DP Workboats; An new era for multicat type workboats
DP Workboats; a new era for Multicat type vessels
![Page 2: Dp Workboats, A New Era For Multicats 2](https://reader033.vdocument.in/reader033/viewer/2022052412/5589a022d8b42ad3608b45c8/html5/thumbnails/2.jpg)
• Owner and operator of 40 workboats for coastal waters
• 40 years experience
• Independent company with a global presence
• Standard & custom built vessels
- Ultra shallow water
- Cable & pipeline (re)burial
• Headquarters in Den Helder, The Netherlands
Profile
![Page 3: Dp Workboats, A New Era For Multicats 2](https://reader033.vdocument.in/reader033/viewer/2022052412/5589a022d8b42ad3608b45c8/html5/thumbnails/3.jpg)
Truckable
Survey Multicats Crew Tenders
Shallow-draft Supply Multipurpose support
Our fleet Our fleet AH tugs
![Page 4: Dp Workboats, A New Era For Multicats 2](https://reader033.vdocument.in/reader033/viewer/2022052412/5589a022d8b42ad3608b45c8/html5/thumbnails/4.jpg)
Dynamic Positioning on workboats
• 2007, Acta Marine was the first operator installing DP on
workboats
• Currently 4 DP vessels in operation
• All vessels are ultra-shallow draft (draft < 2,0 m.)
• DP workboats are competing with standard OSV / PSV DP 2
vessels at a competitive workboat charter rate.
![Page 5: Dp Workboats, A New Era For Multicats 2](https://reader033.vdocument.in/reader033/viewer/2022052412/5589a022d8b42ad3608b45c8/html5/thumbnails/5.jpg)
Thruster set-up for Acta Marine workboats
For excellent position holding capabilities the DP workboats are
equipped with:
• Stern: 2 x fixed propellor & 1 x 360˚ rudder propellor
• Bow: 1 or 2 x 360˚ horizontal propellor/jet
![Page 6: Dp Workboats, A New Era For Multicats 2](https://reader033.vdocument.in/reader033/viewer/2022052412/5589a022d8b42ad3608b45c8/html5/thumbnails/6.jpg)
Workscope for DP workboats
C.Discovery- Nordstream
Backfil of trench; • Nordstream Pipeline, soil layers of 25 cm where backfilled in the trench • Maasvlakte 2, shallow area spray pontoon
![Page 7: Dp Workboats, A New Era For Multicats 2](https://reader033.vdocument.in/reader033/viewer/2022052412/5589a022d8b42ad3608b45c8/html5/thumbnails/7.jpg)
Workscope for DP workboats
Water jetting; Maasvlakte 2, cleaning breakwater for the installation of an additional concrete blocks layer
![Page 8: Dp Workboats, A New Era For Multicats 2](https://reader033.vdocument.in/reader033/viewer/2022052412/5589a022d8b42ad3608b45c8/html5/thumbnails/8.jpg)
Workscope for DP workboats
Offshore Oil & Gas maintenance; • Change out Offshore oil bunker hose GDF SUEZ EP • Removal and installation of splash zone constructions
![Page 9: Dp Workboats, A New Era For Multicats 2](https://reader033.vdocument.in/reader033/viewer/2022052412/5589a022d8b42ad3608b45c8/html5/thumbnails/9.jpg)
Workscope for DP workboats
WID / Mass flow trenching; Removed 30.000m3 sand per day in the port of Sidi Ifni Morocco
![Page 10: Dp Workboats, A New Era For Multicats 2](https://reader033.vdocument.in/reader033/viewer/2022052412/5589a022d8b42ad3608b45c8/html5/thumbnails/10.jpg)
Workscope for DP workboats
WROV Support platform; Explosive Ordnance Disposal German Wadden Sea OWF export cable route
![Page 11: Dp Workboats, A New Era For Multicats 2](https://reader033.vdocument.in/reader033/viewer/2022052412/5589a022d8b42ad3608b45c8/html5/thumbnails/11.jpg)
Workscopes for DP workboats
Vibrocoring/CPT survey; Murmansk Offshore pipeline route Sthokman field
![Page 12: Dp Workboats, A New Era For Multicats 2](https://reader033.vdocument.in/reader033/viewer/2022052412/5589a022d8b42ad3608b45c8/html5/thumbnails/12.jpg)
Additional workscopes for DP multicats
• Trenching with mobile trencher unit
• ROV support platform • Accommodation (12 additional to vessel crew) • Diving from 4p c/t anchor spread • Offshore access to constructions • (Heave comp) Crane works • Cable laying • Cable burial • Cable survey • Cable recovery and jointing • Cable protection deployment (Mattresses etc) • TP cable protection installation (Messenger wire technique)
![Page 13: Dp Workboats, A New Era For Multicats 2](https://reader033.vdocument.in/reader033/viewer/2022052412/5589a022d8b42ad3608b45c8/html5/thumbnails/13.jpg)
NON DP Cable & Pipeline (re)burial
● Post-lay technology - suction dredging with jetting - 4-point mooring - Life tracking of burial process
● Very effective and safe for shore-ends, crossings and exposed parts.
● Succesfully applied on “live” gas pipelines and power cables.
Remedial lowering of cables / pipeline
![Page 14: Dp Workboats, A New Era For Multicats 2](https://reader033.vdocument.in/reader033/viewer/2022052412/5589a022d8b42ad3608b45c8/html5/thumbnails/14.jpg)
Ultra shallow water specialism
Wadden Sea is our backyard
![Page 15: Dp Workboats, A New Era For Multicats 2](https://reader033.vdocument.in/reader033/viewer/2022052412/5589a022d8b42ad3608b45c8/html5/thumbnails/15.jpg)
Thank you for your attention Acta Marine B.V. Het Nieuwe Diep 39d 1781 AE, DEN HELDER The Netherlands T +31 (0)223 615666 www.actamarine.com