6th May 2009 8 June 2009
WelcomesYou
Chennai Container Volume Growth(TEU’s) : 1995 - 2013
1000000
1200000
1400000
160000020121.58
millionTEUs
Achieved1.2 million
markAchieved1 million
mark
20
200000
400000
600000
800000
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
AFTER 2001
19 % GROWTH Y2Y
AFTER 2001
19 % GROWTH Y2Y
BEFORE 2001
9 % GROWTH Y2Y
BEFORE 2001
9 % GROWTH Y2Y
CCTSnapshots
CCTSnapshots
CCT- Overview
o India’s 1st containerterminal -1983
o Until 2001, the terminalwas run by theGovernment Port.
o 30 years BOT awarded toP&O Ports - 2001.
o In 2006, P&O Ports wasacquired by DP World
o India’s 1st containerterminal -1983
o Until 2001, the terminalwas run by theGovernment Port.
o 30 years BOT awarded toP&O Ports - 2001.
o In 2006, P&O Ports wasacquired by DP World
Quay side operations at Mundra International Container Terminal
Quay Length – 885 m
Quay Cranes : 8(5 Mono + 3 Twin)
Draft – 13.4 m
Quay Infrastructure:
Supply Driven Infrastructure
Quay Cranes : 8(5 Mono + 3 Twin)
RTGs – 22 ; ECH - 1
3960 Ground Slots
357 Reefer Points
Yard Infrastructure:
World Class Performance
World Class Performance 2500 moves within 18 hours.
“125 moves per hour on Vessel”
Global Benchmarks – Productivity
Indicators Global Best
Skilled OperatorsSkilled Operators Achieved 50 movesAchieved 50 moves
Import DwellImport DwellTimeTime 22 Hours22 HoursImport DwellImport DwellTimeTime 22 Hours22 Hours
Yard UtilizationYard Utilization 84000 TEUs per Hectare84000 TEUs per Hectare
ProductivityProductivity 31 moves per crane hour31 moves per crane hour
Indicators Before Now(2014)
Berth waitingtime 3 days 0
VesselTurnaround
time72 hours 19 hours
CCT – Productivity Indicators
VesselTurnaround
time19 hours
TrailerTurnaround
time
180minutes 60 minutes
Import DwellDays 7 Days 22 Hours
Gross CraneProductivity
10 movesper hour
31 moves perhour
Chennai Container Terminal - Prior 2001
SIN,PKG & TPP
Port Blair
Colombo
2014 - Connected to 60+ ports globally!
IFXIFX
Chennai Container Terminal - 2014
IMSIMSBOBKYCBOBKYC
10
CCGCCG IFXIFX
Vishrutha (25KM)
SICAL (23 KM)
Triway (16 KM)
ECCT & German Exp (18KM)
Kailash & SattvaLogistics (15 KM)GDL (12 KM)
ICBC & Sattva Hi-tech(11 KM)
Concor (12 KM)
Balmer Lawrie(14 KM)
DR Logistics (23 KM)
Chandra CFS (28 KM)
CWC Madhavaram (15 KM)
Maersk CFS (32 KM)
TRL (15 KM)
CALYX (23 KM)
ICBC & Sattva Hi-tech(11 KM)
Binny (10KM)
AS Shipping (21 KM)
Viking (17KM)
CWC Virugambakkam (25 KM)
CWC Royapuram (2 KM)
Balmer Lawrie(14 KM)
SANCO & ALLCARGO(7KM)
Continental (17 KM)
CWC Chromepet(26 KM)
Sun Global (32 KM)
Glovis (30 KM)
Indev (29 KM)
TRL (15 KM)
Awards and Recognitions2014 Best Container Terminal Operator conferred by EXIM India2014 Terminal of the Year 2014 – Health, Safety & Environment2013 EXIM Achievement Award by Tamil Chamber of Commerce2012 Sir Visvesvaraya Industrial Award by AIMO2012 Best Container Terminal Operator conferred by EXIM India2012 EXIM Achievement Award by Tamil Chamber of Commerce2011 Best Container Terminal Operator conferred by EXIM India2010 DP World Global award for Excellence in Safety and Environment2010 Lloyds List ME and ISC Award for Terminal Operator of the Year2010 National Safety Award – Vishwakarma Rashtriya Puraskar2010 National Safety Award – Vishwakarma Rashtriya Puraskar2010 Maritime Gateway awards for Terminal Operator of the Year2010 EXIM South East India Awards Terminal Operator of the Year2009 Best Container Terminal Operator conferred by EXIM India2008 Exim Achievement Award by Tamil Chamber of commerce2007 Best Customer Award from Hyundai Motors India Ltd
Global Standard Certification
o ISO 9001 : Quality Management
o ISO 14001 : Environmental Management
o OHSAS 18001 : Occupational Health & Safety
o ISO 27001 : Information Security
o ISO 28000 : Supply Chain Security Management
DP World Chennai is committed toQuality, Health, Safety & Environment.
“Green is Sacrosanct for a Sustainable Future”
o ISO 9001 : Quality Management
o ISO 14001 : Environmental Management
o OHSAS 18001 : Occupational Health & Safety
o ISO 27001 : Information Security
o ISO 28000 : Supply Chain Security Management
Safety Initiatives………
About 2500 drivers / cleanersMeet on May Day.
Contractors Rest Area Safety Sign Boards PA System
Drivers Rest Area Shuttle Bus for Pedestrians Safety Gate Roof Top Numbers
Cleaners Rest Area Yard Marshalling Drivers Awareness Objectives for Contractors
More Safety Initiatives………
Truckers Rest Area Concrete for Traffic Control Lashing Cage RTG Blind corner mirror
Environmental Changes Initiatives
o World Environment Day
o Reduced per TEU fuel consumption by 30%reduced exhaust emissions and saving 500,000litres
o Recycled treated sewage water for garden /plants watering.
o Hazardous bund and Spill Trailer
o World Environment Day
o Reduced per TEU fuel consumption by 30%reduced exhaust emissions and saving 500,000litres
o Recycled treated sewage water for garden /plants watering.
o Hazardous bund and Spill Trailer
More - Measures : Future Ready
Launching ofLaunching ofRTG basedRTG based -- WeighingWeighing of Containersof Containers
&&-- RFIDRFID Pilot ProjectPilot Project
ByByShriShri Nitin Gadkari Hon’ble Union Ministry of Shipping on 3Nitin Gadkari Hon’ble Union Ministry of Shipping on 3rdrd Nov 2014Nov 2014
IMO (International Maritime Organization )mandate’s compliance :
Ready for weighing of all containershandled by July 2016
Load Cell unit fixed on all 22RTGs
Certified by Weight & Measureswith tolerance +/- 0.5 tons
Improve Safety & Security
Prevent Revenue Loss toexchequer
- Weighing of Containers
IMO (International Maritime Organization )mandate’s compliance :
Ready for weighing of all containershandled by July 2016
Load Cell unit fixed on all 22RTGs
Certified by Weight & Measureswith tolerance +/- 0.5 tons
Improve Safety & Security
Prevent Revenue Loss toexchequer
Rubber Tyre Gantry Cranelifting a container from a trailer
RFID - Radio Frequency Identification
Container / Trailer Tracking
Only authenticated trailers allowed toenter/exit.
Tampering of data will be eliminated.
Efficient Gate transaction (documents)< 2 minutes / trailer
Multiple Reports arrival/departure oftrailers
Emails/SMS based alerts on entry/exitinto/from CFS/Port
Container / Trailer Tracking
Only authenticated trailers allowed toenter/exit.
Tampering of data will be eliminated.
Efficient Gate transaction (documents)< 2 minutes / trailer
Multiple Reports arrival/departure oftrailers
Emails/SMS based alerts on entry/exitinto/from CFS/Port
•• ee-- Form13Form13 : Web based forms allocation to VOA, COA,CHA and CFS to receive/deliver containers.
•• ee-- SSRSSR : Allow containers arriving after cut-off time.
•• ee-- CRMCRM : Used by all our external customers to log calls.
•• ee-- InvoiceInvoice: To View/download invoices by customers .
•• ee-- Web Access :Web Access :VOA, COA and CFS pre-advise containers.
•• ee--Container SearchContainer Search : On line Container Tracking.
• e- payment : to all Vendors
Web Enabled- Customer Service
•• ee-- Form13Form13 : Web based forms allocation to VOA, COA,CHA and CFS to receive/deliver containers.
•• ee-- SSRSSR : Allow containers arriving after cut-off time.
•• ee-- CRMCRM : Used by all our external customers to log calls.
•• ee-- InvoiceInvoice: To View/download invoices by customers .
•• ee-- Web Access :Web Access :VOA, COA and CFS pre-advise containers.
•• ee--Container SearchContainer Search : On line Container Tracking.
• e- payment : to all Vendors
Projects awaited for to benefit theExim trade at Chennai
EMRIP – Ennore Manali Road Improvement Project
Elevated Corridor Project
Chennai Ennore Port RoadConnectivity project (EMRIP)
Segment Length inKms
Details
Part -1 1.6 Km Port Entry Gate 1 toKasimedu N4 PoliceStation
Part - 2 6.0 Km Kasimedu N4 PoliceStation to ErnavoorJunction (Deferred dueto Resettlement &Rehabilitation of PAF)
Part - 3 5.6 Km MORR (Ernavoorjunction to MFLJunction)
Part -4 9.0 Km TPP Road (MFLjunction to NCTPS)
Part - 5 7.5 Km Northern segment ofInner Ring Road ( MFLJunction toMadhavaram Bridge)
Total stretch – 30 kmsProject Cost – INR 600 crores
Elevated Corridor Project
•
Thank YouThank You