Utilities in Southern Iraq
Arif Alwan AliBasra Governorate Council
Colin McBrideCoalition Provisional Authority (South)
![Page 2: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/2.jpg)
Water
in
Southern Iraq
Arif Alwan Ali
Presentation
21 January 2004
![Page 3: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/3.jpg)
Strategic aims:
• W.H.O. standard water distributed to all networked properties
• All major population centres served by a piped sewerage system and treatment
• Managed landfill sites with collection services in all Governorates
![Page 4: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/4.jpg)
Water:Present situation:• There was a general impression of wastage through leaks,
bursts and deliberate damage to pipes.
![Page 5: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/5.jpg)
But repairs are regularly carried out and better quality and pressure have resulted in a noticeably better service.
![Page 6: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/6.jpg)
In addition, a major program of contracts is being carried out by Bechtel:
• Dredging of Sweet water canal
• Refurbishment of Pumping Station PS2
• De-silting and repair of settling basins
• Refurbishment of R0 Pumping station and treatment works
• Refurbishment of 14 water treatment works in Basrah
![Page 7: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/7.jpg)
R0
PumpingStation
BASRAH(TDS 3100)
AL QURNAH(TDS = 2000-3300ppm)
NASIRIYAH
BAD’AH
UMM QASR
SAFWAN
SHAIBAH
UMKHAYYAL
AZ ZUBAYR
AL KASIM
UNKNOWNSOURCE
SH
AT
T A
L A
RA
B
SHA
TT AL B
ASR
AH
LOYALITY TO LEADER CANAL(brackish water TDS 5000)
PS1 (pump waterunder Euphrates)
PS2 (pump waterUnder LTL Canal)
RIVER EUPHRATES
RIVER TIGRIS
RIVER TIGRISNAMR ALGHARRAF RIVER
CONCRETE DAM
SLUICEGATES
CHANNELCAPACITY21m 3/S
SWC 1100TDS
SETTLING RESERVIOR(CAPACITY 750,000m )3/S
SHATT ALARAB
SHATT ALARAB
AL MOUHAD 15000m(25 x 200cu)
3/hr total capacity
made up of
AL MOUHAD 24000m3/hr
AL QARMA 11600m(8 x 200cu)
3/hr
BASRAH PORT
AL JOUBAYLA1800m(4 x 200 + 1 x 1000cu)
3/hr
AL RYBAT600m(3 x 200cu)
3/hr
BRADAYA2000m(2 x 1000cu)
3/hr
UN
KN
OW
N F
LO
W
TO UMM QASR
RIVER GARMAT ALI
AL QARMA 2500m(10 x 50cu)
3/hr
SCHEMATIC OFWATER TREATMENT ANDDISTRIBUTION SYSTEMIN BASRAH CITY
NOT TO SCALE
SCHEMATIC OF WATER DISTRIBUTIONSYSTEM FOR SOUTHERN IRAQ
NOT TO SCALE DATE 14/04/03(T)
(UT)
(UT)
(T)
(UT)
SWC
From SweetWater Canal
FOR DETAIL OFDISTRIBUTION FROMR0 TO BASRAHSEE INSERT RIGHT
R0
-Sweet Water Canal-Untreated Water-Treated Water-Pumping Station-Treatment Plant-Town-Total Dissolved SolidsUnit = ppm (parts per million)
-Loyalty to Leader Canal > 30m Wide(wider than Sweet Water Canal)
SWC(UT)(T)
TDS
NB
KEY
![Page 8: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/8.jpg)
Sweet Water Canal
![Page 9: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/9.jpg)
Though there were a few mishaps along the way……..
![Page 10: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/10.jpg)
This will lead to a vastly increased quantity available for Basra Governorate, with the aim being 400 litres per person per day. In Maysan, Muthanna and Thi Qar provinces, a series of contracts will be refurbishing existing works and installing new compact units and reverse osmosis units.
Pumping Station PS2 Pumping Station R0
![Page 11: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/11.jpg)
Water Treatment Works to be refurbished
![Page 12: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/12.jpg)
Additionally:
• Major network repairs and refurbishment under the Emergency Infrastructure Plan (EIP) within Basra
• Water treatment and network provision in the 3 other Governorates.
![Page 13: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/13.jpg)
Opportunities:
• Water available for process and cleaning
• Major contracts for refurbishment requires consultants, contractors & suppliers
• Possible contracting out of certain non-core services.
![Page 14: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/14.jpg)
Sewage:
Colin McBride
![Page 15: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/15.jpg)
Sewage
• Basra city has a sewage works capable of giving basic treatment and disposal.
• Subject to a minor refurbishment in summer of 2003.
• Phases 2 & 3 to be completed by MMPW or Bechtel contract in near future.
![Page 16: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/16.jpg)
Basra Sewage Treatment Works
![Page 17: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/17.jpg)
![Page 18: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/18.jpg)
• Less than 50% of Basra city is connected to a piped sewerage system and only about 30% is connected to the Sewage Treatment works.
• A contract is underway to do the final connection another 20% and refurbish sewage pumping stations.
• Phases 4 to 7 of the Basra Sewage Plan will be implemented in the future.
![Page 19: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/19.jpg)
5
S3
S4S5 S1OLD
BASRAH
Al HiyaniyahFLATS
5A 2
STAGE 1
Sub Delegation
C
Road to Al-Faw City
1
31
STAGE 3
Muqudi17
23
4 5 7
176
18
8
Sh
at A
l Bas
rah
Mai
n T
ake
ou
t C
han
nel 24
15
14
13121110
9
STAGE 2
Basrah Sewage Network
MainTreatment
Plant
Disposal Channel
L= 4.7km
To
Al Z
ub
ayr
Cit
yT
o B
asra
h C
ity
Main Road to Baghdad
Shatt Al Basrah Canal
Shatt Al Arab River
Road
Pumping/ lifting station
Sewage Network
River
KEY
N
![Page 20: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/20.jpg)
• Major towns in 3 other Governorates have basic piped sewerage systems and treatment works, to be subject to a series of major contracts for refurbishment.
• Minor population centres serviced by septic tanks and private or state tankering disposal service.
![Page 21: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/21.jpg)
Opportunities:
• Process waste can be received for disposal
• Refurbishment contracts – civil and M&E
• Prospects of contracting–out of non-core activities (eg, jetting, tankering, vehicle maintenance, etc)
![Page 22: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/22.jpg)
Solid Waste Management
•Under control of Ministry of Municipalities and Public Works
•Ministry set up in May 2003- created by CPA subdivision of former Ministry of the Interior
•Responsible for Municipalities and Civil Services at local level •Principal functions –Drinking waterSanitationMunicipal ServicesAdministration
![Page 23: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/23.jpg)
Solid Waste Management
• Previously - An established service in most of the larger cities, part funded by a nominal levy (100 oldID/m) as part of water service charging.
• Rudimentary service in rural areas
![Page 24: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/24.jpg)
Solid Waste ManagementBUT•Serious disruption by the war and the subsequent looting.
•Waste management now very ineffective, largely broken down
•Widespread open dumping•Lack of manpower, equipment, expertise•Infrastructure (lack of) prevents use of sophisticated equipment in many area
![Page 25: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/25.jpg)
Solid Waste Management
Challenges and Opportunities
![Page 26: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/26.jpg)
![Page 27: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/27.jpg)
![Page 28: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/28.jpg)
![Page 29: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/29.jpg)
But it is being worked on……and can be fixed.
![Page 30: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/30.jpg)
And there is a lot of rubble to be disposed off….or used as hardcore.
![Page 31: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/31.jpg)
Opportunities –
Supply of equipment and plant for waste collection, waste treatment and disposal
Construction of infrastructure – Landfills (incl. leachate treatment, gas control)Waste transfer stationsWaste Processing e.g. Material Recovery facilities, Compost Plants, Thermal Treatment
Workshops, depots
![Page 32: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/32.jpg)
Solid Waste ManagementOpportunities –
Service provision – contracts for street cleansing, collection, treatment, disposal, waste recovery
Public/Private partnerships/funding
Project Management – tender preparation, design, bid evaluation, construction supervision
Training – technology transfer
![Page 33: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/33.jpg)
Electricity
Arif Alwan Ali
Presentation
21 January 2004
![Page 34: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/34.jpg)
Overall expenditure:
$5.56 Billion will be spent on electricity sector across Iraq in near future
• $2.6B on generation
• $1.55B on transmission
• $1B on distribution
• $150M on communication & control
• $50M on security
With Japanese pledged to add to above as a donor.
![Page 35: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/35.jpg)
Specifically in the South:
• 6 power stations with a combined output of 1400MW
• New power stations of 290MW being built in the next 7 months
• Large new plant under consideration by MEE and donor Japanese Government
![Page 36: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/36.jpg)
![Page 37: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/37.jpg)
Generation:
•All main units have been overhauled
•Smaller units that have not operated for years are now being overhauled
•From a position of approximately 3000MW last summer throughout Iraq, should be in the region of 6000MW this summer, specifically around 1400MW in South.
![Page 38: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/38.jpg)
Najibiyah Power Station
![Page 39: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/39.jpg)
Transmission:Looting of the 400kV and 132kV lines was extensive, however, the Transmission Co (with help from the military) has a repair program and major contracts are under way with Bechtel and USACE.
![Page 40: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/40.jpg)
Nasiriyah transformer station, was looted, now completely repaired and operational
![Page 41: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/41.jpg)
Distribution:
• Likely to be the bottleneck this coming summer, especially because of the improvement of the standard of living, eg, white goods.
• $10M contract to be awarded soon for distribution sub-stations within Basra
• Smaller contracts to be awarded in other 3 Governorates
• Street lighting also included under distribution company.
![Page 42: Water in Southern Iraq Arif Alwan Ali Presentation 21 January 2004](https://reader035.vdocument.in/reader035/viewer/2022062217/56814951550346895db6a10d/html5/thumbnails/42.jpg)
Opportunities:
• 24hour/7 days per week power in most areas
• $M in contracts and construction to be let
• Consultancy services required
• IPP and PPA still required