Central Avenue Downtown Construction - Green Bay Road to 11th Street (Anticipated between August 1, 2020 and December 15, 2020) Downtown Streetscape Improvements: Central Ave + Wilmette Ave Detour Route Wilmette, IL 1. Central Avenue one-way traffic allowed in westbound direction. 2. Central Avenue eastbound traffic will not be allowed and will be detoured to Lake Avenue. 3. Wilmette Avenue open to two-way traffic. Wilmette Avenue Downtown Construction - Green Bay Road to Lake Avenue (Anticipated between March 1, 2021 and May 30, 2021) 1. Wilmette Avenue one-way traffic allowed in northbound direction. 2. Wilmette Avenue southbound traffic will not be allowed and will be detoured to Green Bay Road. 3. Central Avenue open to two-way traffic. Central Avenue Residential and School Construction - 11th Street to Sheridan Road (Anticipated between August 2020 and September 2021 with a break between December 2020 and March 2021 for winter. During winter, road will be reopened to two-way traffic.) 1. Central Avenue one-way traffic allowed in westbound direction. 2. Central Avenue eastbound traffic will not be allowed and will be detoured to Lake Avenue. DETOUR NOTES FOR DOWNTOWN LEGEND Existing Traffic Signal Staged Construction Zones One-Way traffic on Central Ave + Wilmette Ave Eastbound Central Ave Detour Route Southbound Wilmette Ave Detour Route Road Closure Barrier Green Bay Rd Sheridan Rd Lake Ave Washington Ct Washington Ave Greenleaf Ave Park Ave Linden Ave 12th St 11th St 10th St 9th St 8th St 7th St 6th St 5th St 4th St 3rd St Wilmette Ave Wilmette Ave Central Ave Central Ave Union Pacific Railroad te A Av ve e 1 12 2t ad So R Ro

Upload: others

Post on 06-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Downtown Streetscape Improvements: Central Ave + Wilmette Ave … · 2020. 7. 28. · Central Ave Union Pacific Railroad te A v e 1 2 t a d So Ro. P P P P P P Green Bay Rd Union Pacific

Central Avenue Downtown Construction - Green Bay Road to 11th Street (Anticipated between August 1, 2020 and December 15, 2020)

Downtown Streetscape Improvements: Central Ave + Wilmette Ave Detour RouteWilmette, IL

1. Central Avenue one-way traffic allowed in westbound direction.2. Central Avenue eastbound traffic will not be allowed and will be detoured to Lake Avenue.3. Wilmette Avenue open to two-way traffic.

Wilmette Avenue Downtown Construction - Green Bay Road to Lake Avenue (Anticipated between March 1, 2021 and May 30, 2021)

1. Wilmette Avenue one-way traffic allowed in northbound direction.2. Wilmette Avenue southbound traffic will not be allowed and will be detoured to Green Bay Road.3. Central Avenue open to two-way traffic.

Central Avenue Residential and School Construction - 11th Street to Sheridan Road(Anticipated between August 2020 and September 2021 with a break between December 2020 and March 2021 for winter. During winter, road will be reopened to two-way traffic.)

1. Central Avenue one-way traffic allowed in westbound direction.2. Central Avenue eastbound traffic will not be allowed and will be detoured to Lake Avenue.

DETOUR NOTES FOR DOWNTOWNLEGEND

Existing Traffic Signal

Staged Construction Zones

One-Way traffic on Central Ave + Wilmette Ave

Eastbound Central Ave Detour Route

Southbound Wilmette Ave Detour Route

Road Closure Barrier

Green Bay Rd

Sheridan Rd

Lake Ave

Washington Ct

Washington Ave

Greenleaf Ave

Park Ave

Linden Ave

12th

St

11th

St

10th

St

9th S

t

8th S

t

7th S

t

6th S

t

5th S

t

4th S

t

3rd S

tWilmett

e Ave

Wilmette

Ave

Central Ave

Central Ave

Union Pacific Railroad

te AAvv

ee

1122tad

So

RRo

Page 2: Downtown Streetscape Improvements: Central Ave + Wilmette Ave … · 2020. 7. 28. · Central Ave Union Pacific Railroad te A v e 1 2 t a d So Ro. P P P P P P Green Bay Rd Union Pacific

P

P

P

P

P

P

Green Bay Rd Union Pacific Railroad

Lake Ave

Washington Ct

Greenleaf Ave

12th

St

11th

St

Wilm

ette A

ve

Construction ZoneLEGEND

Pedestrian Access

Two-Way Traffic Flow

On Street ParkingTemporary Angled Parking as Shown

One-Way Traffic Direction

Public Parking Lots

Central Ave

Downtown Streetscape Improvements: Stage 1Wilmette, IL

STAGE 1· CENTRAL AVENUE FROM GREEN BAY ROAD TO 11TH STREET (ANTICIPATED BETWEEN AUGUST 1, 2020 AND DECEMBER 15, 2020) 1. ONE-WAY TRAFFIC IN THE WESTBOUND DIRECTION ONLY.2. EASTBOUND TRAFFIC NOT ALLOWED AND DETOURED TO LAKE AVENUE.3. WILMETTE AVENUE OPEN TO TWO-WAY TRAFFIC.4 . CONSTRUCT NORTH HALF OF ROADWAY.5. PRIOR TO ANY ROADWAY CONSTRUCTION, EXISTING SIDEWALK SHALL BE REMOVED TO ALLOW CONSTRUCTION OF A NEW 5 FOOT WIDE SIDEWALK ADJACENT TO BUILDING FACES.6 . ACTIVITIES INCLUDE WATER MAIN, MINOR STORM SEWER WORK, ROAD RECONSTRUCTION, CURB & GUTTER, SIDEWALK REPLACEMENT, AND TRAFFIC SIGNAL INSTALLATION.7. PARKING WILL BE AVAILABLE ON THE OPPOSITE SIDE OF CONSTRUCTION ACTIVITY. 8. PROJECT TEAM WILL WORK WITH BUSINESS OWNERS TO KEEP PEDESTRIAN ACCESS TO BUILDINGS OPEN AND COORDINATE OPTIMAL TIME/STRATEGY TO POUR THE SIDEWALK IN FRONT OF BUSINESSES.

Lefty’s pizzaSchultz & Odhner's Dry Cleaners

The Bottle shopCraig Scott opticians

William Harris Lee + CO

vALLEY LODGE TAVERN

lAMBRECHT’S jEWELERS

morning glory ltd

gOLD METAL CLEANERS

kelly’s appliances

DEGIULIOKITCHEN DESIGN

vETERANS pARKbIG tOMATO pIZZERIA

ywca shop for gooddOWIZE BISTRO

ST. ROGER ABBEY BAKERYPediatric dentistry

Hubba hubba

NapolitA

WILMETTE THEATERCHUCK WAGON

KOYA SUSHI The Wild Child

Healing tree physical therapyFonseca Martial Arts

Ambiance Window FashionsWilmette Wine CellarForever Young nails

@ Properties

Village Hall + Green

Page 3: Downtown Streetscape Improvements: Central Ave + Wilmette Ave … · 2020. 7. 28. · Central Ave Union Pacific Railroad te A v e 1 2 t a d So Ro. P P P P P P Green Bay Rd Union Pacific

P

P

P

P

P

STAGE 2• CENTRAL AVENUE FROM GREEN BAY ROAD TO 11TH STREET (ANTICIPATED BETWEEN AUGUST 1, 2020 AND DECEMBER 15, 2020) 1. ONE-WAY TRAFFIC IN THE WESTBOUND DIRECTION ONLY.2. EASTBOUND TRAFFIC NOT ALLOWED AND DETOURED TO LAKE AVENUE.3. WILMETTE AVENUE OPEN TO TWO-WAY TRAFFIC.4 . CONSTRUCT SOUTH HALF OF ROADWAY.5. PRIOR TO ANY ROADWAY CONSTRUCTION, EXISTING SIDEWALK SHALL BE REMOVED TO ALLOW CONSTRUCTION OF A NEW 5 FOOT WIDE SIDEWALK ADJACENT TO BUILDING FACES.6. ACTIVITIES INCLUDE WATER MAIN, MINOR STORM SEWER WORK, ROAD RECONSTRUCTION, CURB & GUTTER, SIDEWALK REPLACEMENT, AND TRAFFIC SIGNAL INSTALLATION.7. PARKING WILL BE AVAILABLE ON THE OPPOSITE SIDE OF CONSTRUCTION ACTIVITY. 8. PROJECT TEAM WILL WORK WITH BUSINESS OWNERS TO KEEP PEDESTRIAN ACCESS TO BUILDINGS OPEN AND COORDINATE OPTIMAL TIME/STRATEGY TO POUR THE SIDEWALK IN FRONT OF BUSINESSES. P

Construction Zone

Construction in Previous Stage

LEGEND

Pedestrian AccessTwo-Way Traffic Flow

On Street ParkingTemporary Angled Parking as Shown

One-Way Traffic Direction

Public Parking Lots

Green Bay Rd Union Pacific Railroad

Lake Ave

Washington Ct

Greenleaf Ave

12th

St

11th

St

Central Ave

Downtown Streetscape Improvements: Stage 2Wilmette, IL

Wilm

ette A

ve

Lefty’s pizzaSchultz & Odhner's Dry Cleaners

The Bottle shopCraig Scott opticians

William Harris Lee + CO

vALLEY LODGE TAVERN

lAMBRECHT’S jEWELERS

morning glory ltd

gOLD METAL CLEANERS

kelly’s appliances

DEGIULIOKITCHEN DESIGN

vETERANS pARKbIG tOMATO pIZZERIA

ywca shop for gooddOWIZE BISTRO

ST. ROGER ABBEY BAKERYPediatric dentistry

Hubba hubba

NapolitA

WILMETTE THEATERCHUCK WAGON

KOYA SUSHI The Wild Child

Healing tree physical therapyFonseca Martial Arts

Ambiance Window FashionsWilmette Wine CellarForever Young nails

@ Properties

Village Hall + Green

Page 4: Downtown Streetscape Improvements: Central Ave + Wilmette Ave … · 2020. 7. 28. · Central Ave Union Pacific Railroad te A v e 1 2 t a d So Ro. P P P P P P Green Bay Rd Union Pacific

P

P

P

P

P

STAGE 3 • WILMETTE AVENUE FROM GREEN BAY ROAD TO LAKE AVENUE (ANTICIPATED BETWEEN MARCH 1, 2021 AND MAY 30, 2021) 1. ONE-WAY TRAFFIC IN THE EASTBOUND OR NORTHBOUND DIRECTION ONLY.2. WESTBOUND OR SOUTHBOUND TRAFFIC NOT ALLOWED AND DETOURED TO LAKE AVENUE.3. CENTRAL AVENUE OPEN TO TWO-WAY TRAFFIC.4. CONSTRUCT EAST HALF OF ROADWAY.5. PRIOR TO ANY ROADWAY CONSTRUCTION, EXISTING SIDEWALK SHALL BE REMOVED TO ALLOW CONSTRUCTION OF A NEW 5 FOOT WIDE SIDEWALK ADJACENT TO BUILDING FACES.6. ACTIVITIES INCLUDE RESURFACING WORK.7. PARKING WILL BE AVAILABLE ON THE OPPOSITE SIDE OF CONSTRUCTION ACTIVITY.8. PROJECT TEAM WILL WORK WITH BUSINESS OWNERS TO KEEP PEDESTRIAN ACCESS TO BUILDINGS OPEN AND COORDINATE OPTIMAL TIME/STRATEGY TO POUR THE SIDEWALK IN FRONT OF BUSINESSES.

The first congregationalchurch of Wilmette

P

Construction ZoneLEGEND

Pedestrian Access

Two-Way Traffic Flow

On Street ParkingReversed Temporary Angled Parking as Shown

One-Way Traffic Direction

Public Parking Lots

Green Bay Rd Union Pacific Railroad

Lake Ave

Washington Ct

Greenleaf Ave

12th

St

11th

St

Wilmett

e Ave

Central Ave

Downtown Streetscape Improvements: Stage 3Wilmette, IL

rOLFsALONHIGH TOUCH BOUTIQUE & SPA

THE UPS STOREBELLA TILE & STONE, WILMETTE INC.

THE TRENDY TACO

pANERA bREADJOSEPH A. BANKS

PINKLICIOUS NAILS & SPANick’s Neighborhood Bar + Grill

torion ramenALL WASHED UP

Sofia steakExhibit

Allstate insurance

St. Augustine’s episcopal church

Pediatric Associates of the North Shore

COCOMEROAl’s Meat market

pESCADERO

THE ACTORS TRAINING CENTERJOHN'S SHOES

Village Hall + Green

The first congregationalchurch of Wilmette

depot nuevo restaurant

north side community bank +trust

bella cosa jewelersOUTATIME GAMES ESCAPE ROOM

ELENIS UNISEX HAIR DESIGN

Page 5: Downtown Streetscape Improvements: Central Ave + Wilmette Ave … · 2020. 7. 28. · Central Ave Union Pacific Railroad te A v e 1 2 t a d So Ro. P P P P P P Green Bay Rd Union Pacific

P

P

P

P

P

P

STAGE 4 • WILMETTE AVENUE FROM GREEN BAY ROAD TO LAKE AVENUE (ANTICIPATED BETWEEN MARCH 1, 2021 AND MAY 30, 2021) 1. ONE-WAY TRAFFIC IN THE EASTBOUND OR NORTHBOUND DIRECTION ONLY.2. WESTBOUND OR SOUTHBOUND TRAFFIC NOT ALLOWED AND DETOURED TO LAKE AVENUE.3. CENTRAL AVENUE OPEN TO TWO-WAY TRAFFIC.4. CONSTRUCT EAST HALF OF ROADWAY.5. PRIOR TO ANY ROADWAY CONSTRUCTION, EXISTING SIDEWALK SHALL BE REMOVED TO ALLOW CONSTRUCTION OF A NEW 5 FOOT WIDE SIDEWALK ADJACENT TO BUILDING FACES.6. ACTIVITIES INCLUDE RESURFACING WORK.7. PARKING WILL BE AVAILABLE ON THE OPPOSITE SIDE OF CONSTRUCTION ACTIVITY.8. PROJECT TEAM WILL WORK WITH BUSINESS OWNERS TO KEEP PEDESTRIAN ACCESS TO BUILDINGS OPEN AND COORDINATE OPTIMAL TIME/STRATEGY TO POUR THE SIDEWALK IN FRONT OF BUSINESSES.

P

Construction Zone

Construction in Previous Stage

LEGEND

Pedestrian AccessTwo-Way Traffic Flow

On Street ParkingReversed Temporary Angled Parking as Shown

One-Way Traffic Direction

Public Parking Lots

Green Bay Rd Union Pacific Railroad

Lake Ave

Washington Ct

Greenleaf Ave

12th

St

11th

St

Wilmett

e Ave

Central Ave

Downtown Streetscape Improvements: Stage 4Wilmette, IL

HOTCAKESSHARE LLC

rOLFsALONHIGH TOUCH BOUTIQUE & SPA

THE UPS STOREBELLA TILE & STONE, WILMETTE INC.

THE TRENDY TACO

pANERA bREADJOSEPH A. BANKS

PINKLICIOUS NAILS & SPANick’s Neighborhood Bar + Grill

torion ramenALL WASHED UP

Sofia steakExhibit

Allstate insurance

St. Augustine’s episcopal church

Pediatric Associates of the North Shore

The first congregationalchurch of Wilmette

depot nuevo restaurant

north side community bank +trust

bella cosa jewelers

COCOMEROAl’s Meat market

pESCADERO

OUTATIME GAMES ESCAPE ROOMELENIS UNISEX HAIR DESIGN

THE ACTORS TRAINING CENTERJOHN'S SHOES

Village Hall + Green

Page 6: Downtown Streetscape Improvements: Central Ave + Wilmette Ave … · 2020. 7. 28. · Central Ave Union Pacific Railroad te A v e 1 2 t a d So Ro. P P P P P P Green Bay Rd Union Pacific

Green Bay Rd

Wilmett

e Ave

Wilmett

e Ave

Central Ave

Greenleaf Ave

Linden Ave

Washington Ct

Lake Ave

11th

St

12th

St

Park Ave

Union Pacific Railroad

Downtown Streetscape Improvements: Village Center ParkingWilmette, IL

Commuter Parking LotsFree after 3 PM weekdays and all weekend.

30 Minute Parking

30 Minute - 3 Hour Variable Parking

1 Hour ParkingPublic Parking LotsFree 90 mins to 4 hrs, check signs.

2 Hour Parking

3 Hour Parking

Central Ave

Village Hall + Green

veteranspark

wilmette Library

wilmette metra

station

30

30

2

2

2

2

2

3

3

3

3

3

3

3

2

2

2

22

222

2

1

1

2

2

2

22

30

30

30

30-330-3

30-3

Burmeister Lot

11th + Central Lot

North Poplar Commuter Lot

metra commuter lot

metra commuter lot

1199 Wilmette Lot

village hall Lot

veterans park lot