InJanuary2016furtherengagementwasheldwithkeystakeholdersincludingtheOpenUniversity,substantiallandownersatWaltonHall,ThamesValleyPoliceandrepresentativesfromtheFairfieldPartnershipwhoownlandintheStrategicLandAllocationareaimmediatelyadjacenttotheParish.42.AnearlydraftofthePlanwassharedduringJanuaryandFebruary2016withWardCouncillorsandneighbouringParishCouncillorstogainfurtherfeedbackpriortofinalisinginreadinessforthePre-SubmissionConsultation.
14SubmissionVersion–June2016
43.On3rdFebruary2016atelephoneconversationtookplacewithrepresentativesfromMKRowingClubtoestablishtheiraspirationsforexpansionoftheirbaseatCaldecotteLake.44.InpreparationforthePre-SubmissionConsultationwhichtooktakeplacebetween19thFebruaryand1stApril2016theNPWGproducedtheleafletbelowwhichwasdeliveredtoallhouseholdsintheParish,inadditiontopostersdisplayedonnoticeboardsandinkeycommunitylocations.
45.ThePre-submissionversionoftheneighbourhoodPlanwascirculatedwidelyon19thFebruaryassetoutbelow:
• ToallmembersontheNPWGmailinglist(morethanXXXpeople)• AcopywaspostedprominentlyonthefrontpageoftheWCCwebsite• ThepublicationwaspublicisedontheWCCTwitteraccount• PapercopiesoftheleafletwereleftatBrittenGroveCommunityCentre,
HeronsbrookMeetingPlace,MKSnapandWavendonGatePavilion• Papercopiesoftheleafletweresenthomeinthebookbagsofallpupils
attendingHeronshawSchool,HeronsgateSchoolandWavendonGateSchool• ThePlanwascirculatedtoall6wardcouncilorsfortheArea–aswellaslocal
landowners,developers,communitygroupsandbusinesses• ThePlanwassenttoParishCouncilssurroundingtheNeighbourhoodPlan
area• ThePlanwassenttothestatutoryconsultees,onthebasisofalistprovided
byMiltonKeynesCouncil(*seebelow)• PapercopiesofthePlanweregivenoutattheeventslistedbelow
15Submission Version – June 2016
(*Homes&CommunitiesAgency;NaturalEngland;EnvironmentAgency;EnglishHeritage;NetworkRail;HighwaysAgency;Telecoms;BritishTelecom;NationalGrid;E.ONCentralNetwork;CoalAuthority;AnglianWater;ClinicalCommissioningGroup;VoluntaryBodies–MiltonKeynesCommunityFoundationandCommunityAction;MKEqualityCouncil;TheParksTrust;MiltonKeynesCouncil)46.CommunityDrop-Ineventswereheldon1stMarch,7thMarchand16thMarchwherethepoliciesweredisplayedandmembersofthecommunityhadtheopportunitytoviewthePlananddiscussthecontentwithmembersoftheNPWG.47.ThemainpartoftheNPWG’sengagementworkthroughoutthisperiodwaspromotingthedraftPlanandtheconsultationeventsviaFacebook,TwitterandStreetlife,arelativelynewonlinehubforlocalresidents.48.AttheNPWGmeetingheldon13thApril,theWCCwebsitestatisticswerereviewed.ThenumberofviewstotheNeighbourhoodPlanpageofthewebsitewererecordedasfollows:1stFebruary–29thFebruary 539views1stMarch–31stMarch 162views1stApril–18thApril 55views49.TheperiodfromApriltoMaywasspentworkingontheproposedfinaldraftofthePlan.Allcommentsreceivedfromthepre-submissiondraftofthePlanwerereviewed,aswereconsultationresponsesandtheresultsofthevarioussurveysconductedbytheNPWGduringthepasttwoyears.FurtherprofessionaladvicewasreceivedonthewordingofthepoliciesinthePlanfromMiltonKeynesCouncilplanners,independentplanningadvisors(includingtwowhowerenewtothePlanandhadnotseenanyoftheearlierdrafts).50.AFullCouncilmeetingofWaltonCommunityCouncilon23rdMaygavethefinalsignoffonthepublicationofthefinaldraftreadyforsubmissiontoMiltonKeynesCouncil.51.AttheendofMay,theNPWGcommissionedanindependentHealthcheckofthePlanandfollowingthisreview,furtheramendmentswereagreedtoensurethePlanwasingeneralconformitywiththeNPPF.52.Theprocessofengagementoverthelasttwoyears,notonlyhelpedtoshapethecontentoftheplan,butalsodemonstratedthatallsectorsofthecommunity,bothresidentsandbusinesseshadbeenfullyconsultedandweresupportiveoftheproposal.53.Thefunctionoftheworkingpartywastoensurethatallprocessesofengagement,consultation,policydevelopmentandplanwritingwerecarriedoutproducingatruereflectionofourcommunitiesviewsregardingthewaytheywishtheirneighbourhoodtobepreservedanddevelopedoverthecomingyears.
16SubmissionVersion–June2016
54.InordertoprovideasummaryofthemaineventsaspartoftheNPWG’sconsultationandengagementwork,thefollowingtablehasbeenpreparedtogiveatimelineoftheworkoutlinedabove:WaltonNeighbourhoodPlanEventTableDate Event11September2013 FirstNPWGmeeting9October NPWGmeeting20November NPWGmeeting11December NPWGmeeting15January2014 NPWGmeeting29January NeighbourhoodPlanChampions’Forum12February NPWGmeeting12March NPWGmeeting29March MeettheCouncilDayatHeronsbrookMeetingPlaceApril Stage1Survey11June NPWGmeeting26June EngagementatWavendonGateSchoolFete27&28June EngagementatTrimTrailLaunchatCaldecotteLake9July NPWGmeetingattendedbyNeighbourhoodPlanChampion
fromWoburnSands13August NPWGmeeting10September NPWGmeeting8October NPWGmeeting12November NPWGmeeting11December NPWGmeeting14January2015 NPWGmeeting17February NPWGmeeting11March NPWGmeetingMarch Stage2SurveyandYoungPeople’sSurvey8April NPWGmeeting23April NPWGIssues&Optionsworkshop29April DisplayatAnnualParishMeeting13May AppointedConsultanttowritePlan27May FollowupIssues&OptionsWorkshop10June NPWGmeeting11June WardCouncillorconsultationmeeting8July Business,EducationandCommunityGrouptargetedEvents16July NPWGmeeting12August NPWGmeeting9September NPWGmeeting12September StandatWaltonAutumnFayreatMKSnap11October WalkaboutOldFarmPark14October WalkaboutBrownsWood14October NPWGmeeting17October WalkaboutWavendonGate23October WalkaboutWalnutTreeNorth
17Submission Version – June 2016
29October MeetingParksTrust30October ConferenceCallwithrepresentativesofHewlettPackard6November MeetingHCA11November WalkaboutCaldecotte&WaltonPark11November NPWGmeeting17November MeetingMiltonKeynesCommunityFoundation23November WalkaboutWalnutTreeSouth25November MeetingMiltonKeynesDevelopmentPartnership8December WalkaboutTilbrook9December NPWGmeeting17December WalkaboutWaltonHall21December MeetingMiltonKeynesSailingclub5January2016 MeetingagentactingforHCA12January MeetingsThamesValleyPolice,OpenUniversity,Fairfields
Partnership13January NPWGmeeting3February MeetingDavidLockAssociates10February NPWGmeeting12February TelephoneCallwithMKRowingClub1March ConsultationDrop-InEvent,HeronshawSchool7March ConsultationDrop-InEvent,MKSnap16March ConsultationDrop-InEvent,WavendonGateSchool16March NPWGmeeting1April Endofpre-submissionconsultation6April Reviewofconsultationresponses13April NPWGmeeting11May NPWGmeeting23rdMay WCCFullCouncilmeeting8thJune NPWGmeetingTheabovetablehasalsobeenreflectedintheformofatimelinebelow.
18SubmissionVersion–June2016
ConsultationTimelineEvent Sep
2013Jan2014
Apr2014
June2014
Feb2015
Mar2015
Apr2015
May2015
June2015
July2015
Sept2015
Oct2015
Dec2015
Jan2016
Feb2016
Apr2016
NPWGformed
NPChampionsforum
Stage1Survey
EngagementEvents
Stage2Survey
YoungPeople’sSurvey
AnnualParishMeeting
IssuesandOptionsWorkshops
WardCouncillorConsultation
Business,Education,CommunityGroupConsultation
AutumnFayre
ParishWalkabouts
LandownerConsultation
TargetedConsultation
Pre-submissionConsultation
19Submission Version – June 2016
Part3:ResponsesreceivedtotheconsultationontheproposedfinaldraftoftheNeighbourhoodPlan19thFebruary–1stApril2016&workontheFinalDraftofthePlan,April2016–May2016.55.TheparagraphandtablebelowlisttheresponsesreceivedduringtheconsultationontheproposedfinaldraftoftheNeighbourhoodPlan,between19Februaryand1stApril2016.56.Inallmorethan40responseswerereceived-includingfromlocalresidents,localcouncillors,landownersandstatutoryconsultees.AspartoftheNPWG'scommitmenttotransparencyandopenness,alltheresponseswerepostedontheWCCwebsite.Thetablesbelowprovideasummaryofcommentsreceived-forthefulltextofeachsubmission,pleaseseetheNeighbourhoodPlansectionoftheWCCwebsitewebsite.Commentsareorderedbydatereceived,whichisalsohowtheyarelistedonthewebsite.
WaltonNeighbourhoodPlanPre-SubmissionConsultation2016No. Comments
submittedbySummaryofcomments HowthePlanwasamended
1. RyanHendry(Localresident)
Iwouldliketoaskforfibreopticbroadband.WhenIspeaktoBTorskytheysaywe'renotinyourareaandtospeaktoyourlocalcouncilaboutit.
Noted:Thereissuperfastinternetaccessprovisioninnewestates.CommitmentaddedtoActionPlanforWCCtomonitoralldevelopmentproposalstoensuretheinclusionoffibreopticconnections.
2. Mr.Newcombe(Localresident)
Doesnotbelievethegeneralpublichaveanysayandthelocalauthoritywilldowhattheywishregardless.Willnotbeattendinganymeetingsorturningoutatthereferendum.
Noted.
3. DavidHopkins(CouncillorforDanesborough&Waltonward)
Levelofdetailandlayoutapplauded;AcknowledgedtheplanninghierarchyinrelationtoMiltonKeynes;welcomedthepresumptioninfavourofdevelopmentandusefulconditionssetatbothalocalandcitywidecontext;welcomedemphasisofworkingwithlandownersandagents;questionedhowtheevidencegatheredfromconsultationhasbeentranslatedintopolicy.
Noted;AnindexhasbeenaddedtothePlanwhichmapstheevidencefromtheconsultationtothepoliciesandcommitmentsinthePlan.
4. JenniFerrans(CouncillorforMonkstonward)
Concernedwordingonspecificpoliciesmaynotbestrongenoughtoenforce;Specificcommentsrelatingtogrammar;Introductionunbalanced,focuseson
Noted;Amendmentshavebeenmadetocorrectgrammar,typographicalerrorsandformattingissues;the
20SubmissionVersion–June2016
WalnutTree;P15shouldspecifythefloodplainastheSouth-eastcorner;ConcernregardingreferencestoaccesstoemploymentsitefromH9,suggestalternativewording;RequestrequirementforaLEAPbechangedtoaNEAPatWaltonManor;Requeststheinclusionofahard-standingtoactasthefocusforcommunityevents;RequestedWNP14beamendedtoincludetheadditionalinfrastructurereferencedpreviously;WNP2shouldconsidertheinclusionoftherequirementofaNEAP;Theset-backdistancesshouldbespecified;SupportsdevelopmenttothedensityspecifiedatWNP4,wishittoincludeaffordablehousinginlinewithMKCpolicy;Requestspecificationofaffordabletoincludesomewheelchaircompatiblehomes;P21hastypos;nomentionismadeofcarparkingtonorthofthesouthernparcelatHindheadKnoll;RequestedclarificationofwishforlorryparkingatWT6site;SupportsinprincipleotherrecommendationsforWNP7Reservesites;SupportsexpansionofHealthfacilitiesatlocationAinWNP8,requestexpansionofparkingalsoatsiteB;SuggestedamendingreferencetotriathlonCentreatWNP9toamoregenericterm;Suggestionsforre-wordingmadeforWNP16;Suggestionsforre-wordingofWNP11HiMO’sproposedtoreflectspecificswithinMKC’scurrentpolicies,inparticulartoavoiduseoftermssuchas“negativeimpact”and“insufficient”;suggestedinclusionofsupportforlongertermleases;HighlightedgrammaticalerroratWNP18GridRoadExtensions;RequestedinclusionofrequestforadditionallightingatWalnutTreeLocalCentrecarparkatWNP13ParkingEnhancements;CommentedthattheredwaylinkfromWaltonHalltoKentsHillhasbeenincludedintheKentsHillParkDevelopmentBrief;CommentsregardingWNP16DesignPrinciplesrequestreviewofwordingrelatingtodensitiestomakeanexceptionforhousingsuitablefortheelderly;WouldsupportinclusionofsupportforExtraCareScheme;Requestedconsiderationofspecificationoftreessuitableforplantingalongroadsandtorestricttomainroadswithinadevelopment;requestadditionof“existingfootpaths”afterredwayatWNP16;RequestedconsiderationofotherimprovementsatthesiteslistedinWNP18SportsGroundEnhancements;ConcernregardinglistofinfrastructureatWNP19andthe
introductionhasbeenexpandedtoreflectthewiderarea;thereferencestothefloodplainatWNP1havebeenamendedtoreflectthesouth-eastofthesite;therestrictiontoaccesstotheemploymentareafromtheH9roadwaystub,appliesonlytotheexistingemploymentareaandnotthenewemploymentareas,thereforethereshouldbenoimplicationsforincreasedtrafficfromHullwellGate;theNPWGconsideredthepointregardingtherequestforaNEAPatWaltonManor,howeverduetotheinstallationofaNEAPatnearbySimpsonDriveitwasfeltaminimumrequirementofaLEAPwassufficient;astheNPWGdidnotamendtherequirementforaNEAPatWNP1thishasnotbeenaddedtothelistofinfrastructureatWNP14;WNP2hasbeenamendedtorequireaminimumofaLEAPbuttoupgradetoaNEAPifthishasnotbeenapproved/providedwithinothersiteswithintheWavendonTriangle;SetbackdistancesatWNP4havenowbeenstipulatedinlinewithMKC’sResidentialDesignGuide;TheviewoftheNPWGisthataffordablehousingisnotappropriateforthissitebutwillbedeliveredelsewhereintheareathroughlargerallocatedsites;ThereferencestoretentionofcarparkingatWNP5HindheadKnollhasbeenamendedtoreflectexistingparkingacrossbothparcelsofland;thereferencestolorryparkingatWT6sitewithinWNP7hasbeenincludedasaresultofissuesidentifiedduringareasurveys,theNPWGsupportstheprovisionoftemporaryparkingforlorriesdeliveringtothelocalcentre;thereferencetothetriathloncentreatWNP9hasbeenamendedtoreflectamoregenericwatersportsbasedfacility;referencehasbeenmadeatWNP11HiMO’stotheMKCHiMOpolicy;supportfortheprovisionoflightingatWalnutTreeLocalCentrecarparkhasbeeninsertedatWNP13ParkingEnhancements;theNPWGfeltstronglythattheproposalforanewredwaylinkfromWaltonHalltoKentsHillremainasthereisnocertaintyonthetimingofdeliveryfroman
21Submission Version – June 2016
needtoprioritise,suggestedre-wordingalongthelinesof“oncetheon-siteneedshavebeenmet,thefollowingpiecesofarea-wideinfrastructure…..”
alternativedevelopment;Furthermore,theNPWGwishedtodistinguishthebetweentheupgradeoftheexistingfootpathtoaredwayandtheprovisionofanewredwaywhichfollowsthedesirelineleadingtotheroundaboutatthejunctionoftheH9andV10;theDesignPrincipleatWNP16relatingtotree-linedroadshasbeenamendedtoreflect‘suitabletrees’andhasalsoreferences‘mainroads’inadevelopment;WNP16hasalsobeenamendedtoreferencetheretentionandpotentialextensionoffootpathsinadditiontoredwaysinnewdevelopments;thewordingatWNP18SportsGroundEnhancementshasbeenamendedtoallowforotherimprovementsinadditiontotheprovisionofchangingfacilities,inlinewiththeleisureuseoftheassociatedsites;theNPWGhaveconsideredtheneedtoprioritisethelistofInfrastructureatWNP19,howeveritdoesnotfeelthisnecessaryinadditiontothefactthatitisnotknownwhenthetimingofindividualdevelopmentswillcomeforwardandthereforewhencontributions/infrastructurewillbeprovided;amendmentshavebeenmadetotheintroductorytextinthepolicy.
5. DavidNewland(CouncillorforWaltonCommunityCouncil)
SupportforPlanwithfocuson“Walton’s”needs;policiesdesignedtoprotectandstrengthenourneighbourhood;Supportviewofconcernsonaccessingthehospitalviabus;RequestforPlantoconsiderpublictransportotherthanjustbusservices
Noted;AmendedreferencestoPublicTransportinWNP15–KeyLinksalongwithcommitmentinActionPlan.
6. BowBrickhillParishCouncil
Incrediblydetailedandwellthoughtoutplan;Offersagreaterlevelofforwardplanningthanincrementaldevelopmentcouldachieve;notedapointregardingthenumberofRegisteredCommunityAssetslistedwithinitandconcernregardingenforcementofthisprocess.PointraisedregardingpotentialforfloodingatLandatWaltonManorWNP1ifsitesarealsodevelopedoutsideoftheareaandadjacenttoBowBrickhill;notedtheuseofCaldecotteSiteCWNP6asapotentialsiteforabridge
Noted;TheWaltonManorDevelopmentBriefclearlyidentifiestheexistingriskinrelationtofloodingandwewouldexpectanybriefsfornearbysitestoassesstheincrementalfloodriskstothisarea.
7. HarryMeisuria(Localresident)
QuestionedwhytherearenoethnicmembersintheNPWG.
TheNeighbourhoodPlanWorkingGrouphasbeencreatedentirelyfromvolunteersandwehavemaderepeatedcallsforhelpoverthelasttwoyears.TheGroupreflectsthe
22SubmissionVersion–June2016
communitymemberswhocameforwardasaresult.
8. ShirleyJones(Localresident)
Thegeneralplanistobecongratulatedhavingtakenintoaccountthemesemergingfromthreesurveys;notederrorsintheformattingandgrammar;concernedatthecompleteabsenceoftheword“arts”inanycontext;RequestforreferenceoftheArtsandneedforsufficientinfrastructurewithincommunityfacilitiestosupporttheartsaswellassports;ReferencedtheCriterioninCoventryasanexemplarofprovision;RequestedinputintothedevelopmentproposalsatBrownsWoodSportsGround.
Noted;ThefinalPlanhasbeenproofedandtakenaccountofissueshighlighted.ReferenceandsupportfortheArtshavebeenaddedtotheintroductorychapters.WaltonCommunityCouncilwelcomesthesupportforthedevelopmentatBrownsWoodandnotestheofferofinput.
9. Mr&MrsCrighton(Localresidents)
Objecttoalocalcentre/shopwithinthesiteatWaltonManor;Concernraisedregardingincreaseoftrafficinaresidentialarea;ObjecttoanytrafficaccessingthedevelopmentfromSimpsonRoad;Objecttoany“landmarkbuilding”onthehighergroundatthenorthendofthesight;Concernedthatplannerswillnotenforceagainstdevelopersduetofinance;Welcomeddesignprinciplesreferencetorespectthelocalvernacular.
Noted;TheNPWGhasassessedtheneedforbetterfacilitiesintheWaltonManorareabasedontheultimateamountofdevelopment.Itisimportantattheearlystageofplanningtoprovidethespaceforsuchafacilityevenifitendsupnotbeingrequired.TheWaltonManorDevelopmentBriefcompletedconsultationin2015andsopre-datesourplan.However,Section5.8,page24specifiesthatsecondaryaccessonlybeprovidedfromSimpsonRoadtoacul-de-sacofnomorethan20dwellings.TheDevelopmentBriefpre-datesthisplansowearelimitedwithregardinfluencingthe“landmarkbuilding”.
10. SoniaUnderwood(Localresident)
QuestionedtheinvolvementofyoungpeopleandschoolsinthedevelopmentofthePlan;Requestedabuildingfortheuseofyoungpeopleotherthanthecommunitycentre;Concernregardingsafetyofchildrenwalkingtoschoolandtheincreaseduseofcarsasaresultofthemnotbeingsafe.
Noted;ThePlansetsouttocreatetheenvironmentandfacilitiesthatcanbeusedbypeopleofallagesintheareasofleisure,sports,arts,etc.inaflexiblewayandoverthelongterm.Wehaveconsultedwidelywhichincludedalllocalheadteachersaspartofthisprocessalongwithaspecificsurveyforyoungpeopleaged11-19years.
11. LawrenceHooter(Localresident)
FormerownerofWalnutTreeFarm;Satisfiedwithalltheproposalsfortheareaasanolderresident.
Noted.
12. DilipNathwani(Localresident)
SupportivecommentsaboutthedraftPlanandtheworkthathasgoneintoit.
Noted.
13. KarlKuhle(Localresident)
SupportsthePlan;Concernoverbuildingongreenspaces;Keeptheareathesamewithtreesandopenspace;Requestformoretrees;ConsideraddinggreenareasinTatlingGrovetobedesignatedasformalopenspaceinWNP17
Noted;ThePlanaimstoprotectgreenspacebyidentifyingadditionalareasforfurtherprotectionasformalPublicOpenSpacetoenhancetheircurrentstatusasamenityland.Wheredevelopmenttakesplaceinthefuture,additionalprovisionofopenspacemustconformtocurrentplanningpolicy:TheActionPlancontainsacommitmenttoinvestigateastreettreeplantingscheme,where
23Submission Version – June 2016
appropriate;ThegreenspacesinTatlingGrovewerereviewedbytheNPWGandarecurrentlydesignatedamenitygreenspace;theseareasaretoosmallfordevelopmentandassuchthecurrentdesignationisdeemedsufficient.
14. TonyWillis(Localresident)
CommentsregardingneedforanunderpassnotacrossingonBrickhillStreet;Requestforallnewbuildingstohavesolarpanels;Keepallgreenareasandmakemore;NolinkroadtoSimpsonRoad;NobuildingonWaltonParkatthebottomendduetoflooding;NeedmoreparkingatWalnutTree.
WehaveincludedwithinourInfrastructureprioritieslist,theneedforanunderpassontheV10.ThecurrentplanningrulesandregulationsappliedbyMiltonKeynesCouncilsufficientlycovertheneedtobuildsustainablyandhence,arenotcoveredinthePlan.TheOpenSpacePolicysetsoutallareastobeprotectedfromdevelopment,newdevelopmentonallocatedsitesmustprovideadditionalOpenSpaceinlinewithcurrentplanningpolicy.TheWaltonManorDevelopmentBriefpre-datesourPlananddictatesconstraintsforaccessandbuildinginthefloodplain.ThePlanhasidentifiedtheneedforadditionalparkingmeasuresatWalnutTreeinWNP13.
15. Anonymous DoesnotsupportWNP1LandatWaltonManor;Commentsregardingpooraccess,lackofunderpassandnofacilitiesatWaltonGrange;DoesnotsupportWNP5LandatHindheadKnoll;Commentsrelatingtoparkingbeingamajorissueinthisarea;Doctorsandschoolsalreadyinadequate;SupportWNP8WalnutTreeCommunityHubs;Extrafacilitieswillrequiremoreparking.
Noted;TheWaltonManorDevelopmentBriefisalreadyapprovedandpre-datesthisPlan.HindheadKnollisalreadyallocatedland,howeverthisPlanrequiresparkingatthesouthernendtoberetained.
16. GeoffNew(Localresident)
SupportsthePlan. Noted.
17. C.New(Localresident)
Mainlysupportstheplan;likeswidegrassvergesbutroadsaretoonarrow;Requestmoreoffroadparkingbayssotheydon’tchurnupgrassorparkonbends;Safetyfirst.
Noted;TheActionPlancontainsacommitmenttoinvestigateopportunitiestointroduceadditionalparkinginkeylocations.
18. VanessaMcPake(CouncillorforMonkstonward)
RequestforsocialhousingatBergamotGardenssite;Requestfordevelopmenttoensuregardensbackontoexistingproperties;Concernraisedaboutlackoflightwhenhousesbuilt.
WNP4includespoliciestocoverorientationofhousing,setbackdistancesanddensities.TheviewoftheNPWGisthataffordablehousingisnotappropriateforthissitebutwillbedeliveredelsewhereintheareathroughlargerallocatedsites.
19. Mr&MrsRichmond(Localresidents)
SupporttheNeighbourhoodPlanoverall;ConcernsregardingWNP18ThecommunitypavilionatBrownsWood;Noobjectiontochangingroomfacilityforthesportsgroundbutobjecttoanyfacilitythatisforlateeveninge.g.parties/receptions;Concerntheextendedcarparkwillbeimpactedbynoiseandanti-
Noted;TheNPWGrespectsyourconcernsrelatingtoBrownsWoodPavilion.ThisisamatterforthespecificplanningprocessofthefacilityandyourconcernshavebeendirectedtoWaltonCommunity
24SubmissionVersion–June2016
socialbehaviour. Council.20. A.Banks
(Localresident)Supporttheplan;Notsureunderstandsallofthepolicies;happytounderstandmorebynewsletter.
Noted.
21. Homes&CommunitiesAgency(Landowner)
TheHCAwelcomesproposalstodevelopthesiteatTowergate,WNP2forhousing.CommentedthatwhilsttheHCAcaninfluencedevelopmentwithinthesiteithasnocontroloveradjoiningsites,butwillseektoensurethatdevelopmentofthesitereflectsthedevelopmentinthewiderarea.
Noted;TheNPWGacknowledgesthecomments,howeverstronglyfeelsthattheneedfora“masterplan”tocovertheWavendonTriangleisessentialtoensuresufficientinfrastructuresupportsfutureneeds,regardlessofthetimingofthedevelopmentintheindividualparcelsofland.
22. HewlettPackard(Landowner)
HPEwerepleasedtoworkwiththeCommunityCouncilinthedevelopmentofitsNeighbourhoodPlan;SiteSpecificPolicies-WNP3OutlinePlanningApplicationwasgrantedforupto134unitsandaneighbourhoodshoponTuesday8thMarch2016;RequestforPlantoamendwordingatpage18relatingtothecurrentdesignationofthesite;Commentedthattheextentofthestrategicbufferisamatterforfuturedetermination;RequestthatWNP3beredraftedtoreflectthecurrentplanningcircumstances.
Noted;ThePlanhasbeenamendedtoreflectthecurrentplanningstatus.TheNPWGhaveacknowledgedtheinclusionofspaceforaneighbourhoodshop,whichislinewiththerecommendationfortheWavendonTriangle.
23. MickCarter(Localresident)
SupportsthePlaningeneral;LandatWaltonManorshouldbebuiltsympatheticallyhavingregardtoproximitytoriverpark;UnsureaboutlandatHindheadKnollduetopressureonparking,carparkmustberetained;InfillmustbeappropriateonCommunityFoundationReserve;WG4isneededforschoolparking;SupportsthepolicyonInfrastructureDelivery,butexpansionoftheHealthCentreshouldbehighestpriority.
Noted;WNP5HindheadKnollsiteisalreadyallocatedfordevelopment,butthePlanrequiresretentionofparkingspacesatthesouthernend.Theexpansionofthehealthcentre,isonthelistinthepolicyatWNP19,however,itisamatterforNHSEnglandwithregardthetimingandfundingoftheexpansion.ThePlanseekstoensurethat“space”isavailableforfuturedevelopmentshouldthefundingbecomeavailable.
24. OliverTomlinson(Localresident)
ConcernedaboutdevelopmentatHindheadKnollduetocurrentissueswithparking;suggestparkingprovisionwouldbebettersuited;SupportforCaldecotteLakesidePolicy,butrequestformoregenericfacilitythanspecificsupportforaTriathlonCentre;SupportsHiMOPolicy,butquestionedthewordingof“insufficientparking”
Noted;ThePlanhasidentifiedtheneedforadditionalparkinginthearea.PolicyWNP7identifiespotentialareasforparking,whilsttheActionPlansetsoutacommitmenttoreviewallopportunitiesforadditionalparkingintheareabyWaltonCommunityCouncil.WehaveamendedthewordinginWNP9CaldecotteLakesidetoindicatesupportforamoregenericwaterbasedsportinguse.Themoredetailedspecifications
25Submission Version – June 2016
relatingtoparkingandotherstandardsforWNP11HiMO,arecontainedwithinMKC’scurrentHiMOPolicyandwillbeassessedinaccordancewiththeserequirements.
25. Morris(Localresident)
Doesnotsupporttheplan;Agreesthattherecouldbesomeinfilling;DisagreeswithanydevelopmentonCommunityFoundationReserveSites;DisagreeswithanydevelopmentadjacenttoWaltonHighSchoolinNorthHubA;Allresidentialdevelopmentplansmustprovideadequatecarparkingandhaveroadswideenoughtopermitemergencyservicevehiclesaccesspastparkedunits;Greenareasshouldbeleftastheyare.
Noted;TheCommunityFoundationReservesiteslistedatWNP7arealreadyallocatedforsomeformofdevelopment,thePlansuggestsbestuseintheeventofnosuitablecommunityusebeingidentified.ResidentialdevelopmentmustconformtocurrentMKCplanningrequirementsandwehaveaugmentedwherewefeelitwasnecessarytomeetlocalcircumstances.
26. HistoricEngland(Statutoryconsultee)
NotedninelistedbuildingsinthePlanarea;thegradeIIlistedStMichael’sChurchoftheOpenUniversityandWaltonHall;TheOldRectory,TheOpenUniversity;WaltonLodgeCottage;WalnutTreeFarmhouse;ThatchedCottage,BrickhillStreet;WaltonManorHouse;thestableblocktoWaltonManor;andthebarntothesouthofthestableblock,allgradeII.TheplanareaalsocontainsthesignificantscheduledmonumentoftheshrunkenmedievalvillageofCaldecotte.RequestedreferencetotheconservationandenhancementofheritageassetsintheNeighbourhoodPlanVisionandtotheseheritageassetsinsection4;Welcomestheobjectivetoimprovethebuiltenvironment:Suggestedcheckingwhetherthereareanybuildingsorfeaturesoflocalinterestoranynon-scheduledarchaeologicalrecordsontheHistoricEnvironmentRecord;Suggestedconsiderationofacharacterisationstudy;Reportedthattheyhavenorecordofanyoftheproposeddevelopmentsitesbeingnearanyofthedesignatedheritageassetsinthearea;RequestedtheHistoricEnvironmentRecordbeconsultedforanyrecords;Considerinvolvementofcommunityinidentificationoflocallyimportantbuildings.
Noted;FurtherreferencetoheritageassetshavebeenincludedinthePlanintheIntroductionandAbouttheAreasections;ReviewwasundertakenandnolocallistingshavebeenhighlightedtotheNPWG;ThelocalcommunityhavebeeninvolvedinconsultationthroughoutthedevelopmentofthePlanandtodatenoadditionalbuildingshavebeenhighlightedtobeoflocalimportance.
27. PeterDazley(Localresident)
Feelsthereissufficienthousingalready;openspaceareasshouldbekept;requestedclarificationof“communityuse”;anynewbuildwillimpactonlocalamenities;additionalparkingwouldbeneeded;WG2CommunityFoundationreservesitenotsuitableforanybuildandalsoclosetoschool.
Noted;Somesitesintheareaareallocatedfordevelopmentalreadyandthereforetheplanaimstoensuresuchdevelopmentimprovestheareawithintheplanningguidelines.CommunityuseinrespectoftheReservesitesmeansfacilitiesofusetotheMiltonKeynescommunityasawholei.e.notnecessarilyjustinWalton.AlocalexampleistheMKSnapbuildinginWalnutTree,underthisdesignationonlycommunityor
26SubmissionVersion–June2016
voluntaryorganisationsmaydeveloponthesiteandthefacilitymustbeaccessibletothepublic.WG2isalreadyallocatedandtheNPreflectsthat,butthelandmayproveunsuitablefordevelopmentduetotheconstraintsofthesite.
28. JackieEmens(Localresident)
SupportpolicyWNP4LandatBergamotGardensinprinciple,howeverconcernedregardingsetbackdistances;concernregardingfuturemaintenanceoftreesontheboundary;DonotsupportpolicyWNP5LandatHindheadKnoll,trafficanissueintheareawithoutadditionalhousing;parkingshouldbeapriorityatWT6CommunityFoundationsite;considerationshouldbegiventotrafficturningifWT7HockliffeBraesiteisdeveloped.
Noted;Theconcernregardingthemaintenanceoftreeswillbeaddressedonpointofsaleofthelandandthroughtheplanningprocess.ThelandatWNP5HindheadKnollisalreadyallocatedforhousingdevelopment.ThePlanseekstoensuretheissueofparkingisaddressed.TheWT6siteinpolicyWNP7,hasnotedthesupportoftheprovisionofsharedparkinginanyfuturedevelopment.
29. TheParksTrust(Statutoryconsultee)
AcknowledgesprominenceofmentionofopenspaceandlandscapingwithinthePlan;RequestscontextualdescriptionbeexpandedtohighlightthewiderstrategicroleofCaldecotteLakeandtheOuzelvalleyLinearpark;RequestsreferencetothefactthisareaprovidesfacilitiessuchastheCaldecotteProjectandthemodelrailwayaswellasthesailingclub;acknowledgedthekeyissueidentifiedwithregardimprovementandenhancementofopenspacesandofferedtodiscussfurtherwithWCC;SuggestedconsiderationofaPolicysuchasWNP15fortheimprovementoftheenvironment;Supporttheinclusionof“greenopenspacesandthrivingnaturalenvironment”intheVision;Notedprominenceofresponsesinsurveytoimprovingmaintenanceanddiversifyingopportunities,wouldwelcomefurtherdialoguewithWCCoverhowtheParksTrustmayhelptoaddresstheseconcerns;Requestthe“AbouttheArea”sectionexpandsthedescriptionoftheopenspacenetworkandthefunctionstheseserve;SuggestCaldecotteLakeismentionedbynamewithacknowledgementthatthisservesasaleisure/recreationandwatersportsdestination;Requeststhatthestrategicimportanceofthegreencorridorisreferencedasrunningthroughtheparish;RequestsreferencetoCaldecotteBrookLinearparkbeinganimportantgreencorridorandsurfacewaterdrainagefunction;RequestsacknowledgementthatsomeoftheParksTrust’sPaddocksfallingridroadreserveareasandassuchdesignationoftheseasAssetsofCommunityValueisincompatiblewiththepolicyWNP12forGridRoadExtensions;WelcomestheinclusionofaspecificpolicyforCaldecotteLakeside;requestslargerindicativezonebeidentifiedforthesiteofthetriathloncentre;considerationbegivenforlocationatpromontory;Requestspolicy
Noted;ThedescriptionhasbeenenhancedbyexpandingthecontextualdescriptionoftheareaandtheopenspaceinparticulartohighlightthewiderstrategicroleofCaldecotteLakeandtheOuzelValleyLinearPark;Thezoneforthetriathloncentrehasbeenenlargedandterminologychangedtoreflectamoregenericwaterbaseduse;WCCwillpursueopportunitiestoworktogetherregardingmaintenanceimprovementsandenhancementstoOpenSpacegenerally;ConsiderationwasgiventoanadditionalPolicywithregardimprovingtheenvironment,howeveritwasfeltthisshouldbepursuedthroughthecommitmentsofWCCandanadditionalpolicywasunnecessary;theroleoftheParksTrustinmaintainingthegridroadcorridorshasbeenacknowledged;ConsiderationwasgiventothepotentialconflictofthelocationoftheneighbourhoodplayareawithWNP12,howeveritwasconsideredthiswouldbeaddressedthroughplanning,ifandwhenanyproposedplancameforward.
27Submission Version – June 2016
allowsforflexibilityredevelopmentofotherappropriatecommunityrecreationwherethesearecompatible;RequeststheroleoftheParksTrustinmaintainingthestructurallandscapingalonggridroadsisreferencedintheDeliverysectionofWNP12GridRoadSystem;HighlightsthepotentialconflictbetweenpolicyWNP12GridRoadSystemandWNP14LocationofFacilitieswithregardtheareaidentifiedforaneighbourhoodplay/wheeledsportsarea,astheidentifiedareaiswithinagridroadreservefortheH10
30. StuartCopeland(Localresidentandbusinessowner)
Notedproposedamendmentstotheplanincluding;descriptionwithintheExecutiveSummary;inclusionofreferencestohealthfacilities;Infrastructurebeforeexpansion
TheForewordhasbeenrevisedaccordingly;TheExecutiveSummarynowreflectsthepolicycontent.
31. RaymondMackintosh(Localresident)
RaisedconcernsregardingtheimpactfromtheChurchFarmdevelopmentonschoolsandhealthfacilities;SchooltrafficinGregoriesDriveaproblem;WalnutTreeHealthCentreisatcapacity;
Noted;WavendonGateSchoolareawareoftheissuesrelatingtotrafficandimplicationsfromChurchFarm;ThePlanmakesreferencetothepotentialuseofanysurpluslandatWG4CommunityReservesitebeingutilisedforparkingfollowingtheconstructionofanygridroadextension;ThePlanidentifiespotentialspaceforexpansionoftheHealthfacilities,howeverNHSEnglandareresponsibleforthedistributonoffundingacquiredviaSection106contributions.
32. Brian&InaEaton(Localresident)
SupportsthePlan;supportsintroductionoflay-byandadditionalparkingatWalnutTreelocalcentre;supportsexpansionofthehealthcentre;supportstheintroductionofanunderpassorfootbridgeacrossV10BrickhillStreet.
Noted.
33. WavendonParishCouncil
SupportthePlan.
Noted.
34. MiltonKeynesCouncilPlanners(Statutoryconsultee)
Maderecommendationstoamendtheforeword;SuggestedacknowledgingthedifferingcircumstancesoftheDevelopmentCorporationascomparedtotodayinreferencetotheMiltonKeynesMasterplanascontextsetting;Requestedremovalofspecificdatesregardingreferendum;Section3referencesatimelinewhichdoesnotappearintheConsultationStatement;Consideraddingparagraphnumbering;Commentedongrammaticalerrors;Suggestclarificationof“anacceptablesetbackdistance”;Supportthesitespecificpoliciesandcondoneconstructiveapproach;Requestedclarificationwhetherpoliciesareformalallocationsorsimplypre-emptiveguidelinesforproposals;ConfirmsthepoliciescomplimentMKC’semergingpolicybuttheexaminermayrequiremoreinformationonthisevolvingstrategicpolicycontext;Requested
Noted;TheForewordhasbeenamendedaccordingly;Referencestodatesrelatingtothereferendumhavebeenremoved;TheTimelinehasbeenaddedtotheConsultationStatement;Paragraphnumberinghasbeeninserted;Thetypographicalerrorshavebeenamended;Theacceptableset-backdistanceshavebeendefinedinWNP4;Considerationwasgiventothedensities,howevertheNPWGfeltstronglythattheyshouldremainasdeterminedinthePlan;TheNPWGconsideredtheInfrastructureListbutwishedfortheRedwayLinktoremainasthereisnoguaranteeatthetimeofsubmission,
28SubmissionVersion–June2016
considerationbegiventochangesinwordingarounddensitiestoincludearangenottobeexceeded,orremovalofthe“maximum”aspect;WNP19InfrastructureProjectsreferstoanumberofprojects,theCouncil’sviewisthatitisunlikelythatthelevelofdevelopmentproposedinthePlanwillbeabletofundalltheseprojects;Recognitionisgiventothefactthispolicydoesnotunderpinthedeliveryofthewiderplanandthereforesupportsitsstatusasa“prioritylist”;Recommendedthattheterm“particularlywhereviabilityisuncertain”isreplacedwith“whereviabilityallows”;Suggestedthelistmaybealteredifasexpectedcertainitemsaredeliveredbyproposalsoutwiththeplanareae.g.*theredwaylinkbetweenWaltonHallandKentsHill;SupporttheuseofDeliveryandKeyCommitmentboxestodistinguishpolicyfromotheractions;RequestedreferencetoMKCOfficersberemovedandjustrefertoMiltonKeynesCouncil.
thatdeliveryofthisitemwillproceedfromotherplanneddevelopments.Furthermoreclarificationisrequiredwithregardtheexactrouteoftheproposedredway,takingaccountoftheexistingdesireline.
35. AndrewEve(Localresident)
Supportsinfill,withindesignprinciplesset;Supportsneedfornewinfrastructuresuchasshopsandcommunityfacilities;Supportssocialplanningforplayareas;alldevelopmentshouldbeinkeepingwithoriginalplanforMiltonKeynes,includinggridroadsystem;Supportsproposeddensities;Newhousingdesignshouldbemoreadventurousthanexistingbrickandtiledhouses.
Noted;ThePlanattemptstoencouragedevelopmentinlinewiththeprinciplesofMKandsupportingtheneeds,lookandfeelofthearea;ThePlanattemptstosecuredevelopmentinkeepingwiththeareawhilenotstiflinginnovationofdesign.
36. NaturalEngland(Statutoryconsultee)
NoimpactisforeseenonanyNatura2000designatedsitesnearby;AcknowledgesthePlan’semphasisonmaintainingthegreeninfrastructurenetworkandenhancingwherepossiblewithinnewdevelopment;CommentsregardingtheabilityofallsitesbeingabletosupportwellimplementedSustainableDrainageSystemstocopewithclimatechangeimpactssuchasheavierrainfall;Acknowledgedmentionofaccesstothefootpathnetworkandrequestedenhancementsaresoughtwhereverpossibletohelppromotewalkingandcycling;Acknowledgedthedesignationofnewareasofopenspace.WaltonParishis2.6kmfromWavendonHeathPondsSiteofSpecialScientificInterest(SSSIs)and4.9kmfromHoweParkWoodSSSIhowevertherearen’tanyNatura2000designatedsitesnearbyhencefurthercommentinthisregardisn’tneededasnoimpactisforeseenuponeither.MiltonKeynes
Noted.
37. LesleyBell(Localresident)
DoesnotsupportdevelopmentoftheCommunityFoundationlandatWG1,requestsitremainsasanaturalhabitatforwildlife.
Noted;ThelandatWG1isalreadyallocatedforsomeformofdevelopmentforcommunityuse,thePlanattemptstosupportusethatwillbenefitthelocalarea,eitherdirectlyviafacilitiesorviachangeofuseand
29Submission Version – June 2016
financialcontributionswhichcanthenbeutilisedtoprovidefacilitiesinmoresuitedlocations.
38. ConnollyHomes(Landowner)*
SupportiveofthedraftPlan,howeverhavesomeconcernswithregardtoit’sgeneralconformityintermsofsustainabilityandhavingregardtonationalpolicy;concernsregardinglanguageintheforeword;objectstothepre-submissionconsultationdraftNeighbourhoodPlanasitisnotinconformityoftheMiltonKeynesCoreStrategy2013(MKCS)anddoesnotcontributetoachievingsustainabledevelopment;thedraftplandoesnotmeetthebasicConditionsTests,specificallyinregardtodraftpoliciesWNP12GridRoadExtensionsandWNP19InfrastructureDelivery;thePlandoesnotsolelyrelatetothedevelopmentanduseoflandforadesignatedNeighbourhoodArea;theNeighbourhoodPlanshouldbeingeneralconformitywiththeexistingDevelopmentPlan,whichisthe2013MKCS,someofthepoliciesdonotallowforsufficientflexibilityforthedeliverabilityoftheStrategiclandAllocation(SLA);RequestsamendmenttoWNP12GridRoadExtensions,believingthepolicyconfusingwiththepotentialtomislead;the2013MKCSdoesnotrequireagridroadextensionthroughthereserveland,beingadevelopmentof350homes;ThetitlereferstoGridRoadExtensionsandthefirstparagraphreferstoany“futureroadextensions”,thepolicyshouldbeamended;objectstothereferencetoChurchFarmspecificallyinthispolicy;suggestsre-wordingasfollows;“anyfuturegridroadextensionfordevelopmentbeyondChurchFarmthroughthereserveshouldbeplannedinaccordancewiththeoriginalprinciplesofthegridroadsystem.Developmentofanewgridroadwillbeexpectedtoincludethefollowing”;statesthattheuseof“willberefused”isnotpositivelyworded;SupportsWNP19InfrastructureDeliveryandtheinclusionofageneralpolicyoninfrastructurerequirements,howeverthecontextparagraphcouldbeupdatedtostate“over10residentialunits”onpage41;referencecouldbemadetoMKC’sintentiontointroduceCILduringtheperiodofthePlan;suggestsamendedwordinginrelationCIL,shoulditbeintroduced;Objectstowordingofpolicywhichextendstodevelopments“closelylinked”tothearea,requesttheintroductorytextbedeleted;SpecificrequestthatinWNP19,thestatementseekingagradeseparatedcrossingoverByrdCrescentforanextensionoftheH10beamendedandthatspecificreferencetoChurchFarmisamended;requestsclarificationthatrequirementsforChurchFarmbeseparatedforrequirementsforfutureexpansionofthecitytotheeast;ConcernsregardingsomerequirementsnotbeingflexibletoallowforthedeliverabilityoftheStrategicLandAllocations;concernsregardingthescaleof
Noted;ThePlanhasbeenformulatedwithdueregardtotheNPPFandLocalPlan,fulldetailsofwhichcanbefoundintheBasicConditionsStatement.TheNPWGre-iteratesthatthePlanhasbeenpreparedpositivelyandinanobjectivemanner,howevertheforewordhasbeenamended.Page4ofthebasicConditionsStatementoutlineshowPolicyWNP12GridRoadExtensionsisinlinewithparagraph58oftheNPPF,thepolicyalsoseekstoencouragesustainablemovementwithinthePlanarea,inlinewithParagraphs30and33oftheNPPF.WNP19InfrastructureDeliveryplanspositivelyforthedeliveryofstrategicinfrastructureinthePlanarea,inaccordancewithparagraphs156and157oftheNPPF.FurthermorethePlandoesnotimposepoliciesonlandoutsideofthedesignatedarea.Thepoliciesareallingeneralconformitywiththe2013MKCS.PolicyWNP12GridRoadExtensionshasnowbeenamendedandisentitledGridRoadCorridors;furtheramendmentshavebeenmadetoclarifytheprotectionofthecorridorasawholeandappliestoanyhighwaywithinthereservearea,notsolelytheroadstructure;theNPWGfeelstronglythatthegridsystemprinciplesestablishedforMKareupheldalongwiththeguidancelaidoutintheMKPlanningManual;thereferencetogradeseparatedcrossinginWNP19InfrastructureDeliveryhasbeenamendedtoreflecttherequirementfromanyprovisionofnewhighwayswithinthegridroadcorridors;ContributionswillberequiredfromneighbouringareaswheretheyimpactthePlanarea,inlinewithcurrentplanningprinciples.
30SubmissionVersion–June2016
obligationsthePlanisdeemedtoimposeandthelinktoviabilityofdevelopment;believestheChurchFarmdevelopmentdoesnotrequireanextensiontothegridroadadthattheChurchFarmdevelopmentcanbeservedbyalocalroadconnectionto/fromtheH10roundabout.
39. MiltonKeynesDevelopmentPartnership(Landowner)**
GenerallysupportiveofthePlan;UndertaketointegrateexistinghedgerowsintothedevelopmentatWNP1WaltonManor,wherepractical;Contentwithresidential/mixedusedesignationforWNPCaldecotteCsite;WillcontinuetoliaisewithEast/WestRailandNetworkrail;CommentsthatitisunreasonabletoexpectMKDPtoaddressexistingparkingissuesrelatingtotheBusinessPark.
Noted;TheNPWGacknowledgetheundertakingtoretainhedgerowsatWNP1;TheNPWGalsonoteyourpointregardingtheprovisionofparking,howeverthePolicydoesnotrequirethis,butsimplyaimstostateparkingwouldbesupportedifopportunityarosetoaddressthisneed.
40. NationalGrid(Statutoryconsultee)***
DearSir/MadamWaltonNeighbourhoodPlanConsultationNoimplicationsforNationalGridwereassessedasaresultofthePlan.
Noted.
*originalresponsewasreceivedbythedeadline,howeveranupdatedresponsewasreceivedafterthedeadlineandacceptedon4thApril2016.**receivedafterthedeadlinebutacceptedon4thApril2016.***receivedafterthedeadlinebutacceptedon6thApril2016.
57.Ofthe18statutoryconsultees(seeparagraph45)6responded(aslistedinthetableabove):NaturalEngland;TheParksTrust;MiltonKeynesCouncil;Homes&CommunitiesAgency;EnglishHeritage&NationalGrid.Nocommentswerereceivedfromtheother12organisations.58.TheNPWGwasconcernedthatnocommentshadbeenreceivedfromMiltonKeynesCommunityFoundation.AlthoughthereisnostatutorydutyforthemtocommentonthePlan,itwasfeltthatasthePlanincludedsupportfor“alternativeuses”forsomeoftheReserveSitesinthearea,commentsshouldbesought.Despitenumerousrequests,nosubmissionwasreceived.59.Inordertoaccountfortheengagementwithlandowners,intermsofspecificsitesmentionedintheNeighbourhoodPlan,thefollowingtablehasbeenprepared:
31Submission Version – June 2016
Site Landowner EngagementWNP1LandatWaltonManor
MiltonKeynesDevelopmentPartnership
TheDevelopmentBriefwasapprovedbyMiltonKeynesCouncilin2015;WCCandmembersoftheNPWGrespondedtotheconsultationforthebrief;theChairandmembersoftheNPWGmetwithrepresentativesofMKDPandofficersofMiltonKeynesCouncilinNovember2015andsharedproposalsforthedraftPlan;MKDPrespondedtothepre-submissionconsultation,seecommentsintable.
WNP2LandatTowergate Homes&CommunitiesAgency(HCA)
TheChairandmembersoftheNPWGmetwithrepresentativesofHCAinNovember2015andsharedproposalsforthedraftPlan;afurthermeetingwasheldwiththeiragentsLambert,SmithHampton,inJanuary2016whereourfinaldraftproposalswereshared;HCAsubmittedcommentsonthedraftPlanatpre-submissionconsultationstage,seecommentsintable.
WNP3LandatHewlettPackard
HewlettPackardEnterprises OutlinePlanningpermissionwasgrantedinMarch2016.TheNPWGandWCCsubmittedcommentsandresolvedtoremaininvolvedinfuturediscussionsregardingtheproposals.TheChairandmembersoftheNPWGmetwithrepresentativesofHPE(andtheiragentsCollins&CowardLtd),inOctober2015andsharedproposalsforthedraftPlan;HPEsubmittedcommentsonthedraftPlanatpre-submissionconsultationstage,seecommentsintable.
WNP4LandatBergamotGardens
WaltonCommunityCouncil AsmembersoftheNPWG,WCCcouncillorshavebeenpartytoalldiscussionsandproposalsinrelationtothissite.ThesitehasbeenidentifiedasaPreferredOptionintheMiltonKeynesCouncilSiteAllocations.
WNP5LandatHindheadKnoll
MiltonKeynesDevelopmentPartnership
TheChairandmembersoftheNPWGmetwithrepresentativesofMKDPandofficersofMiltonKeynesCouncilinNovember2015andsharedproposalsforthedraftPlan;MKDPrespondedtothepre-submissionconsultation,seecommentsintable.
WNP6LandatCaldecotteknownasCaldecotteC
MiltonKeynesDevelopmentPartnership
TheChairandmembersoftheNPWGmetwithrepresentativesofMKDPandofficersofMiltonKeynesCouncilinNovember2015andsharedproposalsforthedraftPlan;MKDPrespondedtothepre-submissionconsultation,seecommentsintable.
WNP7CommunityFoundationreserveSites
MiltonKeynesCommunityFoundation
TheChairandmembersoftheNPWGmetwithrepresentativesofMKCFinNovember2015andsharedproposalsforthedraft
32SubmissionVersion–June2016
Plan;MKCFdidnotsubmitaresponseduringthepre-submissionconsultation;followupmessagesweresentinMay2016,noresponsewasreceived.
WNP8WalnutTreeCommunityHubs–NorthHub
MiltonKeynesDevelopmentPartnership
TheChairandmembersoftheNPWGmetwithrepresentativesofMKDPandofficersofMiltonKeynesCouncilinNovember2015andsharedproposalsforthedraftPlan;MKDPrespondedtothepre-submissionconsultation,seecommentsintable.
WNP9CaldecotteLakeside
TheParksTrust TheChairandmembersoftheNPWGmetwithrepresentativesofMKDPinXXXandsharedproposalsforthedraftPlan;MKDPrespondedtothepre-submissionconsultation,seecommentsintable.
WNP17OpenSpace&Leisure
MiltonKeynesCouncil DiscussionswereheldwithofficersofMiltonKeynesCouncilwithregardamenityopenspaceidentifiedforadditionalprotection,noconcernswereraisedandtheareasarealreadyidentifiedasamenitylandintheLocalPlan.
WNP18SportsGroundEnhancements-BrownsWoodSportsGround
MiltonKeynesCouncil DiscussionshavebeenheldbetweenWCCandMiltonKeynesCouncilofficersforproposalsforBrownsWoodSportsGroundduring2015/16.SupporthasbeenindicatedfortheproposalsandthelandisduetotransfertoWCCundertheCommunityAssetTransferProgrammeinJune2016.
60.RegardingtheneedfortheNeighbourhoodPlantobesubjectedtoaStrategicEnvironmentalAssessment(SEA),theNPWGwereadvisedthatthefullassessmentwasnotnecessary.AscopingreportwaspreparedmyMiltonKeynesCouncil,whichdeterminedthatthePlanwouldnotidentifyasignificantamountofdevelopmentintheplanarea.ThescaleofpotentialdevelopmentwouldnotstronglysuggestthataSEAwouldberequired.Thestatutoryconsulteesfurthersupportedthisview.61.NaturalEnglanddidnotrespondtotheSEAscoping,butdidsubmitcommentstothepre-submissionconsultation.62.Subsequenttothepre-submissionconsultationtheNeighbourhoodPlanwasthenfinalisedforsubmissiontoMiltonKeynesCouncil.
33Submission Version – June 2016