Starting Date: 4-Feb-2011Submission Date: Mar 8, 2011

ICT Project - Class IXWork Plan Term 2

SUBTASK ROLE START DATE END DATEPRODUCT

(milestones are highlighted)

Introduction of the project. Requirements discussed.

Teacher initiates 31-Jan-11 4-Feb-11 Select the topic for the project.

Work Plan Teacher 31-Jan-11 7-Feb-11Work Plan posted on softboards and ICT website

Students 7-Feb-11 11-Feb-11 Hard Copy Action Plan submitted

Online Research

Library Research

Writing the Report

Organize the information under main headings and sub headings

Make a flow chart

Decide the navigation tabs.

Design a banner

Design a template

Create 25 pages 28-Feb-11 Draft to be checked by teacher

Create Navigations Students 28-Feb-11 4-Mar-11

Complete the website Students 8-Mar-11

Paraphrased Content with citation to be emailed

18-Feb-1111-Feb-11Students

Students 18-Feb-11 21-Feb-11

Final Submission

21-Feb-11

25-Feb-11

Students

Submit the site map hard copy

Write-up about the layout