STATE OF THE ART WASTE WATERSTATE OF THE ART WASTE WATER
TREATMENT PLANT WITHTREATMENT PLANT WITH
INNOVATIVE SOLUTIONS FORINNOVATIVE SOLUTIONS FOR
BAPCO REFINERY BAHRAINBAPCO REFINERY BAHRAIN
Authors:Authors:
GlenGlen DaiggerDaigger, Si Givens, Mauro Marinetti, Carlo, Si Givens, Mauro Marinetti, Carlo ZaffaroniZaffaroni(CH2M Hill)(CH2M Hill)
Savas Soydaner, David Smith, ManoSavas Soydaner, David Smith, Mano VenkatVenkat, Ali, Ali RedhaRedhaAwadhAwadh,, EbrahimEbrahim MahdiMahdi (BAPCO).(BAPCO).
-
7/22/2019 Water Treatment.pdf
2/17
IntroductionIntroduction
BapcoBapco identified a need to install secondary treatment to improveidentified a need to install secondary treatment to improvethe quality of the waste water being discharged from the Refinerthe quality of the waste water being discharged from the Refinery toy tothe Gulf.the Gulf.
At present the waste water undergoes primary treatment in a systAt present the waste water undergoes primary treatment in a systememwhich consists of American Petroleum Institute (API) oil separatwhich consists of American Petroleum Institute (API) oil separatorsorsfollowed by Induced Air Flotation (IAF) units.followed by Induced Air Flotation (IAF) units.
BapcoBapcoss waste water was considered a challenge to treat becausewaste water was considered a challenge to treat because
of:of: high temperaturehigh temperature
high and variable salinityhigh and variable salinity
stringent water quality regulations.stringent water quality regulations.
Initially the use of a process based on physicalInitially the use of a process based on physical--chemical treatmentschemical treatmentswas considered a possibility because there was no definitivewas considered a possibility because there was no definitivereference in the literature to indicate that the waste water witreference in the literature to indicate that the waste water with theseh thesecharacteristics was treatable biologically.characteristics was treatable biologically.
-
7/22/2019 Water Treatment.pdf
3/17
Introduction (ContIntroduction (Contd)d)Biological secondary treatment was favored because of its lowerBiological secondary treatment was favored because of its lowercost.cost.
Biological secondary treatment has been common practice for aBiological secondary treatment has been common practice for along time in Oil Refineries because of the high flow rates and tlong time in Oil Refineries because of the high flow rates and thehenature and concentration of the contaminants.nature and concentration of the contaminants.
This presentation describes how and why the biological processThis presentation describes how and why the biological processtechnology that will be used in the new plant was selected.technology that will be used in the new plant was selected.
-
7/22/2019 Water Treatment.pdf
4/17
Application of Waste Water TreatmentTechnologies Based on Flow and COD
Concentration
The range of different wastewater treatment methods
1
10
100
1000
0.1 1 10 100Chemical Oxygen Demand (COD), g/l
Wastewater,m3/h
Wet oxidation
AdsorptionCombustion
Biology
Ozone technology
BAPCO
-
7/22/2019 Water Treatment.pdf
5/17
Discharge SpecificationsDischarge Specifications
1 Discharge specification: severe specifications on 4
different nitrogen forms (TKN,N-NH4, N-NO3, N-NO2);
combined with specificationson organic carbon (COD, TOC,BOD);
2 Waste water (WW)composition out of
existing units: high salinity
carbon nitrogen combination
proper for a biological system
3 - Large hydraulic flow:27,300 m3/d(9,950,000 m3/y)
Effluent specifications as required by EWP
Pa ram eter Un its
Final Effluent
Specification
Mo nthly Average (a )
Final Effluent
Specification
Maximum (b )
General Properties
pH - 6 to 9 N ot sp ecified
F
(C)
Total Suspended So l ids mg/ l 20 3 5
Turbidity NTU 25 7 5
BO D mg/ l 25 5 0
C OD mg/ l 150 350
Total Kjeldahl Nitrogen mg/ l 5 10 Oil and Grease mg/ l 8 1 5
Phenols mg/ l 0.5 1
Total Coliform s MPN /100m l 1000 10000
T OC mg/ l 50 -MBAS mg/ l 0.1 0.1
Inorganic
Oxygen mg/ l N ot specified N ot sp ecified
Am monia n i trogen a s N mg/ l 1 3
Sulfide as H 2S mg/ l 0.5 1
Residual Chlorine mg/ l 0.5 2
Cyanide as CN mg/ l 0 .0 5 0.1
Chloride as NaC l mg/ l N ot specified N ot sp ecified
Nitrate [NO 3] N mg/ l N ot specified 1 0
Nitrite [NO 2] N mg/ l N ot specified 1
T otal phosphorus mg/ l 1 2
M etals
Aluminum mg/ l 15 25
Arsenic mg/ l 0.1 0.5
Cadmium mg/ l 0 .0 1 0 .05
Total Chromium mg/ l 0.1 1
Copper mg/ l 0.2 0.5
Iron mg/ l 5 10
Lead mg/ l 0.2 1Mercury mg/ l 0 .001 0.005
Nickel mg/ l 0.2 0.5
Z inc mg/ l 2 5
Tem perature
T + 3C for
receiving w ater
T + 3C for
receiving water
-
7/22/2019 Water Treatment.pdf
6/17
First StepsFirst StepsIt was necessary to use a fundamental approach since there wereIt was necessary to use a fundamental approach since there wereno plants working under similar conditions.no plants working under similar conditions. BapcoBapco decided to startdecided to startwith the basics.with the basics.
Samples of waste water were sent fromSamples of waste water were sent from BapcoBapco to two independentto two independent
consultants in the UK. These consultants performed bench scaleconsultants in the UK. These consultants performed bench scaletreatability tests on the waste water using live activated sludgtreatability tests on the waste water using live activated sludge.e.
The bench scale tests gave a good positive indication that the wThe bench scale tests gave a good positive indication that the wasteastewater from the existing primary treatment is biologically treatawater from the existing primary treatment is biologically treatable.ble.
The bench scale tests did not provide any firm indication regardThe bench scale tests did not provide any firm indication regardinging
which biological process would be best suited.which biological process would be best suited.The bench scale tests did not provide enough information to deveThe bench scale tests did not provide enough information to developlopa plant design and what information there was, was unlikely toa plant design and what information there was, was unlikely toremain valid through scaleremain valid through scale--up.up.
Following the bench scale testsFollowing the bench scale tests BapcoBapco concluded that the next stepconcluded that the next step
would be to conduct pilot scale tests on site in order to increawould be to conduct pilot scale tests on site in order to increase these thelevel of confidence and provide further insight to the solution.level of confidence and provide further insight to the solution.
-
7/22/2019 Water Treatment.pdf
7/17
Pilot PlantPilot PlantA pilot plant with anoxic and aerobic biological treatment zonesA pilot plant with anoxic and aerobic biological treatment zonesfollowed by a membrane separation stage was established on site.followed by a membrane separation stage was established on site. ItIt
was fed with water from the primary treatment.was fed with water from the primary treatment.
The pilot plant was operated on a continuous basis byThe pilot plant was operated on a continuous basis by BapcoBapco forforseveral months and then for 7 months together with CH2M Hill.several months and then for 7 months together with CH2M Hill.
Pilot plant operation provided a range of fundamental processPilot plant operation provided a range of fundamental processinformation. These parameters were used as inputs into processinformation. These parameters were used as inputs into processsimulationsimulation programmesprogrammes in order to:in order to:
select the most appropriate treatment technologyselect the most appropriate treatment technology
prove that the selected technology is effective, applicable andprove that the selected technology is effective, applicable and
viable.viable.
In parallel to the pilot plant operation, onIn parallel to the pilot plant operation, on--site tests, analyses andsite tests, analyses andinvestigations were carried out to characterize the waste waterinvestigations were carried out to characterize the waste water andandthe composite streams.the composite streams.
-
7/22/2019 Water Treatment.pdf
8/17
Pilot PlantPilot Plant FlowsheetFlowsheet
WasteActivated
Sludge
A
noxi
c
PhosphoricAcid
Aerobi
c
Final Effluent(permeate)
MembraneUnit
Spent
Caustic
FeedTank
2
FeedTank
1
SeaWater in
Sea
Water out
Effluentfrom IAF
MembraneTank Feed
HeatExchanger
Caustic
Soda
Acetic
Acid
-
7/22/2019 Water Treatment.pdf
9/17
Pilot Plant ResultsPilot Plant Results
The Pilot Plant demonstrated that an MBR can be used to treatThe Pilot Plant demonstrated that an MBR can be used to treatBapcoBapcoss waste water and provide as complete a biological treatmentwaste water and provide as complete a biological treatment
as possible, leaving only hard/ nonas possible, leaving only hard/ non
--biodegradable/ recalcitrant CODbiodegradable/ recalcitrant COD
and TKN unand TKN un--oxidized.oxidized.
Additional bench scale tests were performed in a onAdditional bench scale tests were performed in a on--site laboratory,site laboratory,using sludge from the pilot plant, to verify the biousing sludge from the pilot plant, to verify the bio--kinetic constants.kinetic constants.
Fundamental process information was used as input to processFundamental process information was used as input to processsimulations used to optimize the design.simulations used to optimize the design.
Reference sites in Italy were visited. These sites were using siReference sites in Italy were visited. These sites were using similarmilar
technology in a tightly controlled discharge environment.technology in a tightly controlled discharge environment.
All of this was translated into a practical design.All of this was translated into a practical design.
-
7/22/2019 Water Treatment.pdf
10/17
Reasons for Selecting MBRReasons for Selecting MBR
TechnologyTechnologyAn MBR process, as BAT, was considered becauseAn MBR process, as BAT, was considered because
the low TSS limitthe low TSS limit
the low TKN limitthe low TKN limit low sludge growth ratelow sludge growth rate
low contaminant loadinglow contaminant loading
Poor floc settling properties resulting from the high salinity.Poor floc settling properties resulting from the high salinity.
It was considered unlikely to meet the specs with anything otherIt was considered unlikely to meet the specs with anything otherthan an MBRthan an MBR..
Despite rapid growth in the number of MBR installations, they haDespite rapid growth in the number of MBR installations, they haveve
not been used in refinery applications because of the perceivednot been used in refinery applications because of the perceived riskriskof membrane fouling by oil. The pilot plant demonstrated theof membrane fouling by oil. The pilot plant demonstrated themanageability of this risk.manageability of this risk.
-
7/22/2019 Water Treatment.pdf
11/17
What the WWTP will achieve forWhat the WWTP will achieve for
BapcoBapcoThe WWT project will enableThe WWT project will enable BapcoBapco to significantly improve theto significantly improve thequality of the discharged process water and comply with thequality of the discharged process water and comply with theenvironmental regulations as specified by the Bahrain Governmentenvironmental regulations as specified by the Bahrain Government..
Currently the Best Available Technology (BAT) for the secondaryCurrently the Best Available Technology (BAT) for the secondarybiological treatment of refinery waste water would be an MBR; abiological treatment of refinery waste water would be an MBR; abiological plant (anoxic and anoxic zones) followed by a membranbiological plant (anoxic and anoxic zones) followed by a membraneeseparation stage.separation stage.
This process offers the most complete biological treatment possiThis process offers the most complete biological treatment possibleble
including nitrogen removal. The specification from the EWP isincluding nitrogen removal. The specification from the EWP isstringent on all forms of nitrogen.stringent on all forms of nitrogen.
Further biological treatment is not possible and as a result ofFurther biological treatment is not possible and as a result of this thethis thepolluting nature of the treated water is at an absolute minimum.polluting nature of the treated water is at an absolute minimum. ThisThiswas supported by toxicity testing.was supported by toxicity testing.
No problems with oil on the membrane or other issues concerningNo problems with oil on the membrane or other issues concerningthe membrane material have been encountered.the membrane material have been encountered.
-
7/22/2019 Water Treatment.pdf
12/17
Process ConfigurationProcess Configuration
Currently the Best Available Technology (BAT) for the secondaryCurrently the Best Available Technology (BAT) for the secondarybiological treatment of refinery waste water would be an MBR; abiological treatment of refinery waste water would be an MBR; abiological plant (anoxic and anoxic zones) followed by a membranbiological plant (anoxic and anoxic zones) followed by a membranee
separation stage.separation stage.
This process offers the most complete biological treatment possiThis process offers the most complete biological treatment possiblebleincluding nitrogen removal. The specification from the EWP isincluding nitrogen removal. The specification from the EWP isstringent on all forms of nitrogen.stringent on all forms of nitrogen.
4 biological stages (anoxic/ aerobic/ anoxic/ aerobic) are neces4 biological stages (anoxic/ aerobic/ anoxic/ aerobic) are necessarysaryto meet the stringent specifications.to meet the stringent specifications.
Further biological treatment is not possible and as a result ofFurther biological treatment is not possible and as a result of this thethis the
polluting nature of the treated water is at an absolute minimum.polluting nature of the treated water is at an absolute minimum. ThisThiswas also supported by toxicity testing.was also supported by toxicity testing.
No problems with oil on the membrane or other issues concerningNo problems with oil on the membrane or other issues concerningthe membrane material were encountered.the membrane material were encountered.
-
7/22/2019 Water Treatment.pdf
13/17
Final Process ConfigurationFinal Process ConfigurationThe final process configuration is:The final process configuration is:
Max capacity 5000Max capacity 5000 USgpmUSgpm
Unit feed pitUnit feed pit
Equalization systemEqualization system
Cooling systemCooling system
Integrated 4Integrated 4--stage flexible biological system (organics removal,stage flexible biological system (organics removal,nitrification and denitrification)nitrification and denitrification)
Membrane tanks for liquid/solid separation systemMembrane tanks for liquid/solid separation system
Sludge treatment (storage and dewatering system)Sludge treatment (storage and dewatering system)
Chemical storage and dosing systemsChemical storage and dosing systems..
-
7/22/2019 Water Treatment.pdf
14/17
Spent CausticSpent CausticBapcoBapco has a waste stream of spent caustic, and ways of handling ithas a waste stream of spent caustic, and ways of handling itin an environmentally acceptable way were being investigated.in an environmentally acceptable way were being investigated.
During the waste stream characterization it was confirmed that tDuring the waste stream characterization it was confirmed that thehespent caustic from the refinery was problematical because of itsspent caustic from the refinery was problematical because of its veryvery
odorous and toxic nature.odorous and toxic nature.
Following experiments on the pilot plant it was demonstrated thaFollowing experiments on the pilot plant it was demonstrated thattthe spent caustic, when added in a controlled manner could bethe spent caustic, when added in a controlled manner could beprocessed by without a problem.processed by without a problem.
The Pilot Plant mass balance showed a COD shortfall as requiredThe Pilot Plant mass balance showed a COD shortfall as requiredby the deby the de--nitrification reaction. As an additional benefit, the spentnitrification reaction. As an additional benefit, the spentcaustic could help reduce the shortage by providing COD. Thiscaustic could help reduce the shortage by providing COD. Thissaves acetic acid addition as COD source.saves acetic acid addition as COD source.
As another benefit, the alkalinity provided by the spent causticAs another benefit, the alkalinity provided by the spent causticreduces the alkalinity required for nitrification. This saves frreduces the alkalinity required for nitrification. This saves fresheshcaustic addition.caustic addition.
-
7/22/2019 Water Treatment.pdf
15/17
ProcessProcess FlowsheetFlowsheet
Acetic acid or othercarbon source
Return
ActivatedSludge Waste
ActivatedSludge
Aerob
icAnoxi
c
Ano
xic
Equalised Effluentfrom IAF
Nitrate Recycle
Final Effluent(permeate)
MembraneUnit
SpentCaustic
Aerob
ic
-
7/22/2019 Water Treatment.pdf
16/17
Project StatusProject StatusThe EDP has been completed.The EDP has been completed.
FlowsheetFlowsheet,, P&IDsP&IDs have been developed.have been developed.Front End Engineering Design (FEED) has started.Front End Engineering Design (FEED) has started.
Engineering Procurement and Construction (EPC) willEngineering Procurement and Construction (EPC) will
follow.follow.Options for further treatment to allow water reuse areOptions for further treatment to allow water reuse are
being examined.being examined.
-
7/22/2019 Water Treatment.pdf
17/17
SummarySummary
From a position of no one knowingFrom a position of no one knowing
anything about the best process, if any atanything about the best process, if any atall, to treat its problematic waste water andall, to treat its problematic waste water and
spent caustic,spent caustic, BapcoBapco first established afirst established a
knowledge base and then developed thatknowledge base and then developed that
further to a practical design based on anfurther to a practical design based on an
MBR, a state of the art technology.MBR, a state of the art technology.