  • 5/24/2018 DPWH - Cost Estimation

    1/63

    Department of Public Works and Highways

  • 5/24/2018 DPWH - Cost Estimation

    2/63

    Cost Estimation Process

    The Cost EstimationProcess as it evolves tospecific stages of projectdevelopment.

    Planning Design Procurement

    Identify and PrepareFeasibility Studies

    and PreliminaryDesign

    PerformDetailed Design

    PrepareBidding

    Documents

    Receiveand

    EvaluateBids

    BBPEE BBDEE Estimate forthe ABC

    Planning Service, PMO-Feasibility Studies

    Implementing OfficesPMOs, ROs and DEOs

    POCW with the assistancefrom PMOs, ROs, DEOs

  • 5/24/2018 DPWH - Cost Estimation

    3/63

    Cost Estimation Process

    Review/Study Design Drawings

    Data Collection Field Surveys

    Labor Equipment Materials Materials Sources Labor

    Evaluation/processing of DataPay Item Quantity

    Calculation (Bill

    of Quantities)

    Cost Estimate

    Unit Price Analysis

    Construction Pay

    Items Unit Rates

    Maintenance Unit

    Rates

    Maintenance

    Activities

    Project CostMaintenance Cost

  • 5/24/2018 DPWH - Cost Estimation

    4/63

    Project Estimate Components BBPEE BBDEE ABCA. Direct Cost ! ! !Materials ! ! !Labor ! ! !Equipment ! ! !Dayworks !Per DO 46 s2007Provisional Sum !Per DO 46 s2007B. Indirect Cost Per DO 57 s2002 Per DO 57 s2002 Per DO 57 s2002OCM ! ! !Profit ! ! !Mobilization/Demobilization ! ! !C. VAT 12% (A+B) 12% (A+B) 12% (A+B)D. Total Civil Works Cost A+B+C A+B+C A+B+CE. Contingency 10% of D 10% of D 5% of D

    F. Engineering Costs Per NEDA Per NEDADetailed Engineering 4-6% (D+E)Construction Supervision* 8-10% (D+E) 8-10% (D+E)*

    Administrative Cost 3.5% (D+E) 3.5% (D+E)G. Feasibility Cost (Optional for Pre-FS) 1-3% (D+E)H. IROW Acquisition Cost ! !I. Total Estimated Project Cost D+E+F+G+H D+E+F+G+H D+E

    Project Estimation Phase

    *Construction Supervision only applies to foreign-assisted projects

  • 5/24/2018 DPWH - Cost Estimation

    5/63

    Work type proposed improvement works of the project Location of the project includes terrain types andembankment and aggregate material sources

    Design plans and specification working drawings andDPWH Standard Specifications Vol. II, Ed. 2004

    Equipment rental rates ACEL Guidebook, ed. 22, yr.2003

    Labor rates and fringe benefits DOLE, Regional WageBoard, SSS, Philhealth, Pag-Ibig, & bonus

    Construction Materials List and Material Sources Map DPWH Department Orders DOs relevant to cost

    estimation

    NEDA Circular Circular/memo relevant to costestimation

    Basic Consideration or Basis of Cost Estimate

  • 5/24/2018 DPWH - Cost Estimation

    6/63

    Unit Price Analysis

    Two Main Parts:

    Direct Cost Labor Materials Equipment

    Indirect Cost (% of Direct Cost as defined in DO 57) OCM (overhead, contingency & miscellaneous) profit Mobilization/Demobilization

  • 5/24/2018 DPWH - Cost Estimation

    7/63

    Unit Price Analysis

    Elements of the Direct Cost Labor

    basic wage fringe benefits bonuses social security & other social charges

    Equipment bare hourly & rental operating cost fuels & lubricants repairs & maintenance labor

    Materials labor equipment

    processing & transport

    Production Rate

  • 5/24/2018 DPWH - Cost Estimation

    8/63

    Unit Price Analysis

    Labor Categories

    Labor Category Labor Index

    1. Foreman, construction2.

    Leadman

    3. Operator, Heavy4. Operator, Light5. Labor, Highly Skilled6. Driver7. Labor, Skilled8. Labor, Unskilled

    1.80

    1.651.50

    1.40

    1.40

    1.30

    1.30

    1.00

  • 5/24/2018 DPWH - Cost Estimation

    9/63

    Basic Labor Rates Calculation

    Monthly Wages based on 314 days per year, 8 hours per day (Basic DailyWage x (314/12))

    Leave, vacation and sick = Basic Monthly Pay / 12 Bonus, 13th Month Pay = Basic Monthly Pay / 12 SSS, Medicare, Employer's Compensation = Amount Representing

    Employer's Contribution, Graduated Scale

    Pag-ibig, Employer's Compensation = Amount Representing Employer'sContribution, (2% of Basic Monthly Wage or P100 max.)

    Rate per Hour = Total rate per month x (12/314/8)

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    10/63

    Unit Price Analysis

    Take the value ofnon-agriculturalsector

  • 5/24/2018 DPWH - Cost Estimation

    11/63

    Unit Price Analysis

    Take the values under thecolumn of total monthlycontributions in reference

    with range of compensation

  • 5/24/2018 DPWH - Cost Estimation

    12/63

    Unit Price Analysis

    Take the values under thecolumn of total monthlycontributions

  • 5/24/2018 DPWH - Cost Estimation

    13/63

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    14/63

    Equipment Category Sample Equipments

    Earthmoving equipmentCompaction equipmentLifting equipmentExcavating equipmentFoundation equipmentAsphalting equipmentConcreting equipmentHauling equipmentAir equipmentPumping equipmentPower generating equipmentShop equipmentSpecial support equipmentMiscellaneous equipmentPlantsOffshore equipmentCable stringing equipmentOthers

    wheel loader, grader, tractor dozervibratory steel drum, plate compactorcranes, forkliftsbackhoe, trencherspile vibratory driver, pile hammer, drill rigasphalt paver/finisher, asphalt distributorpaver/finisher, mixer, transit mixerdump truck, cargo truck, trailercompressor, pneumatic breakers handheldsubmersible pump, diaphragm pumpgenerator setwelding machine, shop machinetruck water wagon/pumpjoint sealer, rebar cutter/benderasphalt concrete plant, concrete batching plantdredger, crane barge, tugboatcable tensioner/puller, splicing machinechip spreader, power broom

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    15/63

    Equipment Unit Rate Analysis

    Basic Calculation

    Bare Month Rental Bare monthly rate 200h/mo. Repair & Miscellaneous

    Repair - 6.3% of Bare Rental Spare Parts 5.1% of Bare Rental Miscellaneous 0.6% of Bare Rental

    Fuel Fuel Price/lit.xHPx0.1514 Oil & Lubricant Price/lit.xHPx0.003

    Labor Operator or driver Labor rate/hr

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    16/63

    Unit Price Analysis

    Sample calculation of

    adjusted equipment

    rates in spreadsheet

  • 5/24/2018 DPWH - Cost Estimation

    17/63

    Materials Category Sample Materials

    Commercial Materials

    Contractors processed materials

    Portland CementReinforcing Steel Bars (RSB or Rebars)LumberPlywoodTie WireStructural SteelCommon Wire Nails (CWN) assorted sizesEmulsified Asphalt (SS-1)Cut-Back Asphalt (MC-70/MC-250)Asphalt Cement Penetration 85/100Joint SealerReflective PaintsMetal Beam Guard Rails,Guard End PiecesReflective Pavement Stud (raised or low profile)Fuel (Diesel/gasoline/premium gasolineLubricantsReinforced Concrete Pipe Culvert (RCPC)Base/Subbased Courses

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    18/63

    Unit Price Analysis

    Sample of contractors process

    materials

  • 5/24/2018 DPWH - Cost Estimation

    19/63

    Unit Price AnalysisHauling Unit Rate Analysis

    Basic Consideration Terrain type Road condition Dump truck capacity Selection of loader capacity, output, bucket fill factor and operating

    factor (to estimate loader production rate) Material type Cycle time

    Loader Load bucket and shift gears

    Turn and dump the load

    Travel distance and time from dumping to loading position and return tothe loading position

    TotalCycleTime,

    T

  • 5/24/2018 DPWH - Cost Estimation

    20/63

    Hauling Unit Rate Analysis (cont.)

    Cycle time Dump Truck

    Average hauling distance

    Terrain type

    Loading time Loaded travel time

    Initial traveled distance during acceleration

    Succeeding traveled distance at an average speed

    Final speed at a distance until it stops

    Unload and maneuver

    Return empty

    Same as loaded but at a greater speed

    Allowance for delay

    Number of dump truck trips, n

    Unit Price Analysis

    TotalCycleTime,

    T

  • 5/24/2018 DPWH - Cost Estimation

    21/63

    Unit Price AnalysisHauling Unit Rate Analysis (cont.)

    Number of dump trucks

    Average hauling output

    Total hauling cost per hour Equipment

    1 Wheel loader, ___ m3/hr -------------- _____ P/hr

    N Dump trucks, ___ m3------------------ _____ P/hr

    Labor1 Leadman, rate --------------------------- _____ P/hr

    2 Laborers, rate --------------------------- _____ P/hr

    Total Cost per hour _____ P/hr

    Total unit cost per m3, (loose volume)

  • 5/24/2018 DPWH - Cost Estimation

    22/63

    Sample of hauling cost analysis using spreadsheet

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    23/63

    Production Rate Derivation of a Pay Item

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    24/63

    Unit Price Analysis

    Elements of the Indirect Cost

    Profit contractors profit Overhead Expenses

    Office Expenses (office equipment and supplies) Engineering and Administrative Cost Transportation allowances Contractors All Risk Insurance Premiums on Bid Security and Performance Security Premium/charges/fees on credit lines

    Contingencies Miscellaneous Expenses Laboratory Tests Other expenses

    Mobilization/Demobilization

  • 5/24/2018 DPWH - Cost Estimation

    25/63

    Estimated

    Direct Cost(EDC)

    Indirect Cost % for OCM

    and Profit (MaximumRanges) % Cost for

    Mob/Demob(Maximum)

    TotalMaximumIndirect

    Cost % forOCM, Profit

    and Mob/

    Demob

    OCM (% of

    EDC)

    Profit (% of

    EDC)

    Up to P1Million 13 15 1 29

    Above P1M to

    P5M12 14 1 27

    Above P5M to

    P10M12 13 1 26

    Above P10M to

    P20M11 12 1 24

    Above 20M to

    P50M11 11 1 23

    Above P50M 10 10 1 21

    Unit Price AnalysisDO 57s 2002

  • 5/24/2018 DPWH - Cost Estimation

    26/63

    Unit Price Analysis

    Cost Currency Components:

    Foreign Cost Component imported equipment & spare parts foreign currency component of locally goods

    & services wages of expatriate personnel foreign overheads & profits

    Local Cost Component local materials

    equipment & supplies wages, local supervision transport & freight overhead & profits

    Tax Component revenue for the government derived from each item

  • 5/24/2018 DPWH - Cost Estimation

    27/63

    Cost Component of Selected Construction Items

    Unit Price Analysis

    DescriptionComponents

    Foreign Local Tax

    (%) (%) (%)

    Heavy Equipment

    Light Equipment

    Reinforcing Steel

    Structural Steel

    Lumber

    Asphalt

    Cement

    Diesel fuel

    Engine oil

    Tires

    Imported Miscellaneous Materials

    Locally Produced Miscellaneous Materials

    Skilled Foreign Labor

    Unskilled Labor

    Royalty

    68

    65

    54

    85

    33

    76

    40

    60

    60

    47

    64

    17

    65

    0

    0

    10

    15

    35

    4

    57

    2

    45

    13

    13

    43

    7

    69

    25

    90

    90

    22

    20

    11

    11

    10

    22

    15

    27

    27

    10

    29

    14

    10

    10

    10

  • 5/24/2018 DPWH - Cost Estimation

    28/63

    Quantity Calculations for Pay Items Bill of Quantities

    Pointers in the conduct of quantity calculations:

    Based on the design plans and specifications Units of measurement are all in metric based on

    DPWH Standard Specifications. Solid mensuration is extensively used and other

    mathematical formulae.

    Used of computer softwares in calculations. Used of calculators (simple or scientific) Conversion factors Rates of application of materials such as, liquified

    asphalt materials, paints, etc.

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    29/63

    Unit Price AnalysisSample Formula of Plane Shapes & Figures

    Area of a TriangleA= "xbase x height= "(bh)

    Perimeter of a Triangle

    P = side1+ side2+ side3

    Area of a ParallelogramA =!x base x height = !(bh)

    Perimeter of a Parallelogram

    P = 2a + 2b

    Area of a RectangleA = width x length = (wl)

    Perimeter of a Rectangle

    P = 2(lwidth) + 2(length) = 2(w) + 2(l)

    Area of a CircleA = !r2

    Circumference of a Circle

    C = 2!r= !D != 3.14 159

  • 5/24/2018 DPWH - Cost Estimation

    30/63

    Sample Formula of Solid Geometric Figures

    Unit Price Analysis

    Volume of Rectangular SolidV = abc

    Surface Area

    SA = 2(ab + ac + bc)

    Volume of CubeV = a3

    Surface Area

    SA = 6a2

    Volume of SphereV = 4/3 !r3

    Surface Area

    SA = 4!r2

    Volume of Circular ConeV = 1/3 !r2h

    Surface Area

    SA = !r2+ !rl

    Volume of Circular CylinderV = !r2h or !D2 4

    Surface Area

    SA = 2 !rh + 2!r2

  • 5/24/2018 DPWH - Cost Estimation

    31/63

    Unit Price AnalysisSample Typical Road Sections

  • 5/24/2018 DPWH - Cost Estimation

    32/63

    # Estimating the work output of a piece of equipment is determined in 2 ways: Using work output formula based on the cycle of operation and other factors whichcontrolled production. Using tables based on past experiences of average work output under varying conditions for

    different operations.

    # To calculate earthmoving equipment consider the volume changes in earth caused byhandling. These volume changes have the following terms, to wit:

    Swell increase in volume of earth that results when it is dug from its natural position. Shrinkage decrease in volume of earth when compacted. Loose yards volume of earth after it has been removed from its natural location and swell

    has taken place.

    In-place yards volume of earth in its natural location before handling. Compacted yards volume of earth that has been properly compacted in embankment on

    fill.

    # Basis of calculations for excavation and fill Loose yards are used to express the carrying capacity of earth moving equipment. In-place yards are converted to compacted yards to determine the volume of materials in a

    fill that will be realized from a given amount of materials in its natural location. In-place yards are converted to loose yards to determine the amount of earth moving

    equipment required to handle the materials.

    The output of equipment in loose yards must be converted to compacted yards to determinethe final volume of fill

    Methods of Estimating Work Output

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    33/63

    1.0 m3

    in natural condition(in-place yards)

    1.25 m3after digging

    (loose yards)

    0.9 m3after compaction

    (compacted yards)

    Volume Changes in Common Earth Caused by Handling

    Bowl Capacity of Dozer

    Illustrations of Soil Handling

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    34/63

    Formula for Earthmoving Equipment Work Output

    where:

    Q = bowl capacity in loose cubic meters

    f = soil conversion factor60 = minutes per hour

    E = efficiency factor

    Cm = total cycle time in minutes

    The working capacity of construction equipment is expressed by

    the work practically done by the operation of equipment per unit

    time ( 1 hour or day)

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    35/63

    Conversion Factors, f

    Soil TypePresent

    Condition

    Converted to

    In-place Loose Compacted

    Sand

    Common Earth

    Clay

    In-place

    Loose

    Compacted

    In-placeLoose

    Compacted

    In-place

    Loose

    Compacted

    1.00

    0.90

    1.05

    1.000.80

    1.11

    1.00

    0.70

    1.11

    1.11

    1.00

    1.17

    1.251.00

    1.39

    1.43

    1.00

    1.59

    0.95

    0.86

    1.00

    0.900.72

    1.00

    0.93

    0.63

    1.00

    Tractor Model Bulldozer Angle Dozer

    D4

    D6

    D7

    D8

    1.25 m3

    1.44 m3

    2.20 m3

    2.40 m3

    1.82 m3

    2.01 m3

    2.58 m3

    2.97 m3

    Bowl Capacity of Dozers (loose yards)

    Unit Price Analysis

    Source: Construction Equipment Manual, BRS/DPWH

  • 5/24/2018 DPWH - Cost Estimation

    36/63

    Sample Calculation for Work Output

    Given: Average haul distance one way 30 m

    Soil type - common earth

    Efficiency factor (E) - 80%

    Speed - 2.5 kph

    Required: Determine in place cubic meters moved per hour if D7 tractor dozer is to be used.

    Solution:

    Step 1. From conversion factor table, the soil conversion factor (f), soil type common earth loose to in-place,

    f = 0.80

    From dozer bowl capacity table, D7 tractor dozer, Q = 2.2 m3

    Step 2. Determine fixed time

    @ 2 gear shift @ 10 sec. per shift = 20 sec = 0.33 min

    Step 3. Determine variable timeTravel forward 30 m @ 2.5 kph

    Travel backward 30 m @ 5.0 kph

    Step 4. Add fixed and variable time

    Total cycle time, Cm = 0.33 + 0.72 + 0.36 = 1.41 min.

    Step 5. Substitute in work output formula

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    37/63

    Unit Price AnalysisSample Typical Cross-Section of Drainage Structures

    Sample Quantity Calculation for Volume of Excavation:Sample: Given a RCPC 1220mm and a length of 5.0 meters, compute volume of excavation.

    Solution: Size of excavation as given from the above drawings for 1220mm:width = 1.60m, height = 2.0 m, length = 5.0 m

    Volume = wxhxl = 1.6x2 x 5 = 16 m3compacted volume (stated in the plans)

    Applying the soil conversion factor, common earth from compacted to loose, use

    factor, f= 1.39 the excavated loose volume = 16x1.39 = 22.24 m3

  • 5/24/2018 DPWH - Cost Estimation

    38/63

    Volume of Backfill and Bedding Materials:Sample: Using the same sample, calculate backfill and bedding materials

    Solution: Size of excavation as given from the above drawings for 1220mm:width = 1.60m, height = 2.0 m, length = 5.0 m

    Volume of trench = wxhxl = 1.6x2 x 5 = 16 m3

    Volume of bedding materials at compacted state, using thickness of 15cm

    = 1.6x 0.15x5 = 1.2 m3

    Using soil conversion factor, compacted to loose, f= 1.17

    Volume of bedding materials required to purchase = 1.2 x 1.17 = 1.404m3Volume of backfill = Voltrench (VolRCPC+ Volbedding) = 16 (7.371+1.2) = 7.429 m

    3

    Applying conversion factor, compacted to loose, f= 1.39

    Volume of backfill required = 7.429x1.39 = 10.326 m3

    Sample Quantity Calculation

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    39/63

    Composition and Strength of Concrete for Use in Structures

    This composition of concrete is used for concrete batching plant.

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    40/63

    Mixture

    Class of

    Concrete

    Proportion Cementin Bags

    Sand

    cu. m.

    Gravel

    cu. m.

    AA

    A

    B

    C

    1:1":3

    1:2:4

    1:2":5

    1:3:6

    12.0

    9.0

    7.5

    6.0

    0.5

    0.5

    0.5

    0.5

    1.0

    1.0

    1.0

    1.0

    Concrete Proportion

    This concrete proportion is used for manual mix.

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    41/63

    MixtureClass of

    Concrete

    ProportionCementin Bags

    40 kgs.

    Sandcu. m.

    A

    B

    C

    D

    1:2

    1:3

    1:4

    1:5

    18.0

    12.0

    9.0

    7.5

    1.0

    1.0

    1.0

    1.0

    Cement and Sand Proportion for Mortar and Plastering

    Unit Price Analysis

    Sample Calculation:

    Given: Volume = 10 m3

    of mortar, use class ASolution: Refer to the above table

    Cement = 10 x 18 = 180 bags

    Sand = 10 x 1.0 = 10 m3

  • 5/24/2018 DPWH - Cost Estimation

    42/63

    Sample Calculation for Asphalt Concrete Pavement:

    Given: Carriageway width = 6.7m, Length = 1 km., thickness = 50cm,use 301(1) - MC-70 Cut-Back Asphalt

    Solution:

    Determine Item 301(1) - Bituminous Prime Coat

    Determine Item 310 Bituminous Concrete Surface Course, Hot-Laid (AC Asphalt Concrete)

    The derived quantities are then summarized in the bill of quantities and subsequently,manually entered in the estimated construction cost spreadsheet which are multiplied bythe unit prices to come up with total cost of that item and summed up all the pay items tocalculate the total direct cost. After which, indirect cost is applied to determined the totalestimated project cost.

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    43/63

    Unit Price Analysis

    Item Number Description Unit Quantity100(1)

    102(1)

    102(2)

    103(3)

    103(6)104(1)

    105(1)

    105(3)

    200

    201

    301(1)

    310

    500(1)

    Clearing and Grubbing

    Unsuitable Excavation

    Surplus Common Excavation

    Foundation Fill

    Pipe Culverts and Drainage ExcavationEmbankment

    Subgrade Preparation (Common Material)

    Subgrade Preparation (Unsuitable Material)

    Aggregate Subbase Course

    Aggregate Base Course

    Bituminous Prime (MC-70 Cut-Back Asphalt)

    Bituminous Concrete Surface Course, Hot-Laid

    RCPC 610mm

    ha.

    m3

    m3

    m3

    m3

    m3

    m2

    m2

    m3

    m3

    ton

    m2

    l.m.

    20

    1,000

    11,000

    2,000

    1,8587,500

    3,000

    5,000

    10,455

    12,156

    30,780

    5,689

    3,105

    Sample of Bill of Quantities

  • 5/24/2018 DPWH - Cost Estimation

    44/63

    Sample of unit

    price analysis in

    spreadsheet

    Unit Price Analysis

  • 5/24/2018 DPWH - Cost Estimation

    45/63

    Unit Price Analysis

    Sample of Summary of Construction Pay Items Unit Prices

  • 5/24/2018 DPWH - Cost Estimation

    46/63

    Unit Price AnalysisSample of Total Estimated Project Cost

  • 5/24/2018 DPWH - Cost Estimation

    47/63

    Unit Price Analysis

    Sample of the Program of Work (POW)

  • 5/24/2018 DPWH - Cost Estimation

    48/63

    Unit Price AnalysisSample of the Approved Budget for the Contract (ABC)

  • 5/24/2018 DPWH - Cost Estimation

    49/63

    Unit Price AnalysisSample of the Minimum Equipment Requirement

  • 5/24/2018 DPWH - Cost Estimation

    50/63

    Maintenance Cost

    Highway Maintenance

    - is defined as the act of preserving and keeping each

    highway type of highway as nearly as possible in its

    original conditions as constructed or as subsequently

    improved. It does not include rehabilitation, bettermentand improvement

    Two calculation methods for maintenance cost

    - EMK (Equivalent Maintenance Kilometrage)

    - Traffic Dependent Method

  • 5/24/2018 DPWH - Cost Estimation

    51/63

    Two Categories: Routine Maintenance

    vegetation control cleaning and repairing culverts cleaning ditches cleaning and repairing traffic signs climatic loss of gravel on shoulder

    Periodic Maintenance road surface repairs resurfacing shoulder repair & resurfacing

    General Cost

    Maintenance Cost

  • 5/24/2018 DPWH - Cost Estimation

    52/63

    Maintenance Cost

    EMK Factors

    Source: BOM/

    DPWH

    0

    AADT

    AADT

    Basic Formula:

    Road:

    MCR= EMKbudgetxFtxFwxLength

    where:

    MCR= maintenance cost for road

    EMKbudget= annual allocation

    Ft= factor for surface type

    Fw= factor for carriageway width

    Length = in kilometer

    Bridge:

    MCB= EMKbudgetxFbxLength

    where:

    MCB= maintenance cost for bridge

    EMKbudget= annual allocation

    Fb= factor for bridge type

    Length = in meter

  • 5/24/2018 DPWH - Cost Estimation

    53/63

    Traffic Dependent Method

    Traffic volume in terms of vehicle units:

    Light vehicles !0.4 vehicle units Buses !2.5 vehicle units Trucks !3.0 vehicle units

    Maintenance Cost

  • 5/24/2018 DPWH - Cost Estimation

    54/63

    Maintenance CostBasic assumptions in calculating routine maintenance unit rates :

    Vegetation Control 0.5 ha/km/year 400 m2/crew day 2 - knapsack movers 2 - unskilled laborers

    Cleaning and Repair of Culverts 1 4 number units/day/km 1 dump truck 3 unskilled laborers Materials

    Replace, Clean and Repair Traffic Signs 2 5 units repaired, repainted or replace daily 1 pick-up vehicle Materials

    Clearing Side Ditches 40 1000 l.m./day (half by grader and half by hand or manual) 1 grader 3 unskilled laborers

    Source: Road Maintenance Manual, BOM-DPWH

  • 5/24/2018 DPWH - Cost Estimation

    55/63

    Maintenance Cost

    Periodic Maintenance

    Road Surface Repair Regravelling gravel road and gravel shoulder Grading & reshaping gravel road Joint & crack sealing for PCCP Pothole repair (spot regravel) for gravel road Patch potholes for ACP Crack sealing for ACP Edge break for ACP

    Resurfacing Asphalt Concrete Overlay

    Shoulder Repair & Resurfacing Regravelling Grading and reshaping Asphalt Concrete Overlay

  • 5/24/2018 DPWH - Cost Estimation

    56/63

    Maintenance Cost

    Sample of routine maintenance unit

    price analysis

  • 5/24/2018 DPWH - Cost Estimation

    57/63

    Maintenance CostPeriodic Maintenance Task

  • 5/24/2018 DPWH - Cost Estimation

    58/63

    Maintenance Cost

    General Formula for Maintenance Cost Calculations Routine Maintenance (peso/km)

    Maintenance Task = QtytablexLshoulderx W x 365 days x unit rateactivity General Cost

    Periodic Maintenance (peso-vehicle unit/km) Maintenance Task = (QtytablexLx Wx 365 daysxunit rateactivity) Frequencyvehiclewhere:

    L = length in meters

    W = width in meters

    Qtytable = Periodic Maintenance Task Tableunit rateactivity = maintenance unit price analysis

    Frequency = benchmark of traffic volume in terms of v.u. as shown in PeriodicMaintenance Task Table

  • 5/24/2018 DPWH - Cost Estimation

    59/63

    Maintenance Cost

    Routine Maintenance Unit Cost

    Road Segment Economic Financial

    a. Vegetation controlb. Cleaning and repair culvertsc. Replace, clean and repair traffic signsd. Clearing side ditches

    P 5,312.58/km

    4,880.19/km

    5,384.64/km

    10,813.92/km

    P 6,498.57/km

    7,055.90/km

    6,667.53/km

    13,250.68/km

    Total per annum P 26,391.34/km P 33,472.67/km

    Routine Maintenance Unit Cost

    Bridge Segment Economic Financial

    a. Concrete bridgeb. Steel bridge P 568.79/l.m.3,714.14/l.m. P 721.41/l.m.4,710.72/l.m.

    Sample of Summary Routine Maintenance Unit Cost

  • 5/24/2018 DPWH - Cost Estimation

    60/63

    Maintenance Cost

    Maintenance Tasks Unit Cost

    Economic Financial

    1. Gravel ( Surface )2. Regrade and Reshape

    a. Carriagewayb. Shoulder

    3. AC Resurfacing ( 3 cm.)4. AC Overlay ( 5 cm. )5. Replacement of Failed Bay

    a. t = 230 mmb. t = 200 mm

    6. Repair of Cracks/Joints7. Patching and Pothole Repair

    a. Pothole Repair ( Gravel )b. Pothole Repair (AC)c. Sealing and Patching (AC)

    8. Road Stripping (painted lines)

    P 481.87/m3

    5.14/m215.41/m2

    94.36/m2135.51/m2

    2,527.25/m22,197.69/m2

    18,066.78/m2

    498.56/m3

    494.06/m2

    510.81/m2

    48.53/m

    P 579.45/m3

    6.29/m218.87/m2

    113.28/m2162.25/m2

    3,089.00/m22,686.20/m2

    22,123.42/m2

    598.08/m3

    597.05/m2

    617.50/m2

    57.48/m

    Sample of Summary of Periodic Maintenance Unit Cost

  • 5/24/2018 DPWH - Cost Estimation

    61/63

    Summary of Maintenance Costs

    Road TypeMaintenance Category

    Routine Periodic

    Economic Financial Economic Financial

    Gravel Roads (5.0m roadway)AC with gravel shoulders

    a.0.5+6.1+0.5b.1.0+6.1+1.0c.1.5+6.1+1.5d.3.0+6.7+3.0

    PCC with gravel shoulders

    a.0.5+6.1+0.5t = 230 mm

    t = 200 mmb. 1.0+6.1+1.0

    t = 230 mm

    t = 200 mmc. 1.5+6.1+1.5

    t = 230 mmt = 200 mm

    d. 3.0+6.7+3.0

    t = 230 mmt = 200 mm

    49,521.08

    31,210.0336,028.73

    40,847.4255,303.51

    31,210.03

    31,210.03

    36,028.73

    36,028.73

    40,847.4240,847.42

    55,303.5155,303.51

    61,286.05

    39,267.1345,061.58

    50,856.0368,239.39

    39,267.13

    39,267.13

    45,061.58

    45,061.58

    50,856.0350,856.03

    68,239.3968,239.39

    737.36a

    80.05a100.55a

    121.06a186.01a

    62.77a

    62.12a

    83.27a

    82.62a

    103.77a103.12a

    166.34a165.69a

    896.59a

    96.33a121.40a

    146.47a225.81a

    75.81a

    75.01a

    100.88a

    100.08a

    125.95a125.15a

    202.43a201.63a

    Maintenance CostSample of Summary Maintenance Cost

    Note: a = vehicle unit, v.u.

  • 5/24/2018 DPWH - Cost Estimation

    62/63

    Sample of Summary of

    Work Unit Cost usedin HDM-4

  • 5/24/2018 DPWH - Cost Estimation

    63/63