dp gezina & dp galyna - cfbv.com support vessel dp gezina/dp galyna dp gezina dp galyna ......
TRANSCRIPT
IntroductionDP Gezina and DP Galyna are two DP 2 support vessels with Ampelmann Heave Compensated gangway. The vessels are diesel electric driven and have a very high focus on crew welfare, safety and efficiency. New 2016 UpgradesThis year both vessels have again been upgraded in the shipyard. In the shipyard the vessels have been upgraded on four points:-A second retractable bow thruster has been fitted. This ensures increase performance during rough weather. Because of this the Ampelmann can be connected to offshore structures with higher waves. The vessels can now also hold position in area with extreme currents. -An additional deck has been fitted. This means that free deck space has been doubled. Leaving more space for containers or work area.-The number of beds has been increase. The vessel can now take a 70 POB of which 50 guests in single and double cabins.-Optionally a pedestal can be put below the Ampelmann. In that case the Ampelmann can connect up to 25.5 m above the waterline. Pedestal is charged additionally to day rate.
www.cfbv.com
Service Support Vessel DP Gezina/DP Galyna
DP Gezina DP GalynaYear built 2007 2008Major Conversions 2013/2016 2013/2016Imo No 9295103 9295490Call Sign 9HA3317 9HA3328Flag Malta MaltaClass +LR100 A1, Service Support
vessel *IWS +LMC,UMS, DP(AA)
DimensionsLength overall 70.10 mBeam 13.40 mDepth to hull 4.20 mOperating draft 3.10 mFree Deck space: +/-250 m2Air draft 17.20 mDisplacement: 1359 tonnesGross Tonnage: 602 tonnes
MachineryMain diesel generators 5 X 600 kWEmergency generator 1 x 220 kW Stabilizers 2 x Rolls RoycePropulsionThrusters 2 x 600 kWRetractable Azimuth thrusters 2 x 400 kW
PerformanceSpeed 12.5 knotsType of fuel Marine Gas OilFuel consumption Between 2.5 and 3.5 m3 per day Fuel consumption 260 l/hr at TransitFuel consumption 200 l/hr at DP Fuel consumption 50 l/hr at anchor/portAutonomy 30 days
AccommodationTotal beds 70Client beds 50Client Offices 3 with 8 desks with phone & internet
vessel *IWS +LMC,UMS, DP(AA)Hospital Imo CompliantChange room Including boots and coverall dryersRestaurant Seating 40 incl separate meeting roomCatering Hot and cold buffet counter (24 hrs)Day room Seating 63 with coffee corner and cinema TVSmoking room Seating 12
www.cfbv.com
Service Support Vessel DP Gezina/DP Galyna
Deck Equipment1 X Mob Boat with man riding crane 2.2 tHeave compensated deck crane: 2 t@ 10 m 1 t @ 20 m
Radio and Navigation EquipmentGMDSS radio equipment area 3Sam Electronic Line integrated bridge with automations and VMS / PMS 2 x Immersat C terminals 1 x MF / HF DCS radio Telephone2 x VHF DSC radio Telephone1 x SSC transceiver 6 channel DCS1 x X-band radar with 21’’ display1 x S-Band radar with 21 “ display2 x ECDIS with 21 “ diplay (electronic charts)3 x VHF portable radio’s1 x Magnetic compass1 x Echo sounder1 x PA / talk back systemLocal area network (LAN) connectedSatellite TV / Entertainment system2 x Autopilot
DP 2 EquipmentPraxis units with 26 “ screens integrated in wing consoles3 x Gyro compass3 x Wind sensors 3 x VRU3 x DGPS1 x Cyscan1 x Radius2 x Hipap
Auxiliary EquipmentWatermakers 2 x Eide Marine 16 m3 p/day eachSewage treatment 1 x Plant Evac Marine Sewage
Treatment Orca III-200: 20 m3
GangwayType Ampelmann XL-type Heave compensatedLocation Mid center, 7.5 m above water lineLength 22 mMax reach 19.5 above water line
All details believed to be correct, but subject to confirmation
www.cfbv.com
Accommodation Barge RossiniAccommodation Barge Sans Vitesse
Accommodation Barge Kalmar
Chevalier FloatelsKootwijkerdijk 23774 JT KootwijkerbroekThe Netherlands
Tel: 31 342 441404Email: [email protected]: www.cfbv.com
www.cfbv.com