dr aung myint maw ycdc(1) · 2016. 7. 15. · 08/07/2016 1 8‐jul‐16 1 presented by dr aung...
TRANSCRIPT
08/07/2016
1
8‐Jul‐16 1
Presented byDr Aung Myint MawAssistant Chief Engineer.YCDC.
Area : The administrative boundary of YCDC, in
1985 ( 133.643 Sq‐Miles) and
now a day ( 292.426 ) Square Miles.
Population : 6 million (2014)
Township ; 33 Tsps
Generation Rate ; 0.41 Kg / Capita / Day
Household Waste Generated : 2000 tons per day
Industrial Waste :150 tons per day
Area : The administrative boundary of YCDC, in
1985 ( 133.643 Sq‐Miles) and
now a day ( 292.426 ) Square Miles.
Population : 6 million (2014)
Township ; 33 Tsps
Generation Rate ; 0.41 Kg / Capita / Day
Household Waste Generated : 2000 tons per day
Industrial Waste :150 tons per day
ProfileProfile
08/07/2016
2
Area MapArea Map
4
08/07/2016
3
Yangon People
&
House Hold
Source Separation
Dry Waste
Wet Waste
Waste
Industry
Construction
Hazardous
Hospital
Others
Household waste
Organic Waste
Inorganic Waste
Waste Define in YangonWaste Define in Yangon
08/07/2016
4
Public (Household)
Carts
Dust Bins
Trucks
Containers
Truck
Truck
Truck
RORO
FDS
Collection and TransportationCollection and Transportation
Household waste
Sorting the Recyclable Materials
Landfill Gas Plant
Landfill Gas Plant
Incineration Plant
Incineration Plant
Household Waste ManagementHousehold Waste Management
08/07/2016
5
IndustriesOn call System
FDS
Tipping Fee at site, 5000 kyat par tons and exceed ton about
added 2000 kyat.
Industrial Waste ManagementIndustrial Waste Management
Containers
Structure of Recycling Market
House Hold and Waste Generator
Household Collectors
Collector/ Local Buyer
Whole Sellers
Factory/ Recycle
Export Domestic User10
08/07/2016
6
Integrated Solid Waste ManagementIntegrated Solid Waste Management
Recyclable
Material Sorting
PCCD Recycle Factory
Private Factory
FDS
Check List at the FDS office
DumpingLeveling
Compacting
Final Disposal Site Management
08/07/2016
7
00.050.10.150.20.250.30.350.40.45
Column6
Column6
0.395 Kg/capita/dayTOWNSHIP OF CITY
0.312 Kg/capita/dayDATA BASED ON C.B.D OF CITY
0.287 Kg/capita/day2% OF CITY POPULATION
0.267 Kg/capita/day3.2% OF CITY POPULATION
0.396 Kg/capita/day7.5 % OF CITY POPULATION
0.411 Kg/capita/day10 % OF CITY POPULATION
2016-2017…Waste Generated = (2000) TPD2016-2017…Waste Generated = (2000) TPD
2015– 2016GenerationRate2015– 2016GenerationRate
Budget Years
Kg
0
100000
200000
300000
400000
500000
600000
700000
800000
Waste Collected
Waste Collected
Waste Collected2007‐2008 4563442008‐2009 4337642009‐2010 4374722010 ‐ 2011 4269992011 ‐ 2012 4792802012 ‐ 2013 5537192013‐2014 5066572014‐2015 5906322015‐2016 716051
Tons
Budget Years
Yearly Waste Collected
08/07/2016
8
Note: (1) Total capital investment about (16) million US $, ( 2)YCDC allocated (8) which fixed (1.4) at 2015-2016, (6.6) at 2016-2017(3) Leap Frog program about (8) million, 3-year program from MoEJ. (4) Joint Crediting Mechanism about from MoFAJ, ongoing stage.
Proposed area for SSIP (15) acre
NO
Location of FDS site
Constructed Year
Planned Capacity
Site ( Plant) Area
Dispose Ton Per Day
( Current)
Remark
1 HtainBin 2002 - 150- Acre
Used- 70 Ac
950 Open Dumping
2 HtweiChaung
2001 - 147 – Acre
Used-47.4 Ac
800 Open
Dumping
3 Dala 2003 - 1.3- Acre 20 Low Landfill Temporary site
4 SeikkyiKhanaung
To
2003 - 0.25 - Acre 5 Low Landfill Temporary site
5 Mingalardon 2003 - 0.91 - Acre 60 Low Landfill Temporary site
6 Shwe PyiThar
2005 - 1 - Acre 60 Low Landfill Temporary site
8‐Jul‐16 16
Existing Used Main ( 2 ) Final Disposal Sites & ( 4 ) Temporary Small FDS
Existing Used Main ( 2 ) Final Disposal Sites & ( 4 ) Temporary Small FDS
08/07/2016
9
1
2
3
HLEGUHLEGU
HLAWGARHLAWGAR
HTAINBINHTAINBIN
7
4
5
6
8
9
HTAWE CHAUNGHTAWE CHAUNG
KYI SUKYI SU
NORTH DAGONNORTH DAGON
THNN LYINTHNN LYIN
DALADALA
2040 ..Selected FDS2040 ..Selected FDS
THAKETATHAKETA
To Sustain Our Planet, Do Our Best