dps calvin rampton 2nd floor - arnell-west.com€¦ · pton 2nd floor remodel m&p...

36
WOOD MOLDING PLYWOOD (SECTION) CONCRETE (SECTION) GYPSUM BOARD (SECTION) TILE (PLAN) COMPACTED GRAVEL (SECTION) RIGID INSULATION (SECTION) BRICK VENEER (PLAN, SECTION) CMU (PLAN, SECTION) STEEL FRAMING (PLAN, SECTION) COMPACTED SUBGRADE ROOM NAME 101 101A 1i AEXXX 1 NAME ELEVATION AEXXX 1 SIM 1 AEXXX SIM SCALE 1 VIEW NAME SCALE AEXXX 1 A 1 ROOM TAG DOOR TAG WINDOW TAG INTERIOR ELEVATION ELEVATION, (DATUM) DETAIL WALL SECTION / EXTERIOR ELEVATION DRAWING TITLE REVISION TAG GRID HEAD WALL TYPE 1 AEXXX SIM CENTERLINE BUILDING SECTION FLAG KEYNOTE TAG WINDOW GLAZING TAG G3 1 ARCHITECT JRCA, Architects 577 South 200 East Salt Lake City, Utah 84111 (801)533-2100 Ph. Contact: Annette Coleman [email protected] MECHANICAL & PLUMBING ENGINEER WHW Engineering, Inc. 8619 South Sandy Parkway #101 Sandy, Utah 84070 (801) 466-4021 Ph. Contact: Caleb Lee calebl@whw-engineering.com ELECTRICAL ENGINEER BNA Consulting 635 South State Street Salt Lake City, Utah 84111 (801)532-2196 Ph. Contact: Brian Hicks [email protected] GENERAL INFORMATION GI101 GENERAL INFORMATION GI111 CODE ANALYSIS DEMOLITION DP102 SECOND LEVEL DEMO PLAN DP162 SECOND LEVEL DEMO REFLECTED CEILING PLAN ARCHITECTURAL AE102 SECOND LEVEL FLOOR PLAN AE122 SECOND LEVEL FINISH PLAN AE132 SECOND LEVEL FURNISHING PLAN AE162 SECOND LEVEL REFLECTED CEILING PLAN AE411 INTERIOR ELEVATIONS AE511 WALL TYPES / INTERIOR DETAILS AE601 DOOR & FRAME TYPES / SCHEDULES MECHANICAL MG001 MECHANICAL GENERAL NOTES & LEGEND MD102 2ND FLOOR MECHANICAL DEMOLITION PLAN ME102.1 2ND FLOOR MECHANICAL DEMOLITION PLAN ME102.2 2ND FLOOR MECHANICAL GRD PLAN ME501 MECHANICAL DETAILS ME502 MECHANICAL DETAILS ME601 MECHANICAL SCHEDULES PG001 PLUMBING GENERAL NOTES & LEGEND PD102 2ND FLOOR PLUMBING DEMOLITION PLAN PE102 2ND FLOOR PLUMBING PLAN PE501 PLUMBING DETAILS PE601 PLUMBING SCHEDULES ELECTRICAL E001 SYMBOLS AND NOTES E002 SCHEDULES E201 LEVEL 2 LIGHTING PLAN E301 LEVEL 2 POWER PLAN E401 LEVEL 2 SYSTEMS PLAN E501 ONE-LINE DIAGRAM E601 PANELBOARD SCHEDULES E701 ELECTRICAL DIAGRAMS E702 ELECTRICAL DIAGRAMS ET001 AUDIOVISUAL SYMBOLS, SCHEDULES, AND NOTES ET301 LEVEL 2 AUDIOVISUAL PLAN ET701 AUDIOVISUAL DIAGRAMS PLYW'D PLYWOOD P.S.I. POUND PER SQUARE INCH P.S.F. POUNDS PER SQUARE FOOT R RAD. RADIUS REC. RECOMMENDATION REG. REGISTER REQ'D REQUIRED R.A. RETURN AIR REV. REVISION R.D. ROOF DRAIN RFG. ROOFING RM. ROOM RGH. ROUGH RND. ROUND S SCR. SCREW SECT. SECTION SEL. SELECT SHT. SHEET SIM. SIMILAR SLDG. SLIDING SM. SMOOTH SPEC. SPECIFICATION SPL. SPLASH SQ. SQUARE S.S. STAINLESS STEEL STD. STANDARD STRUC. STRUCTURE S.A. SUPPLY AIR SUSP. SUSPENDED SW.BD. SWITCHBOARD T TELCO TELEPHONE COMPANY T.G. TEMPERED GLASS T&G TONGUE & GROOVE T&B TOP & BOTTOM T.O. TOP OF T.O.C. TOP OF CURB T.O.D. TOP OF DECK T.O.P. TOP OF PARAPET TYP. TYPICAL U U.N.O. UNLESS NOTED OTHERWISE V V. VENT V.T.R. VENT THROUGH ROOF VERT. VERTICAL V.G. VERTICAL GRAIN VEST. VESTIBULE V.C.T. VINYL COMPOSITION TILE V.C.P. VITREOUS CLAY PIPE W W.C. WATER CLOSET W.H. WATER HEATER W.P. WATER PROOF W.R. WATER RESISTANT W.W.F. WELDED WIRE FABRIC W.F. WIDE FLANGE WDW. WINDOW W/ WITH W/O WITHOUT WD. WOOD FL. FLASHING G GALV. GALVANIZED GA. GAUGE G.C. GENERAL CONTRACTOR G.S.N. GENERAL STRUCTURAL NOTES GL. GLASS GD. GRADE GRL. GRILLE GRD. GROUND GYP. GYPSUM H HDW. HARDWARE HDWD. HARDWOOD HTR. HEATER HT. HEIGHT H.P. HIGH POINT H.M. HOLLOW METAL HORIZ. HORIZONTAL H.B. HOSE BIB H.W. HOT WATER HR. HOUR I IN. INCH I.D. INSIDE DIAMETER INSUL. INSULATION INT. INTERIOR INV. INVERT J JAN. JANITOR JT. JOINT JST. JOIST L LAM. LAMINATED LDG. LANDING LAV. LAVATORY LT. LIGHT L.W.C. LIGHT WEIGHT CONCRETE LVR. LOUVER M M.B. MACHINE BOLT MFR. MANUFACTURER M.O. MASONRY OPENING MAT'L MATERIAL MAX. MAXIMUM MECH. MECHANICAL MTL. METAL MIN. MINIMUM MLDG. MOLDING MULL. MULLION N N.G. NATURAL GRADE NOM. NOMINAL N/A NOT APPLICABLE N.I.C. NOT IN CONTRACT N.T.S. NOT TO SCALE O O.C. ON CENTER OPNG. OPENING O.D. OUTSIDE DIAMETER O.F.S. OVERFLOW SCUPPER O.F.C.I. OWNER FURNISHED, CONTRACTOR INSTALLED P PT. PAINT PTD. PAINTED PR. PAIR PNL. PANEL d PENNY P.L. PLASTIC LAMINATE PL. PLATE PLBG. PLUMBING P.C. PLUMBING CONTRACTOR A AC ACOUSTIC ADD ADDENDUM A/C AIR CONDITIONING ALT. ALTERNATE AL ALUMINUM A.B. ANCHOR BOLT & AND ARCH ARCHITECT(URAL) ASP. ASPHALT @ AT B BSMT. BASEMENT B.M. BENCHMARK BLKG. BLOCKING BD. BOARD B.O. BOTTOM OF BLDG. BUILDING C CAB'T CABINET C.I.P. CAST IN PLACE C.B. CATCH BASIN CLG. CEILING CL CENTER LINE C.T. CERAMIC TILE CH CHANNEL C.O. CLEAN OUT CLR. CLEAR CL. CLOSET COL. COLUMN CONC. CONCRETE CMU CONCRETE MASONRY UNIT COND. CONDITION CONN. CONNECTION CONST. CONSTRUCTION CONT CONTINUOUS CJ CONTROL JOINT D D.P. DAMP PROOFING D.B. DECK BEARING DIAG. DIAGONAL DIA. DIAMETER DIM. DIMENSION DISP. DISPENSER DWL. DOWEL DN. DOWN D.S. DOWN SPOUT D.W.V. DRAINAGE WASTE VENT DWG. DRAWING E EA. EACH E.W.C. ELEC. WATER COOLER EL. ELECTRIC ELEV. ELEVATION EQ. EQUAL EQUIP. EQUIPMENT EXH. EXHAUST EXIST. EXISTING E.J. EXPANSION JOINT EXT. EXTERIOR F FT. FEET FIN. FINISH(ED) F.E. FIRE EXTINGUISHER F.E.C. FIRE EXTINGUISHER CABINET FIXT. FIXTURE ph: (801) 533-2100 A R C H I T E C T S S L C, Utah 84111 577 South 200 East jrcadesign.com 1 2 3 4 5 6 A B C D E 1 2 3 4 5 6 DATE PROJECT #: REVISION 5/26/2017 12:59:41 PM C:\Users\acoleman.JRCA\Documents\16028 - DPS Calvin Ramption LVL 2_V17_acoleman.rvt GI101 GENERAL INFORMATION 05/08/2017 D P S C A L V I N R A M P T O N 2 N D F L O O R 4 5 0 1 S O U T H 2 7 0 0 W E S T W E S T V A L L E Y C I T Y , U T 8 4 1 1 9 16028 PERMIT DOCUMENTS 05/08/2017 ABBREVIATIONS DRAWING INDEX MATERIALS / SYMBOLS DESIGN TEAM 1. WHILE THE DOCUMENTS ARE SEPARATED BY SHEET NUMBERS FOR CONVENIENCE IN REFERENCING DOCUMENTATION, SHEET NAMES AND NUMBERS ARE NOT INTENDED TO DEFINE SCOPE. CONTRACTORS AND SUBCONTRACTORS ARE RESPONSIBLE FOR ALL WORK DESCRIBED IN THE ENTIRE PACKAGE. GENERAL NOTES: DPS CALVIN RAMPTON 2ND FLOOR 4501 SOUTH 2700 WEST WEST VALLEY CITY, UT 84119 PERMIT DOCUMENTS 05/08/2017 DFCM PROJECT NO.: 17332550 VICINITY MAP THE FOLLOWING DOCUMENTS ARE REQUIRED BEFORE A CERTIFICATE OF OCCUPANCY IS ISSUED: 1. A CODE INSPECTION REPORT RECOMMENDING THAT A CERTIFICATE OF OCCUPANCY BE ISSUED 2. FINAL REPORT FROM THE SPECIAL INSPECTION AGENCY 3. CERTIFICATE OF FIRE CLEARANCE FROM THE STATE FIRE MARSHALL. 4. REPORT OF THE DISINFECTION OF ALL POTABLE WATER SYSTEM. IPC 610 NOTE: DEFERRED SUBMITTALS SHALL BE SUBMITTED TO THE ARCHITECT UPON RECEIPT AND REVIEW, THE ARCHITECT SHALL SUBMIT THE DEFERRED SUBMITTALS TO THE BUILDING OFFICIAL VIA THE EDMS WITH AN ACCOMPANIED LETTER FROM THE ARCHITECT STATING THAT THE SUBMITTALS ARE IN CONFORMANCE WITH THE DESIGN. WORK RELATED TO THE DEFERRED SUBMITTAL SHALL NOT COMMENCE UNTIL THE BUILDING OFFICIAL HAS APROVED THE SUBMITTAL. 1. FIRE ALARM SYSTEM; DUE APPROXIMATELY 45 DAYS AFTER NOTICE TO PROCEED. 2. FIRE SUPRESSION SYSTEM; DUE APPROXIMATELY 45 DAYS AFTER NOTICE TO PROCEED. DEFERRED SUBMITTALS 09/28/2017

Upload: others

Post on 27-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

WOOD MOLDING

PLYWOOD (SECTION)

CONCRETE (SECTION)

GYPSUM BOARD (SECTION)

TILE (PLAN)

COMPACTED GRAVEL (SECTION)

RIGID INSULATION (SECTION)

BRICK VENEER (PLAN, SECTION)

CMU (PLAN, SECTION)

STEEL FRAMING (PLAN, SECTION)

COMPACTED SUBGRADE

ROOMNAME

101

101A

1i

AEXXX

1

NAMEELEVATION

AEXXX

1

SIM

1

AEXXXSIM

SCALE

1 VIEW NAMESCALEAEXXX

1

A

1

ROOM TAG

DOOR TAG

WINDOW TAG

INTERIOR ELEVATION

ELEVATION, (DATUM)

DETAIL

WALL SECTION / EXTERIOR ELEVATION

DRAWING TITLE

REVISION TAG

GRID HEAD

WALL TYPE

1

AEXXXSIM

CENTERLINE

BUILDING SECTIONFLAG

KEYNOTE TAG

WINDOW GLAZING TAGG3

1

ARCHITECT

JRCA, Architects577 South 200 EastSalt Lake City, Utah 84111(801)533-2100 Ph. Contact: Annette Coleman [email protected]

MECHANICAL & PLUMBING ENGINEER

WHW Engineering, Inc.8619 South Sandy Parkway #101Sandy, Utah 84070(801) 466-4021 Ph. Contact: Caleb Lee [email protected]

ELECTRICAL ENGINEER

BNA Consulting635 South State StreetSalt Lake City, Utah 84111(801)532-2196 Ph. Contact: Brian Hicks [email protected]

GENERAL INFORMATION

GI101 GENERAL INFORMATION

GI111 CODE ANALYSIS

DEMOLITION

DP102 SECOND LEVEL DEMO PLAN

DP162 SECOND LEVEL DEMO REFLECTED CEILING PLAN

ARCHITECTURAL

AE102 SECOND LEVEL FLOOR PLAN

AE122 SECOND LEVEL FINISH PLAN

AE132 SECOND LEVEL FURNISHING PLAN

AE162 SECOND LEVEL REFLECTED CEILING PLAN

AE411 INTERIOR ELEVATIONS

AE511 WALL TYPES / INTERIOR DETAILS

AE601 DOOR & FRAME TYPES / SCHEDULES

MECHANICAL

MG001 MECHANICAL GENERAL NOTES & LEGEND

MD102 2ND FLOOR MECHANICAL DEMOLITION PLAN

ME102.1 2ND FLOOR MECHANICAL DEMOLITION PLAN

ME102.2 2ND FLOOR MECHANICAL GRD PLAN

ME501 MECHANICAL DETAILS

ME502 MECHANICAL DETAILS

ME601 MECHANICAL SCHEDULES

PG001 PLUMBING GENERAL NOTES & LEGEND

PD102 2ND FLOOR PLUMBING DEMOLITION PLAN

PE102 2ND FLOOR PLUMBING PLAN

PE501 PLUMBING DETAILS

PE601 PLUMBING SCHEDULES

ELECTRICAL

E001 SYMBOLS AND NOTES

E002 SCHEDULES

E201 LEVEL 2 LIGHTING PLAN

E301 LEVEL 2 POWER PLAN

E401 LEVEL 2 SYSTEMS PLAN

E501 ONE-LINE DIAGRAM

E601 PANELBOARD SCHEDULES

E701 ELECTRICAL DIAGRAMS

E702 ELECTRICAL DIAGRAMS

ET001 AUDIOVISUAL SYMBOLS, SCHEDULES, AND NOTES

ET301 LEVEL 2 AUDIOVISUAL PLAN

ET701 AUDIOVISUAL DIAGRAMS

PLYW'D PLYWOOD

P.S.I. POUND PER SQUARE INCH

P.S.F. POUNDS PER SQUARE FOOT

R

RAD. RADIUS

REC. RECOMMENDATION

REG. REGISTER

REQ'D REQUIRED

R.A. RETURN AIR

REV. REVISION

R.D. ROOF DRAIN

RFG. ROOFING

RM. ROOM

RGH. ROUGH

RND. ROUND

S

SCR. SCREW

SECT. SECTION

SEL. SELECT

SHT. SHEET

SIM. SIMILAR

SLDG. SLIDING

SM. SMOOTH

SPEC. SPECIFICATION

SPL. SPLASH

SQ. SQUARE

S.S. STAINLESS STEEL

STD. STANDARD

STRUC. STRUCTURE

S.A. SUPPLY AIR

SUSP. SUSPENDED

SW.BD. SWITCHBOARD

T

TELCO TELEPHONE COMPANY

T.G. TEMPERED GLASS

T&G TONGUE & GROOVE

T&B TOP & BOTTOM

T.O. TOP OF

T.O.C. TOP OF CURB

T.O.D. TOP OF DECK

T.O.P. TOP OF PARAPET

TYP. TYPICAL

U

U.N.O. UNLESS NOTED OTHERWISE

V

V. VENT

V.T.R. VENT THROUGH ROOF

VERT. VERTICAL

V.G. VERTICAL GRAIN

VEST. VESTIBULE

V.C.T. VINYL COMPOSITION TILE

V.C.P. VITREOUS CLAY PIPE

W

W.C. WATER CLOSET

W.H. WATER HEATER

W.P. WATER PROOF

W.R. WATER RESISTANT

W.W.F. WELDED WIRE FABRIC

W.F. WIDE FLANGE

WDW. WINDOW

W/ WITH

W/O WITHOUT

WD. WOOD

FL. FLASHING

G

GALV. GALVANIZED

GA. GAUGE

G.C. GENERAL CONTRACTOR

G.S.N. GENERAL STRUCTURALNOTES

GL. GLASS

GD. GRADE

GRL. GRILLE

GRD. GROUND

GYP. GYPSUM

H

HDW. HARDWARE

HDWD. HARDWOOD

HTR. HEATER

HT. HEIGHT

H.P. HIGH POINT

H.M. HOLLOW METAL

HORIZ. HORIZONTAL

H.B. HOSE BIB

H.W. HOT WATER

HR. HOUR

I

IN. INCH

I.D. INSIDE DIAMETER

INSUL. INSULATION

INT. INTERIOR

INV. INVERT

J

JAN. JANITOR

JT. JOINT

JST. JOIST

L

LAM. LAMINATED

LDG. LANDING

LAV. LAVATORY

LT. LIGHT

L.W.C. LIGHT WEIGHT CONCRETE

LVR. LOUVER

M

M.B. MACHINE BOLT

MFR. MANUFACTURER

M.O. MASONRY OPENING

MAT'L MATERIAL

MAX. MAXIMUM

MECH. MECHANICAL

MTL. METAL

MIN. MINIMUM

MLDG. MOLDING

MULL. MULLION

N

N.G. NATURAL GRADE

NOM. NOMINAL

N/A NOT APPLICABLE

N.I.C. NOT IN CONTRACT

N.T.S. NOT TO SCALE

O

O.C. ON CENTER

OPNG. OPENING

O.D. OUTSIDE DIAMETER

O.F.S. OVERFLOW SCUPPER

O.F.C.I. OWNER FURNISHED,CONTRACTOR INSTALLED

P

PT. PAINT

PTD. PAINTED

PR. PAIR

PNL. PANEL

d PENNY

P.L. PLASTIC LAMINATE

PL. PLATE

PLBG. PLUMBING

P.C. PLUMBING CONTRACTOR

A

AC ACOUSTIC

ADD ADDENDUM

A/C AIR CONDITIONING

ALT. ALTERNATE

AL ALUMINUM

A.B. ANCHOR BOLT

& AND

ARCH ARCHITECT(URAL)

ASP. ASPHALT

@ AT

B

BSMT. BASEMENT

B.M. BENCHMARK

BLKG. BLOCKING

BD. BOARD

B.O. BOTTOM OF

BLDG. BUILDING

C

CAB'T CABINET

C.I.P. CAST IN PLACE

C.B. CATCH BASIN

CLG. CEILING

CL CENTER LINE

C.T. CERAMIC TILE

CH CHANNEL

C.O. CLEAN OUT

CLR. CLEAR

CL. CLOSET

COL. COLUMN

CONC. CONCRETE

CMU CONCRETE MASONRY UNIT

COND. CONDITION

CONN. CONNECTION

CONST. CONSTRUCTION

CONT CONTINUOUS

CJ CONTROL JOINT

D

D.P. DAMP PROOFING

D.B. DECK BEARING

DIAG. DIAGONAL

DIA. DIAMETER

DIM. DIMENSION

DISP. DISPENSER

DWL. DOWEL

DN. DOWN

D.S. DOWN SPOUT

D.W.V. DRAINAGE WASTE VENT

DWG. DRAWING

E

EA. EACH

E.W.C. ELEC. WATER COOLER

EL. ELECTRIC

ELEV. ELEVATION

EQ. EQUAL

EQUIP. EQUIPMENT

EXH. EXHAUST

EXIST. EXISTING

E.J. EXPANSION JOINT

EXT. EXTERIOR

F

FT. FEET

FIN. FINISH(ED)

F.E. FIRE EXTINGUISHER

F.E.C. FIRE EXTINGUISHER CABINET

FIXT. FIXTURE

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/26

/201

7 12

:59:

41 P

MC

:\U

sers

\acole

man.J

RC

A\D

ocum

ents

\16028 -

DP

S C

alv

in R

am

ption L

VL 2

_V

17_acole

man.r

vt

GI101

GENERALINFORMATION

05/08/2017

DP

S C

ALV

IN R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

TW

ES

T V

ALLE

Y C

ITY

, U

T 8

4119

16028

PERMIT DOCUMENTS

05/08/2017

ABBREVIATIONS DRAWING INDEXMATERIALS / SYMBOLS DESIGN TEAM

1. WHILE THE DOCUMENTS ARE SEPARATED BY SHEET NUMBERSFOR CONVENIENCE IN REFERENCING DOCUMENTATION, SHEETNAMES AND NUMBERS ARE NOT INTENDED TO DEFINE SCOPE.CONTRACTORS AND SUBCONTRACTORS ARE RESPONSIBLEFOR ALL WORK DESCRIBED IN THE ENTIRE PACKAGE.

GENERAL NOTES:

DPS CALVIN RAMPTON 2ND FLOOR4501 SOUTH 2700 WEST

WEST VALLEY CITY, UT 84119

PERMIT DOCUMENTS

05/08/2017

DFCM PROJECT NO.: 17332550

VICINITY MAP

THE FOLLOWING DOCUMENTS ARE REQUIRED BEFORE A CERTIFICATE OF OCCUPANCY IS ISSUED:1. A CODE INSPECTION REPORT RECOMMENDING THAT A

CERTIFICATE OF OCCUPANCY BE ISSUED2. FINAL REPORT FROM THE SPECIAL INSPECTION AGENCY3. CERTIFICATE OF FIRE CLEARANCE FROM THE STATE FIRE

MARSHALL.4. REPORT OF THE DISINFECTION OF ALL POTABLE WATER

SYSTEM. IPC 610

NOTE: DEFERRED SUBMITTALS SHALL BE SUBMITTED TO THE ARCHITECT UPON RECEIPT AND REVIEW, THE ARCHITECT SHALL SUBMIT THE DEFERRED SUBMITTALS TO THE BUILDING OFFICIAL VIA THE EDMS WITH AN ACCOMPANIED LETTER FROM THE ARCHITECT STATING THAT THE SUBMITTALS ARE IN CONFORMANCE WITH THE DESIGN. WORK RELATED TO THE DEFERRED SUBMITTAL SHALL NOT COMMENCE UNTIL THE BUILDING OFFICIAL HAS APROVED THE SUBMITTAL.

1. FIRE ALARM SYSTEM; DUE APPROXIMATELY 45 DAYS AFTER NOTICE TO PROCEED.

2. FIRE SUPRESSION SYSTEM; DUE APPROXIMATELY 45 DAYS AFTER NOTICE TO PROCEED.

DEFERRED SUBMITTALS

09/28/2017

Page 2: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

REF.

UP

UP

REF.

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

MAXIMUM TRAVEL DISTANCE 148 FEET

MAXIMUM TRAVEL DISTANCE 165 FEET

OCCUPANT LOAD = 37

CONTRACT AREA

CONTRACT AREACONTRACT AREA

CODE ANALYSIS

A. Occupancy and Group: ______ ______ ______ ______ ______

Change in Use: Yes ____ No ____ Mixed Occupancy: Yes ____ No ____ Special Use and Occupancy (e.g. High Rise, Covered Mall): ___________

B. Seismic Design Category: _______ Design Wind Speed: ________mph

C. Type of Construction (circle one):

A B A B A B A B A B

D. Fire Resistance Rating Requirements for the Exterior Walls based on the fire separation distance (in hours): North: ________ South: ________ East: ________ West: ________

E. Mixed Occupancies: ________ Nonseparated Uses: ________

F. Sprinklers:

Required: ________ Provided: ________

Type of Sprinkler System (IBC 903.3.1): _______________________

G. Number of Stories: ________ Building Height: ________

H. Actual Area per Floor (square feet): _______________________________

_______________________________

L. Design Occupant Load: ________

Exit Width Required: ________ Exit Width Provided: ________

ADEQUATE PLUMBING FIXTURE COUNTS ARE LOCATED IN THE COMMON AREAS OF THE BUILDING.

0

5

APPLICABLE CODES

International Building Code ______International Mechanical Code ______International Fuel Gas Code ______International Plumbing Code ______International Fire Code ______International EnergyConservation Code ______

National Electrical Code ______Uniform Code forBuilding Conservation ______ADA AccessibilityGuidelines ______International ExistingBuilding Code ______

Year Year

I I II II III III IV IV V V

20152015

201520152015

2015

2014

B

X X

NONE

NO YES

NO N/A

0 0 0

~ 70'-0"

Project Area - 13,852 s.f.

Entire Building - 184,998 s.f.

C N/A

NFPA 13

138

28 64

2010

N/A

Project: DPS Calvin Rampton 2nd Floor Remodel

Project Address: 4501 South 2700 WestWest Valley City, UT 84119

Owner: DFCM

2015

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/26

/201

7 12

:59:

42 P

MC

:\U

sers

\acole

man.J

RC

A\D

ocum

ents

\16028 -

DP

S C

alv

in R

am

ption L

VL 2

_V

17_acole

man.r

vt

GI111

CODEANALYSIS

05/08/2017

DP

S C

ALV

IN R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

TW

ES

T V

ALLE

Y C

ITY

, U

T 8

4119

16028

PERMIT DOCUMENTS

05/08/2017

SCALE 1/8" = 1'-0"GI111

1 CODE ANALYSIS PLAN

NORTHPROJECT

16'8'0"

09/28/2017

Page 3: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

UP

UP

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

1'-0

"

24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 12'-0"

8'-4" 6"

02.02

CONTRACT AREA

CONTRACT AREACONTRACT AREA

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/26

/201

7 12

:59:

38 P

MC

:\U

sers

\acole

man.J

RC

A\D

ocum

ents

\16028 -

DP

S C

alv

in R

am

ption L

VL 2

_V

17_acole

man.r

vt

DP102

SECOND LEVELDEMO PLAN

05/08/2017

DP

S C

ALV

IN R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

TW

ES

T V

ALLE

Y C

ITY

, U

T 8

4119

16028

PERMIT DOCUMENTS

05/08/2017

SCALE 1/8" = 1'-0"DP102

1 SECOND LEVEL DEMO PLAN

GENERAL NOTES:

KEY NOTES:

1. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, ANDNOTIFY ARCHITECT OF ANY DISCREPANCIES BETWEENEXISTING CONDITIONS AND THOSE DOCUMENTED PRIOR TOCOMMENCING DEMOLITION.

2. REFER TO MECHANICAL, ELECTRICAL, AND/OR PLUMBINGDRAWINGS WHEN DEMOLITION REQUIRES REMOVAL ORTERMINATION OF SUCH UTILITIES.

3. ALL CONDITIONS AND DIMENSIONS OF THE EXISTING BUILDINGWHETHER EXPRESSLY DRAWN OR IMPLIED DO NOT REPRESENTIN-DEPTH FIELD INVESTIGATIONS OR MEASUREMENTS. THECONTRACTOR IS REQUIRED TO FIELD VERIFY AND NOTIFY THEARCHITECT OF ANY DISCREPANCIES PRIOR TO PROCEEDINGWITH THE WORK.

4. THE REMAINDER OF THE BUILDING WILL REMAIN OCCUPIED ANDOPERATIONAL DURING THIS CONSTRUCTION. THECONTRACTOR IS TO PROVIDE TEMPORARY MEANS TO ASSURECONTINUOUS PROTECTION OF THE OCCUPANTS, THEIRFINISHES, FIXTURES AND OTHER POSSESSIONS FROM INJURY,DAMAGE OR LOSS DUE TO CONSTRUCTION, OR RELATEDACTIVITIES. THE CONTRACTOR IS TO MAINTAIN EXISTING FIREPROTECTION SYSTEMS, EXITS AND EXIT WAYS, AND ALL OTHERREQUIRED ELEMENTS AT ALL TIMES TO PROVIDE FOR SAFE,SECURE AND LEGAL ACCESS, OCCUPANCY AND EGRESS INSTRICT ACCORDANCE WITH ALL APPLICABLE CODES ANDORDINANCES. COORDINATE WITH OWNERS OPERATIONALNEEDS AND FUNCTIONS PRIOR TO PROCEEDING WITH THEWORK.

5. ALL CORRIDOR SYSTEMS SHALL BE MAINTAINED AND CLEAR OFOBSTRUCTION AND PROVIDE ACCESSIBLE MEANS OF EGRESSAT ALL TIMES DURING DEMOLITION AND CONSTRUCTION.

6. THE CONTRACTOR IS RESPONSIBLE FOR THE PLACEMENT ANDERECTION OF ALL TEMPORARY PROTECTION FOR MEANS OFEGRESS AT ALL TIMES DURING DEMOLITION ANDCONSTRUCTION.

7. THE BUILDING MAIN ENTRY DOORS ARE NOT TO BE USED FORTHE REMOVAL OF ANY DEMOLITION WASTE DURING NORMALOPERATING HOURS. COORDINATE WITH OWNER FOR BUILDINGACCESS AFTER HOURS OR ALTERNATE MEANS OF REMOVINGDEMOLITION WASTE FROM THE BUILDING.

8. DO NOT DISTURB, DISRUPT, DAMAGE OR ALTER ANYSTRUCTURAL CONDITION OF THE EXISTING BUILDING UNLESSSPECIFICALLY INDICATED WITHIN IN THE CONTRACTDOCUMENTS. NOTE, ADJACENT WORK MAY REQUIREALTERNATION AS A RESULT OF INDENTIFIED ALTERNATIONS.GC TO NOTIFY ARCHITECT IF UNKNOWN ALTERNATIONS AREBELIEVED TO BE EXTENSIVE AND NOT REQUIRE ADDITIONALREVIEW OR APPROVAL PRIOR TO PROCEEDING WITH THEWORK.

9. IN ANY CUTTING, PATCHING OR ALTERATIONS TO THE EXISTINGSTRUCTURE OR ITS COMPONENTS MAY BE REQUIRED FOR THEINSTALLATION OF NEW CONSTRUCTION BEYOND WORKIDENTIFIED FOR ALTERATIONS, THE CONTRACTOR WILL NOTIFYTHE ARCHITECT IN WRITING, IN ADVANCE OF ALL SUCH WORKAS MAY BECOME NECESSARY. SUCH WORK IS NOT A BASIS FOREXTRA COMPENSATION.

10. THE EXISTING PERIMETER WALL SYSTEMS ARE NOT TO BEREMOVED. ANY DAMAGE EITHER EXISTING OR AS A RESULT OFCONSTRUCTION ACTIVITY IS TO BE REPAIRED TO MATCHEXISTING AND/ OR NEW CONSTRUCTION WHERE APPLICABLE.

11. THE EXTENT OF WORK IS HEREBY IDENTIFIED AS THE SCOPEOF WORK INDICATED WITHIN DP102 AND DP162. NO WORKSHALL TAKE PLACE BEYOND AREAS IDENTIFIED FORALTERATION UNLESS SPECIFICALLY REQUIRED. CONTRACTORSHALL NOTIFY THE OWNER AND ARCHITECT WORK REQUIREDBEYOND THE BOUNDARY PRIOR TO PROCEEDING.

12. REMOVE EXISTING CARPET, VCT, AND BASE. LEVEL FLOORWITH HYDRAULIC PATCHING COMPOUND.

13. WHERE EXISTING WALL IS REMOVED, PATCH AND REPAIR ALLADJACENT WALLS THAT WILL REMAIN.

14. PROTECT ALL EXISTING FIRE PROOFING. FIRE PROOFING THATIS DAMAGED MUST BE PATCHED BY FACTORY CERTIFIEDINSTALLER AND INSPECTED BY SPECIAL INSPECTION AGENCYSELECTED BY OWNER AT NO EXPENSE TO OWNER.

15. REMOVE ALL EXISTING HORIZONTAL WINDOW BLINDS ONEXTERIOR WINDOWS AND SIDE LIGHTS.

16. ALL EXISTING DOOR AND SIDELIGHT FRAMES TO BE REMOVED.

17. DEMO ONLY AS NEEDED AROUND EXISTING COLUMNS.

NORTHPROJECT

16'8'0"

02.02 ALL EXISTING COLUMN WRAPS TO BE MAINTAINED ASMUCH AS POSSIBLE THROUGH DEMOLITION. PATCH,REPAIR, OR REBUILD AS NEEDED OR REQUIRED. SEEDETAIL C5/AE511

09/28/2017

Page 4: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

CONTRACT AREA

CONTRACT AREACONTRACT AREA

DEMO CEILING

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/26

/201

7 12

:59:

40 P

MC

:\U

sers

\acole

man.J

RC

A\D

ocum

ents

\16028 -

DP

S C

alv

in R

am

ption L

VL 2

_V

17_acole

man.r

vt

DP162

SECOND LEVELDEMO

REFLECTEDCEILING PLAN

05/08/2017

DP

S C

ALV

IN R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

TW

ES

T V

ALLE

Y C

ITY

, U

T 8

4119

16028

PERMIT DOCUMENTS

05/08/2017

SCALE 1/8" = 1'-0"DP162

A6 SECOND LEVEL DEMO REFLRCTED CEILING PLAN

NORTHPROJECT

16'8'0"

GENERAL NOTES:

KEY NOTES:

1. FIRE SUPPRESSION SYSTEMS SHALL BE ADDRESSED ANDCOORDINATED BY MECHANICAL ENGINEER AND CONTRACTORPRIOR TO ANY DEMOLITION.

2. PRIOR TO ANY DEMOLITION OR REMODELING THE TEST ANDBALANCE CONTRACTOR SHALL MEASURE ALL REGISTERS,GRILLES, AND DIFFUSERS AT FULL COOLING CFMS.

3. HE SHALL PREPARE A REPORT OF HIS TESTING AND SUBMIT ITTO THE ARCHITECT/ENGINEER FOR REVIEW PRIOR TOBEGINNING ANY OF THE WORK RELATED TO THIS PROJECT.

4. AFTER REVIEW OF THE REPORT THE ARCHITECT/ENGINEERWILL ISSUE COMMENTS RELATIVE TO ANY DISCREPANCIES ORISSUES DISCOVERED.

5. SEE MECHANICAL DRAWINGS FOR COORDINATING NOTES ON *ITEMS PRIOR TO DEMOLITION. THESE ITEMS MUST BE DONEPRIOR TO FULL DEMOLITION.

6 FULL CEILING DEMO WILL TAKE PLACE. ALL EXISTING TILES &GRID.

7

LEGEND:

09/28/2017

Page 5: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

REF.

UP

UP

REF.

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

SIACENTRANCE

COLLABORATIONAREA

COLLABORATIONAREA

COLLABORATIONAREA

LOCKERS

28'-2

5/8

"7'

-11

7/8"

16'-11"

24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 12'-0"

24'-0

"24

'-0"

24'-0

"

6"

SECUREROOM

139

SERVERRM

140

OFFICE

137

OFFICE

136OFFICE

135

CONFERENCEROOM

134

OFFICE

129

OFFICE

128

OFFICE

125

OFFICE

124

OFFICE

123

OFFICE

122WAR

ROOM

121

TOILET

120

SECUREINTERVIEW

118

SECUREINTERVIEW

117

FORENSICROOM

119

HOLDING

116

SECURECORRIDOR

115

EVIDENCESTORAGE

114STAIR B

B

EVIDENCETECH

OFFICE

113

EVIDENCEPROCESSING

OFFICE

112

RECORDS

111

OFFICE

110

OFFICE

109

OFFICE

108

OFFICE

107

OFFICE

106

VICTIMSADVOCATE

OFFICE

105

WAITING

101

HOTELSTATIONS

126

RECEPTION

102

OFFICE

131

OFFICE

130SHARED

CONFERENCEROOM

133

SOFTINTERVIEW

ROOM

103

STORAGE

132

BREAKROOM

148

OFFICE

147

OFFICE

146

OFFICE

145

OFFICE

144

OFFICE

143

CONTROLROOM

142

STORAGE

141

STAIR C

C

STAIR A

A

ELECT.

104

OPENOFFICE

127

OPENOFFICE

138

A1

AE

411

A2

AE411

A3

AE411

TYP

118A

120A

121B

121A

117A

119A

116A

115A

114A

BA

113A

112A

111A110A109A108A107A106A105A

103A

102A

104A

131A

133B

132A

133A

148A

147A146A145A144A143A142A141A

CA

140A

139A

137A 136A

135A

134A

129A

128A

125A 124A 123A 122A

6'-7" 10'-0" 10'-0" 10'-0" 10'-0"

10'-8 1/8" 7'-5" 12'-0" 12'-2 1/2"

11'-9

1/2

"12

'-6 1

/8"

11'-9 1/2" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0"

13'-2 1/2" 13'-10" 10'-0"

7'-6

1/1

6"

7'-4

1/4

"7'

-0"

11'-0

"7'

-8 1

/8"

6'-4

3/8

"12

'-3 1

/2"

3'-1

0"

4'-2

1/2

"9'

-0"

9'-0

"

EQ EQ

8'-0" 7'-2 1/2" 8'-0"2 1/2" 11'-9 1/2" 12'-2 1/2" 11'-9 1/2" 12'-1 3/4"

9'-10 1/2" 14'-4 5/8" 12'-0" 20'-0" 12'-0" 13'-5"

10'-7

7/8

"

9'-4

7/8

"

A

A

A A A A

A

A A

A

A

A A

A

A

A

A

A

A

A

A

A

B

B

B

B B

BB

B

B

B

BBB

B

BB

B

BB

B

B

C

BB

B B

B

COMM RM

149149A

15'-4

5/8

"

10'-0 7/8"

A A A A A

A

E

18'-0

"6'

-2 1

/2"

44'-0"

9'-0

"9'

-0"

E

E

B

B

B

02.01

02.03

AE511

C5

TYP

B

130A

AA

A

02.0402.0402.04

B

A5

AE

411

A4

AE411

B5

AE

411

7'-10"

CONTRACT AREA

CONTRACT AREACONTRACT AREA

7'-1

0"

AE511

B4

TYP

B

12'-0"

AE511

D2

TYP

12.01

02.07

ROOMNAME

101

101A

1

ROOM TAG, SEE FINISH SCHEDULE AE122

DOOR TAG, SEE DOOR SCHEDULE SHEET AE601

WALL TYPE TAG, SEE SHEET AE511

SEE DETAIL A1/AE511

SEE DETAIL A2/AE511

SEE AE511 FOR DETAILS OF WALL CONSTRUCTION

A

B

SEE DETAIL A3/AE511.

C

D

E

NOT USED

SEE DETAIL A5/AE511

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/26

/201

7 12

:59:

25 P

MC

:\U

sers

\acole

man.J

RC

A\D

ocum

ents

\16028 -

DP

S C

alv

in R

am

ption L

VL 2

_V

17_acole

man.r

vt

AE102

SECOND LEVELFLOOR PLAN

05/08/2017

DP

S C

ALV

IN R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

TW

ES

T V

ALLE

Y C

ITY

, U

T 8

4119

16028

PERMIT DOCUMENTS

05/08/2017

LEGEND:

INTERIOR WALL LEGEND:

NORTHPROJECT

SCALE 1/8" = 1'-0"AE102

A1 SECOND LEVEL FLOOR PLAN 16'8'0"

1. SEE SHEET GI101 FOR ARCHITECTURAL LEGENDS, SYMBOLS,AND ABBREVIATIONS.

2. ALL DIMENSIONS ARE TO FACE OF STUD OR CMU IN NEWCONSTRUCTION, FACE OF FINISH IN EXISTING (U.N.O.).

3. ALL FLOOR FINISH CHANGES OCCUR AT CENTER LINE OFDOORS IN CLOSED POSITION U.N.O.

4. COORDINATE LOCATIONS OF ALL FLOOR AND ROOF DRAINSWITH PLUMBING PLANS.

5. SEE SHEET AE511 FOR WALL TYPES & DETAILS.

6. SEE SHEET AE601 FOR DOOR SCHEDULE.

7. ALL ANGLED WALLS ARE AT 45°, UNLESS NOTED OTHERWISE

8. SEE E4/AE411 FOR TYPICAL TOILET ACCESSORIESINSTALLATION.

9. ALL EXISTING INTERIOR AND PERIMETER WALLS TO REMAINSHALL BE PATCHED AND REPAIRED TO CLEAN UP ANY DAMAGEOR OPENINGS LEFT FROM DEMOLITION.

10. ALL FLOORS TO BE PATCHED, REPAIRED, AND LEVELED FROMANY DAMAGED OR OPENINGS DUE TO DEMOLITION. PATCH ALLPENETRATIONS THAT WILL NOT BE USED IN NEWCONSTRUCTION.

GENERAL NOTES:

02.01 EXISTING LOCKERS FROM CURRENT TENANT SPACE TOBE RELOCATED & INSTALLED IN NEW LOCATION.COORDINATE WITH OWNER.

02.03 OPERABLE PARTITION. ALCOVE MEASUREMENTS TBDBY MANUFACTURER SIZING & SPECIFICATIONSACCORDING TO SIZE NEED FOR ROOM.

02.04 BUILT-IN BENCH WITH SECURE HAND CUFF BARS.

02.07 ANTI-LIGATURE BARS REQUIRED IN THIS APPLICATION.

12.01 SAFE PROVIDED BY OWNER N.I.C.

KEY NOTES:

09/28/2017

Page 6: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

REF.

REF.

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

OPENOFFICE

127

OFFICE

125

OFFICE

124

OFFICE

123

OFFICE

122

WARROOM

121

SECUREINTERVIEW

118

TOILET

120

FORENSICROOM

119

SECUREINTERVIEW

117

HOLDING

116

SECURECORRIDOR

115

EVIDENCESTORAGE

114

STAIR B

B

EVIDENCETECH

OFFICE

113

EVIDENCEPROCESSING

OFFICE

112

RECORDS

111OFFICE

110

OFFICE

109

OFFICE

108

OFFICE

107

OFFICE

106

VICTIMSADVOCATE

OFFICE

105

WAITING

101

ELECT.

104

STAIR A

A

SOFTINTERVIEW

ROOM

103RECEPTION

102

OFFICE

131

OFFICE

130

SHAREDCONFERENCE

ROOM

133

HOTELSTATIONS

126

OFFICE

128

OFFICE

129

CONFERENCEROOM

134

OFFICE

135

OFFICE

136

OFFICE

137

OPENOFFICE

138

OFFICE

147

OFFICE

146

OFFICE

145

OFFICE

144

OFFICE

143

CONTROLROOM

142

STORAGE

141

STAIR C

C

SERVERRM

140

SECUREROOM

139

COMM RM

149

STORAGE

132

BREAKROOM

148W2

W3

W2

W3

W3

09.02

09.02

09.02

09.02

09.0209.02

09.0209.0209.02

09.02 09.02 09.02

09.02

09.0209.02

09.0209.0209.0209.0209.02

09.02

09.0209.0209.02

CONTRACT AREA

CONTRACT AREACONTRACT AREA

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/26

/201

7 12

:59:

29 P

MC

:\U

sers

\acole

man.J

RC

A\D

ocum

ents

\16028 -

DP

S C

alv

in R

am

ption L

VL 2

_V

17_acole

man.r

vt

AE122

SECOND LEVELFINISH PLAN

05/08/2017

DP

S C

ALV

IN R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

TW

ES

T V

ALLE

Y C

ITY

, U

T 8

4119

16028

PERMIT DOCUMENTS

05/08/2017

SCALE 1/8" = 1'-0"AE122

1 SECOND LEVEL FINISH PLAN

GENERAL NOTES:

1. ALL EXISTING METAL CORE DOORS TO BE PAINTED W2 TOMATCH HOLLOW METAL DOOR FRAMES.

2. ALL PAINT FINISHES TO BE SATIN. DOOR FRAMES AND HMDOORS TO BE GLOSS FINISH.

3. ALL FINISH MATERIALS EITHER SPECIFIED OR IMPLIED, ARE TOBE IN ACCORDANCE WITH ASTM E84 AS A CLASS A TYPE FINISHMATERIAL.

4. FLOOR CARPET SHALL BE TESTED IN ACCORDANCE TOMATIONAL FIRE PROTECTION ASSOCIATION STANDARD 253 ANDBE A CLASS 1 IN CORRIDORS. EXIT ENCLOSURES AND EXITPASSAGEWAYS AND CLASS II IN ALL ROOMS.

5. PATCH AND REPAIR ALL EXISTING WALLS TO REMAIN BEFOREREPAINTING. LEVEL 5 FINISH REQUIRED. THIS INCLUDES ALLPERIMETER WALLS AND COLUMNS.

6. ONE WALL IN EACH OFFICE WILL BE AN ACCENT COLOR. TBD BYTENANTS.

7 ALL EXISTING WINDOW SILLS TO BE CLEANED AND PREPAREDOF ANY DAMAGE AS REQUIRED.

FLOOR FINISH

F1 CARPET TILE - SHAW CONTRACT, STYLE - LINAGE TILE59106, COLOR - VERSATILE 05500, 24X24, QUARTER TURNINSTALL

F2 RESILIENT FLOORING - FORBO, MARMOLEUM, CONCRETE,3709 SILT

BASE FINISH

B1 CARPET BASE - SHAW CONTRACT, SHAW CONTRACT,HIGHLIGHT 60735, LAVA 35549, 4" BOUND

B2 RUBBER BASE - ROPPE, BURNT UMBER 194, 4"

WALL FINISH

W1 FIELD PAINT - SHERWIN WILLIAMS, CITY LOFT SW7631

W2 ACCENT PAINT - SHERWIN WILLIAMS, ELEPHANT EARSW9168

W3 ACCENT PAINT - SHERWIN WILLIAMS, DUSTBLUE SW9161

W4 FRP - COLOR TBD. INSTALLED UP TO 60" A.F.F. APPROVEDBY ARCHITECT

1. SEE FINISH PLAN FOR ACCENT PAINT LOCATIONS NOTINDICATED ON SCHEDULE.

2. EXISTING FINISHES TO REMAIN.

ROOM FINISH SCHEDULE NOTES:

KEY NOTES:

ROOM FINISH SCHEDULE

ROOM NO. ROOM NAME FLOOR BASE

WALL

NOTESN E S W

127 OPEN OFFICE F1 B1 W1 W2 W1 W1

128 OFFICE F1 B1 W1 W1 W1 W1

129 OFFICE F1 B1 W1 W1 W1 W1

130 OFFICE F1 B1 W1 W1 W1 W1

131 OFFICE F1 B1 W1 W1 W1 W1

132 STORAGE F1 B1 W1 W1 W1 W1

133 SHARED CONFERENCE ROOM F1 B1 W2 W3 W1 W1

134 CONFERENCE ROOM F1 B1 W1 W3 W1 W1

135 OFFICE F1 B1 W1 W1 W1 W1

136 OFFICE F1 B1 W1 W1 W1 W1

137 OFFICE F1 B1 W1 W1 W1 W1

138 OPEN OFFICE F1 B1 W1 W1 W1 W1 1

139 SECURE ROOM F1 B1 W1 W1 W1 W1

140 SERVER RM F2 B2 W1 W1 W1 W1

141 STORAGE F1 B1 W1 W1 W1 W1

142 CONTROL ROOM F2 B2 W1 W1 W1 W1

143 OFFICE F1 B1 W1 W1 W1 W1

144 OFFICE F1 B1 W1 W1 W1 W1

145 OFFICE F1 B1 W1 W1 W1 W1

146 OFFICE F1 B1 W1 W1 W1 W1

147 OFFICE F1 B1 W1 W1 W1 W1

148 BREAK ROOM F2 B2 W1 W1 W1 W3

149 COMM RM F2 B2 W1 W1 W1 W1

A STAIR A -- -- -- -- -- -- 2

B STAIR B -- -- -- -- -- -- 2

C STAIR C -- -- -- -- -- -- 2

ROOM FINISH SCHEDULE

ROOM NO. ROOM NAME FLOOR BASE

WALL

NOTESN E S W

101 WAITING F1 B1 W1 W3 W1 W1

102 RECEPTION F1 B1 W2 W1 W1 W1

103 SOFT INTERVIEW ROOM F1 B1 W3 W1 W1 W1

104 ELECT. -- -- -- -- -- -- 2

105 VICTIMS ADVOCATE OFFICE F1 B1 W1 W1 W1 W1

106 OFFICE F1 B1 W1 W1 W1 W1

107 OFFICE F1 B1 W1 W1 W1 W1

108 OFFICE F1 B1 W1 W1 W1 W1

109 OFFICE F1 B1 W1 W1 W1 W1

110 OFFICE F1 B1 W1 W1 W1 W1

111 RECORDS F1 B1 W1 W1 W1 W1

112 EVIDENCE PROCESSING OFFICE F1 B1 W1 W1 W1 W1

113 EVIDENCE TECH OFFICE F1 B1 W1 W1 W1 W1

114 EVIDENCE STORAGE F2 B2 W1 W1 W1 W1

115 SECURE CORRIDOR F2 B2 W1 W1 W1 W1

116 HOLDING F2 B2 W1 W1 W1 W1

117 SECURE INTERVIEW F1 B1 W1 W1 W1 W1

118 SECURE INTERVIEW F1 B1 W1 W1 W1 W1

119 FORENSIC ROOM F1 B1 W1 W1 W1 W1

120 TOILET F2 B2 W1/W4 W1/W4 W1/W4 W1/W4

121 WAR ROOM F1 B1 W1 W1 W3 W1

122 OFFICE F1 B1 W1 W1 W1 W1

123 OFFICE F1 B1 W1 W1 W1 W1

124 OFFICE F1 B1 W1 W1 W1 W1

125 OFFICE F1 B1 W1 W1 W1 W1

126 HOTEL STATIONS F1 B1 W1 W1 W1 W3

NORTHPROJECT

16'8'0"

09.02 ACCENT WALL LOCATION. COLOR FROM SCHEDULE TBDBY TENANTS.

09/28/2017

Page 7: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

REF.

REF.

UP

UP

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

A1

AE

411

A2

AE411

A3

AE411

SIACENTRANCE

COLLABORATIONAREA

COLLABORATIONAREA

COLLABORATIONAREA

LOCKERS

CO

PY

AR

EA

28'-2

5/8

"7'

-11

7/8"

16'-11"

24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 12'-0"

24'-0

"24

'-0"

24'-0

"

12'-0

3/3

2"

6"

32'-10"

8'-4"

8'-0

"

9'-1

0 1/

16"

8'-10"

SECUREROOM

139

SERVERRM

140

OFFICE

137

OFFICE

136OFFICE

135

CONFERENCEROOM

134

OFFICE

129

OFFICE

128

OFFICE

125

OFFICE

124

OFFICE

123

OFFICE

122

WARROOM

121

TOILET

120

SECUREINTERVIEW

118

SECUREINTERVIEW

117

FORENSICROOM

119

HOLDING

116

SECURECORRIDOR

115

EVIDENCESTORAGE

114

STAIR B

B

EVIDENCETECH

OFFICE

113

EVIDENCEPROCESSING

OFFICE

112

RECORDS

111

OFFICE

110

OFFICE

109

OFFICE

108

OFFICE

107

OFFICE

106

VICTIMSADVOCATE

OFFICE

105

WAITING

101

HOTELSTATIONS

126

RECEPTION

102

OFFICE

131

OFFICE

130SHARED

CONFERENCEROOM

133

SOFTINTERVIEW

ROOM

103

STORAGE

132

BREAKROOM

148

OFFICE

147

OFFICE

146

OFFICE

145

OFFICE

144

OFFICE

143

CONTROLROOM

142

STORAGE

141

STAIR C

C

STAIR A

A

ELECT.

104

OPENOFFICE

127

OPENOFFICE

138

TYP

A5

AE

411

A4

AE411

B5

AE

411

CONTRACT AREA

CONTRACT AREACONTRACT AREA

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/26

/201

7 12

:59:

31 P

MC

:\U

sers

\acole

man.J

RC

A\D

ocum

ents

\16028 -

DP

S C

alv

in R

am

ption L

VL 2

_V

17_acole

man.r

vt

AE132

SECOND LEVELFURNISHING

PLAN

05/08/2017

DP

S C

ALV

IN R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

TW

ES

T V

ALLE

Y C

ITY

, U

T 8

4119

16028

PERMIT DOCUMENTS

05/08/2017

SCALE 1/8" = 1'-0"AE132

A6 SECOND LEVEL FURNISHING PLAN

1. FURNITURE TO BE PROVIDED BY OWNER. LAYOUT IS FOR COORDINATION WITH ELECTRICAL PLANS & SPACE REQUIREMENTS.

GENERAL NOTES:

NORTHPROJECT

16'8'0"

09/28/2017

Page 8: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

STAIR B

BSTAIR C

C

STAIR A

A

ELECT.

104

9'-0"

C2

114

9'-0"

C1

121

9'-0"

C2

120

9'-0"

C2

1169'-0"

C2

1199'-0"

C3

117

9'-0"

C3

118

9'-0"

C2

115

9'-0"

C1

127

9'-0"

C1

139

9'-0"

C1

138

9'-0"

C1

137

9'-0"

C1

136

9'-0"

C1

135

9'-0"

C1

126

9'-0"

C1

129

9'-0"

C1

128

9'-0"

C1

125

9'-0"

C1

123

9'-0"

C1

131

9'-0"

C1

130

9'-0"

C1

133

9'-0"

C1

148

9'-0"

C1

101

9'-0"

C1

145

9'-0"

C1

144

9'-0"

C1

143

9'-0"

C1

142

9'-0"

C1

141

9'-0"

C1

106

9'-0"

C1

107

9'-0"

C1

108

9'-0"

C1

109

9'-0"

C1

110

9'-0"

C1

112 9'-0"

C1

113

9'-0"

C1

103

9'-0"

C1

132

9'-0"

C1

102

9'-0"

C1

105

9'-0"

C1

111

9'-0"

C1

1249'-0"

C1

122

09.01

9'-0"

C1

138

9'-0"

C1

126

9'-0"

C1

101

9'-0"

C1

102

9'-0"

C1

149

CONTRACT AREA

CONTRACT AREACONTRACT AREA

RETURN AIR GRILL - SEE MECH.

SUPPLY AIR GRILL - SEE MECH.

2x4 LIGHT FIXTURE - SEE ELEC.

2x2 LIGHT FIXTURE - SEE ELEC.

EXHAUST FAN - SEE MECH.

--

A

VARIES

RM ROOM NUMBER

CEILING HEIGHT

CEILING TYPE

GYP BOARD CEILING

ACOUSTICAL PANEL & SUSPENSION SYSTEM INSTALL AT 9'-0'' A.F.F. - SEE DETAILS D1-D4/AE521

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/26

/201

7 12

:59:

33 P

MC

:\U

sers

\acole

man.J

RC

A\D

ocum

ents

\16028 -

DP

S C

alv

in R

am

ption L

VL 2

_V

17_acole

man.r

vt

AE162

SECOND LEVELREFLECTED

CEILING PLAN

05/08/2017

DP

S C

ALV

IN R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

TW

ES

T V

ALLE

Y C

ITY

, U

T 8

4119

16028

PERMIT DOCUMENTS

05/08/2017

SCALE 1/8" = 1'-0"AE162

A1 SECOND FLR RCP 16'8'0"

09.01 ISOLATION JOINT LOCATION

KEY NOTES:

REFLECTED CEILING PLAN LEGEND:

CEILING TYPES:

C1 24X24 ACOUSTICAL TILE- ROCK FON ALASKA OR ARMSTRONGEQUIVALENT

C2 SUSPENDED GYPSUM BOARD CEILING SYSTEM.

C3 12X12 ACOUSTICAL TILE

GENERAL NOTES:

1. REFER TO ELECTRICAL & MECHANICAL PLANS FOR SPECIFIC LOCATIONS & NOTES ON FIXTURES & HVAC.

2. ALL FINISH MATERIALS, EITHER SPECIFIED OR IMPLIED ARE TO BE IN ACCORDANCE WITH ASTM E84 AS A CLASS 'A' TYPE FINISH MATERIAL

NORTHPROJECT 09/28/2017

Page 9: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

REF.

REF.

UP

UP

H.C.ACCESSIBLE

ELECTRICAL SWITCH

FIRE CABINET

ELECTRICAL OUTLET

SIGNSCONTROLS

5'-0

"

18"

4'-0

"5'-0

"

GENERAL NOTES:

- ALL MEASUREMENTS ARE TO FINISH FLOOR - ALL ADA ACCESSIBLE FIXTURES TO COMPLY WITH ANSI A117 LATEST EDITION- ENCLOSURE CAN PROTRUDE A MAX. OF 19" AND CANNOT REDUCE THE MIN. REQUIRED CLEAR WIDTH OF ACCESSIBLE PATH.TOILET TISSUE

DISPENSER

SANITARY NAPKIN DISPOSAL

TOILETS

16"-18"

3'-0"

2'-0" 1'-0"

1'-6

"

3'-4"

1'-0" 3'-6"

8"

NOTE 2: 12" ABOVE GRAB BAR. 46" IF RECESSED

2'-9

1/2

"2'

-2 1

/2"

2'-1

0"

3'-6" 3'-6" 2'-6"

1'-8

"1'

-7"

1'-9

"

5"

1'-8"3'-0"3'-0"

B1

AE411

5"

B2

AE411

B3

AE411

3'-0"

2'-1

0"

7'-2

"

5'-6"

EQ EQ

02.06

02.05

08.01

SCHEDULED BASE

3/4" PLASTICLAMINATE FRONT

FULL ROUND EDGE

POST-FORMED PLASTICLAMINATE COUNTERTOP& BACK SPLASH W/COVED SPLASH JOINT

PLASTIC LAMINATE DOOR

3/4" PLASTICLAMINATE DOOR

3/4" PLASTICLAMINATE BOTTOM

(2) 3/4" PLASTIC LAMINATEADJUSTABLE SHELVES

(1) 3/4" PLASTICLAMINATE ADJUSTABLESHELF

12"

TO

RIM

OF

SIN

K

34"

6"1

1/2"

4"

1"

3"

4"

24"

18"

SCHEDULED BASE

3/4" PLASTICLAMINATE FRONT

FULL ROUND EDGE

POST-FORMED PLASTICLAMINATE COUNTERTOP& BACK SPLASH W/COVED SPLASH JOINT

PLASTIC LAMINATE DOOR

3/4" PLASTICLAMINATE DOOR

3/4" PLASTICLAMINATE BOTTOM

(2) 3/4" PLASTIC LAMINATEADJUSTABLE SHELVES

(1) 3/4" PLASTICLAMINATE ADJUSTABLESHELF

12"

TO

RIM

OF

SIN

K

34"

6"1

1/2"

4"

1"

3"

4"

24"

SCHEDULED BASE

3/4" PLASTICLAMINATE FRONT

SINK & FAUCET;SEE PLUMBING DRAWINGS

FULL ROUND EDGE

3/4" PLASTICLAMINATE DOOR

POST-FORMED PLASTICLAMINATE COUNTERTOP& BACK SPLASH W/COVED SPLASH JOINT

3"

4"1

1/2"

6"

1"

24"

4"

TO

RIM

OF

SIN

K

34"

16'-0"

4'-0" 4'-0" 4'-0" 4'-0"

7'-2

"

02.05 02.0502.05

08.01

7'-2

"

8'-0"

02.05

02.06

4'-0" 4'-0"

08.01

4'-6"

7'-2

"

02.06

08.01

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

1 1

2 2

3 3

4 4

A3

AE411

SIACENTRANCE

COLLABORATIONAREA

LOCKERS

SECUREROOM

139

SERVERRM

140

OFFICE

137

OFFICE

136 OFFICE

135

CONFERENCEROOM

134

OFFICE

129

OFFICE

128

OFFICE

125

OFFICE

124

OFFICE

123

OFFICE

122 WARROOM

121

TOILET

120

SECUREINTERVIEW

118

SECUREINTERVIEW

117

FORENSICROOM

119

HOLDING

116

SECURECORRIDOR

115

EVIDENCESTORAGE

114STAIR B

B

EVIDENCETECH

OFFICE

113

EVIDENCEPROCESSING

OFFICE

112

RECORDS

111

OFFICE

110

OFFICE

109

OFFICE

108

OFFICE

107

OFFICE

106

VICTIMSADVOCATE

OFFICE

105

WAITING

101

HOTELSTATIONS

126

RECEPTION

102

OFFICE

131

OFFICE

130SHAREDCONFERENCE

ROOM

133

SOFTINTERVIEW

ROOM

103

STORAGE

132

BREAKROOM

148

OFFICE

147

OFFICE

146

OFFICE

145

OFFICE

144

OFFICE

143

CONTROLROOM

142

STORAGE

141

STAIR C

C

STAIR A

A

ELECT.

104

OPENOFFICE

127

OPENOFFICE

138

TYP COMM RM

149

02.01

AE511

C5

TYP

5'-6" 5'-6" 5'-6" 5'-6" 5'-6"

5'-6" 8'-0"

8'-0"

16'-0

"

8'-0"

8'-0"

2'-0

"

5'-6" 5'-6" 5'-6" 5'-6"

5'-6"5'-6"5'-6"5'-6"5'-6"5'-6"5'-6"

4'-6

"4'

-6"

2'-0

"

1'-4"

2'-0"

A5

AE

411

TYP

A4

AE411

B5

AE

411

TYP

TYP

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/26

/201

7 12

:59:

35 P

MC

:\U

sers

\acole

man.J

RC

A\D

ocum

ents

\16028 -

DP

S C

alv

in R

am

ption L

VL 2

_V

17_acole

man.r

vt

AE411

INTERIORELEVATIONS

05/08/2017

DP

S C

ALV

IN R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

TW

ES

T V

ALLE

Y C

ITY

, U

T 8

4119

16028

PERMIT DOCUMENTS

05/08/2017

1. APPLIANCES PROVIDED BY OWNER.

SCALE 1/4" = 1'-0"AE411

D1 STANDARD MOUNTING HEIGHTS

GENERAL NOTES:

02.01 EXISTING LOCKERS FROM CURRENT TENANTSPACE TO BE RELOCATED & INSTALLED IN NEWLOCATION. COORDINATE WITH OWNER.

02.05 BUTT JOINT 5/8" GLAZED WINDOW IN HM FRAME,WITH 1/16" BLACK CAULK SEAMS.

02.06 ALUMINUM HORIZONTAL LOUVER BLINDS - 1".COLOR TBD BY ARCHITECT. LOCATED ON ALLINTERIOR DOOR SIDELITE WINDOWS.

08.01 TEMPERED GLASS REQUIRED AT ALL SIDELITES.

KEY NOTES:

SCALE 3/8" = 1'-0"AE411

A1 BREAK RM WEST ELEVATIONSCALE 3/8" = 1'-0"AE411

A2 BREAK RM NORTH ELEVATIONSCALE 3/8" = 1'-0"AE411

A3 5'-6" SIDELITE ELEVATION TYP.

SCALE 1" = 1'-0"AE411

B1 CABINET SECTIONSCALE 1" = 1'-0"AE411

B2 CABINET SECTIONSCALE 1" = 1'-0"AE411

B3 CABINET SECTION

MILLWORK FINISH SCHEDULE

HORIZONTAL PLAM NEVAMAR - WALL STREET ALLUSION, ALT005T

VERTICAL PLAM PIONITE - CAVALCADE, AT650 SUEDE

SCALE 3/8" = 1'-0"AE411

A5 CONFERENCE RM SIDELITE ELEVATIONSCALE 3/8" = 1'-0"AE411

A4 8'-0" SIDELITE ELEVATION TYP.

SCALE 3/8" = 1'-0"AE411

B5 4'-6" SIDELITE ELEVATION TYP.

SCALE 3/32" = 1'-0"AE411

C5 SECOND LEVEL SIDELITE DIM PLAN

09/28/2017

Page 10: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

5/8" TYPE 'X' GYPSUM BOARD

3 1/2'' METAL STUDS@ 16" O.C.

5/8" TYPE 'X' GYPSUM BOARD

ONE LAYER 5/8" TYPE 'X' GYPSUM BOARD APPLIED PARALLEL WITH EACH SIDE OF 3 1/2'' METAL @ 16" O.C. WITH 2" DRYWALL SCREWS @ 7" O.C. WALLBOARD SCREWED TO TOP & BOTTOM PLATES @ 7" O.C. STAGGER JOINTS @ 24" O.C. EACH SIDE

T.O.W 8'' ABOVE CEILING

R-11 BATT INSULATION

SCHEDULED PARTITION

CONT. SEALANT

1/4"

STEEL STUD SYSTEM

PLANINTERSECTION W/

INTERIOR WALL

FLEXIBLE SEALANT OR TAPE

FLEXIBLE SEALANT OR

TAPE

CONT. SEALANT, BOTH SIDES

PLANTYPICAL

PARTITION-MULLION

INTERSECTION

1/4"

MUDDABLE EDGE TRIM, TYP. SCHEDULED PARTITION

DRYWALL SCREW

STEEL RUNNER TRACK

R-11 BATT IN FLUTES

1/2"

SCHEDULED WALL

CONT. SEALANT,EACH SIDE

H.M. FRAME

20 GA. x 4" SHEET METAL AS REQUIRED

METAL WALL STUDS

TYPICAL FOR EQUIPMENT REQUIRING BLOCKING U.N.O.

LEN

GT

H R

EQ

. B

Y M

AN

UF

AC

TU

RE

R

OPERABLE PARTITION

STEEL BEAM, REFER TO STRUCT. DRAWINGS, PRE DRILL FOR HANGER BOLTS, COORDINATE W/ OPERABLE PARTITION MANUF.

5/8" GYP. BD.; EXTEND TO B.O. ROOF DECK

3 5/8" METAL STUDS @ 16" O.C. W/ CONT. SOUND BATT; EXTEND TO B.O. ROOF DECK

HANGER BRACKET SYSTEM BY OPERABLE PARTITION MANUF.

OPERABLE PARTITION DOOR TRACK BY OPERABLE PARTITION MANUF.

3 5/8" METAL BACE TOSTRUCTURE @ 48" O.C.,

STAGGER

SCHEDULD CEILING

5/8" GYP. BD., TYP.

3 5/8" METAL STUDS @ 16" O.C.

SCHEDULED CEILINGSCHEDULED CEILING

2"

SCREW ATTACHMENT TO STUDS

7/8" EDGE TRIM WITH CONT. ACOUSTICAL SEALANT BETWEEN WALL ASSEMBLY AND TRIM

SCHEDULED SUSPENSION SYSTEM

WALL ASSEMBLY AS SCHEDULED

SCHEDULED CEILING7/8"

8" MAX.

1/8"

NOTE: COMPLY W/ 1997 UBC STANDARDS 25-2

BERC2 SEISMICCLIP OR

EQUAL

ICC-ESR-1308 (MANUFACTURE REQUIREMENTS)

1" EDGE TRIM

SCREW ATTACHMENT TO STUDS

SCHEDULED SUSPENSION SYSTEM

SCHEDULED WALL

ACOUSTICAL SEALANT

SCHEDULED CEILING

SEISMIC CLIP EACH END, RESTRAIN AT ONE END ONLY. PROVIDE 3/4" GAP MIN. BETWEEN EDGE TRIM VERTICAL AND SUSPENSION "T" RUNNERS

8" MAX.

7/8"

3/4" MIN.

SPACER BAR

COMPRESSION STRUT AT INTERSECTION MUST BE PLACED AT 12'-0" O.C. (MAX.) EACH WAY AND WITHIN 6'-0" OF PERIMETER WALLS

(4) - 12 GA. SPLAY WIRES

CROSS T

MAIN RUNNER

ACOUSTICAL LAY-IN PANEL CEILING

8'-6"

10'-0"

11'-6"

15'-0"

SINGLE 2 1/2" X 20 GA. METALSTUD (Imin = 0.18 in4)

BACK TO BACK 2 1/2" X 20 GA. METAL STUDS SCREWED TOGETHER @ 24" O.C.

1" DIAMETER CONDUIT (EMT)

3/4" DIAMETER CONDUIT (EMT)

STRUT SIZE MAX. LENGTH

2"

45°

7/8" FURRING CHANNELS @ 16" O.C.

5/8" TYPE 'X' GYP. BD.

1 1/2" C.R. CHANNEL @ 48" O.C.

12 GA. HANGER

NOTE:SEE SPECIFICATION FORADDITIONAL REQUIREMENTS

SCHEDULED PARTITIONS.

8'' M

IN

3 5/8" MTL STUD BRACE TOSTRUCTURE @ 32" O.C. EACHWAY; STAGGER.

CEILING AS SCHEDULED.

5/8" TYPE 'X' GYPSUM BOARD

3 1/2'' METAL STUDS@ 16" O.C.

5/8" TYPE 'X' GYPSUM BOARD

ONE LAYER 5/8" TYPE 'X' GYPSUM BOARD APPLIED PARALLEL WITH EACH SIDE OF 3 1/2'' METAL STUDS @ 16" O.C. WITH 2" DRYWALL SCREWS @ 7" O.C. WALLBOARD SCREWED TO TOP & BOTTOM PLATES @ 7" O.C. STAGGER JOINTS @ 24" O.C. EACH SIDE

EXTEND TO DECK ABOVE

R-11 BATT INSULATION

5/8" TYPE 'X' GYPSUM BOARD

5/8" TYPE 'X' GYPSUM BOARD3 5/8" STEEL STUDS @ 24'' O.C

ONE LAYER 5/8'' TYPE X GYPSUM WALLBOARD OR GYPSUM VENEER BASE APPLIED PARALLEL OR AT RIGHT ANGLES TO EACH SID OF 3 5/8'' STEEL STUDS 24'' O.C. WITH 1'' TYPE S DRYWALL SCREWS 8'' O.C. AT VERTICAL JOINTS AND 12'' O.C. AT WALL PERIMETER AND INTERMEDIATE STUDS. FACE LAYER 5/8'' TYPE X GYPSUM WALLBOARD OR GYPSUM VENEER BASE APPLIED PARALLEL OR AT RIGHT ANGLES TO ONE SIDE WITH 1 5/8'' TYPE S DRYWALL SCREWS 12'' O.C.

JOINTS STAGGERED 24'' EACH LAYER AND SIDE. SOUND TESTED WITH 3 1/2''

STC RATING OF 50+ WP 1052. EXTEND TO DECK ABOVE.

BEAM

3 5/8'' MTL STUD

5/8'' GYP

5/8'' GYP

3 5/8'' MTL STUD

5/8" TYPE 'X' GYPSUM BOARD

3 5/8'' METAL STUD @ 16" O.C.

5/8" TYPE 'X' GYPSUM BOARD

INSULATION

ONE LAYER 5/8" TYPE 'X' GYPSUM BOARD APPLIED PARALLEL WITH EACH SIDE OF 2x4 WOOD METAL @ 16" O.C. WITH 2" DRYWALL SCREWS @ 7" O.C. WALLBOARD SCREWED TO TOP & BOTTOM PLATES @ 7" O.C. STAGGER JOINTS @ 24" O.C. EACH SIDE

T.O.W 42'' A.F.F.

.060 ALUMINUM BREAK METAL CLOSURE TO MATCH EXISTING

WINDOW FINISH

1/8'' THICK DOUBLE SIDED FOAM TAPE, BLACK TO RUN CONT. FULL HEIGHT OF

WINDOW FRAME.

EXISTING WINDOW SYSTEM

.060 ALUMINUM BREAK METAL CAP TO MATCH EXISTING WINDOW FINISH

WINDOW HEIGHT STUD

FULL HEIGHT STUD

PARTITION AS INDICATED

SCREEN HOUSING MOUNTED TO STRUCTURE ABOVE.

FINISH CEILING

COORDINATE SIZE OF OPENING WITH SIZE OF SCREEN HOUSING

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/26

/201

7 12

:59:

36 P

MC

:\U

sers

\acole

man.J

RC

A\D

ocum

ents

\16028 -

DP

S C

alv

in R

am

ption L

VL 2

_V

17_acole

man.r

vt

AE511

WALL TYPES /INTERIORDETAILS

05/08/2017

DP

S C

ALV

IN R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

TW

ES

T V

ALLE

Y C

ITY

, U

T 8

4119

16028

PERMIT DOCUMENTS

05/08/2017

SCALE 1 1/2" = 1'-0"AE511

A1 WALL TYPE A

SCALE 3" = 1'-0"AE511

B2 1-13 SOUND WALL DETAIL - FLOORSCALE 3" = 1'-0"AE511

B3 1-14 SOUND WALL DETAIL - TO EXISTINGSCALE 3" = 1'-0"AE511

B4 1-15 SOUND WALL DETAIL - AT MULLIONSCALE 3" = 1'-0"AE511

B1 1-19 SOUND WALL HEAD DETAIL

SCALE 3" = 1'-0"AE511

C1 9-01 INTERIOR H.M. DOOR HEADSCALE 3" = 1'-0"AE511

C4 BLOCKING DETAIL

SCALE 1 1/2" = 1'-0"AE511

D1 2-09 OPERABLE PARTITION HEAD DETAIL

SCALE 3" = 1'-0"AE511

C2 2-05 CEILING TRANSITION DETAIL

SCALE 3" = 1'-0"AE511

E1 2-04.1 RESTRAINED EDGE DETAIL @ ACOUSTICAL LAY-IN CEILING - DFCMSCALE 3" = 1'-0"AE511

E2 2-06 EDGE DETAIL @ ACOUSTICAL LAY-IN CEILINGSCALE 3" = 1'-0"AE511

E3 2-01 TYPICAL COMPRESSION STRUTSCALE 3" = 1'-0"AE511

E4 2-02 SUSPENDED GYP. BD. CEILING SYSTEM

SCALE 3" = 1'-0"AE511

B5 2-17 WALL BRACING DETAIL

SCALE 1 1/2" = 1'-0"AE511

A2 WALL TYPE BSCALE 3" = 1'-0"AE511

A3 WALL TYPE C

SCALE 3" = 1'-0"AE511

C5 COLUMN WRAP DETAIL

SCALE 1 1/2" = 1'-0"AE511

A5 WALL TYPE E

GENERAL NOTES:

NOT USED

SCALE 3" = 1'-0"AE511

D2 TYP. MULLION/PARTITION WALL DETAIL

SCALE 1 1/2" = 1'-0"AE511

C3 RECESSED PROJECTION SCREEN

09/28/2017

Page 11: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

ALUMINUM

FRAME FINISH

DOOR & FRAME FINISH LEGEND

AL

PAINTED H.M.PT

DOOR FINISH

WOOD - OSHKOSH SWAL GINGER WD

PAINTED H.M.PT

ALUMINUM FRAME W/ GLASS STOREFRONTGLASS

HARDWARE SCHEDULE

PASSAGE SETB

LOCKSETS - OFFICES / MINIMAL SECUREA

PASSAGE SET W/ DEADBOLTC

LOCKSETS W/ CARD READERD

REFER TO SPECIFICATION FOR DOOR HARDWARD DETAILS.

GLASSWD

H

W

H

W

6" 6"

6"1'

-0"

GLAZINGAS SCHEDULED

EXIT DEVICE WHERE OCCURES

H2"

2" W 2"

H

2" W

2"

1'-6" 2"

2"

4"

3'-0

"

2"

4'-0" 4'-0" 4'-0" 4'-0"

16'-0"

2"

H2"

2" 4'-4" 2" W 2"

H2"

2" W 2"

2"6'

-10"

2"2"

6'-1

0"

2"

7'-10" 2"

EQ EQ

H2"

2" W 2" 2'-8" 2'-8" 2"

5'-6"

F3 F4 F5 F6F1 F2

DOOR AND FRAME SCHEDULE

DOOR

DOOR

Hardware

FRAME

ASSEMBLY

FIRE RATING NOTES

SIZE

MATL FINISH GLAZING TYPE MATL FINISHWIDTH HEIGHT

101A 3'-0" 7'-0" GLASS GLASS TEMPERED D F2 AL AL

102A 3'-0" 7'-0" WD WD -- D F1 HM PT

103A 3'-0" 7'-0" WD WD -- B F1 HM PT

104A 3'-0" 7'-0" WD WD -- A -- HM PT 1

105A 3'-0" 7'-0" WD WD -- A F5 HM PT 1

106A 3'-0" 7'-0" WD WD -- A F5 HM PT

107A 3'-0" 7'-0" WD WD -- A F5 HM PT

108A 3'-0" 7'-0" WD WD -- A F5 HM PT

109A 3'-0" 7'-0" WD WD -- A F5 HM PT

110A 3'-0" 7'-0" WD WD -- A F5 HM PT

111A 3'-0" 7'-0" WD WD -- B F5 HM PT

112A 3'-0" 7'-0" WD WD -- A F1 HM PT

113A 3'-0" 7'-0" WD WD -- A F1 HM PT

114A 3'-0" 7'-0" WD WD -- D F1 HM PT

115A 3'-0" 7'-0" GLASS GLASS TEMPERED D F2 AL AL

116A 3'-0" 7'-0" WD WD -- D F1 HM PT

117A 3'-0" 7'-0" WD WD -- C F1 HM PT

118A 3'-0" 7'-0" WD WD -- C F1 HM PT

119A 3'-0" 7'-0" WD WD -- A F1 HM PT

120A 3'-0" 7'-0" WD WD -- B F1 HM PT

121A 3'-0" 7'-0" WD WD -- B F1 HM PT

121B 3'-0" 7'-0" WD WD -- D F1 HM PT

122A 3'-0" 7'-0" WD WD -- A F5 HM PT

123A 3'-0" 7'-0" WD WD -- A F5 HM PT

124A 3'-0" 7'-0" WD WD -- A F5 HM PT

125A 3'-0" 7'-0" WD WD -- A F5 HM PT

128A 3'-0" 7'-0" WD WD -- A F4 HM PT

129A 3'-0" 7'-0" WD WD -- A F3 HM PT

130A 3'-0" 7'-0" WD WD -- A F3 HM PT

131A 3'-0" 7'-0" WD WD -- A F3 HM PT

132A 3'-0" 7'-0" WD WD -- B F1 HM PT

133A 3'-0" 7'-0" WD WD -- B F1 HM PT

133B 3'-0" 7'-0" WD WD -- B F1 HM PT

134A 3'-0" 7'-0" WD WD -- B F4 HM PT

135A 3'-0" 7'-0" WD WD -- A F4 HM PT

136A 3'-0" 7'-0" WD WD -- A F4 HM PT

137A 3'-0" 7'-0" WD WD -- A F5 HM PT

138A 3'-0" 7'-0" GLASS GLASS TEMPERED D F2 AL AL

139A 3'-0" 7'-0" -- -- -- -- -- -- -- 2

140A 3'-0" 7'-0" WD WD -- B F1 HM PT

141A 3'-0" 7'-0" WD WD -- A F1 HM PT

142A 3'-0" 7'-0" WD WD -- A F1 HM PT

143A 3'-0" 7'-0" WD WD -- A F1 HM PT

144A 3'-0" 7'-0" WD WD -- A F5 HM PT

145A 3'-0" 7'-0" WD WD -- A F5 HM PT

146A 3'-0" 7'-0" WD WD -- A F5 HM PT

147A 3'-0" 7'-0" WD WD -- A F5 HM PT

148A 3'-0" 7'-0" WD WD -- B F1 HM PT

149A 3'-0" 7'-0" WD WD -- A F1 HM PT

BA 3'-0" 7'-0" -- PT -- D -- -- PT 1

CA 3'-0" 7'-0" -- PT -- D -- -- PT 1

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/26

/201

7 12

:59:

37 P

MC

:\U

sers

\acole

man.J

RC

A\D

ocum

ents

\16028 -

DP

S C

alv

in R

am

ption L

VL 2

_V

17_acole

man.r

vt

AE601

DOOR & FRAMETYPES /

SCHEDULES

05/08/2017

DP

S C

ALV

IN R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

TW

ES

T V

ALLE

Y C

ITY

, U

T 8

4119

16028

PERMIT DOCUMENTS

05/08/2017

1. EXISTING HM DOOR FRAME TO REMAIN AND BE PAINTEDW2.

2. THIS DOOR WILL BE PROVIDED AND INSTALLED BY OWNER.N.I.C.

DOOR SCHEDULE NOTES:

GENERAL NOTES:

SCALE 3/8" = 1'-0"

DOOR TYPES

SCALE 3/8" = 1'-0"

FRAME TYPES

09/28/2017

Page 12: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

LC EL.

R

D

HH

H

R

M

M

M

P

T

S

S

F

PS

IBTT

TT

F&T

CD

G

CF

MU

D

HWS

HWR

CHWS

CHWR

HTWS

HTWR

LPS

LPR

MPS

MPR

HPS

HPR

CS

CR

PC

L

S

HG

FOS

FOR

FOV

SYMBOL ABR. DESCRIPTION

GENERAL TERMINOLOGY

SECTION LETTER DESIGNATION

SECTION DRAWN ON THIS SHEET

DETAIL NUMBER DESIGNATION CORRESPONDING WITH GRID LOCATION

MECHANICAL EQUIPMENT DESIGNATION

EQUIPMENT ITEM DESIGNATION

REGISTER, GRILL OR DIFFUSER DESIGNATION WITH BALANCING CFM LISTED BELOW

GRILLE, OR LOUVER DESIGNATION WHERE BALANCING NOT REQUIRED

REVISION DESIGNATOR AND NUMBER

KEY NOTE DESIGNATOR AND NUMBER

POC POINT OF CONNECTION

POR POINT OF REMOVAL

AFF ABOVE FINISHED FLOOR

AP ACCESS PANEL

CENTER LINE ELEVATION

INV. ELEV. INVERT ELEVATION

GC GENERAL CONTRACTOR

MC MECHANICAL CONTRACTOR

ATC CONTROL CONTRACTOR

EC ELECTRICAL CONTRACTOR

FPC FIRE PROTECTION CONTROL

NIC NOT IN CONTRACT

NTS NOT TO SCALE

VCP VITRIFIED CLAY PIPE

C COMMON

NC NORMALLY CLOSED

NO NORMALLY OPEN

1

SYMBOL ABR. DESCRIPTION

AIR SIDE

EXISTING AIR DUCT TO BE REMOVED

EXISTING AIR DUCT TO REMAIN

NEW AIR DUCT

NEW SPIRAL DUCT

NEW MEDIUM PRESSURE DUCT

RECT. TO RECT. AIR DUCT TAKE-OFF

RECT. TO RND. AIR DUCT TAKE-OFF

RND. TO RND. AIR DUCT TAKE-OFF

RECT. TAKE-OFF AT END OF MAIN

MEDIUM PRESSURE TAKE-OFF

MEDIUM PRESSURE HIGH EFFICIENCY TAKEOFF

BURIED OR UNDER FLOOR DUCT

FLEXIBLE AIR DUCT

LINED DUCT

VANED ELBOW

RADIUS ELBOW

CONCENTRIC DUCT TRANSITION

ECCENTRIC DUCT TRANSITION

FLEXIBLE AIR DUCT CONNECTION

VOLUME DAMPER

SUPPLY AIR DIFFUSER

RETURN AIR, FRESH AIR, AND TRANSFER AIR

CEILING MOUNTED EXHAUST FAN OR EXHAUST GRILLE

RETURN OR OUTSIDE AIR DUCT UP

SUPPLY DUCT UP

EXHAUST AIR INTAKE UP

RETURN OR OUTSIDE AIR DUCT DOWN

SUPPLY DUCT DOWN

EXHAUST DUCT DOWN

ROUND DUCT UP

LOWER DUCT DOWN

RAISE DUCT UP

LOWER DUCT DOWN

FLEXIBLE DUCT CONNECTION

PARALLEL BLADE DAMPER

OPPOSED BLADE DAMPER

HUMIDIFIER

AIRFLOW MEASURING STATION

FILTER BANK

COIL

AP ACCESS PANEL

EXISTING EQUIPMENT TO BE REMOVED

EXISTING EQUIPMENT TO REMAIN

NEW EQUIPMENT

MVD MOTORIZED VOLUME DAMPER

BD BACKDRAFT DAMPER

FD FIRE DAMPER

RD RADIATION TYPE FIRE DAMPER

SD SMOKE DAMPER

FS FIRE & SMOKE DAMPER

T-STAT WALL MOUNTED THERMOSTAT MECHANICAL EQUIPMENT CONTROLLED

WALL MOUNTED TEMP. SENSOR

H-STAT WALL MOUNTED HUMIDISTAT

F-STAT WALL MOUNTED FIRESTAT

SA SUPPLY AIR

RA RETURN AIR

EA EXHAUST AIR

OA OUTSIDE AIR

MA MIXED AIR

FA FRESH AIR

RF RELIEF AIR

VD

SYMBOL ABR. DESCRIPTION

WET SIDE

PUMP

REGULATOR

PSD PUMP SUCTION DIFFUSER

UNION

MANUAL ACTUATOR (BALL, BUTTERFLY, NEEDLE, ETC. VALVES)

MANUAL ACTUATOR (GATE, GLOBE, S&D, OS&Y, ETC. VALVES)

PNEUMATIC DIAPHRAGM ACTUATOR

ELECTRIC MOTOR ACTUATOR

SOLENOID ACTUATOR

THREADED VALVE CONNECTION

FLANGED VALVE CONNECTION

BUTTERFLY VALVE

GATE VALVE

GLOBE VALVE - STRAIGHT PATTERN

GLOBE VALVE - ANGLE PATTERN

MOTORIZED 2-WAY CONTROL VALVE

MOTORIZED 3-WAY CONTROL VALVE

CHECK VALVE

PRV PRESSURE REDUCING VALVE

PRV PRESSURE REDUCING VALVE W/ CHECK

CBV CIRCUIT BALANCING VALVE

BV BALL VALVE

PRV PRESSURE RELIEF VALVE

TRV THERMAL RELIEF VALVE

SRV SAFETY RELIEF VALE

PLUG VALVE

NEEDLE VALVE

TDV TRIPLE DUTY VALVE

TDV TRIPLE DUTY VALVE - ANGLE

TDV TRIPLE DUTY VALVE - STRAIGHT

AUTOMATIC AIR VENT

MANUAL AIR VENT

STRAINER

STRAINER W/ PLUGGED BLOW OFF

VTI VENTURI

PRESSURE GAUGE AND GAUGE COCK - WATER

PRESSURE GAUGE AND GAUGE COCK - STEAM

THERMOMETER AND THERMOWELL

WATER TEMPERATURE SENSOR AND THERMOWELL

FLOW SWITCH

PS PRESSURE SWITCH

TW THERMOWELL

PRESSURE AND TEMPERATURE TAP

INVERTED BUCKET STEAM TRAP

THERMOSTATIC STEAM TRAP

FLOAT & THERMOSTATIC STEAM TRAP

DIRECTION OF FLOW

BACKFLOW PREVENTING VALVE

SYMBOL ABR. DESCRIPTION

WET SIDE CONT

PITCH DOWN

ELBOW UP

ELBOW DOWN

TEE UP

TEE DOWN

EXISTING PIPING TO BE REMOVED

EXISTING PIPING TO REMAIN

NEW PIPING

PIPE CAP OR PLUG

CONCENTRIC REDUCER

ECCENTRIC REDUCER

EXPANSION JOINT

FLEXIBLE CONNECTION

ANCHOR POINT

CONDENSATE DRAIN

NATURAL GAS PIPING

CHEMICAL FEED LINE

MAKE-UP WATER LINE

CW CULINARY COLD WATER

HW CULINARY HOT WATER

RECIRCULATED CULINARY HOT WATER

EQUIPMENT DRAIN

HEATING WATER SUPPLY

HEATING WATER RETURN

CHILLED WATER SUPPLY

CHILLED WATER RETURN

HIGH TEMPERATURE HEATING WATER SUPPLY

HIGH TEMPERATURE HEATING WATER RETURN

LOW PRESSURE STEAM

LOW PRESSURE STEAM RETURN

MEDIUM PRESSURE STEAM

MEDIUM PRESSURE STEAM RETURN

HIGH PRESSURE STEAM

HIGH PRESSURE STEAM RETURN

CONDENSER SUPPLY

CONDENSER RETURN

PUMPED CONDENSATE

REFRIGERANT LIQUID

REFRIGERANT SUCTION

REFRIGERANT HOT GAS

FUEL OIL SUPPLY

FUEL OIL RETURN

FUEL OIL VENT

MECHANICAL LEGEND

TRTU-1

M

BD

F

R

S

FS

S

F

S

ME101A

A2

1AH

CFM

D-1

R-1

GENERAL NOTES:

MECHANICAL INFORMATION IS NOT LIMITED TO THE MECHANICAL

DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR INFORMATION

OF THE EXISTING BUILDING AND SITE CONDITIONS, EXISTING PIPING,

EXISTING ELECTRICAL, AND EXISTING SUPPORTS.

A - EACH DRAWING SHEET AND THE SPECIFICATIONS HAVE BEEN

PREPARED TO SUPPLEMENT EACH OTHER AND THEY SHALL BE

INTERPRETED AS AN INTEGRAL UNIT WITH ITEMS SHOWN AND NOTED

ON ONE AND NOT THE OTHER BEING FURNISHED AND INSTALLED AS

THOUGH SHOWN AND CALLED OUT IN ALL PLACES. ITEMS IN

SPECIFICATIONS OR DRAWINGS LISTED WHICH ARE DIFFERING IN

EFFICIENCY OR QUALITY SHALL BE HELD TO THE GREATEST OF:

EFFICIENCY, QUALITY OR GOVERNING CODE.

B - THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE

INSTALLATION OF THE SYSTEMS ACCORDING TO THE TRUE INTENT AND

MEANING OF THE CONTRACT DOCUMENTS.

C - THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT WITH PROPER

SERVICE ACCESS AND CLEARANCES ACCORDING TO MANUFACTURERS

RECOMMENDATIONS. THE CONTRACTOR SHALL REVIEW SUPPLIERS BID

PACKAGES FOR COMPLETENESS AND COMPLIANCE TO THE

SPECIFICATIONS, SCHEDULES, AND DESIGN INTENT (ALL EQUIPMENT

AND METHODS). THE CONTRACTOR SHALL REMOVE AND REINSTALL

CORRECTLY AT HIS OWN EXPENSE ANY EQUIPMENT NOT IN

COMPLIANCE.

D - THE CONTRACTOR SHALL CONSULT MANUFACTURERS

INSTALLATION INSTRUCTIONS FOR SIZES, METHODS, ACCESSORIES,

AND CLEARANCES IN SPACE AVAILABLE PRIOR TO BIDDING PROJECT.

E - ANYTHING NOT CLEAR OR IN CONFLICT WILL BE EXPLAINED BY

MAKING APPLICATION TO THE ENGINEER IN WRITING.

ANY AND ALL ALTERATIONS TO THE SYSTEM SHOWN SHALL BESUBMITTED TO THE ENGINEER PRIOR TO CHANGES FOR APPROVAL.CONTRACTOR SHALL NOT START ANY CHANGES UNTIL NOTIFIED INWRITING. IF CHANGES ARE MADE PRIOR TO APPROVAL CONTRACTORSHALL TAKE ALL RESPONSIBILITY FOR THE CHANGES MADE AND ALLCOSTS RELATING TO FAILURE OR REPLACEMENT OF ALTERATIONS.

CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND LOCATIONS.

THE WORKING DRAWINGS ARE DIAGRAMMATIC. THEY DO NOT SHOWEVERY OFFSET, BEND, OR ELBOW NECESSARY FOR THE COMPLETEINSTALLATION IN THE SPACE PROVIDED. ALL LOCATIONS FORMECHANICAL EQUIPMENT SHALL BE FIELD VERIFIED AND COORDINATEDWITH ALL DRAWINGS. THE CONTRACTOR SHALL PROVIDE ORCOORDINATE WITH THE GENERAL CONTRACTOR PROVISIONS FORBLOCKOUTS OR CORE DRILLS THROUGH STRUCTURE.

THE INSTRUCTION TO "PROVIDE" ALSO INCLUDES INSTALLATION.

MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL SMOKE ANDFIRE DAMPERS AS REQUIRED BY LOCAL CODES AND AUTHORITIES.

SHEET METAL DUCT SIZES SHOWN ON DRAWINGS ARE FREE AREADIMENSIONS.

PROVIDE AND INSTALL BALANCING DAMPERS IN ALL SUPPLY ANDEXHAUST AIR BRANCH DUCTS. BALANCE TO CFM SHOWN ON PLAN.

SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATIONOF DIFFUSERS AND GRILLES.

PROVIDE TURNING VANES IN ALL ELBOWS OF RECTANGULAR DUCT.

THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY IN HANDLINGAND DISPOSING OF REFRIGERANTS, OILS, ETC. ALL SUCH MATERIALSSHALL BE HANDLED, DISPOSED, AND USED IN ACCORDANCE WITH ALLLOCAL, STATE, AND FEDERAL LAWS.

THE MECHANICAL CONTRACTOR SHALL VERIFY MOTOR VOLTAGES WITHTHE ELECTRICAL DRAWING BEFORE ORDERING MOTORIZEDEQUIPMENT AND CONTROLS.

C.F.M. LISTED IS ACTUAL AIR.

SUPPLIERS SHALL REVIEW ALL DRAWINGS AND THE SPECIFICATIONSPRIOR TO SUBMITTING PRICES TO THE CONTRACTOR. ALL QUESTIONSAND DISCREPANCIES SHALL BE BROUGHT TO THE ENGINEERSATTENTION PRIOR TO BIDDING.

CONTRACTOR SHALL THOROUGHLY REVIEW AND SIGN SUBMITTALSFOR COMPLETENESS AND COMPLIANCE TO THE SPECIFICATIONS PRIORTO ENGINEERS REVIEW. SUPPLIERS SHALL HIGHLIGHT OR MARK ALLINFORMATION REQUIRED TO SHOW COMPLIANCE TO THESPECIFICATIONS. ALL REQUESTED EXCEPTIONS TO THESPECIFICATIONS, OR SCHEDULES SHALL BE CLEARLY NOTED ANDEXPLAINED. SUBMITTAL REVIEW AND ACCEPTANCE IS FOR DESIGNCONCEPT ONLY, AND DOES NOT AT ANY TIME RELIEVE THECONTRACTOR OF RESPONSIBILITY TO MEET SPECIFICATIONS,CAPACITIES, OR DESIGN INTENT.

ALL MECHANICAL SHALL BE INSTALLED AND CONFORM TO THE 2015EDITION OF THE IMC AND IPC WITH UTAH ANNOTATIONS AND LOCALAUTHORITY REQUIREMENTS.

THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE DRAINING DOWNAND RE-FILLING OF ALL SYSTEMS NECESSARY TO COMPLETE THEWORK OUTLINED BY THIS PROJECT. THIS INCLUDES PROVIDING THEREQUIRED CHEMICAL TREATMENT WHEN RE-FILLING THE SYSTEM.

ALL PIPING, MATERIALS, ETC. SHALL BE NEW AND DOMESTIC MADE

UNLESS SPECIFICALLY AUTHORIZED IN WRITING PRIOR TO BID.

PROVIDE SPRINKLER MODIFICATIONS PER PERFORMANCESPECIFICATION THROUGH DESIGN BUILD NICET LEVEL 4 CERTIFIED FIRESPRINKLER CONTRACTOR.

G-1

G-2

G-3

G-4

G-5

G-6

G-7

G-8

G-9

G-10

G-11

G-12

G-13

G-14

G-15

G-16

G-17

G-19

G-20

1

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

05/11/17

5/2

3/2

017 8

:12:4

9 A

MC

:\U

sers

\cale

bl.W

HW

EN

GIN

EE

RIN

G\D

ocum

ents

\17017 C

al R

am

pto

n 2

nd F

loor

rem

odel M

&P

v17_cale

bl@

whw

-engin

eering.c

om

.rvt

MG001

MECHANICAL

GENERAL

NOTES &

LEGEND

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

09/28/2017

Page 13: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

1 1

2 2

3 3

4 4

1 1 1

2

3

2

2

2

2 2

2

2

2

22

22

2

2

2

2

22

2

2

2

1 11

11

1

11

1 1

1

1

1

1

1

11

1

1

1

11

1

1 1

11

11

1

1

1

1 1

1

1

1 1

11

11

1

1

1

11

1

11 1

1 1

11

1

1

1

11

1

1

11 1

1

11

1

1

1

1

1

1

1

11

1

1

1

1

11

1

1

1

1

11

11

11

1

1

1

11

1

1 1

4

4

4

4

3

5

5

5

3

5

3

3 3

3

3

3

34

4 4

4

4

33

3

4

4

4

3

22

2

2

2

6

7

6

22

2

8

3

8

8

88

8

8

2

8

2

8

8

8

8

3

8

2

88

8

2

82

8

8

5

2

5

2

2

5

2

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

05/11/17

5/2

3/2

017 8

:12:3

6 A

MC

:\U

sers

\cale

bl.W

HW

EN

GIN

EE

RIN

G\D

ocum

ents

\17017 C

al R

am

pto

n 2

nd F

loor

rem

odel M

&P

v17_cale

bl@

whw

-engin

eering.c

om

.rvt

MD102

2ND FLOOR

MECHANICAL

DEMOLITION

PLAN

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

N

SCALE 1/8" = 1'-0"MD102

1 HVAC DEMO LEVEL 216'8'0"

SHEET NOTES

1 REMOVE EXISTING GRILLES, REGISTERS, AND DIFFUSERS IN THISAPPROXIMATE LOCATION. FIELD VERIFY.

2 REMOVE EXISTING DUCTWORK BACK TO THIS APPROXIMATE LOCATION.FIELD VERIFY.

3 EXISTING MECHANICAL EQUIPMENT IN THIS APPROXIMATE LOCATIONSHALL REMAIN AND BE RE-USED. FIELD VERIFY.

4 REMOVE EXISTING FUME HOOD AND ALL ASSOCIATED ITEMS IN THISAPPROXIMATE LOCATION. FIELD VERIFY.

5 REMOVE EXISTING DUAL DUCT BOX AND ALL ASSOCIATED ITEMS IN THISAPPROXIMATE LOCATION. FIELD VERIFY.

6 REMOVE EXISTING EXHAUST DUCTWORK BACK TO THIS APPROXIMATELOCATION AND CAP IN CEILING. FIELD VERIFY.

7 REMOVE EXISTING SPLIT SYSTEM UNIT IN THIS APPROXIMATE LOCATION.REMOVE CONDENSOR, REFRIGERANT PIPING, AND ALL ASSOCIATEDITEMS. FIELD VERIFY EXACT LOCATION OF REFRIGERANT PIPING ANDCONDENSOR.

8 REMOVE EXISTING VAV BOX AND ALL ASSOCIATED ITEMS IN THISAPPROXIMATE LOCATION. FIELD VERIFY.

GENERAL NOTES:

1. REMOVE ALL EXISTING LAB EXHAUST. REMOVE ALL FUME HOODS AND ASSOCIATED EXHAUST FANS ON ROOFTOP. FIELD VERIFY LOCATION OF EXHAUST, AND CORRESPONDING FUME HOOD BEFORE DEMOLITION.

09/28/2017

Page 14: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

1 1

2 2

3 3

4 4

11

12"ø

SA

20"ø MPC

14"ø MPC

6"ø SA

6"ø SA

6"ø

SA

10"ø

SA

6"ø

SA

10"ø MPC

6"ø SA

6"ø SA

8"ø

SA

8"ø SA

10"ø SA10"ø SA

12"ø SA

8"ø SA 8"ø SA8"ø SA

1

1

12"ø SA

6"ø SA

6"ø SA1

1

12"ø

SA

1

1

8"ø SA

12"ø SA

1

10"ø SA

1

18"ø MPC

14"ø MPH8"ø SA

12"x12" SA

8"ø

SA

8"ø

SA

12"x8" SA

12"x

8"

SA

8"ø SA

8"ø SA

14"x12" SA

8"ø SA

8"ø SA

10"ø SA

8"ø

SA

8"ø

SA

2

8"ø SA

12"x8" SA

3

3

3

3

8"ø

SA

8"ø

SA

8"ø

SA

8"ø

SA

10"ø SA14"x12" SA

3

14"x12" SA8"ø SA

8"ø SA

10"ø SA

8"ø SA

8"ø SA

8"ø

SA

10"ø SA

8"ø SA

14"x12" SA

10"ø MPC

6"ø MPC6"ø MPC

12"x8" SA12"x8" SA

6"ø SA

6"ø SA

12"x8" SA

8"ø SA

14"ø

MP

C

6"ø MPC

10"ø MPC

6"ø MPC

12"x

8"

SA

8"ø SA

12"x8" SA

6"ø SA

18"x12" TA318"x12" TA

10"ø MPC

6"ø MPC

8"ø MPC

10"ø EA

10"ø SA12"x10" SA

6"ø SA12"x8" SA

10"ø MPC

8"ø MPC

12"x10" SA12"x10" SA8"ø SA

8"ø SA

8"ø SA

8"ø SA

8"ø SA

8"ø SA12"ø SA

12"ø SA

8"ø SA

8"ø SA

24"x22" TA

12"x10" SA

8"ø SA8"ø SA

3

3

18"x12" TA

18"x12" TA

12"ø SA

10"ø SA10"ø SA

8"ø MPH

8"ø MPC

8"ø SA

8"ø SA

8"ø SA

8"ø SA

8"ø SA

8"ø SA 8"ø SA

8"ø SA

18"x12" TA

1

8"ø

SA

10"ø

SA

8"ø SA

14"x12" SA

10"ø SA

1

12"x10" SA

8"ø

SA

8"ø SA

18"x12" TA

18"x12" TA

18"x12" TA8"ø SA

3

8"ø SA

8"ø SA

8"ø SA

12"x

10

" S

A

12"ø MPC

1

12"x10" SA

12"ø SA8"ø SA

8"ø SA6"ø SA

16"x14" SA

16"x14" SA

16"x14" SA

3

3

12"ø MPC

12"ø MPC

10"ø MPH

10"ø MPC

8"ø SA

12"x10" SA

8"ø SA8"ø SA

1

312"x10" SA

12"x

8"

SA

8"ø SA

12"x8" SA

4

1 1/4"ø CHWR (EXIST)

1 1/4"ø CHWS (EXIST)

1"ø CHWR1"ø CHWS

1"ø CHWS1"ø CHWR 1/2"ø CHWS

1/2"ø CHWR

12"x6" SA

6"ø

EA

5

6

1

1

1

1

1

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

05/11/17

5/2

3/2

017 8

:12:4

2 A

MC

:\U

sers

\cale

bl.W

HW

EN

GIN

EE

RIN

G\D

ocum

ents

\17017 C

al R

am

pto

n 2

nd F

loor

rem

odel M

&P

v17_cale

bl@

whw

-engin

eering.c

om

.rvt

ME102.1

2ND FLOOR

MECHANICAL

DUCT AND

PIPING PLAN

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

N

SCALE 1/8" = 1'-0"ME102.1

1 2ND FLOOR MECHANICAL DUCT AND PIPING PLAN16'8'0"

SHEET NOTES

1 TIE INTO EXISTING DUCTWORK IN THISAPPROXIMATE LOCATION. FIELD VERIFY.

2 CAP EXISTING DUCTWORK IN THIS APPROXIMATELOCATION. FIELD VERIFY.

3 TIE INTO EXISTING MEDIUM PRESSURE DUCTWORKIN THIS APPROXIMATE LOCATION. FIELD VERIFY.

4 TIE INTO EXISTING CHILLED WATER PIPING IN THISAPPROXIMATE LOCATION. FIELD VERIFY.

5 DAYLIGHT EXHAUST DUCTWORK THROUGH EXISTINGPENETRATION IN THIS APPROXIMATE LOCATION.MODIFY EXISTING PENETRATION AS NEEDED. SEALWATER TIGHT. FIELD VERIFY EXACT ROUTING ANDPENETRATION SIZE. TERMINATE WITH WALL VENT.

6 PROVIDE EXHAUST RISER IN THIS APPROXIMATELOCATION. ROUTE UP AND THROUGH SHAFT TOROOFTOP AND TERMINATE WITH MANUFACTURER'SAPPROVED WEATHER CAP. FIELD VERIFYPENETRATION AND DAYLIGHT LOCATION.

GENERAL NOTES:

1. PROVIDE BALANCING DAMPERS FOR ALL SUPPLY AND EXHAUST BRANCHES.

2. PROVIDE FULL TEST AND BALANCE OF ALL SYSTEMS AND DIFFUSERS BY A CERTIFIED CONTRACTOR.

3. PROVIDE RETURN BOOTS ON ALL PLENUM RETURN GRILLES. SEE DETAIL #1 ON SHEET ME501.

1 Date 1 Revision 1

1

09/28/2017

Page 15: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

1 1

2 2

3 3

4 4

D-3

240

D-3

240

D-5

100

R-6

R-3

R-3

D-5

100R-3

D-5

100

D-5

80

D-6

200

R-3

D-5

100

D-1

100

D-1

100

R-1R-3

R-1

R-1

R-1R-1R-1R-1

R-1

R-1

R-1

R-1

R-1R-1

R-1

R-1R-1

R-1R-1

R-1 R-2

R-1R-1

R-1R-1

R-1

R-2

R-1

R-1 R-1

R-1

R-2

R-2

R-1

R-2

R-1

R-1

D-2

200

D-1

200

D-2

225

D-2

150

D-2

150

D-2

175

D-2

180

D-2

125

D-1

100

R-2

D-2

155

D-2

155

D-2

175

D-2

130

D-2

180

D-1

70

D-1

90

D-2

200

D-2

150

D-2

150

D-2

150

D-2

150

D-2

200

D-2

200

D-3

225

D-3

325

D-2

150

D-2

300

D-2

300

D-2

200

D-3

300

D-2

180

D-2

175

D-2

175

D-2

175

D-2

125D-2

125

D-2

125

D-1

100

D-1

100

D-2

125

D-2

125

D-2

125

D-2

125

D-2

150

D-2

200

D-2

200

D-2

200

D-2

200

D-1

200

D-2

200

D-2

200

D-2

200

D-2

200

D-2

200

D-2

200

D-2

200

D-2

200

R-2

R-2

D-2

275

R-2

DDB

208VAV

224

VAV

225

SI

1

VAV

223

R-1

R-1

D-2

200

D-2

200

VAV

217

VAV

216

VAV

213

VAV

212

R-1

DDB

223

DDB

201

VAV

203

D-2

125

D-2

125

D-2

125

D-2

125

D-2

125

D-2

125

D-2

125

D-2

125

VAV

204

D-2

125

D-2

125

D-2

125

D-2

125

VAV

210

VAV

209

VAV

208

VAV

202

D-2

125

VAV

207

DDB

221

DDB

222

VAV

201

DDB

202

R-1

VAV

215

VAV

211

VAV

206

VAV

214

VAV

218

D-1

100

VAV

219

VAV

220

VAV

221

VAV

222

DDB

207

DDB

206

DDB

205

DDB

203

DDB

204

D-2

200

VAV

205

12"x

10

" S

A

1

FC

2

FC

1

D-4

250

R-1

2

2

3

3

3

3

3

3

33

34

4

5

5

5

56

6

6

6

6

6

6

6

56

5

6

6

6

6 6

6

6

6

EF

2

EF

1

7

7

8

T8

T8

T 8

9

8 T

8T

T 8

T 8

T8

T 8

T 8

T 8

T 8

8 T

T8

T

T8

8

T

T 8

8

TT

T

8 8

8

T

T

T

T 8

8

8

8

T

T

TT 88

8

8

T

T

8

8

9

T 8

8T

8T

8T

T 8

1

1

1

EF

1

1

1

6"ø EA

1

6"ø EA

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

05/11/17

5/2

3/2

017 8

:12:4

8 A

MC

:\U

sers

\cale

bl.W

HW

EN

GIN

EE

RIN

G\D

ocum

ents

\17017 C

al R

am

pto

n 2

nd F

loor

rem

odel M

&P

v17_cale

bl@

whw

-engin

eering.c

om

.rvt

ME102.2

2nd FLOOR

MECHANICAL

GRD AND

EQUIPMENT

PLAN

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

N

SCALE 1/8" = 1'-0"ME102.2

1 2nd FLOOR MECHANICAL GRD AND EQUIPMENT PLAN

GENERAL NOTES:

1. PROVIDE BALANCING DAMPERS FOR ALL SUPPLY AND EXHAUST BRANCHES.

2. PROVIDE FULL TEST AND BALANCE OF ALL SYSTEMS AND DIFFUSERS BY A CERTIFIED CONTRACTOR.

3. PROVIDE RETURN BOOTS ON ALL PLENUM RETURN GRILLES. SEE DETAIL #2 ON SHEET ME501.

SHEET NOTES

1

2 PROVIDE NEW VAV BOX IN THIS APPROXIMATELOCATION. FIELD VERIFY.

3 PROVIDE NEW SILENCER IN THIS APPROXIMATELOCATION. FIELD VERIFY.

4 RE-BALANCE EXISTING VAV BOX TO CFM AS SHOWN.SEE SCHEDULE ON SHEET ME601. REPLACE 3' INLETFLEX DUCTWORK WITH HARD DUCT. INCLUDEOFFSETS AND TRANSITIONS AS NECESSARRY. FIELDVERIFY.

5 RE-BALANCE EXISTING DUAL DUCT BOX TO CFM ASSHOWN. SEE SCHEDULE ON SHEET ME601. REPLACE3' INLET FLEX DUCTWORK WITH HARD DUCT.INCLUDE OFFSETS AND TRANSITIONS ASNECESSARRY. FIELD VERIFY.

6 PROVIDE NEW DUAL DUCT BOX IN THISAPPROXIMATE LOCATION. FIELD VERIFY.

7 PROVIDE NEW DATA ROOM FAN COIL IN THISAPPROXIMATE LOCATION. FIELD VERIFY.

8 PROVIDE NEW DDC THERMOSTAT FOR EACH BOX.COORDINATE EXACT LOCATION WITH OWNER ANDARCHITECT.

9

1 Date 1 Revision 1

09/28/2017

Page 16: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

4 1/

2" W

IDE

RUNNER

2"

2"

12"C.C

.MAX.

2"

12"C.C.MAX.

SCALE: NONE

RETURN GRILLE

2 ELBOWSREQ'D

W

L = 2 x WSOUND SHALLNOT HAVE ADIRECT PATH TOPLENUM

PROVIDE HANGERSTRAP TOSTABILIZE ANDBALANCE BOOT

RETURN AIR BOOTW/ 1" LINER

PROVIDE HANGERSTRAP TO STABILIZEAND BALANCE BOOT

PROVIDE HANGERSTRAP TO STABILIZEAND BALANCE BOOT

W

L = 2 x W

SOUND SHALL NOT HAVE ADIRECT PATH TO PLENUM

PROVIDE HANGER STRAP TOSTABILIZE AND BALANCE BOOT.CONNECT TO EXISTING OVERHEADSTRUCTURE.

SCALE: NONE

CEILINGRETURN GRILLE

16x22 RETURN AIR BOOTW/ 1" LINER

SCREW SHEET METAL STRAPSTO DUCT TOP AND BOTTOM. TWOPLACES BOTH SIDES OF BOOT.

3'-0"

6"

18"

D

RETURN AIR FLOWMAIN

AIR D

UCT

SUPPLY AIR FLOW

R

RIGID ROUNDDUCT ORDIFFUSERCOLLAR

INSULATION NOTSHOWN ON DUCTWORK

LOCKING QUADRANTHANDLE OR REMOTECEILING OPERATORWHERE DAMPERIS INACCESSIBLE.

FASTEN RIGID DUCTTO FITTING W/ #10x3/4"SHEET METAL SCREWS.DO NOT INTERFERE W/VOLUME DAMPEROPERATION.

AIRBRANCHDUCT (TYP.)

ATTACH FLEXIBLE DUCTTO END. SEE DETAIL ?/M-?.

SIZE CUT OUT ACCORDINGTO MANUFACTURERSRECOMMENDATIONS.

INSULATION NOTSHOWN SEESPECIFICATIONS

22GA. RIGID SHEET METALWRAPPED WITHINSULATION.

NEOPRENE BUSHINGEACH END

SCALE: NONE

SCALE: NONE

NYLON CLAMP OVER INSULATION

NYLON CLAMP OVER FLEX DUCT

INSULATION

FLEX DUCT

#10x3/4" SHEET METALSCREWS

SEAL SEAM WITHHARD-CASTDUCT SEALER

22 GA. BLADE

3/8" SQUARE ROD

SEE DETAIL A.1

45°

1" x 16 GA.HANGER STRAP

1" x 18 GA.HANGER STRAP

SIZE PERSMACNA

NOTE: MAXIMUMSPACING OF 10'-0"

ATTACH HANGER STRAPSTO STRUCTURE

SCALE: NONE

SHEET METAL SCREW3/8" BOLT

DUCTDUCTS < 20" DIA

20" DIA TO 36" DIA.DUCTS > 36" DIA

HANGERS MUST NOT DEFORM DUCT SHAPE

NOTE:

SEE SPECIFICATIONS FOR

SEISMIC RESTRAINT

REQUIREMENTS.

FLO

W

AIR

.

SINGLE THICKNESSTURNING VANES

LEADING AND TRAILINGEDGE TO BE PARALLELWITH SIDE OF DUCT.

1" LONG MINIMUMTRAILING EDGE

SCALE: NONE

ENDS OF LINER SHALL BEBUTTED FIRMLY TOGETHER.ALL JOINTS, SEAMS, AND TEARSSHALL BE COATED W/ ADHESIVEDURING INSTALLATION.

NOT MORE THAN 2"FROM EDGE OF LINER.

ALL ENDS OF LINER TOBE COATED W/ ADHESIVE

DUCTLINERONE INCH THICK 1-1/2 LBDENSITY FIBERGLASS.

TOP AND BOTTOMSECTIONS OF LINERSHALL OVERLAP THESIDES

GRIP NAILS SHALL BEINSTALLED BY AIRHAMMER OR BYAUTOMATIC FASTENEREQUIPMENT.

INSULATED PINS, FASTENERSOR GRIP NAILS.

1" THICKDUCT LINER

SCALE: NONE

METAL FASTENERS

SHEET METAL DUCT

1" x 18 GAUGE STRAPHANGERS AT 8'-0"SPACING.

#10 x 3/4" SELFTAPPING CADMIUM PLATEDSHEET METAL SCREWS TOANCHOR STRAPS TO DUCT.ALL STRAPS TO BE TIGHTAGAINST DUCT AND SUPPORTMEMBERS. (TYPICAL)

NO POP RIVETSALLOWED

NOTE:

DUCT SHALL BE WRAPPED

EXTERNALLY AS PER THE

SPECIFICATIONS.

(1) #10 x 2"SHEET METALSCREWS@ EACH TRUSSCHORD (TYP.)

BOTTOM OF TRUSSCHORD

5/8" GYPSUMBOARD

1-1/4" MIN.PENETRATION

2' - 0" MAXIMUM

FOR UPPER ATTACHMENTSEE DETAIL

1" x 18 GA.BAND CLAMP

MAX. SAG 1/2" PERFOOT OF SUPPORTSPACING.

SCALE: NONE

1" x 18 GAUGE STRAPHANGERS AT 8'-0"SPACING.

2"

1"

SCALE: NONE

EXTENDED RETURN AIR SOUND BOOT DETAIL1

RETURN AIR BOOT DETAIL2

ROUND-TO-ROUNDDUCT CONSTRUCTION DETAIL

4

DETAILA.1

ROUND DUCT SUPPORT DETAIL3

SINGLE THICKNESS TURNING VANE DETAIL5

DUCT LINER DETAIL8DUCT STRAP HANGER DETAIL

6 FLEXIBLE DUCT SUPPORT DETAIL7

R-1

16/22

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

05/11/17

5/2

3/2

017 8

:12:4

8 A

MC

:\U

sers

\cale

bl.W

HW

EN

GIN

EE

RIN

G\D

ocum

ents

\17017 C

al R

am

pto

n 2

nd F

loor

rem

odel M

&P

v17_cale

bl@

whw

-engin

eering.c

om

.rvt

ME501

MECHANICAL

DETAILS

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

09/28/2017

Page 17: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

M

C

! !

!!

3'-0" MAX.

TYPICAL DIFFUSER CONNECTION DETAIL2

END VIEW SIDE VIEW

1FAN COIL UNIT DETAIL

CHILLED WATER COIL PIPING ISOMETRIC3

NOTES:

PROVIDE SUPPORT TO ALL BRANCH DUCT

RUNOUTS. MINIMUM OF TWO SUPPORT ON

BRANCH DUCTS SECTIONS OVER 6'-0" IN LENGTH.

UL 181 LABELED INSULATED FLEX DUCT

SEE SPECS. NO SAGS OR SHARP TURNS

ALLOWED. MAXIUM RUN LIMITED TO 3'-0"

STRETCH DUCT RUN FOR SMOOTH INTERIOR.

NYLON BAND ON ENDOF DUCT INSULATIONAND OVER FLEX DUCTINSULATION. SEE DETAILME501

SCALE: NONE

2" x 24 GAGE

DIFFUSER

T-BAR FORLAY-IN CEILINGS

ROUND RIGIDDUCT

FLEX DUCT INSULATIONNOT SHOWN

NYLON BAND(TYPICAL)

LAY-IN CEILING

DUCT

SA

FLEX CONNECTION

HEATING COIL

COOLING COIL

ATTACH TO STRUCTURE

VIBRATIONISOLATORS

3/8" ROD.(FOUR REQUIRED)

CHANNEL(TYPICAL)

SCALE: NONE

PROVIDE CONDENSATEOVERFLOW CUTOUTSWITCH.

CONDENSATE DRAINCONNECTION. ROUTE TO DRAINAS SHOWN ON MECHANICAL PLAN.

RETURN AIR GRILLE

1" FILTER

SUPPLY DIFFUSER

16 / 8 SA DUCT

CHWR

CHWS

3/4"

PROVIDE ISOLATIONVALVES AS SHOWN(TYP.)

1/2" AIR VENT ANDCOIL DRAINS (TYP.)

SIZE CONTROL VALVE FOR 3 PSI PRESSUREDROP.

SCALE: NONE

PROVIDE VENTED P-TRAP

TO DRAIN

3/4"

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

05/11/17

5/2

3/2

017 8

:12:4

8 A

MC

:\U

sers

\cale

bl.W

HW

EN

GIN

EE

RIN

G\D

ocum

ents

\17017 C

al R

am

pto

n 2

nd F

loor

rem

odel M

&P

v17_cale

bl@

whw

-engin

eering.c

om

.rvt

ME502

MECHANICAL

DETAILS

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

09/28/2017

Page 18: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

VAV BOX SCHEDULE

DIFFUSER SCHEDULE

REGISTER, LOUVER, & GRILLE SCHEDULEDUAL DUCT BOX SCHEDULE

SYMBOL SERVESINLET DIA.(INCHES)

COOLING

NC LEVELMANUF.MODEL #

SCHEDULENOTES

MAX CFM MIN CFMMX APD

(IN)

NEW 6" 250 75 1.0 25 PRICE SDV 1,2

NEW 6" 250 75 1.0 25 PRICE SDV 1,2

NEW 10" 500 150 1.0 25 PRICE SDV 1,2

NEW 10" 500 150 1.0 25 PRICE SDV 1,2

NEW 6" 180 75 1.0 25 PRICE SDV 1,2

NEW 10" 500 150 1.0 25 PRICE SDV 1,2

EXISTING 8" 400 120 1.0 25 PRICE SDV 1,2

EXISTING 8" 225 65 1.0 25 PRICE SDV 1,2

EXISTING 8" 300 90 1.0 25 PRICE SDV 1,2

EXISTING 6" 175 52 1.0 25 PRICE SDV 1,2

NEW 6" 125 35 1.0 25 PRICE SDV 1,2

NEW 6" 100 30 1.0 25 PRICE SDV 1,2

NEW 6" 100 30 1.0 25 PRICE SDV 1,2

NEW 10" 500 150 1.0 25 PRICE SDV 1,2

NEW 6" 100 30 1.0 25 PRICE SDV 1,2

NEW 8" 400 120 1.0 25 PRICE SDV 1,2

NEW 8" 400 120 1.0 25 PRICE SDV 1,2

NEW 6" 100 30 1.0 25 PRICE SDV 1,2

NEW 8" 275 82 1.0 25 PRICE SDV 1,2

EXISTING 8" 310 93 1.0 25 PRICE SDV 1,2

NEW 6" 175 82 1.0 25 PRICE SDV 1,2

EXISTING 8" 470 140 1.0 25 PRICE SDV 1,2

NEW 12" 800 240 1.0 25 PRICE SDV 1,2

NEW 12" 800 240 1.0 25 PRICE SDV 1,2

NEW 12" 800 240 1.0 25 PRICE SDV 1,2

1. SIZED AT 1.0" STATIC PRESSURE DROP ACROSS BOX. 2. SEE SPECIFICATIONS FOR APPROVED MANUFACTURERS.

SYMBOL TYPE MAX CFM FACE SIZE NECK SIZECEILING

TYPEBLOW PATTERN NC

MANUF. &MODEL

SCHEDULENOTES

CEILING 210 24X24 6" LAY-IN 4-WAY 25 PRICE SPD 1,2,3,4,6

CEILING 330 24X24 8" LAY-IN 4-WAY 25 PRICE SPD 1,2,3,4,6

CEILING 450 24X24 10" LAY-IN 4-WAY 25 PRICE SPD 1,2,3,4,6

CEILING 180 12X12 6" HARD 4-WAY 25 PRICE SPD 2,3,4,6

CEILING 250 12X12 8" HARD 4-WAY 25 PRICE SPD 2,3,4,6

1. PROVIDE LAY-IN CEILING AND BORDER / MODULE AS REQUIRED. SEE ARCHITECTURAL CEILING PLANS. 2. MAXIMUM NC AT CFM LISTED. 3. PROVIDE TRANSITION TO DIFFUSER NECK SIZE AS REQUIRED TO DUCTWORK SHOWN ON PLAN. 4. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURERS. 5. FINISH SHALL BE STANDARD WHITE. 6. FINISH SHALL BE SPECIFIED BY ARCHITECT.

CFM

D-1

CFM

D-2

CFM

D-3

CFM

D-4

CFM

D-5

SYMBOL TYPE SERVICE MAX CFMNOMINAL

SIZETHROAT

SIZECEILING

TYPEMAX NC

MANUF. &MODEL

SCHEDULENOTES

CEILING RETURN 800 24X12 24X12 LAY-IN 25 PRICE 535 1,2,3,4,6

CEILING RETURN 1200 24X24 24X24 LAY-IN 25 PRICE 535 1,2,3,4,6

CEILING RETURN 375 12X12 12X12 HARD 25 PRICE 535 2,3,4,6

1. PROVIDE LAY-IN CEILING AND BORDER / MODULE AS REQUIRED. SEE ARCHITECTURAL CEILING PLANS. 2. MAXIMUM NC AT CFM LISTED. 3. PROVIDE TRANSITION TO DIFFUSER NECK SIZE AS REQUIRED TO DUCTWORK SHOWN ON PLAN. 4. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURERS. 5. FINISH SHALL BE STANDARD WHITE. 6. FINISH SHALL BE SPECIFIED BY ARCHITECT.

R-1

R-2

R-3

SYMBOL SERVESINLET DIA.COLD(IN)

INLET DIA.HOT (IN)

COOLINGMAX CFM

HEATINGMAX CFM

MANUF.MODEL #

SCHEDULE NOTES

EXISTING 8" 8" 480 480 PRICE DDS 1

EXISTING 10" 10" 705 705 PRICE DDS 1

EXISTING 6" 6" 300 300 PRICE DDS 1

EXISTING 8" 8" 400 400 PRICE DDS 1

EXISTING 10" 10" 800 800 PRICE DDS 1

EXISTING 8" 8" 550 550 PRICE DDS 1

NEW 8" 8" 400 400 PRICE DDS 1

NEW 10" 10" 800 800 PRICE DDS 1

EXISTING 8" 8" 300 300 PRICE DDS 1

EXISTING 8" 8" 400 400 PRICE DDS 1

EXISTING 6" 6" 180 180 PRICE DDS 1

1. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURERS.

DDB201

DDB202

DDB203

DDB204

DDB205

DDB206

DDB207

DDB208

DDB221

DDB222

DDB223

201VAV

202VAV

203VAV

204VAV

205VAV

206VAV

207VAV

208VAV

209VAV

210VAV

211VAV

212VAV

213VAV

214VAV

215VAV

216VAV

217VAV

218VAV

219VAV

220VAV

221VAV

222VAV

223VAV

224VAV

225VAV

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

05/11/17

5/2

3/2

017 8

:12:4

9 A

MC

:\U

sers

\cale

bl.W

HW

EN

GIN

EE

RIN

G\D

ocum

ents

\17017 C

al R

am

pto

n 2

nd F

loor

rem

odel M

&P

v17_cale

bl@

whw

-engin

eering.c

om

.rvt

ME601

MECHANICAL

SCHEDULES

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

09/28/2017

Page 19: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

FAN COIL UNIT SCHEDULE SILENCER SCHEDULE

EXHAUST FAN SCHEDULE

SYMBOLROOMSSERVED

FAN (2 SPEED) COOLING COIL (4 ROW)

MANUF. &MODEL #

SCHEDULENOTES

CFM ESP H.P. V - PH - HZ

MIN.REQ'DCAP.

TOTALBTUH

GPM

COND.ENT.

EVAP.DB° F

PIPESIZE

CND.ENT.

EVAP.WB° F

COMM ROOM 250 0.35 1/3 120-1-60 29,465 2.2 80 3/4" 67WILLIAMS

LH-R1,2,3,4

SECUREROOM

600 0.35 1/3 120-1-60 11,105 5.9 80 3/4" 67WILLIAMS

LH-R1,2,3,4

1. DISCHARGE AIR TEMPERATURE AT 55° F AND 20° F DELTA 'T' ON WATER.

2. PROVIDE WITH ECM TYPE MOTOR.

3. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURER'S.

4. PROVIDE INTEGRAL CONDENSATE PUMP, PROVIDED BY MANUFACTURER, AND ASSOCIATED CONDENSATE DRAIN PIPING TO NEAREST DRAIN.

SYMBOLROOMSSERVED

AIRPRESSURE

DROP(IN. W.G.)

AIR FLOW(CFM)

AIR VELOCITY(FPM)

LENGTHWEIGHT

(LBS)MANUF. &MODEL #

SCHEDULENOTES

SECUREROOM

0.04 1500 409 60" 129PRICE

RL1

1. PROVIDE SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURER'S.

SYMBOLMANUFACTURER

& MODEL No.SERVES C.F.M.

STATICPRESSURE

IN. WG.

MAXNOISESONES

MOTOROPER. WT.

(LBS)SCHEDULE

NOTES

V - ∅ - Hz WATTS RPM

COOKGC-168

RESTROOM 158 .25 3.5 120-1-60 47.3 1160 15 1

COOKGC-168

BREAKROOM 158 .25 3.5 120-1-60 47.3 1160 15 1

1. COORDINATE WITH ELECTRICAL FOR SINGLE POLE SWITCH.

EF1

EF2

1FC

2FC

1SI

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

05/11/17

5/2

3/2

017 8

:12:4

9 A

MC

:\U

sers

\cale

bl.W

HW

EN

GIN

EE

RIN

G\D

ocum

ents

\17017 C

al R

am

pto

n 2

nd F

loor

rem

odel M

&P

v17_cale

bl@

whw

-engin

eering.c

om

.rvt

ME602

MECHANICAL

SCHEDULES

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

09/28/2017

Page 20: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

R

PLUMBING LEGEND

SDPD

MEANING SYMBOL OR ABBREVIATION

MEANING SYMBOL OR ABBREVIATION

HOT WATER LINE WALL CLEANOUT WCO

COLD WATER LINE CLEANOUT CO

HOT WATER RECIRCULATING LINE

CLEANOUT TO GRADE COTG

VENT LINE FLOOR CLEANOUT FCO

WASTE LINE BALL VALVE

GAS LINE UNION

VENT THRU ROOF VTR CONNECTION TO EXISTING PIPING

UNDER FLOOR UF REGULATOR

SANITARY SEWER SOFT WATER SW

PRIMARY ROOF DRAIN (PRD) SECONDARY ROOF DRAIN (SRD)

SS

PLUMBING GENERAL NOTES:

ALL PLUMBING SHALL BE INSTALLED AND CONFORM TO THE 2015EDITION OF THE INTERNATIONAL PLUMBING CODE (IPC) WITH UTAHANNOTATIONS AND LOCAL AUTHORITY REQUIREMENTS.

ALL PIPING MATERIALS SHALL MEET ALL REQUIREMENTS OF IPCAND LOCAL AUTHORITY. PLASTIC PIPING SHALL BE ALLOWED ONLYWHERE ALLOWED BY CODE. PLASTIC PIPING SHALL NOT BEROUTED THROUGH RETURN AIR PLENUMS OR OTHER AREASPROHIBITED BY THE IMC, IPC OR NFPA CODES OR BY LOCALAUTHORITY

GAS PIPING INSTALLATION SHALL BE IN STRICT ACCORDANCEWITH GAS COMPANY REGULATIONS, NFPA CODE REQUIREMENTS,AND LOCAL AUTHORITY.

ALL MATERIALS SHALL BE NEW AND SHALL BE DOMESTIC MADEUNLESS SPECIFICALLY APPROVED OTHERWISE IN WRITING BYARCHITECT OR OWNER.

PROVIDE VACUUM BREAKERS AND BACK FLOW PREVENTERSWHERE REQUIRED BY CODE OR WHERE THERE MAY BE ANYPOSSIBLE CHANCE FOR CROSS CONTAMINATION. PREVENTERSSHALL BE INSTALLED IN ACCORDANCE WITH UTAH CODE.

ALL PLUMBING INFORMATION IS NOT LIMITED TO THE PLUMBINGDRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FORINFORMATION ON ALL OTHER CONSTRUCTION DOCUMENTSINCLUDING SPECIFICATIONS, ARCHITECTURAL DRAWING,STRUCTURAL DRAWINGS, MECHANICAL DRAWINGS, ANDELECTRICAL DRAWINGS.

THE WORKING DRAWINGS ARE DIAGRAMMATIC. BECAUSE OF THESMALL SCALE OF THE DRAWING, THEY DO NOT SHOW EVERYOFFSET, BEND OR ELBOW NECESSARY FOR THE COMPLETEINSTALLATION IN THE SPACE PROVIDED. ALL PIPING SHALL BECHECKED AND COORDINATED WITH THE SPECIFICATIONS,ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICALDRAWINGS.

COORDINATE ALL PIPING AND PLUMBING EQUIPMENT WITH ALLOTHER TRADES AND/OR CONTRACTORS PRIOR TO INSTALLATION.

ANY AND ALL ALTERATIONS TO THE SYSTEM SHOWN SHALL BESUBMITTED TO THE ENGINEER PRIOR TO CHANGES FORAPPROVAL. CONTRACTOR SHALL NOT START ANY CHANGES UNTILNOTIFIED IN WRITING. IF CHANGES ARE MADE PRIOR TO APPROVALCONTRACTOR SHALL TAKE ALL RESPONSIBILITY FOR THECHANGES MADE AND ALL COSTS RELATING TO FAILURE ORREPLACEMENT OF ALTERATIONS.

GAS LINE FITTINGS SHALL BE STANDARD WELD FITTINGS WITHTAPERED REDUCERS. DO NOT USE VALVES, UNIONS, OR AUTOCONTROLS IN GAS LINES ROUTED IN INACCESSIBLE CONCEALEDSPACES.

ALL WATER SYSTEMS SHALL MEET THE REQUIREMENTS OFANSI/NSF STANDARD 61, CONCERNING METAL CONTAMINANTS INTHE WATER SYSTEM.

WATER PIPING SHALL NOT BE ROUTED IN OUTSIDE WALLS OR ONEXTERIOR SIDE OF BUILDING INSULATION ENVELOPE.

WATER HAMMER ARRESTORS SHALL BE INSTALLED IN ALL WATER

LINES WITH QUICK OPEN OR QUICK CLOSE VALVES.

WATER HAMMER ARRESTOR SCHEDULE:

TYPE A 1-11 FIXTURE UNITS

TYPE B 12-32 FIXTURE UNITS

TYPE C 33-60 FIXTURE UNITS

TYPE D 61-113 FIXTURE UNITS

ALL PIPING, MATERIALS, ETC. SHALL BE NEW AND DOMESTIC MADE

UNLESS SPECIFICALLY AUTHORIZED IN WRITING PRIOR TO BID.

G-1

G-2

G-3

G-4

G-5

G-6

G-7

G-8

G-9

G-10

G-11

G-12

G-13

G-14

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

05/11/17

5/2

3/2

017 8

:13:0

0 A

MC

:\U

sers

\cale

bl.W

HW

EN

GIN

EE

RIN

G\D

ocum

ents

\17017 C

al R

am

pto

n 2

nd F

loor

rem

odel M

&P

v17_cale

bl@

whw

-engin

eering.c

om

.rvt

PG001

PLUMBING

GENERAL

NOTES &

LEGEND

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

09/28/2017

Page 21: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

1

11

1

22

2222

2

2

2

2

2

2

2 2

22

2

2

2

2

3

3

3

33

33

3 2

2

2

233

3

3

2

1

2

3

4

2 3

4

3

4

3

3

3

3

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

05/11/17

5/2

3/2

017 8

:12:5

4 A

MC

:\U

sers

\cale

bl.W

HW

EN

GIN

EE

RIN

G\D

ocum

ents

\17017 C

al R

am

pto

n 2

nd F

loor

rem

odel M

&P

v17_cale

bl@

whw

-engin

eering.c

om

.rvt

PD102.1

LAB PLUMBING

DEMOLITION

PLAN

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

N

SCALE 1/8" = 1'-0"PD102.1

1 LAB PIPING DEMOLITION PLAN

SHEET NOTES

1 REMOVE VAC AND COMPRESSED AIR PIPING IN THISAPPROXIMATE LOCATION BACK TO MAIN AND CAP.FIELD VERIFY. REMOVE EXISTING FIXTURES AND ALLASSOCIATED ITEMS.

2

3 REMOVE HELIUM AND NITROGEN PIPING IN THISAPPROXIMATE LOCATION BACK TO MAIN AND CAP.FIELD VERIFY. REMOVE EXISTING FIXTURES AND ALLASSOCIATED ITEMS.

4

GENERAL NOTES:

1. SEE SHEET PD102.2 FOR DOMESTIC WATER AND WASTE DEMOLITION PLAN.

2. EXISTING PIPING IS SHOWN FOR SCHEMATIC PURPOSES ONLY. FIELD VERIFY ALL ROUTING OF EXISTING PIPING AND LOCATE REMOVAL POINTS PRIOR TO DEMOLITION.

3. REMOVE ALL LAB PIPING BACK TO MAINS AND CAP. FIELD VERIFY.

09/28/2017

Page 22: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

1 1

2 2

3 3

4 4

1

1

12

2

2

1

1

1 2

1

11

2

2

33

3

3

3

333

3

3

3

3

33

1

3

1

3 3

13

3

3

3

3

33 1 2

321

3

3

3

3

12

12

3 1

3

2 2

23

2

1

11

4

4

5

5

5

5

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

05/11/17

5/2

3/2

017 8

:12:5

6 A

MC

:\U

sers

\cale

bl.W

HW

EN

GIN

EE

RIN

G\D

ocum

ents

\17017 C

al R

am

pto

n 2

nd F

loor

rem

odel M

&P

v17_cale

bl@

whw

-engin

eering.c

om

.rvt

PD102.2

PLUMBING

DOMESTIC

DEMOLITION

PLAN

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

N

SCALE 1/8" = 1'-0"PD102.2

1 2ND FLOOR DOMESTIC WATER, WASTE, & VENT DEMOLTION PLAN

SHEET NOTES

1 REMOVE SANITARY SEWER AND VENT BACK TO MAINAND CAP IN THIS APPROXIMATE LOCATION. FIELDVERIFY. REMOVE EXISTING FIXTURES AND ALLASSOCIATED ITEMS.

2

3 REMOVE EXISTING DOMESTIC WATER PIPING BACKTO MAIN AND CAP IN THIS APPROXIMATE LOCATION.FIELD VERIFY.

4 REMOVE EXISTING PLUMBING FIXTURE AND ALLASSOCIATED ITEMS IN THIS APPROXIMATELOCATION. FIELD VERIFY. PATCH AND REPAIR FLOORPENETRATIONS.

5 EXISTING HYDRANT IN THIS APPROXIMATE LOCATIONSHALL REMAIN.

GENERAL NOTES:

1. SEE SHEET PD102.1 FOR LAB PLUMBING DEMOLITION PLAN.

2. EXISTING PIPING IS SHOWN FOR SCHEMATIC PURPOSES ONLY. FIELD VERIFY ALL ROUTING OF EXISTING PIPING AND LOCATE REMOVAL POINTS ON LEVEL BELOW PRIOR TO DEMOLITION.

3. REMOVE ALL ABANDONED PIPING.

09/28/2017

Page 23: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

F

F

G

G

H

H

I

I

J

J

K

K

L

L

M

M

N

N

O

O

P

P

1 1

2 2

3 3

4 4

1 1

11

1 1

1 1

1

1 1 1

11

1

1

2

2

BS-1

1/2"ø HW

2"ø SS

1/2"ø CW

3 4

4

WC-1

FD-1

L-13

33

5

5

5

5

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

05/11/17

5/2

3/2

017 8

:13:0

0 A

MC

:\U

sers

\cale

bl.W

HW

EN

GIN

EE

RIN

G\D

ocum

ents

\17017 C

al R

am

pto

n 2

nd F

loor

rem

odel M

&P

v17_cale

bl@

whw

-engin

eering.c

om

.rvt

PE102.1

DOMESTIC

PLUMBING NEW

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

N

SCALE 1/8" = 1'-0"PE102.1

1 2ND FLOOR PLUMBING PLAN

SHEET NOTES

1

2 PROVIDE WATER LINE WITH WATER HAMMERARRESTER AND ICE MAKER BOX TOREFRIGERATORS. FIELD VERIFY.

3 TIE INTO EXISTING DOMESTIC WATER PIPING IN THISAPPROXIMATE LOCATION. FIELD VERIFY.

4 TIE INTO EXISTING WASTE PIPING IN THISAPPROXIMATE LOCATION. FIELD VERIFY.

5 PROVIDE NEW CLEANOUT IN THIS APPROXIMATELOCATION. FIELD VERIFY.

09/28/2017

Page 24: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

9 IN

CH

ES

CHROMEWALL COVERAND SCREW

MAY EXTEND AS AWASTE OR VENT LINE.

SCALE: NONE

FLOORLINE

PVC DWVPIPE

PLUGGEDTEE

WALL

ADJUSTABLE HEAD SETFLUSH WITH FINISHED FLOOR

CAULKED OUTLETTYPE CONNECTION

SCALE: NONE

SLOPE SLOPE

FINISHED FLOOR

CONCRETE (TYP.)

RUBBER SEALTRAP GUARD

HANGER ROD

PIPE

HANGER

SUPPORT NUT

LOCKING NUT

CALCIUM SILICATE BLOCK

16 GA. ZINC COATED SHEETSTEEL SHEILD AT LEAST 12" LONG(TYP)

MOUNT PIPING TO UNISTRUT

PROVIDE PIPE CLAMPSWITH BOLTS AND NUTS

CALCIUM SILICATEBLOCK

CALCIUM SILICATEBLOCK

BOLT UNISTRUT TO EXISTINGWALL AND CONCRETE USINGEXPANSION ANCHOR BOLTS

ATTACH TO ROOMOVERHEAD STRUCTURE

SPRING TYPE ISOLATORFOR INSTALLATIONNEAR HOT WATERPUMPS

CLEVIS HANGER

INSULATION

16 GAGE ZINCCOATED SHEETSTEEL SHIELD ATLEAST 12" LONG.

HEAVY DUTYCLEVIS HANGER

HANGER ROD

SUPPORT NUT

LOCKING NUT

HEAVY DUTYCLEVIS HANGER

PIPE

SINGLE HORIZONTAL RUNWITHOUT INSULATION

CLEVIS HANGER

ATTACH TO EXISTING CEILING

INSULATION WITH OR WITHOUTVAPOR BARRIER

NOTE:

PROVIDE WITH VAPOR BARRIER

ON CHILLED WATER AND

DOMESTIC COLD WATER PIPING

6"

CLEANOUT AND ACCESSCOVER. TOP OF COVERTO BE FLUSH W/ TOP OFFLOOR.

BALANCE OF PIPINGSAME AS CLEANOUTTO GRADE.

BRASS CLEANOUT PLUG W/COUNTER SUNK HEAD.

18" SQUARE CONC. PADTROWEL SMOOTH AND EDGE.

WASTE LINELENGTH TO SUIT.

1/8 BEND IF CLEANOUTOCCURS AT END OF LINE.

SCALE: NONE

1/8 BEND.

FINISH GRADE

WASTE LINE

FLOOR LINE

1/8 BEND

WALL CLEAN-OUT DETAIL1

FLOOR DRAIN DETAIL2

PIPE HANGER DETAIL3

CLEAN-OUT DETAILS4

FLOOR CLEANOUT (FCO)

CLEANOUT TO GRADE (COTG)

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

05/11/17

5/2

3/2

017 8

:13:0

0 A

MC

:\U

sers

\cale

bl.W

HW

EN

GIN

EE

RIN

G\D

ocum

ents

\17017 C

al R

am

pto

n 2

nd F

loor

rem

odel M

&P

v17_cale

bl@

whw

-engin

eering.c

om

.rvt

PE501

PLUMBING

DETAILS

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

09/28/2017

Page 25: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

PLUMBING FIXTURE SCHEDULE

SYMBOL FIXTURE

INDIVIDUAL LINE SIZES

REMARKS

TRAP WASTE VENTCOLD

WATERHOT

WATER

BREAK SINK 1-1/2" 1-1/2" 1-1/2" 1/2" 1/2" SINGLE COMPARTMENT

FLOOR DRAIN 3" 3" 2" - - PROVIDE WITH TRAP PRIMER

LAVATORY 1-1/2" 1-1/2" 1-1/2" 1/2" 1/2"SELF SUPPORTING PROVIDEWITH THERMOSTATIC ANDPRESSURE MIXING VALVE.

WATER CLOSET INT 4" 2" 1" -FLOOR MOUNTED, FLUSH VALVE,

ADA COMPLIANT

BS-1

FD-1

L-1

WC-1

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

05/11/17

5/2

3/2

017 8

:13:0

0 A

MC

:\U

sers

\cale

bl.W

HW

EN

GIN

EE

RIN

G\D

ocum

ents

\17017 C

al R

am

pto

n 2

nd F

loor

rem

odel M

&P

v17_cale

bl@

whw

-engin

eering.c

om

.rvt

PE601

PLUMBING

SCHEDULES

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

09/28/2017

Page 26: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

2017 BNACONSULTING SA

LT L

AK

E

ST.G

EO

RG

E

BNA635 South State Street

Salt Lake City, Utah 84111

CONSULTING

P:801.532.2196F:801.532.2305

www.bnaconsulting.com

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/1

6/2

017 2

:44:5

2 P

ME

:\U

ser

File

s\R

evit 2

017\1

7072 R

am

pto

n E

lec v

17_abonill

aP

373E

.rvt

E001

SYMBOLS AND

NOTES

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

SHEET INDEXE001 SYMBOLS AND NOTES

E002 SCHEDULES

E201 LEVEl 2 LIGHTING PLAN

E301 LEVEL 2 POWER PLAN

E401 LEVEL 2 SYSTEMS PLAN

E601 PANELBOARD SCHEDULES

E701 ELECTRICAL DIAGRAMS

E702 ELECTRICAL DIAGRAMS

ET001 AUDIOVISUAL SYMBOLS, SCHEDULES, AND NOTES

ET301 LEVEL 2 AUDIOVISUAL PLAN

ET701 AUDIOVISUAL DIAGRAMS

ABBREV. DESCRIPTION ABBREV. DESCRIPTION

ABBREVIATIONS INDEX

# NUMBER

AC ALTERNATING CURRENT

A.F.F. ABOVE FINISH FLOOR

AIC AMPS INTERRUPTING CAPACITY

AM AMPS METER

AMP AMPERE

ANN ANNUNCIATOR

ATS AUTOMATIC TRANSFER SWITCH

AUX AUXILIARY

AWG AMERICAN WIRE GAUGE

BC BARE COPPER

BFG BELOW FINISH GRADE

C CONDUIT

CAB CABINET

CATB COMMUNITY ANTENNA TELEVISION

CATV CABLE TELEVISION

CKT CIRCUIT

CLG CEILING

CNTR CONTRACTOR

C.O. CONDUIT ONLY

CRT COMPUTER TERMINAL

CT CURRENT TRANSFORMER

CU COPPER

C/W COMPLETE WITH

DB DECIBEL

DC DIRECT CURRENT

DWG DRAWING

(E) EXISTING

EC EMPTY CONDUIT

EG EMERGENCY GENERATOR

EMT ELECTRICAL METALLIC TUBING

EX EXPLOSION PROOF

FACP FIRE ALARM CONTROL PANEL

FC FOOT CANDLE

FT FOOT

GFI GROUND FAULT INTERRUPTER

GND GROUND

GRC GALVANIZED RIGID CONDUIT

HP HORSE POWER

HZ HERTZ

IG ISOLATED GROUND

IMC INTERMEDIATE METALLIC CONDUIT

IN INCH

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT AMPERES

KVAR KILOVARS

KW KILOWATT

LRA LOCKED ROTOR AMPS

LTG LIGHTING

MNF MANUFACTURER

MATV MASTER ANTENNA TELEVISION

MAX MAXIMUM

MB MAIN BUS

MCC MOTOR CONTROL CENTER

MCM 1000 CIRCULAR MILLS

MH MANHOLE

MIC MICROPHONE

MIN MINIMUM

MTG MOUNTING

MTR MOTOR

N/A NOT APPLICABLE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECT. MANUFAC. ASSOC.

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION ASSOC.

N.I.C. NOT IN CONTRACT

NO NORMALLY OPENED

NTS NOT TO SCALE

OS & Y OUTSIDE SCREW & YOKE

PB PUSHBUTTON

PF POWER FACTOR

PFR PHASE FAILURE RELAY

PNL PANEL

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE CONDUIT

(R) RELOCATE

RECEP RECEPTACLE

REQ REQUIREMENT

RLA RATED LOAD AMPS

RMS ROOT MEAN SQUARE

SE SERVICE ENTRANCE

SPEC SPECIFICATIONS

SPKR SPEAKER

SS SELECTOR SWITCH

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

TTB TELEPHONE TERMINAL BOARD

TTC TELEPHONE TERMINAL CABINET

TV TELEVISION

TYP TYPICAL

UG UNDERGROUND

UP UTAH POWER

UPS UNINTERRUPTED POWER SUPPLY

V VOLT (KV-KILOVOLT)

VA/R VOLT-AMPS/REACTIVE

VM VOLT METER

W WATTS

W/ WITH

WH WATTHOUR METER

W/O WITHOUT

WP WEATHERPROOF

XFMR TRANSFORMER

XFMR SW TRANSFER SWITCH

XP EXPLOSION PROOF

1P SINGLE-PHASE

2P TWO-POLE

3P THREE-POLE

4P FOUR-POLE

∅ PHASE

GENERAL NOTESCONSULT ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF ALL LIGHTING FIXTURES.

VERIFY ALL EQUIPMENT DIMENSIONS AND LOCATIONS BEFORE BEGINNING ROUGH IN. CONSULT ALL APPLICABLE CONTRACT DRAWINGS AND SHOP DRAWINGS TO INSURE NEC CODE CLEARANCES REQUIRED AROUND ALL ELECTRICAL EQUIPMENT.

CONTRACTOR SHALL VERIFY ALL ELECTRICAL LOADS (VOLTAGE, PHASE, CONNECTION REQUIREMENTS, ETC) OF ALL EQUIPMENT FURNISHED UNDER ALL DIVISIONS, INCLUDING ALL EXISTING EQUIPMENT TO BE RE-USED. REVIEW ALL SHOP DRAWINGS AND EXISTING EQUIPMENT BEFORE BEGINNING ROUGH-IN.

SEE SECTION 265100 (16510) OF THE SPECIFICATION FOR REQUIRED COORDINATION MEETINGS WITH MECHANICAL AND CEILING CONTRACTORS.

SEE APPLICABLE SHOP DRAWINGS FOR ROUGH IN LOCATION OF ALL EQUIPMENT, WIRING DEVICES, ETC. WHERE APPLICABLE MOUNT ALL WIRING DEVICES ABOVE BACK SPLASH EXCEPT THOSE SERVING UNDER COUNTER EQUIPMENT.

SEE SPECIFICATION FOR ENERGY SAVING LAMP AND BALLAST REQUIREMENTS.

FINISHES OF ALL LIGHT FIXTURES SHALL BE AS SELECTED BY ARCHITECT.

THE ELECTRICAL CONTRACTOR SHALL NOTIFY AND COOPERATE WITH THE MECHANICAL CONTRACTOR SUCH THAT NO PIPING, DUCTS, OR EQUIPMENT FOREIGN TO THE OPERATION OF THE ELECTRICAL EQUIPMENT SHALL BE PERMITTED TO BE INSTALLED IN, ENTER OR PASS THRU ELECTRICAL ROOMS OR SPACES, OR ABOVE OR BELOW ELECTRICAL EQUIPMENT IN OTHER AREAS.

ELECTRICAL BOXES SHALL NOT BE LOCATED IN MASONRY COLUMNS IN BRICK WALLS OR IN GROUTED CELLS ADJACENT TO OPENINGS. COORDINATE LOCATION OF BOXES WITH MASONRY CONTRACTOR.

ALL PENETRATIONS OF FIRE RATED FLOORS, WALLS, AND CEILINGS SHALL BE SEALED WITH APPROVED MATERIAL TO MAINTAIN FIRE RATING OF SURFACE PENETRATED.

CIRCUITS EXTENDING OVER 70' FOR 120 VOLT AND 115' FOR 277 VOLT 20 AMP CIRCUITS SHALL BE RUN WITH CONDUCTORS PER TABLE BELOW.

10.

8.

7.

9.

5.

4.

6.

2.

1.

3.

11.

842

TC

J

P

F

S

F

H

S

D

D

R

CM

D

ML

CR

34EQ

A

H

MM

S

1D

2D

A

I

M

ES

T

A

PP

S

S

S

S

S

S

S

C

S

SEE DIAGRAM,SPECIFICATION

EQUIPMENT CABINET/RACK CIRCUIT TO 120V

ARCHITECTURAL ROOM NUMBER

TIME CLOCK +5'-0" 2.

JUNCTION BOX ('F' IN FLOOR) AS NOTED

MOTOR OUTLETEQUIP.

TO SUIT

PHOTO-ELECTRIC CONTROL TORK 2000AAS NOTED

PUSHBUTTON +4'-0" 2.

NON-FUSED DISCONNECT SWITCH +5'-0" 5.

FUSED DISCONNECT SWITCH +5'-0" 5.

MANUAL STARTER THERMAL OVERLOAD SWITCH WITH PILOT LIGHT

T+4'-0" 2.

VARIABLE FREQUENCY DRIVEVFD +6'-6"

MAGNETIC STARTER / DISCONNECT COMBINATION +5'-0"

PANEL BOARDTOP AT+6'-0"

MAIN DISTRIBUTION PANEL

TELEPHONE TERMINAL BOARD

FIRE ALARM MANUAL STATION +4'-0" 2.

SMOKE DETECTOR CEILING

DUCT SMOKE DETECTOR MTD. IN DUCT

FIRE/SMOKE DAMPER

DOOR HOLDER AS NOTED

ST TAMPER SWITCH

FIRE ALARM RELAY OR SECURITY RELAY

FIRE ALARM CONTROL MODULE

DURESS PUSHBUTTON +4'-0"

MAGNETIC SHEAR LOCK

ACCESS CONTROL CARD READER +4'-0" 2.

CAMERA - SEE SCHEDULE AS NOTED

EQUIPMENT NUMBER

LIGHT FIXTURE (LETTER DESIGNATES TYPE)

BELL +7'-6"

HEAT DETECTOR CEILING

SF FLOW SWITCH

FW WATER FLOOD INDICATOR

FIRE ALARM MONITOR MODULE

6.

SECURITY SYSTEM DOOR SWITCHDOORJAMB

MOUNT AS PER. MFR.

SECURITY SYSTEM OVERHEAD DOOR SWITCH CEILING

SECURITY SYSTEM KEYED ACCESS SWITCH +4'-0" 2.

INFRARED SENSOR AS NOTED

MOUNT AS PER. MFR.

SECURITY MOTION DETECTOR

ELECTRIC DOOR STRIKE

DOOR POSITION INDICATING SWITCH

O.S. & Y. VALVE SEE DIAGRAM

LOW VOLTAGE TRANSFORMER

CORD DROP SEE DIAGRAM

AUTOMATIC RELAY PACK CEILINGSEE DIAGRAM. SPEC.

POWER PACK CEILINGSEE DIAGRAM, SPEC.

CALL SWITCH +4'-0" 2.

PLUGMOLD+46" OR

AS NOTED

SPECIAL PURPOSE OUTLET 10. WITH CAP. 11.AS NOTED+16" OR

MOMENTARY CONTACT SWITCH, CENTER POSITION OFF +4'-0" 2.

TIMER SWITCH +4'-0" 2.TM

PSWITCH WITH PILOT LIGHT +4'-0" 2.

K KEY OPERATED SWITCH +4'-0" 2.

4 FOUR-WAY SWITCH +4'-0" 2.

3 THREE-WAY SWITCH +4'-0" 2.

x4. 2.SINGLE POLE SWITCH +4'-0"

AS NOTEDCEILING/WALL MOUNTED EXIT LIGHTCEILING/

1.3.8.

FLOOD OR TRACK FIXTURE AS NOTED

EGRESS LIGHT FIXTURE AS NOTED UNSWITCHED

LIGHT FIXTURE AS NOTED 1

RECESSED DOWNLIGHT FIXTURE CEILING 1.

WALL LIGHT FIXTURE AS NOTED 1.

CEILING LIGHT FIXTURE CEILING 1.

CABLE TRAY AS NOTED

CONDUIT STUB LOCATION CONDUITCAP

CONDUIT DOWN

CONDUIT UP

CONDUIT RUN CONCEALED IN FLOOR OR GROUND

CONDUIT RUN CONCEALED IN WALL OR CEILING

3 CIRCUIT, HOME RUN TO PANEL

2 CIRCUIT, HOME RUN TO PANEL

ONE CIRCUIT, HOME RUN TO PANEL

CLOCK OUTLET +7'-6" 8.

ELECTRIC WATER COOLER RECEPTACLEWSEE DIAGRAM

A DUPLEX RECEPTACLE 9.

+4'-0" 2.CEILING/WALL MOUNTED OCCUPANCY SENSOR CEILING/

BASEAREA LIGHT POLE AND FIXTURE CONCRETE SEE DIAGRAM

VARIABLE INTENSITY SWITCH +4'-0" 2.D

DUPLEX RECEPTACLE 9. 11.AS NOTED+16" OR

WEATHERPROOF RECEPTACLEWP 2. 9.AS NOTED+24" OR

GROUND FAULT INTERRUPTER DUPLEX RECEPTACLE 9. 11.AS NOTED+16" OR

DUPLEX RECEPTACLE EMERGENCY POWER (RED) 9. 11.AS NOTED+16" OR

FOURPLEX RECEPTACLE 9. 11.AS NOTED+16" OR

FOURPLEX RECEPTACLE EMERGENCY POWER (RED) 9. 11.AS NOTED+16" OR

TELEVISION OUTLET 11.AS NOTED+16" OR

LOW VOLTAGE WALLSTATION (SUBSCRIPT INDICATES +4'-0"CONFIGURATION & CONTROL SEQUENCE) SEE DIAGRAM

ELECTRICAL SYMBOL SCHEDULE

NOTESMOUNTING

HEIGHTDESCRIPTIONSYMBOL

STANDARD MOUNTING HEIGHT UNLESS OTHERWISE NOTED ON PLANS

1. SEE FIXTURE SCHEDULE FOR TYPE, MOUNTING AND WATTAGE.2. HEIGHT MEASURED TO CENTER LINE OF THE BOX FROM THE FINISH FLOOR.3. REFER TO DRAWINGS FOR DIRECTIONAL ARROWS.4. SUBSCRIPT KEYS SWITCH TO FIXTURES CONTROLLED.5. NEMA TYPE 'ND' NON-FUSED UNLESS NOTED 'F' (FUSED). USE 'HD' 480 V.6. HEIGHT MEASURED TO TOP OF THE BOX FROM FINISH FLOOR.

NOTESMOUNTING

HEIGHTDESCRIPTIONSYMBOL

7. PROVIDE H.O.A. AND S.S. PUSHBUTTONS AS REQUIRED.8. DOUBLE ARROWS DENOTE A DOUBLE FACE UNIT.9. COORDINATE WITH MILLWORK SHOP DRAWINGS AND ELEVATIONS FOR HEIGHT.10. SUBSCRIPT DENOTES NEMA CONFIGURATION.11. HEIGHT MEASURED TO BOTTOM OF THE BOX FROM FINISH FLOOR.12. COORDINATE WITH DOOR HARDWARE SUPPLIER.

RECESSED WALLWASH DOWNLIGHT FIXTURE CEILING 1.

WIRELESS ACCESS POINT, ONE CABLE CEILING

FT FLIP-TOP BOX

TOMBSTONE RECEPTACLE

DIGITAL DAYLIGHT SENSOR CEILING

VASPIRATING SMOKE DETECTION SYSTEM CEILING MOUNT AS

PER. MFR.

UPPER OUTLETSWITCH CONTROLLEDDUPLEX RECEPTACLE 9. 11.AS NOTED

+16" OR

SIMPLEX RECEPTACLE 9. 11.AS NOTED+16" OR

ISOLATED GROUND RECEPTACLEIG 2. 9.AS NOTED+16" OR

DATA OUTLET, ONE CABLE 9. 11.AS NOTED

DATA OUTLET, TWO CABLES 9. 11.AS NOTED+16" OR

DATA OUTLET, THREE CABLES 9. 11.+16" OR

PT POKE THRU - SEE SCHEDULE FLOOR

9.

MAGNETIC STARTER +5'-0" 7.

CHIME +7'-6"

E FIRE ALARM SIGNAL SPEAKER/STROBE 6.

K FIRE ALARM SPEAKER ONLY 6.

G GLASS BREAK DETECTOR CEILING

+16" OR

AS NOTED

DEMOLITION NOTES

3.

1.

2.

6.

4.

5.

9.

7.

8.

COORDINATE ALL NEW ELECTRICAL EQUIPMENT REQUIREMENTS AND MAKE CONNECTION TOEXISTING SYSTEMS. THIS INCLUDES LIGHTING, POWER, SIGNAL, RACEWAY AND OTHERSYSTEMS INCLUDED UNDER DIVISION 26 (16).

RELOCATE, REWIRE AND/OR RECONNECT EXISTING ELECTRICAL DEVICES AND/OR EQUIPMENTTHAT FOR ANY REASON OBSTRUCTS CONSTRUCTION.

CONCEAL ALL RACEWAY AND WIRING IN EXISTING WALLS, CEILINGS, FLOORS, ETC. EXCEPTWHERE THE USE OF SURFACE METAL RACEWAYS (E.G. WIRE MOLD) IS INDICATED ONDRAWINGS OR IN SPEC.

LEAVE ALL EXISTING EQUIPMENT, IN PORTIONS OF THE BUILDING NOT BEING REMODELED, INWORKING CONDITION. RESTORE ALL INTERRUPTED BRANCH CIRCUITS, FEEDERS, ETC. TOWORKING CONDITION.

EXISTING RACEWAYS MAY BE REUSED (IN PLACE) WHERE POSSIBLE, AND WHERE INCOMPLIANCE WITH THE SPECIFICATIONS AND THE INTENT OF THE CONTRACT DOCUMENTS.INSURE INTEGRITY OF EXISTING RACEWAY BEFORE REUSE.

REMOVE ALL RACEWAYS, CONDUCTORS, BOXES, DEVICES, EQUIPMENT, ETC. THAT ARE NOTTO BE REUSED.

REMOVE EXISTING LIGHT FIXTURES WHICH ARE NOT TO BE REUSED, PLACE IN CARTON,LABEL APPROPRIATELY, AND RETURN TO OWNER, OR PROPERLY DISPOSE OF FIXTURES THATTHE OWNER CHOOSES NOT TO KEEP.

DO NOT PENETRATE STRUCTURAL ELEMENTS OF FLOORS, WALLS, CEILINGS, ROOFS, ETC.

DISCONNECT AND RECONNECT ANY/ALL FIXTURES, DEVICES, EQUIPMENT, ETC. REQUIREDFOR PROPER COMPLETION OF THE WORK.

12.

EL ELECTRIC DOOR LOCK 12.

GROUND FAULT INTERRUPTER FOURPLEX RECEPTACLE 9. 11.AS NOTED+16" OR

MAXIMUM LENGTH

20 AMP MINIMUM BRANCH CIRCUIT CONDUCTOR SIZING

BRANCH CIRCUIT VOLTAGE

CONDUCTOR LENGTH (FT) 120 VOLT 277 VOLT

<70 MIN. #12 AWG

70 - 115

115 - 170

170 - 270

271 - 380

>380

MIN. #12 AWG

MIN. #10 AWG MIN. #12 AWG

MIN. #8 AWG MIN. #10 AWG

MIN. #6 AWG MIN. #8 AWG

NOTE B MIN. #8 AWG

NOTE B NOTE B

A. THESE ARE BASED ON MAXIMUM LENGTH OF CIRCUIT.

B. PERFORM VOLTAGE DROP CALCULATIONS AND PROVIDE CONDUCTOR SIZE TO KEEPBRANCH CIRCUIT VOLTAGE DROP LESS THAN 3% WITH A 15 AMP LOAD.

C. CONTRACTOR SHALL ENSURE THAT THE INSTALLATION OF EACH BRANCH CIRCUITSTAYS WITHIN 3% VOLTAGE DROP FOR A 15 AMP LOAD. IF NECESSARY,CONTRACTOR SHALL INCREASE WIRE AND CONDUIT SIZE TO MEET THE STANDARD ATNO ADDITIONAL COST TO OWNER.

R ACCESS CONTROL SYSTEM, REQUEST TO EXIT

K SECURITY SYSTEM KEYPAD +4'-0" 2.

POWER POLE

RCDIGITAL ROOM CONTROLLER (SUBSCRIPT INDICATES NUMBER OF RELAYS) CEILING

SEE DIAGRAM, SPEC.X

CONDUIT/CIRCUIT CONTINUATION

.

TVSS PROTECTED RECEPTACLE 9. 11.AS NOTED+16" OR

DATA OUTLET, W/MORE THAN (3) CABLES 9. 11.+16" OR

AS NOTEDX

CORD REEL SEE DIAGRAM

H CONCEALED FIRE ALARM SIGNAL HORN/STROBE

E CONCEALED FIRE ALARM SIGNAL SPEAKER/STROBE

S CONCEALED FIRE ALARM SIGNAL STROBE 6.CEILING

SCSMOKE/CARBON MONOXIDE DETECTOR

CCARBON MONOXIDE DETECTOR

CEILING

CEILING

BR ACCESS CONTROL BIOMETRIC READER +4'-0" 2.

TW TWO-WAY COMMUNICATION SYSTEM CALL STATION

TWZTWO-WAY COMMUNICATION SYSTEM ANNUNCIATOR

DUPLEX RECEPTACLE WITH USB OUTLET 9. 11.AS NOTEDU+16" OR

SIMPLEX RECEPTACLE WITH USB OUTLET 9. 11.AS NOTED+16" OR

U

GROUND BUS BAR

+4'-0"

+4'-0" 11.

2.PANEL

SUBSCIPT A=ANALOG, D = DIGITAL

9. 11.AS NOTED+16" OR

CONTROLLED RECEPTACLE

RECEPTACLE SWITCH PACK CEILINGR

B BLUE ALARM SIGNAL STROBE WITHBLUE COLORED LENS (CO VISUAL ALARM) +8'-0"

CEILING/ MOUNT AS PER. MFR.

EPABOVE

CEILINGSEE DIAGRAM, SPEC.

EMERGENCY LIGHTING CONTROL UNIT

+8'-0"

S CONCEALED FIRE ALARM SIGNAL STROBE WALL 6.+8'-0"

CLG

+8'-0"FIRE ALARM STROBE

ECONCEALED FIRE ALARM SIGNAL SPEAKER/STROBE WALL

6.+8'-0"

CLG CEILING

+8'-0"

H 6.+8'-0"CONCEALED FIRE ALARM SIGNAL HORN/STROBE WALL

CLG CEILING

6.+8'-0"FIRE ALARM SIGNAL HORN/STROBE

X

2., SEE DIAGRAM, SPEC.

F FLOOR BOX - SEE SCHEDULE FLOORSEE DIAGRAM, SPEC.SEE DIAGRAM, SPEC.

SEE DIAGRAM, SPEC.

DEVICE/EQUIPMENT (TEXT DESIGNATES TYPE) SEE SCHEDULE

09/28/2017

Page 27: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

2017 BNACONSULTING SA

LT L

AK

E

ST.G

EO

RG

E

BNA635 South State Street

Salt Lake City, Utah 84111

CONSULTING

P:801.532.2196F:801.532.2305

www.bnaconsulting.com

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/1

6/2

017 2

:44:5

3 P

ME

:\U

ser

File

s\R

evit 2

017\1

7072 R

am

pto

n E

lec v

17_abonill

aP

373E

.rvt

E002

SCHEDULES

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

LIGHTING SHOP DRAWING REQUIREMENTS

PRIOR APPROVAL REQUIREMENTS

BIDDING REQUIREMENTS

NOTE: NOT ALL ABBREVIATIONS WILL NECESSARILY BE USED.

LIGHT FIXTUREABBREVIATION SCHEDULE

LIGHT FIXTUREGENERAL NOTES

REFER TO SPECIFICATIONS 260500, 265100 & 265600 (16001, 16510 & 16551).

LINEAR LIGHTING MUST INCLUDE DETAILED DRAWINGS WITH SUPPORT DETAILS, STEM LOCATIONS AND HAVE ALL LENGTHS IDENTIFIED WITH STEM LOCATIONS.COLOR SAMPLES MUST BE INCLUDED IN FIRST SUBMITTAL.

CUT SHEETS MUST BE STAMPED WITH THE FACTORY REPRESENTATIVE'S COMPANY NAME.

VALUE ENGINEERING CONDUCTED WITHOUT THE DESIGN TEAM IE; ARCHITECT, OWNER, ENGINEER & LIGHTING CONSULTANT/DESIGNER WILL NOT BE ALLOWED, REVIEWED OR APPROVED.

PROVIDE A LIST OF SPARE PARTS & EQUIPMENT.

REFER TO THE ARCHITECTURAL REFLECTED CEILING PLANS FOR LOCATIONS OF LIGHT FIXTURES. BRING ALL DISCREPANCIES OF LOCATIONS AND QUANTITIES TO THE ATTENTION OF THE ARCHITECT AND ELECTRICAL ENGINEER PRIOR TO BIDDING.

REFER TO ARCHITECTURAL ELEVATIONS FOR MOUNTING HEIGHTS AND LOCATIONS OF LIGHT FIXTURES. BRING ALL DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT PRIOR TO BIDDING.

REFER TO THE SPECIFICATIONS FOR OTHER LIGHT FIXTURE, REQUIREMENTS AND ACCEPTABLE MANUFACTURERS.

REFER TO ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR LOUVER REQUIREMENTS AS REQUIRED.

CONFIRM AVAILABLE MOUNTING DEPTHS OF ALL LIGHT FIXTURES AND COMPARE WITH DEPTHS SHOWN ON SHOP DRAWINGS. BRING ALL POTENTIAL CONFLICT AREAS TO THE ATTENTION OF THE ARCHITECT AND ELECTRICAL ENGINEER PRIOR TO RELEASE.

PRIOR APPROVAL IS REQUIRED BEFORE BIDDING THIS PROJECT.

PRIOR APPROVALS SHALL BE SUBMITTED TO THE ELECTRICAL ENGINEER'S OFFICE AT LEAST (8) EIGHT WORKING DAYS BEFORE THE BID. PRIOR APPROVALS RECEIVED AFTER THIS TIME PERIOD SHALL BE REJECTED.

PRIOR APPROVALS SHALL BE SIGNED BY A PRINCIPAL OF THE SUBMITTING ORGANIZATION STATING THAT THEY HAVE PREPARED AND/OR REVIEWED THE SUBMITTAL AND THAT THE PRODUCTS PROPOSED ARE EQUIVALENT TO THOSE SPECIFIED. ANY EXCEPTIONS SHALL BE SO NOTED.

ITEMS THAT ARE SUBMITTED AND HAVE BEEN APPROVED WILL BE LISTED IN THE ADDENDUM(S). VERBAL APPROVAL WILL NOT BE GIVEN ON ANY ITEM.

IT IS NOT THE RESPONSIBILITY OF THE ELECTRICAL ENGINEER TO NOTIFY THE SUBMITTING PARTY OF ERRORS IN THE SUBMITTAL. NOTIFICATION OF ERRORS BY THE ELECTRICAL ENGINEER PRIOR TO ISSUANCE OF THE ADDENDUM(S) MAY NOT BE GIVEN.

PRIOR APPROVALS SHALL CONSIST OF TWO SETS OF CUT SHEETS DESCRIBING THE PRODUCTS BEING SUBMITTED AS EQUIVALENTS. FAXES ARE NOTACCEPTABLE. ALL SPECIFICATION INFORMATION SHALL BE CLEARLY MARKED, WITH NON-APPLICABLE INFORMATION CROSSED OUT. COMPLETE PHOTOMETRIC DATA SHALL BE PROVIDED. PRODUCTS WITHOUT PHOTOMETRIC DATA WILL NOT BE APPROVED.

SUPPLY POINT-BY-POINTS AS REQUIRED BY THE ELECTRICAL ENGINEER AND/OR LIGHTING DESIGNER.

SAMPLE FIXTURES MUST BE SUPPLIED WITH A CORD, PLUG AND 120V DRIVER.

BID ONLY PRODUCTS THAT ARE SPECIFIED OR APPROVED BY ADDENDUM.

PACKAGING OF LIGHT FIXTURES WITH OTHER SYSTEMS IS NOT ALLOWED.

WHEN ONLY ONE PRODUCT IS APPROVED FOR BIDDING, THE PRICE FOR THAT ITEM SHALL BE BROKEN OUT SEPARATELY WHEN SUBMITTING PRICING TO VARIOUS DISTRIBUTORS AND/OR CONTRACTORS.

WHEN A CONTRADICTION EXISTS BETWEEN A SPECIFIC MODEL NUMBER AND THE DESCRIPTION, THE DESCRIPTION SHALL GOVERN.4.

6.

5.

4.

2.

3.

1.

7.

8.

6.

5.

4.

3.

2.

1.

3.

2.

1.

MOD

SFBA

CFBA

WALL@CLG

CCBA

SCBA

A.F.F.

MODIFY STANDARD LIGHT FIXTURE AS INDICATED

STANDARD FINISH AS SELECTED BY THE ARCHITECT

CUSTOM FINISH AS SELECTED BY THE ARCHITECT

STANDARD PAINTED COLOR AS SELECTED BY THE ARCHITECT

CUSTOM PAINTED COLOR AS SELECTED BY THE ARCHITECT

WALL MOUNT AT CORNER OF WALL AND CEILING

ABOVE FINISH FLOOR

5.

3.

4.

2.

1.

FIXTURE SCHEDULE

TYPE DESCRIPTION MFR. CATALOG NUMBER VOLTSTOTALWATTS LAMP

A HIGH PERFORMANCE 4" LINEAR LED LUMINARE WITH HIGH LIGHTOUTPUT, 80 CRI, 3500K, BOTTOM DIFFUSER, SINGLE CIRCUIT 277

VOLT, FOR 1" T-BAR CIELING

FINELITE HP-4 D-4'-H-8-35-BG-277-FM-SC-C1 277 V 2880 LUMEN LED,3500 K, 80+CRI

B HIGH PERFORMANCE 4" LINEAR LED LUMINARE WITH HIGH LIGHTOUTPUT, 80 CRI, 3500K, BOTTOM DIFFUSER, SINGLE CIRCUIT 120

VOLT, FOR 1" T-BAR AND GYPSUB BOARD CIELING

FINELITE HP-4 D-4'-H-8-35-BG-120-FM-SC-C1 120 V 28.4 2880 LUMEN LED,3500 K, 80+CRI

C 2'X4' HIGH PERFORMANCELED LAY-IN FIXTURE, 3500 K, HIGH LUMEN,DUAL VOLTAGE (120/277), 0-10VOLT DIMMING

COLUMBIA LCAT-24-35-HL-G-R-ED 277 V 20 2642 LUMEN LED,3500 K, 80+CRI

D 2'X4' HIGH PERFORMANCELED LAY-IN EMERGENCY FIXTURE, 3500 K,HIGH LUMEN, DUAL VOLTAGE (120/277), 0-10VOLT DIMMING, 1400

LUMEN BATTERY PACK

COLUMBIA LCAT-24-35-HL-G-R-ED-ELL14 277 V 20 2642 LUMEN LED,3500 K, 80+CRI

E EDGE-LIT LONG LIFE RECESSED MOUNT, ENERGY EFFICIENT, DUALVOLTAGE, ANODIZED ALUMINUM UNIVERSAL CHEVRON LED EXIT

LIGHT

EATON EU-R-70-1G 277 V 4.5 MAX 70 LED LAMPS

NOTES:

1. NON-FUSED DISCONNECT SWITCH A. FURNISHED, INSTALLED, AND CONNECTED UNDER DIVISION 26(16).

2. FUSED DISCONNECT SWITCH B. FURNISHED AND INSTALLED UNDER ANOTHER DIVISION REQUIRING

3. BREAKER IN ENCLOSURE CONNECTION UNDER DIVISION 26(16).

4. MANUAL STARTER W/THERMAL OVERLOAD C. FURNISHED UNDER ANOTHER DIVISION BUT INSTALLED AND

5. MAGNETIC STARTER CONNECTED UNDER DIVISION 26(16).

6. MAGNETIC STARTER/NON-FUSED DISCONNECT COMBINATION D. FURNISHED, INSTALLED AND CONNECTED UNDER ANOTHER DIVISION.

7. MAGNETIC STARTER/FUSED DISCONNECT COMBINATION

8. MAGNETIC STARTER/BREAKER COMBINATION CB = CIRCUIT BREAKER - THERMAL MAGNETIC9. VARIABLE FREQUENCY DRIVE CKW = CHILLER KILOWATTS

10. REDUCED VOLTAGE STARTER

11. DIRECT CONNECTION

12. RECEPTACLE/SPECIAL PURPOSE OUTLET/ETC. NOTE 1: PER 250.122(A), EQUIPMENT GROUND IS NOT REQUIRED TO BE13. TWO-SPEED STARTER, COORDINATE W/MOTOR TYPE LARGER THAN PHASE CONDUCTOR.

14. SOLID STATE SOFT STARTER

EQUIPMENT SCHEDULE

UNIT # DESCRIPTION

LOAD

VOLT

PH

AS

E

FU

LL

LO

AD

AM

PS

CO

ND

UIT

S

IZE WIRES OCPD REFERENCE NOTES

HP

FL

A

MC

A

VA

SE

TS

QT

Y

SIZ

E

EQ

UIP

. G

ND

.

TY

PE

AM

PS

ST

AR

TE

R

DIS

CO

NN

EC

T

OT

HE

R

REMARKS

FC 1 FAN COIL 0.33 120 V 1 9.8 A 3/4" 1 2 12 12 CB 20 A

FC 2 FAN COIL 0.33 120 V 1 9.8 A 3/4" 1 2 12 12 CB 20 A

09/28/2017

Page 28: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

RC

RC

RC

RC

RC

RC

RC

RC

RC

RC

F G H I J K L M N O P

1

2

3

4

OFFICE131

OFFICE130

OFFICE135

CONFERENCEROOM

134

OFFICE136

OFFICE143

OFFICE144

OFFICE145

OFFICE147

OFFICE146

SERVER RM140

SECURE ROOM139

??

VICTIMSADVOCATE

OFFICE105

OFFICE106

OFFICE107

OFFICE108

OFFICE110

EVIDENCESTORAGE

114

SECURECORRIDOR

115

WAR ROOM121

SECUREINTERVIEW

118

TOILET120

FORENSICROOM

119

SECUREINTERVIEW

117

HOLDING116

OFFICE125

OFFICE124

OFFICE122

OFFICE123

OFFICE129

OFFICE128

OFFICE137

BREAK ROOM148

EVIDENCETECH OFFICE

113

EVIDENCEPROCESSING

OFFICE112

ELECT.104

OPEN OFFICE138

OFFICE109

CONTROLROOM

142STORAGE141

STAIR CC

STAIR AA

STORAGE132

WAITING101

RECORDS111

STAIR BB

OPEN OFFICE127

L2A-1L2A-5

L2A-5L2A-1

L2A-1

L2A-5

EMCL-13 EMCL-13

1 1

11

1

1

1

1 1

1

1

1

1

2

2

2

2

L2A-3

L2A-3

L2A-3

L2A-1

L2A-1

EMCL-13

EMCL-13

EMCL-13

'EMCL'

'L2A'

'P2A'

'P2B'

UPS-10

L2A-3

L2A-1

'UPS'

A

A

A

A

A

A

A A A A

B

B

B

B

B

B

B

B

B

BB

B BA A A A A A

C

C

C

C

D D

D

D D

A

A

AA

A

A

A

A

AAAAA

A

A

D

D

D

D

C

C

C

C

DD

DC D

B

B

B

E

E

E

EE

EE

E

RC2

RC2 RC2

RC2

RC2

RC2

RC2

RC2

RC2

RC2

RC2

RC2

RC2

D

2017 BNACONSULTING SA

LT L

AK

E

ST.G

EO

RG

E

BNA635 South State Street

Salt Lake City, Utah 84111

CONSULTING

P:801.532.2196F:801.532.2305

www.bnaconsulting.com

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/1

6/2

017 2

:44:5

4 P

ME

:\U

ser

File

s\R

evit 2

017\1

7072 R

am

pto

n E

lec v

17_abonill

aP

373E

.rvt

E201

LEVEl 2

LIGHTING PLAN

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUSSCALE = 1/8" = 1'-0"

Level 2 Lighting Plan

SHEET KEYNOTES

1 DIM EMERGENCY LIGHTING WITH SURROUNDING LIGHTING. UPON POWER FAILURE, EMERGENCY LIGHTING TO TURN TO FULL BRIGHTNESS

EXISTING LIGHT FIXTURES TO REMAIN.2

GENERAL NOTESPROVIDE UNSWITCHED HOT TO ALL EXIT SIGNS.1.

SENSOR GENERAL NOTESTHE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE SENSOR MANUFACTURER FOR PROPER PLACEMENT AND ADJUSTMENT OF OCCUPANCY SENSORS.

EACH ZONE SHALL HAVE COVERAGE BY OCCUPANCY SENSOR SUCH THAT NO BLIND SPOT EXIST.

UPON COMPLETION OF THE INSTALLATION, THE SYSTEM SHALL BE COMPLETELY COMMISSIONED BY THE MANUFACTURER'S FACTORY AUTHORIZED TECHNICIAN WHO WILL VERIFY ALL ADJUSTMENTS AND SENSOR PLACEMENT TO ENSURE A TROUBLE FREE INSTALLATION.

THE LOCATION AND QUANTITIES OF SENSORS SHOWN ON THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE ONLY THE ROOMS WHICH ARE TO BE PROVIDED WITH SENSORS. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ADDITIONAL SENSORS IF REQUIRED TO PROPERLY COVER THE RESPECTIVE ROOM.

4.

2.

1.

3.

09/28/2017

Page 29: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

PTPT

PT

PT

JJJJ

JJJJ

JJ

JJ

J

J

T

T

F G H I J K L M N O P

1

2

3

4

OFFICE131

OFFICE130

OFFICE135

CONFERENCEROOM

134

OFFICE136

OFFICE143

OFFICE144

OFFICE145

OFFICE147

OFFICE146

SERVER RM140

SECURE ROOM139

COMM RM149

VICTIMSADVOCATE

OFFICE105

OFFICE106

OFFICE107

OFFICE108

OFFICE110

EVIDENCESTORAGE

114

SECURECORRIDOR

115

WAR ROOM121

SECUREINTERVIEW

118

TOILET120

FORENSICROOM

119

SECUREINTERVIEW

117

HOLDING116

OFFICE125

OFFICE124

OFFICE122

OFFICE123

OFFICE129

OFFICE128

OFFICE137

BREAK ROOM148

EVIDENCETECH OFFICE

113EVIDENCE

PROCESSINGOFFICE

112

ELECT.104

OPEN OFFICE138

OFFICE109

'P2B'

'L2A'+60" +60"

+60"+60"+60"

+60" +60"

+60"

CONTROLROOM

142STORAGE

141

+96"+60" A

A

A

A

WAITING101

RECORDS111

STAIR BB

W

'P2A'

'T2'(HUNG ABOVE)

STAIR CC

STAIR AA

STORAGE132

OPEN OFFICE127

(E)

(E)

(E)

(E)

+60"

A

A

1

P2A-1

P2A-1

P2A-1

P2A-3

P2A-3

P2A-3

P2A-4P2A-4

P2A-11

P2A-11

P2A-9

P2A-9

P2A-9P2A-7P2A-7

P2A-7

P2A-5

P2A-5

P2A-5

P2A-11

P2A-4

P2A-13

P2A-13

P2A-15

P2A-15

P2A-15

P2A-15

P2A-17P2A-17

P2A-19

P2A-19

P2A-19

P2A-19

P2A-19

P2B-1

P2B-1

P2B-1 P2B-3P2B-3

P2B-3

P2B-5

P2B-5

P2B-5 P2B-7P2B-7

P2B-7

P2B-9P2B-9

P2B-9

P2B-11

P2B-11

P2B-11

EMCL-1

EMCL-1

EMCL-1EMCL-1

P2B-15 P2B-15 P2B-15

P2B-15

P2A-21

P2A-21P2A-21 P2A-23

P2A-23

P2A-23P2A-25

P2A-25

P2A-25

P2A-29

P2A-29P2A-29

P2A-27

P2A-27

P2A-27

P2A-6

P2A-6

P2A-6

P2A-8

P2A-8

P2A-8

P2A-10,12,14 P2A-16

P2A-2

P2A-4

P2B-17P2B-17

P2B-17 P2B-19

P2B-19

P2B-19 P2B-21

P2B-21

P2B-21 P2B-23

P2B-23

P2B-23

P2B-25

P2B-25P2B-25

P2B-25

P2B-25

P2B-27,29

P2B-6P2B-8

P2A-18

P2A-20 P2A-20 P2A-20 P2A-20

P2A-22

P2A-24P2A-24

P2A-22 P2A-22

P2A-28P2A-26

P2A-26

P2B-2 P2B-4

'EMCL' (E)

EMCL-3

EMCL-3

EMCL-7EMCL-7

EMCL-7

EMCL-5

EMCL-5

EMCL-7

P2B-13

P2B-13P2B-13

EMCL-9

EMCL-9 EMCL-11

EMCL-9

EMCL-11

UP

S-1

UP

S-3

UP

S-3

UPS-1UPS-25

UPS-21

UPS-21

UPS-19

UPS-19

UPS-15

UPS-15

UP

S-1

3

UP

S-1

3

UPS-9

UPS-9

UPS-7

UPS-7

P2A-27

2 2

2 2

2 2

2 2

2

3

'UPS'4

5

5

5

5

5 5

5

5

5

CLG

CLG

FC

1

P2B-20

FC

2 UPS-5

+48"+48"

6 6

7

7

7

8

8

7

7

P2A-21

P2A-21

P2A-23

P2A-23

P2A-3

P2A-3

P2A-1

P2A-1

P2A-11P2A-11

P2B-10,12P2B-14,16

P2B-18

2017 BNACONSULTING SA

LT L

AK

E

ST.G

EO

RG

E

BNA635 South State Street

Salt Lake City, Utah 84111

CONSULTING

P:801.532.2196F:801.532.2305

www.bnaconsulting.com

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/1

6/2

017 2

:44:5

5 P

ME

:\U

ser

File

s\R

evit 2

017\1

7072 R

am

pto

n E

lec v

17_abonill

aP

373E

.rvt

E301

LEVEL 2

POWER PLAN

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUSSCALE = 1/8" = 1'-0"

Level 2 Power Plan

SHEET KEYNOTES

1 DEVICES SHALL BE INSTALLED BEHIND WALL-MOUNTED MICROWAVE. COORDINATE WITH FURNITURE PEOPLE PRIOR TO ROUGH-IN

PROVIDE CONNECTION TO SYSTEMS FURNITURE.

EXISTING DATA RACK TO REMAIN.

PROVIDE 120/240 SINGLE PHASE PANEL TO CIRCUIT TO UPS

PROVIDE (3) CAT-6 CABLES TO EACH CUBICLE SPACE

PROVIDE A TWO PORT DATA KEYSTONE WALL PLATE. LEAVE (1) PORT BLANK FOR FUTURE EXPANSION AND PROVIDE (1) CATEGORY CABLE BACK TO COMM RM 149.

PROVIDE A BLANK KEYSTONE WALL PLATE WITH A 3/4" CONDUIT STUBBED UP TO ACCESSIBLE CEILING FOR FUTURE VIDEO WALL EXPANSION.

PROVIDE A 3/4" CONDUIT STUBBED UP TO ACCESSIBLE CEILING. RUN CATEGORY CABLE BACK TO CONTROL ROOM 142

2

3

4

5

GENERAL NOTESFOR VAV POWER, PROVIDE A DEDICATED 20A CIRCUIT FROM THE EQUIPMENT BRANCH FOR EVERY 3,000 SQ. FT. COORDINATE EXACT LOCATION OF JUNCTION BOX WITH MECHANICAL CONTRACTOR PRIOR TO ROUGH-IN. PROVIDE CIRCUIT FROM NEAREST 120V EQUIPMENT BRANCH PANEL.

1.

6

7

8

09/28/2017

Page 30: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

REF.

REF.

CR

CR

CR

CR

CR

CR

H15cd

S15cd

S15

cd

S15

cd

H75

cdH

15cdH

15cd

H15

cd

H15

cd

S

15cd

H75

cd

H75cd

H15cd

H15cd

H75

cd

S15cd

H15

cd

H15

cd

H15cd

H15

cd

H75cd

H

H75cd

CR

S

CR

CR

CR

F G H I J K L M N O P

1

2

3

4

OFFICE131

OFFICE130

OFFICE135

CONFERENCEROOM

134

OFFICE136

OFFICE143

OFFICE144

OFFICE145

OFFICE147

OFFICE146

SERVER RM140

SECURE ROOM139

??

VICTIMSADVOCATE

OFFICE105

OFFICE106

OFFICE107

OFFICE108

OFFICE110

EVIDENCESTORAGE

114

SECURECORRIDOR

115

WAR ROOM121

SECUREINTERVIEW

118TOILET

120

FORENSICROOM

119

SECUREINTERVIEW

117

HOLDING116

OFFICE125

OFFICE124

OFFICE122

OFFICE123

OFFICE129

OFFICE128OFFICE

137

BREAK ROOM148

EVIDENCETECH OFFICE

113EVIDENCEPROCESSING

OFFICE112

ELECT.104

OPEN OFFICE138

OFFICE109

STORAGE132

WAITING101CONTROL

ROOM142

STORAGE141

STAIR CC

RECORDS111

STAIR BB

+8'-0"

+8'-0"

1

1

2017 BNACONSULTING SA

LT L

AK

E

ST.G

EO

RG

E

BNA635 South State Street

Salt Lake City, Utah 84111

CONSULTING

P:801.532.2196F:801.532.2305

www.bnaconsulting.com

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/1

6/2

017 2

:44:5

6 P

ME

:\U

ser

File

s\R

evit 2

017\1

7072 R

am

pto

n E

lec v

17_abonill

aP

373E

.rvt

E401

LEVEL 2

SYSTEMS PLAN

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

SCALE = 1/8" = 1'-0"

Level 2 Systems Plan

SHEET KEYNOTES

1 CAMERAS WILL BE PROVIDED BY THE OWNER. COORDINATE WITH OWNER PRIOR TO ROUGH-IN.

GENERAL NOTESWHEREVER A CARD READER IS SHOWN, PROVIDE A 3/4" CONDUIT STUBBED UP TO ACCESSIBLE CEILING SPACE.

1.

09/28/2017

Page 31: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

2017 BNACONSULTING SA

LT L

AK

E

ST.G

EO

RG

E

BNA635 South State Street

Salt Lake City, Utah 84111

CONSULTING

P:801.532.2196F:801.532.2305

www.bnaconsulting.com

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/1

6/2

017 2

:44:5

7 P

ME

:\U

ser

File

s\R

evit 2

017\1

7072 R

am

pto

n E

lec v

17_abonill

aP

373E

.rvt

E601

PANELBOARD

SCHEDULES

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

AIC RATING AMPS RMS SYSM.

Legend: 41 A 45 A 36 A AMPS/PHASE 14440 VA

4860 5260 4320 TOTAL (VA) CONNECTED LOAD TOTAL

SPARE 20 A 1 -- 41 0 VA 0 VA 42 -- 1 20 A SPARE

SPARE 20 A 1 -- 39 0 VA 0 VA 40 -- 1 20 A SPARE

SPARE 20 A 1 -- 37 0 VA 0 VA 38 -- 1 20 A SPARE

SPARE 20 A 1 -- 35 0 VA 0 VA 36 -- 1 20 A SPARE

SPARE 20 A 1 -- 33 0 VA 0 VA 34 -- 1 20 A SPARE

SPARE 20 A 1 -- 31 0 VA 0 VA 32 -- 1 20 A SPARE

RECEPTACLE OFFICE 128 20 A 1 29 540 VA 30

RECEPTACLE OFFICE 129 20 A 1 27 720 VA 200 VA 28 1 20 A RECEPTACLE CONFERENCE...

RECEPTACLE OFFICE 135 20 A 1 25 540 VA 360 VA 26 1 20 A RECEPTACLE CONFERENCE...

RECEPTACLE OFFICE 136 20 A 1 23 900 VA 360 VA 24 1 20 A RECEPTACLE SHARED...

RECEPTACLE OFFICE 137 20 A 1 21 900 VA 560 VA 22 1 20 A RECEPTACLE SHARED...

RECEPTACLE Room 127, 132,... 20 A 1 19 900 VA 720 VA 20 1 20 A RECEPTACLE SHARED...

RECEPTACLE BREAK ROOM... 20 A 1 17 360 VA 180 VA 18 1 20 A RECEPTACLE IT ROOM 142

RECEPTACLE BREAK ROOM... 20 A 1 15 720 VA 0 VA 16 1 20 A POWER OPEN OFFICE 138

RECEPTACLE BREAK ROOM... 20 A 1 13 360 VA 0 VA 14 1 20 A POWER OPEN OFFICE 138

RECEPTACLE Room 138, C,... 20 A 1 11 900 VA 0 VA 12 1 20 A POWER OPEN OFFICE 138

RECEPTACLE OFFICE 147 20 A 1 9 540 VA 0 VA 10 1 20 A POWER OPEN OFFICE 138

RECEPTACLE OFFICE 146 20 A 1 7 540 VA 540 VA 8 1 20 A RECEPTACLE OFFICE 131

RECEPTACLE OFFICE 145 20 A 1 5 540 VA 540 VA 6 1 20 A RECEPTACLE OFFICE 130

RECEPTACLE OFFICE 144 20 A 1 3 900 VA 720 VA 4 1 20 A RECEPTACLE OPEN OFFICE 138

RECEPTACLE Office 144 20 A 1 1 900 VA 0 VA 2 1 20 A POWER OPEN OFFICE 138

ITEM AMPS POLEWIRESIZE

CIR.NO. A B C A B C

CIR.NO.

WIRESIZE POLE AMPS ITEM

BRANCH BREAKERS

SPD

200% NEUTRAL

AMP: 225 A ISO GROUND

FED FROM: SUBFEED LUGS

MOUNTING: SURFACE LOCATION: ELECT.-1 104-1 MAINS: MLO

PANEL: P2A TYPE: NQOD VOLTS: 120/208 Wye PHASE: 3 WIRES: 4

PANELBOARD SCHEDULE

AIC RATING AMPS RMS SYSM.

Legend: 36 A 20 A 18 A AMPS/PHASE 8736 VA

4236 2340 2160 TOTAL (VA) CONNECTED LOAD TOTAL

SPARE 20 A 1 -- 41 0 VA 0 VA 42 -- 1 20 A SPARE

SPARE 20 A 1 -- 39 0 VA 0 VA 40 -- 1 20 A SPARE

SPARE 20 A 1 -- 37 0 VA 0 VA 38 -- 1 20 A SPARE

SPARE 20 A 1 -- 35 0 VA 0 VA 36 -- 1 20 A SPARE

SPARE 20 A 1 -- 33 0 VA 0 VA 34 -- 1 20 A SPARE

SPARE 20 A 1 -- 31 0 VA 0 VA 32 -- 1 20 A SPARE

POWER OPEN OFFICE 127 20 A 1 29 0 VA 30

POWER OPEN OFFICE 127 20 A 1 27 0 VA 28

RECEPTACLE Room 138, 127 20 A 1 12 25 900 VA 26

RECEPTACLE OFFICE 122 20 A 1 12 23 540 VA 24

RECEPTACLE OFFICE 123 20 A 1 12 21 540 VA 22

RECEPTACLE OFFICE 124 20 A 1 12 19 540 VA 1176 VA 20 12 1 20 A FAN COIL - COMM ROOM

RECEPTACLE OFFICE 125 20 A 1 12 17 540 VA 0 VA 18 1 20 A POWER OPEN OFFICE 127

RECEPTACLE OPEN OFFICE... 20 A 1 12 15 720 VA 0 VA 16 1 20 A POWER OPEN OFFICE 127

RECEPTACLE OPEN OFFICE... 20 A 1 12 13 540 VA 0 VA 14 1 20 A POWER OPEN OFFICE 127

RECEPTACLE OFFICE 110 20 A 1 12 11 540 VA 0 VA 12 1 20 A POWER OPEN OFFICE 127

RECEPTACLE OFFICE 109 20 A 1 12 9 540 VA 0 VA 10 1 20 A POWER OPEN OFFICE 127

RECEPTACLE OFFICE 108 20 A 1 12 7 540 VA 0 VA 8 1 20 A POWER OPEN OFFICE 127

RECEPTACLE OFFICE 107 20 A 1 12 5 540 VA 0 VA 6 1 20 A POWER OPEN OFFICE 127

RECEPTACLE OFFICE 106 20 A 1 12 3 540 VA 0 VA 4 1 20 A POWER

RECEPTACLE VICTIMS... 20 A 1 12 1 540 VA 0 VA 2 1 20 A POWER

ITEM AMPS POLEWIRESIZE

CIR.NO. A B C A B C

CIR.NO.

WIRESIZE POLE AMPS ITEM

BRANCH BREAKERS

SPD

200% NEUTRAL

AMP: 225 A ISO GROUND

FED FROM: SUBFEED LUGS

MOUNTING: SURFACE LOCATION: ELECT.-1 104-1 MAINS: MLO

PANEL: P2B TYPE: NQOD VOLTS: 120/208 Wye PHASE: 3 WIRES: 4

PANELBOARD SCHEDULE

AIC RATING AMPS RMS SYSM.

Legend: 0 A 0 A 0 A AMPS/PHASE 0 VA

0 0 0 TOTAL (VA) CONNECTED LOAD TOTAL

41 42

39 40

37 38

35 36

33 34

31 32

29 30

27 28

25 26

23 24

21 22

19 20

17 18

15 16

13 14

11 12

9 10

7 8

LIGHTING 20 A 1 5 0 VA 6

LIGHTING 20 A 1 3 0 VA 4

LIGHTING 20 A 1 1 0 VA 2

ITEM AMPS POLEWIRESIZE

CIR.NO. A B C A B C

CIR.NO.

WIRESIZE POLE AMPS ITEM

BRANCH BREAKERS

SPD

200% NEUTRAL

AMP: 100 A ISO GROUND

FED FROM: SUBFEED LUGS

MOUNTING: SURFACE LOCATION: ELECT.-1 104-1 MAINS: MLO

PANEL: L2A TYPE: NF VOLTS: 480/277 Wye PHASE: 3 WIRES: 4

PANELBOARD SCHEDULE

AIC RATING AMPS RMS SYSM.

Legend: 26 A 20 A 16 A AMPS/PHASE 7296 VA

3060 2340 1896 TOTAL (VA) CONNECTED LOAD TOTAL

SPARE 20 A 1 -- 41 0 VA 0 VA 42 -- 1 20 A SPARE

SPARE 20 A 1 -- 39 0 VA 0 VA 40 -- 1 20 A SPARE

SPARE 20 A 1 -- 37 0 VA 0 VA 38 -- 1 20 A SPARE

SPARE 20 A 1 -- 35 0 VA 0 VA 36 -- 1 20 A SPARE

SPARE 20 A 1 -- 33 0 VA 0 VA 34 -- 1 20 A SPARE

SPARE 20 A 1 -- 31 0 VA 0 VA 32 -- 1 20 A SPARE

29 1176 VA 30 -- -- -- --

27 1440 VA 28 -- -- -- --

25 1620 VA 26 3 20 A UPS

23 24

21 22

19 20

17 18

15 16

LIGHTING 20 A 1 13 0 VA 14

RECEPTACLE WAR ROOM 121 20 A 1 11 360 VA 12

RECEPTACLE WAR ROOM 121 20 A 1 9 540 VA 10

RECEPTACLE Room 119, 117,... 20 A 1 7 720 VA 8

RECEPTACLE Room 120, 116 20 A 1 5 360 VA 6

RECEPTACLE Room 114, B, 115 20 A 1 3 360 VA 4

RECEPTACLE Room 113, 112,... 20 A 1 1 720 VA 2

ITEM AMPS POLEWIRESIZE

CIR.NO. A B C A B C

CIR.NO.

WIRESIZE POLE AMPS ITEM

BRANCH BREAKERS

SPD

200% NEUTRAL

AMP: 225 A ISO GROUND

FED FROM: SUBFEED LUGS

MOUNTING: SURFACE LOCATION: ELECT.-1 104-1 MAINS: MLO

PANEL: EMCL TYPE: NQOD VOLTS: 120/208 Wye PHASE: 3 WIRES: 4

PANELBOARD SCHEDULE

Legend:

TOTAL AMPS: 12 A

TOTAL CONN. LOAD: 4236 VA

10 LIGHTING 1 20 A 0 VA

9

8

7

6

5

4

3

2

1 UPS 3 20 A 4236 VA

CKT CIRCUIT DESCRIPTION # OF... AMPS LOAD REMARKS

Enclosure: SPD:

Mounting: Wires: 4 Mains Rating:

Supply From: EMCL Phases: 3 Mains Type:

Location: SERVER RM 140 Volts: 120/208 Wye A.I.C. Rating:

Switchboard: UPS

SWITCHBOARD SCHEDULE

AIC RATING AMPS RMS SYSM.

Legend: 14 A 12 A 10 A AMPS/PHASE 4236 VA

1620 1440 1176 TOTAL (VA) CONNECTED LOAD TOTAL

29 30

27 28

RECEPTACLE SECURE ROO... 20 A 1 25 180 VA 26

23 24

RECEPTACLE SECURE ROO... 20 A 1 21 360 VA 22

RECEPTACLE SECURE ROO... 20 A 1 19 360 VA 20

17 18

RECEPTACLE SECURE ROO... 20 A 1 15 360 VA 16

RECEPTACLE SECURE ROO... 20 A 1 13 360 VA 14

11 12

RECEPTACLE SECURE ROO... 20 A 1 9 360 VA 10

RECEPTACLE SECURE ROO... 20 A 1 7 360 VA 8

FAN COIL - SECURE ROOM 20 A 1 12 5 1176 VA 6

RECEPTACLE SERVER RM 140 20 A 1 3 360 VA 4

RECEPTACLE SERVER RM 140 20 A 1 1 360 VA 2

ITEM AMPS POLEWIRESIZE

CIR.NO. A B C A B C

CIR.NO.

WIRESIZE POLE AMPS ITEM

BRANCH BREAKERS

SPD

200% NEUTRAL

AMP: 225 A ISO GROUND

FED FROM: UPS SUBFEED LUGS

MOUNTING: SURFACE LOCATION: SERVER RM 140 MAINS: MLO

PANEL: UPS TYPE: NQOD VOLTS: 120/208 Wye PHASE: 3 WIRES: 4

PANELBOARD SCHEDULE

09/28/2017

Page 32: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

A001 TYP. RECESSED FIXTURE MOUNTINGDIAGRAM

NTS

RECESSED TROFFER

LAY-IN CEILING

FIXTURE CLAMP. PROVIDE ONE PERSIDE PER FIXTURE.

#12 GA. WIRE HANGER AT EACHCORNER OF FIXTURE (TYP.)INDEPENDENT OF CEILING SUPPORTSYSTEM.

H001 TYPICAL TRAPEZE CONDUIT RACK

NTS

DIAGRAM

UNISTRUT CHANNEL - SIZEAS REQUIRED BY WEIGHT

SUPPORTED RACEWAY 3/4" TO 6" (TYP.)

ALL THREAD ROD-SIZE ASREQUIRED(MIN. 3/8")

BEAM CLAMP, HANGERCLAMP OR APPROVED

SUPPORT, AS REQUIRED BYWEIGHT SUPPORTED

STRUCTURAL UNIT(BEAM, JOIST, SLAB, ETC.) DO

NOT SUPPORT FROMBOTTOM CORD OF STEEL

TRUSSES.

SIZE AS REQUIRED

WIRE SHALL NOT BE USED AS ACOMPONENT OF ANY RACEWAYHANGER SYSTEM.DO NOT SUPPORT ANY RACEWAYLARGER THAN 1" FROM BOTTOMCORD OF STEEL TRUSSES.

NOTE:

H003 TYPICAL RACEWAY SUPPORT METHODS

NTS

DIAGRAM

STRUCTURAL UNIT

RACEWAY - 3/4" THRU 1"RACEWAY - 3/4" THRU 1"

STRUCTURAL UNIT

BEAM CLAMPS ORHANGER CLAMPS AS

REQUIRED BY WEIGHTSUPPORTED

CONDUIT HANGER

BEAM CLAMPS ORHANGER CLAMPS AS

REQUIRED BY WEIGHTSUPPORTED

RACEWAY - 3/4" THRU 6"

ALL THREAD - SIZE ASREQUIRED (3/8" MINIMUM)

S

R001 DEVICE MOUNTING HEIGHTS

NTS

DIAGRAM

IC

FLOOR LINE

16

" M

IN.

48

" M

AX

IMU

M

TYPICAL REFLECTED CEILING

HORN/STROBE

INSTALL SPEAKERS ANDSMOKE DETECTORS INSAME LAY-IN TILE

WHERE DEVICES ARE SHOWN INSAME WALL SPACE, ALIGNVERTICALLY AND HORIZONTALLYAS SHOWN. COORDINATE WITHARCHITECTURAL DRAWINGS &CABINETRY DRAWINGS

96"

TYPICAL WALL SECTION

J

VOLUMECONTROL

WALLPHONE

LIGHTSWITCH

OUTLET DATAOUTLET

FIRE ALARMPULL STATION

JUNCTION BOX

OUTLET

L008 MULTIPLE SERVICE FLOOR BOXDIAGRAM

NTS

COVER LID COVER FLANGE

FLOOR BOX AS SPECIFIED

THICKENED SLAB

CONCRETE FLOOR WITHVCT TILE

FLOOR BOX

COVER FLANGECOVER LID

1/8" SPACER

E016 SECURITY DOOR (MAG. LOCK 2)DIAGRAM

NTS

JUNCTION BOX MINI-POWER BOOSTERFURNISHED WITH DOORHARDWARE

POWER CIRCUIT. SEEPOWER PLANS

SCHEDULED CEILINGVERIFY WIRINGREQUIREMENTS WITH

HARDWARE INSTALLER

TO SMART TERMINALINTERFACE

TO FIRE ALARM CONTROLPANEL

POWER TRANSFER HINGEFRUNISED WITH DOOR

HARDWARE

NTS

TYPICAL ROUGH IN REQUIREMENTSDIAGRAM H004

6"

4

OUTLET BOXTYPICAL

12"

48"

16"

12"

6

5

(TYP.)

6

TYP. FOR WOOD AND METAL STUD ROUGH-IN.

PLASTER RINGS NOT SHOWN. COORDINATE RINGDEPTH TO BE FLUSH WITH FINAL FINISHED SURFACE

LOCATE ALL OUTLET BOXES IN ACCORDANCE WITH ARCH. AND MECH. DRAWINGS, AND WITHALL APPLICABLE SHOP DRAWINGS.

OUTLET BOXES ON OPPOSITE SIDES OF WALLS OR PARTITIONS IN THE SAME STUD SPACEMUST BE SEPARATED BY A MIN. OF 6" HORIZONTAL DISTANCE.

ELECTRICAL BOXES INSTALLED IN FIRE RESISTANT WALLS OR PARTITIONS SHALL COMPLYWITH IBC 714.3.2 (24" SEPARATION ON OPPOSITE SIDES OR WITH FIRE STOP PUTTY ON EACHBOX.)

INSULATED THROAT EMT CONNECTOR.

CADDY FASTENER, THROUGH STUD CABLE/CONDUIT SUPPORT 'FB12P'.

CADDY BOX MOUNTING BRACKET 'RBS16'.

4

3

2

1

NOTES:

(TYP.)

5

EMT

EMT

EMT

EMT

7

7

EMT

CL

LCADJUSTABLEBARHANGER(TYP.)

8

8

2017 BNACONSULTING SA

LT L

AK

E

ST.G

EO

RG

E

BNA635 South State Street

Salt Lake City, Utah 84111

CONSULTING

P:801.532.2196F:801.532.2305

www.bnaconsulting.com

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/1

6/2

017 2

:44:5

7 P

ME

:\U

ser

File

s\R

evit 2

017\1

7072 R

am

pto

n E

lec v

17_abonill

aP

373E

.rvt

E701

ELECTRICAL

DIAGRAMS

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

09/28/2017

Page 33: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

WALLSTATION 'RC1' CONFIGURATION

CONTROL SEQUENCE

WALLSTATION 'RC2' CONFIGURATION

CONTROL SEQUENCE

S001

S003

DIAGRAM

NTS

LAYOUTS & LIGHTING CONTROLS SEQUENCESRELAY CONTROL PANEL WALLSTATION

0-10V DIMMING, 1, 2, 3, EM RELAY, PLUG LOADDIAGRAM

NTS

TYPICAL ROOM CONTROLLER, DAYLIGHTING,

1

2

1

1

2

2

3

4

5

5 5

4

3

6

6

1

7

7

1. ALL PROGRAMING SHALL MEET THE REQUIREMENTS OF THE

IECC 2015 OR CURRENT ENERGY CODE APPLIED TO THE

PROJECT.

2. THE LIGHTING CONTROLS AS SHOWN ARE BASED UPON

EATON LIGHTING CONTROLS. PRIOR APPROVAL IS

REQUIRED BEFORE BIDDING THIS PROJECT. SEE PRIOR

APPROVAL NOTES.

3. COORDINATE ALL INSTALLATION REQUIREMENTS,

CONNECTIONS AND CABLE TYPE WITH THE SUPPLIER PRIOR

TO ANY INSTALLATION.

4. PROVIDE DAYLIGHT ZONE CONTROL REQUIREMENTS PER

C405.2.2.3.

5. PROVIDE INTUITIVE BUTTON LABELING TO MATCH

APPLICATION AND LOAD/RELAY CONTROLS. PROVIDE

FACTORY ENGRAVED LABELING FOR ALL INDIVIDUAL

PUSH-BUTTONS. DEVICE AND COVERPLATE COLORS AS

SELECTED BY ARCHITECT.

6. PROGRAM OF ALL LIGHTING CONTROL SYSTEMS AS

INDICATED AND/OR AS DIRECTED BY THE ELECTRICAL

ENGINEER AND/OR OWNER. MEET WITH THE ELECTRICAL

ENGINEER AT THEIR OFFICE PRIOR TO PREPARATION OF

SHOP DRAWINGS TO DISCUSS SPECIFIC PROGRAMMING AND

ZONING REQUIREMENTS OF SYSTEM(S). EACH NETWORKED

OR STANDALONE SYSTEM SHALL BE PROGRAMMED TO

REVERT BACK TO ITS NORMAL“ON” POSITION ONE HOUR

AFTER SELECTING A SCENE OR RAISING OR LOWERING A

LIGHTING ZONE.

GENERAL DIAGRAM NOTES:

ALL ON

ALL OFF

ALL OFF

LOWER

RAISE

ALL ON

GENERAL DIAGRAM NOTES:

1. THE LIGHTING CONTROLS AS SHOWN ARE BASED UPON EATON LIGHTING CONTROLS. PRIOR APPROVAL IS REQUIRED BEFORE BIDDING THIS PROJECT. ANY

SYSTEM DIFFERENT FROM EATON THAT REQUIRES ADDITIONAL RELAYS NOT SHOWN ON PLANS DUE TO LACK OF SEPARATION OF RELAYS AND DIMMING

ZONES MUST BE ACCOUNTED FOR AND PROVIDED IN THE BID AND MUST FUNCTION AS SIMILAR TO THAT WHICH IS REQUIRED IN FINAL INSTALLATION.

2. EXACT SPACE LAYOUTS VARY. SEE PLANS FOR APPROXIMATE EQUIPMENT LOCATIONS AND QUANTITY.

3. ALL ROOM CONTROLLERS SHALL ALLOW FOR TYPICAL 0-10V DIMMING, DAYLIGHT HARVESTING AND OCCUPANCY SENSING. INDEPENDENT DIMMING AND

OVERRIDE OF EACH ZONE IS REQUIRED.

4. EACH ROOM CONTROLLER SHALL BE ABLE TO BE INDEPENDENTLY PROGRAMMED ON-SITE.

5. PROVIDE EMERGENCY LIGHTING CONTROL UNIT IN ROOMS/AREAS THAT SHOW EMERGENCY LIGHTING BEING CONTROLLED IN CONJUNCTION WITH NORMAL

LIGHTING.

6. ALL CEILING-MOUNTED OCCUPANCY SENSORS SHALL BE PROVIDED WITH AN AUXILIARY CONTACT FOR HVAC CONTROL.

7. PROVIDE A UL 924 RELAY AS SPECIFIED FOR AUTOMATIC EMERGENCY LIGHTING CONTROL. THE UL 924 RELAY AUTOMATICALLY TRACKS WITH RELAY 1 AND

CAN BE CONNECTED TO ANY OF THE THREE 0-10V DIMMERS. THE UL 924 RELAY AUTOMATICALLY CLOSES AND DISCONNECTS THE 0-10V CONTROL OPEN

LOSS OF NORMAL POWER PROVIDING ADEQUATE EGRESS LIGHTING CONTROL. LADDERLESS MAINTENANCE TESTING OF THE UL 924 RELAY CAN BE

ACHIEVED BY PRESSING THE ALL OFF BUTTON FOUR TIMES.

8. ALL LOW VOLTAGE WIRE/CABLE FOR LIGHTING SENSORS, INTERCOM, AUDIO/VISUAL EQUIPMENT, CLASSROOM SOUND AMPLIFICATION, ETC. TO BE

PROPERLY SUPPORTED PER THE TELE/DATA SPEC, NEC 800.12/300.11. AND AT 5’-0” INTERVALS AND TO FOLLOW BUILDING STRUCTURAL LINES. PULLING

WIRE DIAGONALLY ACROSS ROOMS IS NOT ALLOWED. USING CEILING SYSTEM OR LIGHT FIXTURE SUPPORT/SEISMIC WIRES FOR SUPPORTS NOT ALLOWED.

1

2

3

4

5

6

BLACK - Hot(120/277VAC)

WHT/ORG or WHT/BLKNeutral

BLUE - Relay In(120/277VAC)

LIGHTING LOAD (1) YELLOW

RED

PURPLE

*Requires 0-10v

dimming driver/ballasts

Violet - Dimmer 1 (D1)

Gray - Dimmer 1 (D1)

Gray - Dimmer 2 (D2)

Violet - Dimmer 2 (D2)

Gray - Dimmer 3 (D3)

BLUE - Emergency Power In(120/277VAC)

EMERGENCY NEUTRAL

YELLOWEmergency Power OUT

YELLOWEmergency Power OUT

EMERGENCY LIGHTING LOAD

(Tracks with normal lighting

YELLOW load)

LIGHTING LOAD (2)

LIGHTING LOAD (3)

WALLSTATION(SEE PLANS FOR TYPES)

CONNECT UP TO FOURWALLSTATIONS PERROOM CONTROLLER

PROVIDE ADDITIONALWALLSTATIONS ASSHOWN/NEEDED

QUICKCONNECT

COUPLER

(GGRC-COUPLER)

ADJUSTABLEDAYLIGHT SENSORDOME

DAYLIGHT SENSOR *IMMEDIATELY

PROVIDES MULTI-ZONE DAYLIGHT DIMMING UPON

POWERUP

DUAL TECHNOLOGY CEILINGOCCUPANCY/VACANCY SENSOR(CEILING MOUNTED TYPES ONLY)

*Defaults to vacancy sensor modeManual On/Automatic Off (all loads) for maximum energy

savings

OCC-RJ45(OCCUPANCYCOUPLER)

EMERGENCY NOTE: EMERGENCY LOAD TRACKS WITH

NORMAL LIGHTING.YELLOW LOAD FOR ON/OFF. IF DIMMING IT

WILL BE ADJUSTED WITH THE DIMMING ZONE IT IS GROUPED

WITH. UPON LOSS OF NORMAL POWER TO THE RELAY, THE

EMERGENCY LOAD WILL BE FORCED ON AND FULL BRIGHT

TO 100%. IN ROOM LADDERLESS TESTING IS DONE BY

PRESSING THE "ALL OFF" BUTTON FOUR TIMES, WITHIN 3

SECONDS. THE EMERGENCY RELAY DEVICE IS UL924 LISTED.

*0-10V DIMMING ZONE NOTE:

KEYED NOTES:

EXACT ROOM CONTROLLER MODEL WILL VARY. PROVIDE

THE CORRECT ROOM CONTROLLER MODEL BASED UPONWHAT IS SHOWN ON PLANS AND WHAT IS REQUIRED FOR

PROPER LIGHTING CONTROL SEQUENCING.

SEE LIGHTING PLANS FOR BRANCH CIRCUIT

REQUIREMENTS.

PROVIDE DAYLIGHT ZONE CONTROL REQUIREMENTS PER

IECC-2015 C405.2.2.3. LOCATE DAYLIGHT SENSOR(S) PER

MANUFACTURER'S RECOMMENDATION AND WHERE

REQUIRED WITHIN THE ROOM FOR PROPER COVERAGE.

PROVIDE ADDITIONAL DIMMING ZONES/RELAYS AND

WIRING TO CONTROL THE DAYLIGHTING ZONE SEPARATE

FROM THE FIXTURES OUTSIDE THE DAYLIGHT ZONE.

PROVIDE DUAL TECH. OCCUPANCY SENSOR(S) AS

SHOWN. LOCATE OCCUPANCY SENSOR(S) PER

MANUFACTURER FOR PROPER PLACEMENT AND

ADJUSTMENT OF OCCUPANCY SENSORS. PROVIDE

ADDITIONAL SENSORS IF REQUIRED TO PROPERLY

COVER THE RESPECTIVE ROOM.

PROVIDE LOW VOLTAGE WALLSTATION AS SEE DIAGRAM

FOR WALLSTATION LAYOUT AND CONFIGURATION.

IF INDICATED, SEE DRAWINGS FOR DIMMING ZONES

REQUIRED e.g. 'D1', 'D2', 'D3'.

MOUNT ROOM CONTROLLER(S) ABOVE ENTRY DOOR

ALONG WITH ANY OTHER RELATED DEVICES. PROVIDE

INDICATOR LABELING ON CEILING TILE NEAREST THEROOM CONTROLLER. COORDINATE WITH ARCHITECT FOR

STYLE AND METHOD OF LABELING.

RELAY/CONNECTED LOAD

Violet - Dimmer 3 (D3)

OCC-RJ45(OCCUPANCYCOUPLER)

1. THE 0-10V DIMMING ZONES WITHIN THE ROOM

CONTROLLER CAN BE WIRED AND CONTROLLED

INDEPENDENT OF THE CONNECTED LOADS. THIS

ALLOWS A EACH LOAD TO HAVE A DEDICATED

0-10V DIMMING ZONE OR A SINGLE LOAD TO HAVE

UP TO THREE 0-10V DIMMING ZONES.

2. ALL RELAYS REQUIRING DIMMING AND/OR

DAYLIGHT HARVESTING SHALL UTILIZE 0-10V

DIMMING. PROVIDE 0-10V DIMMING WIRING AND

CONTROLS AS REQUIRED.

(R1)

(R2)

(R3)

ENGRAVING

ALL OFF

PROGRAMMING

ALL ON

BUTTON SHALL TURN ALL LIGHTING LOADS OFF.

BUTTON SHALL TURN ALL LIGHTING RELAYS ON, ALL DIMMING ZONES TO 100%.

UPON ENTERING THE SPACE, THE INTEGRAL OCCUPANCY SENSOR SHALL TURN LIGHTING ON TO 50% LIGHTLEVEL. OCCUPANCY SENSOR WILL TURN OFF LIGHTS AFTER VACANCY/TIME OUT.

ENGRAVING

RAISE

LOWER

ALL OFF

PROGRAMMING

ALL ON

PRESS AND HOLD - BUTTON SHALL INCREASE ALL DIMMING ZONES LEVELS.

PRESS AND HOLD - BUTTON SHALL DECREASE ALL DIMMING ZONES LEVELS.

UPON ENTERING THE SPACE, THE INTEGRAL OCCUPANCY SENSOR SHALL TURN LIGHTING ON TO 50% LIGHTLEVEL. OCCUPANT THEN CAN SET LIGHT LEVELS BASED UPON AVAILABLE SCENES. OCCUPANCY SENSORWILL TURN OFF LIGHTS AFTER VACANCY/TIME OUT.

BUTTON SHALL TURN ALL LIGHTING RELAYS ON, ALL DIMMING ZONES TO 50%.

BUTTON SHALL TURN ALL LIGHTING LOADS OFF

2017 BNACONSULTING SA

LT L

AK

E

ST.G

EO

RG

E

BNA635 South State Street

Salt Lake City, Utah 84111

CONSULTING

P:801.532.2196F:801.532.2305

www.bnaconsulting.com

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/1

6/2

017 2

:44:5

7 P

ME

:\U

ser

File

s\R

evit 2

017\1

7072 R

am

pto

n E

lec v

17_abonill

aP

373E

.rvt

E702

ELECTRICAL

DIAGRAMS

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

09/28/2017

Page 34: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

2017 BNACONSULTING SA

LT L

AK

E

ST.G

EO

RG

E

BNA635 South State Street

Salt Lake City, Utah 84111

CONSULTING

P:801.532.2196F:801.532.2305

www.bnaconsulting.com

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/1

6/2

017 2

:44:5

9 P

ME

:\U

ser

File

s\R

evit 2

017\1

7072 R

am

pto

n E

lec v

17_abonill

aP

373E

.rvt

ET001

AUDIOVISUAL

SYMBOLS,

SCHEDULES,

AND NOTES

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

ROUGH-IN SCHEDULE

SYMBOL DESCRIPTION CABLE TYPEROUGH-INMOUNTING

HEIGHTNOTES

AUDIOVISUAL GENERAL NOTESCABLE AND CONDUIT SCHEDULE

AUDIO AND VIDEO WIRING TYPES:

AUDIO AND VIDEO SYSTEM WIRING IS DIVIDED INTO WIRING GROUPS ACCORDING TO THEIR NOMINAL LEVELS:

AUDIO AND VIDEO CONDUIT SEPARATION

MINIMUM CONDUIT SEPARATION BETWEEN CONDUITS CARRYING WIRING OF DIFFERENT AUDIO AND VIDEO GROUPS IS AS FOLLOWS:

ELECTRICAL CONDUIT SEPARATION

MINIMUM CONDUIT SEPARATION BETWEEN CONDUITS CARRYING AUDIO AND VIDEO WIRING AND OTHER ELECTRICALSERVICE CONDUIT IS AS FOLLOWS:

NOTE: CONDUITS SHALL NOT RUN MORE THAN 20 FEET IN PARALLEL WITHIN THE GIVEN DISTANCES ABOVE.

CABLING GROUPS AND CONDUIT SEPARATION SCHEDULE

ABBREV. DESCRIPTION ABBREV. DESCRIPTION ABBREV. DESCRIPTION

RESPONSIBILITY MATRIX

ABBREVIATIONS INDEX

NOTE: NINETY DEGREE CROSSING IN CLOSE PROXIMITY IS PERMITTED.

NOTE: GROUPS LISTED ABOVE SHALL NEVER BE COMBINED WITHIN THE SAME CONDUIT

NOTE: MATRIX REFERS TO RESPONSIBILITY BETWEEN OWNER AND CONTRACTORS FOR GENERAL ROUGH-IN AND FURNISHINGS.

DESCRIPTION MANUFACTURER MODEL NUMBER CABLE GROUPCONDUIT REQUIREMENTSCABLE TYPE

AUDIOVISUAL SYMBOLS, SCHEDULES & NOTES

RxH

RxT

AX

AT

MD

DP#

FB#

HD

HV

IR

KP1

MC

M

SC#

TP0

TP3

TP5

TP7

TxD

TxH

TxM

TxT

US

VG

V

SV

MA

KP2

KP3

TPT

(#)MA

(#)LA

(#)CT

(#)UTP

(#)STP

(#)HD

(#)VG

(#)S12

(#)S16

(#)AT

(#)RG6

(#)RG11

(#)SFB

(#)MFB

P#

R#

P#

C#

CHV

CHD

AXT

MDT

GP1

GP2

MAT

CSA

(#)HD

T

LOUDSPEAKER

PENDANT LOUDSPEAKER

HDMI RECEIVER, WALL PLATE

HDBaseT CATEGORY OUTPUT, WALL PLATE

SOUND CABINET / EQUIPMENT RACK

AUXILIARY INPUT, WALL PLATE

NOTES:

1. HEIGHT MEASURED TO BOTTOM OF THE BOX FROM FINISHEDFLOOR.

2. HEIGHT MEASURED TO CENTER LINE OF THE BOX FROM THEFINISHED FLOOR.

3. REFER TO SPECIFICATIONS FOR CUSTOM ROUGH-IN

REQUIREMENTS.4. STANDARD MOUNTING HEIGHT UNLESS OTHERWISE NOTED ON

PLANS.

5. ROUGH-IN TO BE HORIZONTAL.6. ROUGH-IN TO BE INSTALLED ABOVE ACCESSIBLE CEILING.7. ROUGH-IN TO BE INSTALLED ABOVE CEILING.

8. CABLE FROM DEVICE TO BE HOMERUN TO DESTINATION WITHOUTSPLICES.

9. ABOVE TABLE/COUNTER MOUNTED DEVICE.

10. REFER TO MANUFACTURER'S RECOMMENDED CABLEREQUIREMENTS FOR EXACT CABLE REQUIRED.

* TYPICAL SYMBOL SCHEDULE. SOME SYMBOLS MAY NOT BE USED IN

THIS SET OF DRAWINGS.

A1

AV ANTENNA

DUAL MICROPHONE INPUT, WALL PLATE

HDMI INPUT, WALL PLATE

HDMI AND VGA INPUT, WALL PLATE

INFRARED SENSOR, WALL/CEILING

KEYPAD 1

LOUDSPEAKER, CABINET

WALL MOUNTED LOUDSPEAKER

MICROPHONE INPUT, CEILING

MICROPHONE INPUT, WALL PLATE

PROJECTOR

TOUCH PANEL, 10" DIAGONAL

TOUCH PANEL, 3" DIAGONAL

TOUCH PANEL, 5" DIAGONAL

TOUCH PANEL, 7" DIAGONAL

HDMI AND VGA TRANSMITTER, WALL PLATE

HDMI INPUT TRANSMITTER, WALL PLATE

HDMI AND VGA TRANSMITTER, MILLWORK

HDBaseT CATEGORY INPUT, WALL PLATE

USB INPUT, WALL PLATE

VGA INPUT, WALL PLATE

VOLUME CONTROL

VOLUME CONTROL WITH SOURCE SELECTOR

A1

KEYPAD 2

KEYPAD 3

A1

A1

PROJECTION SCREEN, NUMBER REFERS TO SCREENSIZE REFER TO SPECIFICATIONS FOR SCREEN TYPE

DISPLAY, NUMBER REFERS TO SCREEN SIZEREFER TO SPECIFICATIONS FOR DISPLAY TYPE

MICROPHONE INPUT WITH AUXILIARY INPUT, WALL PLATE

ROUGH-IN IDENTIFIER:

A0: 4" SQUARE 2 1/8" DEEP JUNCTION BOX.A1: 4" SQUARE 2 1/8" DEEP JUNCTION BOX WITH SINGLE GANG

MUDRING.A1E: 4" SQUARE 2 1/8" DEEP JUNCTION BOX WITH 1 1/2" EXTENSION

WITH SINGLE GANG MUDRING.

A2: 4" SQUARE 2 1/8" DEEP JUNCTION BOX WITH DOUBLE GANGMUDRING.

A2E: 4" SQUARE 2 1/8" DEEP JUNCTION BOX WITH 1-1/2" EXTENSION

WITH DOUBLE GANG MUDRING.A3: 8 5/8" x 4 1/2" x 1 5/8" JUNCTION BOX WITH 3-GANG MUDRING.A4: 10 7/16" x 4 1/2" x 1 5/8" JUNCTION BOX WITH 4-GANG MUDRING.

B1E: 4 11/16" SQUARE JUNCTION BOX WITH 1 1/2" EXTENSION WITHSINGLE GANG MUDRING.

B2E: 4 11/16" SQUARE JUNCTION BOX WITH 1 1/2" EXTENSION WITH

DOUBLE GANG MUDRING.C1: 12" x 12" x 4" JUNCTION BOX WITH TRIM RING AND GROMMET.C2: SEE SPECIFICATIONS FOR ROUGH-IN INFORMATION.D1: HUBBELL - HBL260 WITH SINGLE GANG MUD RING.

D2: HUBBELL - HBL260 WITH DOUBLE GANG MUD RING.D3: HUBBELL - HBL263 WITH TRIPLE GANG MUD RING.

4,8.

B1E

B1E

A1E

A1E

B2E

A1E

B2E

A0

A0

A1E

B1E

B1E

A1E

A1E

A1

A2

B1E

B1E

A3

PER MFG

A0

A0

(2) A0

A0

C2

A0

B1E

A1E

C1

FURNITURE BOX, NUMBER REFERS TO BOXTYPE REFER TO SPECIFICATIONS FOR DESCRIPTION

4,8.

4,8.

(1) MA(1) LA

4,8.

4.

4.

4.

4.

4.

4.

4.

4.

4.

4.

6.

6.

4.

4.

4,5.

SWITCH HEIGHT

SWITCH HEIGHT

SWITCH HEIGHT

IN MILLWORK

4,5.

4,5.

4,5.

AS NOTED 4.

AS NOTED 4.

CEILING

CEILING

AS NOTED

CEILING ORWALL

CEILING

7.

7.

2,4.

7.

6.

AS NOTED

SWITCH HEIGHT 4,10.

SWITCH HEIGHT

SWITCH HEIGHT

4,10.

4,10.

SWITCH HEIGHT

SWITCH HEIGHT

SWITCH HEIGHT

CEILING

CEILING

AS NOTED

AS NOTED

RECEPTACLEHEIGHT

IN MILLWORK/UNDER TABLE

RECEPTACLEHEIGHT

RECEPTACLEHEIGHT

RECEPTACLEHEIGHT

RECEPTACLEHEIGHT

RECEPTACLEHEIGHT

RECEPTACLEHEIGHT

CEILING

RECEPTACLEHEIGHT

RECEPTACLEHEIGHT

RECEPTACLEHEIGHT

RECEPTACLEHEIGHT

(1) LA

(2) MA

(1) MA

(1) HD

(1) VG

(1) MA

(1) STP

(1) STP

(1) STP

(1) HD(1) VG

(1) STP

(1) STP

(1) STP

(1) STP

(1) S16

(1) S16

(1) AT

(1) CT

(1) UTP

(1) UTP

(1) UTP

(1) UTP

(1) S12

(1) S16

SEE SPEC.

(1) UTP

AS NOTED

(1) S16

(1) S16

1. ET SHEETS SHOW WORK AND MATERIALS BY DIVISION 26 AND DIVISION 27. SEE SPECIFICATIONS AND DRAWING NOTES FOR RESPONSIBILITY FOR EACH ITEM.

2. ELECTRICAL CONTRACTOR SHALL COORDINATE REQUIRED PROVISIONS WITH THE PROJECT AV SYSTEMS INTEGRATOR PRIOR TO INSTALLATION OF AV SYSTEMROUGH-IN. WHERE CONDUIT AND JUNCTION BOX PROVISIONS ARE SIGNIFICANTLY DIFFERENT FROM THOSE SHOWN ON THE DRAWINGS, NOTIFY THE AV

CONSULTANT IN WRITING OF THE REQUIREMENTS. WHERE MINOR MODIFICATIONS TO PROVISIONS ARE REQUIRED, THEY SHALL BE MADE AT NO ADDITIONALCOST AS A MATTER OF JOB COORDINATION.

3. BIDDERS SHALL THOROUGHLY ACQUAINT AND EXAMINE THE EXISTING PROJECT CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED, INCLUDING THECOMPLETE SET OF PLANS AND SPECIFICATIONS COVERING THE ENTIRE PROJECT. BIDDERS SHALL BECOME FULLY CONVERSANT WITH THE TYPE OF GENERALCONSTRUCTION AS WELL AS ALL PERTINENT FACTS AFFECTING THE COST OF CARRYING OUT THE WORK THEY WILL CONTRACT TO PERFORM AND BRING ANY

DISCREPANCIES OR OMISSIONS FOUND IN THE DRAWINGS TO THE AV CONSULTANT'S ATTENTION BEFORE SUBMITTING BID.

4. AV SYSTEMS INTEGRATOR SHALL PROVIDE A FULLY FUNCTIONING SYSTEM IN EVERY RESPECT. ANY DISCREPANCIES IN THE DRAWINGS SHALL BE BROUGHT TO

THE ATTENTION OF THE PROJECT AV CONSULTANT PRIOR TO BIDDING.

5. THE FOREGOING WORK SHALL BE COMPLETE IN EVERY RESPECT, AND ANY MATERIAL OR WORK NOT SPECIFICALLY MENTIONED OR SHOWN ON THE DRAWINGS,

BUT NECESSARY TO FULLY COMPLETE THE WORK, SHALL BE FURNISHED BY THE PROJECT AV SYSTEMS INTEGRATOR.

6. NO CHANGES TO THE DESIGN SHALL BE MADE WITHOUT THE PROJECT AV CONSULTANT'S WRITTEN CONSENT.

7. WHERE APPLICABLE, AV SYSTEMS INTEGRATOR SHALL FOLLOW ALL MANUFACTURER'S INSTALLATION GUIDELINES.

8. REFER TO DRAWINGS FOR EXACT NUMBER OF COMPONENTS USED IF NOT SPECIFIED IN EQUIPMENT LIST.

9. COORDINATE EXACT SPEAKER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS. ANY CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF THEPROJECT AV CONSULTANT PRIOR TO BIDDING.

10. CONFIRM AVAILABLE MOUNTING DEPTHS OF ALL SPEAKERS AND COMPARE WITH DEPTHS SHOWN ON SHOP DRAWINGS. BRING ALL POTENTIAL CONFLICT AREASTO THE ATTENTION OF THE ARCHITECT AND AV CONSULTANT PRIOR TO RELEASE.

11. INSTALL/SUSPEND ALL AUDIOVISUAL SYSTEMS EQUIPMENT IN COMPLIANCE WITH SEISMIC CODES, MANUFACTURER'S WRITTEN INSTRUCTIONS, AND INDUSTRYBEST PRACTICES. DURING THE SUBMITTAL PROCESS, PROVIDE SHOP DRAWINGS WHICH DETAIL PROPOSED MOUNTING FOR ALL SUCH EQUIPMENT.

12. ALL TWISTED-PAIR (U/UTP, F/UTP, U/FTP, S/FTP) CATEGORY TYPE CABLING SHALL BE TERMINATED BY CERTIFIED DATA TECHNICIANS.

13. ALL HDBaseT SIGNAL CABLING, TERMINATIONS, AND TERMINATION HARDWARE SHALL COMPLY WITH TIA/EIA WIRING CONFIGURATION T568B. ALL HDBaseT SIGNAL

CABLING SHALL BE SHIELDED/FOIL (SF/UTP) CATEGORY TYPE CABLE.

14. CONDUCT A RADIO FREQUENCY AUDIT OF THE SITE PRIOR TO SELECTING RF OPERATIONAL FREQUENCIES. AV SYSTEMS INTEGRATOR TO ENSURE

INTERFERENCE FREE OPERATION OF ALL RF DEVICES. AV SYSTEMS INTEGRATOR SHALL COORDINATE AUDIT RESULTS WITH MANUFACTURER PRIOR TOPURCHASING RF EQUIPMENT.

15. PROVIDE RACK MOUNT KITS FOR ALL RACK MOUNTED EQUIPMENT. PROVIDE CUSTOM RACK MOUNT KITS WHEN NOT AVAILABLE FROM THE EQUIPMENTMANUFACTURER.

16. PROVIDE SURGE PROTECTION DEVICE (SPD) IN ALL AV EQUIPMENT RACKS.

17. ALL AV EQUIPMENT RACKS SHALL BE GROUNDED AND BONDED TO MEET OR EXCEED THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE (NEC), IEC 1000-5-2,

ANSI/J-STD-607-A.

18. ALL AV EQUIPMENT SHALL BE GROUNDED PER MANUFACTURER'S SPECIFICATIONS.

19. PROVIDE MANUFACTURER RECOMMENDED POWER SUPPLIES OR TRANSFORMERS FOR ALL SPECIFIED EQUIPMENT.

20. FILL ALL UNUSED RACK SPACE WITH BLANK PANELS UNLESS OTHERWISE NOTED.

21. THE CONTRACTOR SHALL TAKE FULL RESPONSIBILITY FOR LACK OF COORDINATION WITH AV CONSULTANT AS ADDRESSED IN THE DOCUMENTS

NOTES:

1. APPROVED EQUALS FROM OTHER MANUFACTURERS ARE BELDEN, GEPCO/GENERAL, ICE AND LIBERTY CABLE.2. WHEN COMBINING CABLE TYPES OF THE SAME GROUP, THE TYPE WITH THE LARGEST CONDUIT REQUIREMENT DICTATES CONDUIT SIZE.

3. CONDUIT REQUIREMENTS ARE MINIMUM, UNLESS OTHERWISE NOTED.4. ALL CATEGORY CABLE SHALL BE TESTED TO ANSI/TIA/EIA-568C AND IEEE 802.3an STANDARDS USING A LEVEL IIIe TESTER.5. CABLE QUANTITY INDICATED ON DRAWINGS SHOWS ON FINAL RUN. IF NOT NOTED PROVIDE CABLING FOR SINGLE DEVICE.

6. # INDICATES NUMBER OF CABLES WITHIN THE SAME RUN.

GROUP WIRING TYPE

GROUP 1 FIBER OPTIC CABLE

GROUP 2 O mV TO 100 mV SIGNALS, EXAMPLE: MICROPHONE LEVEL SIGNAL

GROUP 3 100 mV TO 10 V SIGNALS, EXAMPLE: LINE-LEVEL SIGNAL

GROUP 4 10 V TO 70 V SIGNALS, EXAMPLE: SPEAKER LEVEL SIGNAL

GROUP 5 CONTROL, DIGITAL CIRCUITS, DATA AND VIDEO

GROUP

GROUP 1

GROUP 2

GROUP 3

GROUP 4

GROUP 5

GROUP 1 GROUP 2 GROUP 3 GROUP 4 GROUP 5

ADJACENT

ADJACENT

ADJACENT

ADJACENT

ADJACENT

ADJACENT

ADJACENT

ADJACENT

ADJACENT

ADJACENT ADJACENT

ADJACENT

ADJACENT

6"

6"

6" 6"

6"

6"12"

12"

12"

12"

12"

12"

277/480V AC CIRCUIT

GROUP 1 GROUP 2 GROUP 3 GROUP 4 GROUP 5

ADJACENT

120/208V AC CIRCUIT ADJACENT

24" 24" 24" 24"

24"24" 12" 12"

8.

# NUMBER

AFF ABOVE FINISH FLOOR

AUX AUXILIARY

AWG AMERICAN WIRE GAUGE

BC BARE COPPER

C CONDUIT

CATV CABLE TELEVISION

CLG CEILING

CNTR CONTRACTOR

CU COPPER

C/W COMPLETE WITH

DWG DRAWING

(E) EXISTING

FT FOOT

GND GROUND

IG ISOLATED GROUND

IN INCH

J-BOX JUNCTION BOX

LTG LIGHTING

MFG MANUFACTURER

MAX MAXIMUM

MIC MICROPHONE

MIN MINIMUM

MTG MOUNTING

N/A NOT APPLICABLE

NIC NOT IN CONTRACT

NTS NOT TO SCALE

(R) RELOCATE

SPEC SPECIFICATIONS

SPKR SPEAKER

TV TELEVISION

TYP TYPICAL

UG UNDERGROUND

UPS UNINTERRUPTED POWER SUPPLY

W WATTS

W/O WITHOUT

TOUCH PANEL, TABLE TOP 9.AS NOTED (1) UTP

INSTALL

OWNERGENERALCONTRACTOR

ELECTRICAL CONTRACTOR

AVINTEGRATOR

FURNISH INSTALL FURNISH INSTALL FURNISH INSTALLFURNISH

CONDUIT W/PULL STRING

CABLING

DISPLAY(S)

DISPLAY BACK BOX(ES)

PROJECTOR(S)

PROJECTOR MOUNT(S)

DISPLAY MOUNT(S)

PROJECTOR SCREEN(S)

(1) CT or(1) UTP

(1) CT or(1) UTP

(1) CT or(1) UTP

MICROPHONE, 22 AWG3/4" CONDUIT = (14) CABLES1" CONDUIT = (23) CABLES

WEST PENN 2291

LINE LEVEL, 22 AWG3/4" CONDUIT = (14) CABLES1" CONDUIT = (23) CABLES

WEST PENN 3291

CONTROL1" CONDUIT = (7) CABLES1 1/4" CONDUIT = (12) CABLES

WEST PENN 577350

UN-SHIELDED TWISTED PAIR 5

SHIELDED TWISTED PAIR, CAT 61" CONDUIT = (4) CABLES1 1/4" CONDUIT = (8) CABLES

WEST PENN 54246AF

HIGH RESOLUTION VIDEO1" CONDUIT = (1) CABLES1 1/4" CONDUIT = (4) CABLES

WEST PENN 56CRGB2P

SPEAKER, 12 AWG1" CONDUIT = (3) CABLES1 1/2" CONDUIT = (7) CABLES2" CONDUIT = (11) CABLES

WEST PENN 4227

SPEAKER, 16 AWG1" CONDUIT = (10) CABLES1 1/4" CONDUIT = (17) CABLES

WEST PENN 4225

ANTENNA, COAXIAL RG8X3/4" CONDUIT = (4) CABLES1" CONDUIT = (7) CABLES

WEST PENN 5807

RG-6 COAXIAL CABLE3/4" CONDUIT = (5) CABLES1" CONDUIT = (8) CABLES

WEST PENN 525841

RG-11 COAXIAL CABLE1" CONDUIT = (3) CABLES1 1/4" CONDUIT = (6) CABLES

WEST PENN 525821

SINGLE MODE FIBER OPTIC3/4" CONDUIT = (10) CABLES1" CONDUIT = (17) CABLES

1

MULTIMODE FIBER OPTIC3/4" CONDUIT = (10) CABLES1" CONDUIT = (17) CABLES

1

PER SPEC27 1500

PER SPEC27 1500

PER SPEC27 1500

PER SPEC27 1500

1" CONDUIT = (9) CABLES1 1/4" CONDUIT = (15) CABLES

WEST PENN 4246

AV CAMERA AS NOTED 1,8.A2E

HDMI AND VGA TRANSMITTER, WALL PLATE (POLEVAULT) A2E 4.(1) UTPRECEPTACLE

HEIGHT

DUAL HDMI TRANSMITTER, WALL PLATE (POLEVAULT) A2E 4.(1) UTPRECEPTACLE

HEIGHT

A1ECALL SWITCH +4'-0" 7.

AUXILIARY INPUT, WALL PLATE, UTP TRANSMITTER A1

DUAL MICROPHONE INPUT, WALL PLATE, UTP TRANSMITTER A1 4,8.

4,8.RECEPTACLE

HEIGHT

RECEPTACLEHEIGHT

(1) UTP

(1) UTP

1 GANG GROMMET PASS THROUGH PLATE

2 GANG GROMMET PASS THROUGH PLATE

D1

D2

AS NOTED

AS NOTED

MICROPHONE AND AUXILIARY INPUT, WALL PLATE, UTP TRANSMITTER 4.(1) UTPA1ERECEPTACLE

HEIGHT

CLASSROOM SOUND AMPLIFICATION SYSTEM IN MILLWORK

HDMI < 25'1 1/4" CONDUIT = (1) CABLES2" CONDUIT = (3) CABLES

WEST PENN 5CN-HD700-XX

3.

HDMI > 25'1 1/4" CONDUIT = (1) CABLES2" CONDUIT = (3) CABLES

EXTRON 5HDMI Pro/xx

AUDIO OUTPUT, XLR, WALL PLATE A1 4,8.RECEPTACLE

HEIGHT(1) LA

AS NOTED

AS NOTED

AS NOTED

AUDIOVISUAL SHEET INDEXET001 AUDIOVISUAL SYMBOLS, SCHEDULES, AND NOTES

ET301 LEVEL 2 AUDIOVISUAL PLAN

ET701 AUDIOVISUAL DIAGRAMS

09/28/2017

Page 35: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

DP

5D

P5

DP

5D

P5

DP

5D

P5

DP

5D

P5

TP0

KP

2

TP0

SC

1P1

SC

1P2

Rx

Rx

HD

DP

1

GP1

T

T

J

J J

J

J

F G H I J K L M N O P

1

2

3

4

OFFICE131

OFFICE130

OFFICE135

CONFERENCEROOM

134

OFFICE136

OFFICE143

OFFICE144

OFFICE145

OFFICE147

OFFICE146

SERVER RM140

SECURE ROOM139

COMM RM149

VICTIMSADVOCATE

OFFICE105

OFFICE106

OFFICE107

OFFICE108

OFFICE110

EVIDENCESTORAGE

114

SECURECORRIDOR

115

WAR ROOM121

SECUREINTERVIEW

118

TOILET120

FORENSICROOM

119

SECUREINTERVIEW

117

HOLDING116

OFFICE125

OFFICE124

OFFICE122

OFFICE123

OFFICE129

OFFICE128

OFFICE137

BREAK ROOM148

EVIDENCETECH OFFICE

113EVIDENCE

PROCESSINGOFFICE

112

ELECT.104

OPEN OFFICE138

OFFICE109

STORAGE141

CONTROLROOM

142

STAIR AA

STAIR CC

UnoccupiedUnoccupied

STORAGE132

WAITING101

RECORDS111 Unoccupied

Unoccupied

STAIR BB

OPEN OFFICE127

UnoccupiedUnoccupied

UnoccupiedUnoccupied

UnoccupiedUnoccupied

V302

ET701

TO 'R1'(1) UTP TO 'R1'

(1) UTP

(1) STP

1

1

1

1

TO 'R1'

(E)

(1) HDTO 'R1'

(1) STP

(E)

(E)

TO 'R1'

(1) STP

TO 'R1'

(1) STP

(E)

(2) HD

(E)

12"X12"X4"

23 3

SHAREDCONFERENCE

ROOM133

(E)

(E)

(E)

(E)

(1) HD(1) VG

(1) HD(1) VG

V201

ET701

V201

ET701

2017 BNACONSULTING SA

LT L

AK

E

ST.G

EO

RG

E

BNA635 South State Street

Salt Lake City, Utah 84111

CONSULTING

P:801.532.2196F:801.532.2305

www.bnaconsulting.com

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/1

6/2

017 2

:45:0

0 P

ME

:\U

ser

File

s\R

evit 2

017\1

7072 R

am

pto

n E

lec v

17_abonill

aP

373E

.rvt

ET301

LEVEL 2

AUDIOVISUAL

PLAN

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

SCALE = 1/8" = 1'-0"

Level 2 Audiovisual Plan

SHEET KEYNOTES

1 COORDINATE WITH ARCHITECTURAL PLANS FOR EXACT HEIGHT OF DISPLAYS PRIOR TO ROUGH-IN.

PROVIDE 3/4" CONDUIT AND PULL STRING BACK TO CONTROL ROOM 142 AND TERMINATE.

PROVIDE 3/4" CONDUIT AND PULL STRING UP TO CEILING STRUCTURE AND TERMINATE.

2

3

09/28/2017

Page 36: DPS CALVIN RAMPTON 2ND FLOOR - arnell-west.com€¦ · pton 2nd floor remodel m&p v17_calebl@whw-engineeri ng.com.rvt me102.2 2nd floor mechanical grd and equipment plan 00/00/2014

VGHD

HD

VG

V201 TYPICAL CONFERENCE ROOM AVDIAGRAM

NTS

P1

FLOOR BOX

DIAGRAM NOTES

DEVICES SHALL BE MOUNTED WITHIN FLOOR BOX. PROVIDE (1) 12' HDMI

CABLE AND (1) 12' VGA+AUDIO CABLE FOR CONNECTION FROM FLOOR

BOX TO OWNER PROVIDED FURNITURE.

PROVIDE (1) 1" CONDUIT TO THE ACCESSIBLE CEILING.

(1) HDMI(1) VGA

1" C.FLOOR BOX

HDMI 1

VGA 1

PROJECTOR

RCA - L

RCA - R

PROJECTOR

1

2

2

1

2017 BNACONSULTING SA

LT L

AK

E

ST.G

EO

RG

E

BNA635 South State Street

Salt Lake City, Utah 84111

CONSULTING

P:801.532.2196F:801.532.2305

www.bnaconsulting.com

ph: (801) 533-2100

A R C H I T E C T S

S L C, Utah 84111577 South 200 East

jrcadesign.com

123456

A

B

C

D

E

123456

DATE

PROJECT #:

REVISION

5/1

6/2

017 2

:45:0

0 P

ME

:\U

ser

File

s\R

evit 2

017\1

7072 R

am

pto

n E

lec v

17_abonill

aP

373E

.rvt

ET701

AUDIOVISUAL

DIAGRAMS

00/00/2014

DP

S C

AL R

AM

PT

ON

2N

D F

LO

OR

4501 S

OU

TH

2700 W

ES

T

WE

ST

VA

LLE

Y C

ITY

, U

T 8

4119

16028

PROJECT STATUS

09/28/2017