Transcript
Page 1: Weekly report template

Name-Surname Mr. Niphon worathiprommaStudent ID. 54261516

Group Name 8

Engineering Team Members ten Golf tom b arm gun

Product Design Team Members -

Weekly ProgressIn the first week that I need to do is find out about. ToasterAnd the option to work. The work has three levels: soft, warm.And let us know if the bread is ready to eat or not.

Figure 1. Figure 2.

Engineering AnalysisStrong PointWorkable And better performance. The price is not much different.

Week PointTherefore, the structure is not designed to have a device that may not fit the original structure.

Next Week JobThe design and the information included in the circuit.

Top Related