Download - Wat is het C2C project? Walter Tempst, OVAM
![Page 1: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/1.jpg)
![Page 2: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/2.jpg)
C2C{Network project
![Page 3: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/3.jpg)
3
What’s INTERREG IVC ?
Priority 2 > Environment and Risk prevention Sub-theme > Waste prevention and management Capitalisation Project ‘Regions for Economic Change Initiative’
> Moving to a recycling society
C2CN selected as INTERREG IVC project
![Page 4: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/4.jpg)
4
C2CN selected as Fast Track Network
What’s a Fast Track Network and why C2CN was selected?
![Page 5: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/5.jpg)
5
C2CN selected as Fast Track Network
European Commission as 11th partner bringing in expertise and assistance from
European CommissionDG Regional Policy
European CommissionDG Enterprise and Industry
European CommissionDG Environment
involving and mobilising Management Authorities of mainstream EU Operational Funds programmes
![Page 6: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/6.jpg)
6
C2CN general goals
Create European platform for gathering and disseminating knowledge on C2C
(…) how C2C can be formulated and implementedDraw up 'action plans' in which we demonstrate
regionally to produce sustainable solutions
Establish links with regional policy objectives (...)
Promote regional stakeholder involvement
![Page 7: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/7.jpg)
7
C2CN target areas
Product (…) design
Built environment design/development
Area specific design/development
Governance for C2C
![Page 8: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/8.jpg)
8
C2CN target areas
Product (…) design
Built environment design/development
Area specific design/development
Governance for C2C
Governance for C2C
Framew
ork for C2C
![Page 9: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/9.jpg)
9
C2CN expected outputs
1 long term European Partnership / C2C Network 14 good practices succesfully transfered (minimal) 4 general perspective studies (1 for each target area) 10 regional Action Plans 1 Good Practice Handbook (describing good practices) 1 Guide on Waste Management and C2C 1 set of policy recommendations 10 regional waste management policies addressed / improved 10 functional regional networks on C2C and waste management 6 mio EUR of mainstream funds dedicated to the
implementation of good practices (from this project)
Regional Action Plans
Guide on Waste Management and C2C
Good Practices Handbook
Perspectivestudies
![Page 10: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/10.jpg)
10
C2CN expected outputs
1 long term European Partnership / C2C Network 14 good practices succesfully transfered (minimal) 4 general perspective studies (1 for each target area) 10 regional Action Plans 1 Good Practice Handbook (describing good practices) 1 Guide on Waste Management and C2C 1 set of policy recommendations 10 regional waste management policies addressed / improved 10 functional regional networks on C2C and waste management 6 mio EUR of mainstream funds dedicated to the
implementation of good practices (from this project)
Regional Action plans
Guide on Waste Management and C2CGood Practices
Handbook
6 mio EUR of EU mainstream funds dedicated
to action
Policy recommendations
Policy recommendations
![Page 11: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/11.jpg)
11
C2CN expected outputs
1 long term European Partnership / C2C Network 14 good practices succesfully transfered (minimal) 4 general perspective studies (1 for each target area) 10 regional Action Plans 1 Good Practice Handbook (describing good practices) 1 Guide on Waste Management and C2C 1 set of policy recommendations 10 regional waste management policies addressed / improved 10 functional regional networks on C2C and waste management 6 mio EUR of mainstream funds dedicated to the
implementation of good practices (from this project)
Regional Action plans
Guide on Waste Management and C2CGood Practices
Handbook
Long term European C2C partnership / network
6 mio EUR EU of mainstream
funds dedicated to action
Policy recommendationsLong term Regional C2C
partnership / network
![Page 12: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/12.jpg)
12
C2CN work breakdown 2010
Thematic Seminar
Perspective Study A
Perspective Study B
Good Practices Handbook
Perspective studies
C2C Cases
C2CFramework
{
C2CFramework
![Page 13: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/13.jpg)
13
Work in progress > thematic seminars
Area specific development - Launch event (Maastricht NL, July 8-9th 2010)
Governance for C2C (Leuven BE, July 12-13th 2010)
Product / process design (Milan IT, Sep 9-10th 2010)
Building design / built environment (Ipswich UK, Sep 15-16th 2010)
![Page 14: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/14.jpg)
14
C2CN work breakdown 2011
Guide on Waste Management and C2C
Regional Action PlansPolicy recommendations
Adoption of good practices
Perspective studies
Study/site visits
6 mio EUR of EU mainstream funds
dedicated to action
![Page 15: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/15.jpg)
15
C2CN budget breakdown
Total budget 2,48 mio EUR Cofinancing 25 % Management 20 % Communication 15 % Exchange 65 % Budget OVAM 257.000 EUR
![Page 16: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/16.jpg)
16
C2CN partner regions
![Page 17: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/17.jpg)
17
C2CN management on overall project level International
Executive Board
International Steering
Committee
External Endorsement
Committee
Regional stakeholder involvement
![Page 18: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/18.jpg)
18
Regional stakeholder involvement
Based on functional networks
Other networks invited ...
![Page 19: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/19.jpg)
19
C2CN links to Flemish policy / initiatives
![Page 20: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/20.jpg)
20
C2CN links to EU and international policy
EU policy and EC involvement via Fast Track Network Other INTERREG projects PRE-WASTE (4C), SufalNet4EU (4C), FRESH (4C) and C2C
Islands (4B) > exchange info, practices, outputs, speakers (events)
Informal Council on Environment Global Forum Sustainable Material Management
(Mechelen, October 25-27th)
![Page 21: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/21.jpg)
21
Work in progress > collecting cases
Cases / good practices not necessarily 100 % C2C not necessarily implemented potential for learning, transfer
and implementation Collecting and sending
![Page 22: Wat is het C2C project? Walter Tempst, OVAM](https://reader033.vdocument.in/reader033/viewer/2022061119/5465504caf79590f738b6ac9/html5/thumbnails/22.jpg)