WSDOT Perspective on MAP-21 and Pavement Management
Mark RussellPavement Design Engineer
Washington State DOT
1
![Page 2: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/2.jpg)
Performance Management in MAP-21Title 23, U.S.C.
2
![Page 3: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/3.jpg)
Performance MeasuresFor Decision Making
• Project & Network Level Pavement Management
For Accountability• State Legislature• Governor’s Office• State Auditor’s Office• GASB• MAP-21
3
![Page 4: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/4.jpg)
Typical PavementPerformance Measures
• Present Serviceability Index (PSI) - 1958• Roughness (IRI) - 1986• Distress (cracking, rutting, raveling, faulting, etc.)• Friction (Skid Number, macrotexture, IFI)• Structure (deflection, seismic response)• Remaining Service Life (RSL)
What about cost?? Performance at what price??
4
![Page 5: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/5.jpg)
Cost-Effectiveness
“…the most efficient investment…”– Annual Cost ($ / lane-mile / year of life)
• Historical Cost of Acceptable Pavement Performance– Actual historical cost ($/LMY)
• Expected Cost of Future Pavement Rehab– Projected LCCA ($ /LMY)
5
![Page 6: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/6.jpg)
• Long Term– Evaluating Pavement Design Strategies over
many performance periods– Assumed performance– FHWA RealCost
• Operational (Year-to-Year)– Historical performance is known– Evaluation of single performance period– Decisions involve maintenance/preservation
and rehabilitation/reconstruction
Comparing LCCA
6
![Page 7: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/7.jpg)
Maint.(what, when,
where, how, why)
Rehab.(what, when,
where, how, why)
Reconst.(what, when,
where, how, why)
Cost(minimize annual
life-cycle cost)
Performance(achieve minimum
requirement)
Decisions and Outcomes
7
![Page 8: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/8.jpg)
• 18,500 lane-miles
• $16 billion pavement replacement cost
The Pavement Management Perspective
Chip Seal6,00032%
Asphalt10,25055%
Concrete2,25013%
Statewide Lane Miles
![Page 9: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/9.jpg)
Long-life History by Pavement Type
Structure Life (Years)
5060
9
![Page 10: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/10.jpg)
10
Pavement Models: Flexible and RigidFlexible pavements• Asphalt or chip seal• Managed in cycles • Emphasis is to limit scope
of work to only resurfacing
Rigid pavements• Concrete pavements
managed as long-term structures
• Eventually must be reconstructed. Pa
vem
ent C
ondi
tion
Years
Concrete (Rigid)
Pave
men
t Con
ditio
n
Asphalt (Flexible)
Years
Pave
men
t Con
ditio
n
Chip Seal (Flexible)
Years
50-year Pavement Comparison
![Page 11: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/11.jpg)
11
LLCC: Asphalt and Chip Seal
Reconstruction ?? ($$$$$$)
Rehab ($$$)??
Years
Cond
ition
Inde
xes
0
100
Optimum time for Rehab
Excessive Vehicle Operating Costs
Excessive Agency Construction Costs
Do Nothing ??
Index value 45 ~ 50
Maintenance ($) ??
Preventive Strategic Reactive
![Page 12: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/12.jpg)
12
LLCC: Concrete
TotalReconst.
(index < 25)
Waitfor TotalReconst.
(Replace high risk panels)
Grindand/or
DBRand
SelectiveReconst.
Grind
Years
Cond
ition
Inde
xes
0
100
Risk of Catastrophic Failure:Very Low Low Med. High
Strategy:
Cannot do grind or DBR after this point
MUST do reconstruction after this point
![Page 13: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/13.jpg)
Replacement (Strategy) Analysis• Decision Analysis to consider:
– Do Nothing (no replacement)– Maintenance– Rehabilitation– Reconstruction
• If proposed alternative results in lower annual cost, then make decision for (strategy) replacement
13
![Page 14: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/14.jpg)
$250 k
12 years 12 years
$26,638/yr=
$250 k
15 years 15 years
$23,538/yr$5 k $15 k
=
10
Calculation of Equivalent Uniform Annual Cost (EUAC) for an asphalt pavement resurfacing ($250k for 12 year period).
Spending additional $5k on maintenance in year 10 and $15k in year 15 results in EUAC that is $3.1k less (12% reduction in annual cost). (Assumed Discount Rate 4%)
Replacement Analysis
14
![Page 15: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/15.jpg)
Flexible Cost Effectiveness EvaluationTypical (Avg.) Annual CostConst. LMY $/LMY *
Project Type Cost($/LM) gained (no user $)
Crack Seal $5,000 3 $ 1,800Chip Seal $45,000 7 $ 7,500Rehab (ACP) $250,000 14 $23,000Reconst (ACP) $900,000 20 $66,000
* includes 4% Discount Rate 15
![Page 16: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/16.jpg)
Rigid Cost Effectiveness EvaluationTypical (Avg.) Annual CostConst. LMY $/LMY *
Project Type Cost($/LM) gained (no user $)
Grinding $150,000 15 $13,500Rehab. $250,000 15 $22,500Reconst. (CSOL) $900,000 50 $49,000Reconst. (unbonded) $1,600,000 50 $74,000Reconst. (PCC) $2,500,000 50 $116,000
* includes 4% Discount Rate
16
![Page 17: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/17.jpg)
17
![Page 18: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/18.jpg)
WSDOT 10-Year Concrete Plan
• Maximize opportunities for rehabilitation• Project staging on congested corridors• 515 lane-miles of reconstruction • 366 lane-miles of rehabilitation• $103 million per year
18
![Page 19: WSDOT Perspective on MAP-21 and Pavement … Russell...MAP-21 and Pavement Management ... • Structure (deflection, seismic response) • Remaining Service Life (RSL) ... • Long](https://reader031.vdocument.in/reader031/viewer/2022011800/5aca93b67f8b9a51678dfeff/html5/thumbnails/19.jpg)
19
$0
$50
$100
$150
$200
$250
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Projected
Chip Seal
Asphalt
Concrete
Preservation Funding
(2014 $ in Millions)