Rede�ning Water
Septech Holdings Limited
Wastewater Signature Projects
-
Dubai AUH SHJ AjmanGCC Wastewater Projects Map
3,000m3/daySTP-MBBR Process
Yas Island, Abu Dhabi, UAE
1,100m3/daySTP-EA Process
Sharjah Municipality, Sharjah, UAE
1,100m3/daySTP-SBR Process
Sharjah Municipality, Sharjah, UAE
1,000m3/daySTP-MBBR Process
Al Reef Villas, Abu Dhabi, UAE
1,000m3/daySTP-MBBR Process
Al Moosa Labour Camp, SHJ, UAE
300m3/daySTP-UTB Process
Sharjah Expo Centre, Sharjah, UAE
200m3/daySTP-UTB Process
Domestic Sewage, Abu Dhabi, UAE
1
2
3
4
5
6
7
DUBAI
ABU DHABI
SHARJAH
1
1425
4
6
11
108
9
123
AJMAN
7
13
UAE
140m3/daySTP-UTB Process
Wadi Al Helo, Sharjah, UAE
120m3/daySTP-UTB Process
Al Maha Desert Resort, Dubai, UAE
Sewage Treatment Plant, Sharjah, UAE
80m3/daySTP-EP Process
60m3/daySTP-GW Process
50m3/daySTP-UTB Process
CNIA Bu Hasa Camp, Abu Dhabi, UAE
40m3/daySTP-UTB Process
Ajman City Centre, Ajman, UAE
8
9
10
11
12
13
14
Grey Water Treatment, Sharjah, UAE
80m3/daySTP-UTB Process
Sewage Treatment Plant, Dubai, UAE
-
Al Ula Winter Camp Development Project – Kingdom of Saudi ArabiaCASE STUDY
Al Ula Winter Camp Development Project.
Al Ula, Kingdom of Saudi Arabia
STP processing 10m3/day, 36m3/day, 53m3/day, 60m3/day,
Design, supply, installation & commissioning of Sewage Treatment Plant
Underground Trickling Bio-filter(UTB) including Pump Stations
PROJECT NAME:
PROJECT LOCATION:
PROJECT SIZE:
SERVICES PROVIDED:
PRODUCTS PROVIDED:
Septech manufactured, supplied and installed varioussizes of underground wastewater tanks to
Al Ula, Kingdom of Saudi Arabia
-
Yas Island, Abu Dhabi, UAECASE STUDY
Yas Island Worker Camp Sewerage Treatment Plant (STP)
Yas Island, Abu Dhabi
STP processing 3,000m3/day
Concept, design and installation of STP for Yas Island construction worker camp
STP with Moving Bed Biological Reactor (MBBR) producing water suitable for irrigation purposes
PROJECT NAME:
PROJECT LOCATION:
PROJECT SIZE:
SERVICES PROVIDED:
PRODUCTS PROVIDED:
Our STP Plant in Yas Island treats sewage water suitable for service to population equivalent of 15,000
-
Wadi Al Helo, Sharjah,UAECASE STUDY
Wadi Al Helo Villas (80 nos. villas)
Wadi Al Helo, Sharjah, UAE
STP processing 80m³/day, 25m³/day and 15m³/day
Supply and Installation of Sewage Treatment Plant
Underground Trickling Biofilter (UTB)
PROJECT NAME:
PROJECT LOCATION:
PROJECT SIZE:
SERVICES PROVIDED:
PRODUCTS PROVIDED:
Septech’s UTB Technology - Sharjah Municipality’s choice for Wadi Al Helo Community
-
Al Reef Villas, Abu Dhabi,UAECASE STUDY
Al Reef Villas
Abu Dhabi,UAE
STP processing 1,000m3/day
Concept, design and installation of STP for Al Reef Villas (1,100 villa complex)
STP with Moving Bed Biological Reactor (MBBR) producing water suitable for irrigation purposes
PROJECT NAME:
PROJECT LOCATION:
PROJECT SIZE:
SERVICES PROVIDED:
PRODUCTS PROVIDED:
Septech’s MBBR Technology treats 1,000m3 of waste water per day at Al Reef Villas
-
UAEAbu DhabiP. O. Box 73374Abu Dhabi, UAET: +971 2 550 7553F: +971 2 550 5781
DubaiP. O. Box 27930Dubai, UAET: +971 4 408 8777F: +971 4 408 8788
Dubai (DIFC)P. O. Box 27930Dubai, UAET: +971 4 369 7090F: +971 4 369 7092
SharjahP. O. Box 5985Sharjah, UAET: +971 6 542 0888F: +971 6 542 0332
AustraliaHWT Tower, Level 23,40 City Road, Southbank,VIC 3006T: +61 3 9077 5453F: +61 3 9939 7099
6th FL, Tower A, 1 CybercityEbene, MauritiusT: +230 403 6000F: +230 403 6060
Tlalnepantla, EdodeMexico 54135T: +5255 5367 1693F: +5255 5367 1258
Mauritius
MexicoJL, Letjen, TB.Simatupang Kav. 35,Suite# 3,4,5Jakarta Selatan 12430
Indonesia
SpainC/Veira, Y Clavijo,52,10, 35002.Las Palmas
EuropeP. O. Box 583Muscat, Postal Code 115Sultanate of Oman
Oman
RiyadhP. O. Box 86334Riyadh 11622Saudi ArabiaT: +966 1148 68547F: +966 1148 68548
KSA
Corporate Office Courier AddressFirst Floor, Block B, Al Naboodah Bldg., Sheikh Zayed Road, Dubai, UAE
septechwastewatersignatureprojectsSeptech - Corp. Overview.pdfSlide Number 23
Septech - Corp. Overview.pdfSlide Number 45Slide Number 46Slide Number 47Slide Number 48
Septech - Corp. OverviewSlide Number 68