DRAFTTottenham Green & Seven Sisters
4.1
43
Tottenham Physical Development Framework: Tottenham Green & Seven Sisters
A Plan for Tottenham Green/Seven Sisters:
Tottenham Green & Seven Sisters is the cultural heart of Tottenham, as Hoxton Square is to Hackney or Bloomsbury is to Camden. The current contribution of existing functions located around the Green (the College of Haringey, Enfield and North East London, the Bernie Grant Art Centre, Town Hall, Old Fire Station, Marcus Garvey Library and Tottenham Leisure Centre), as well as the activities and ambitions of Holy Trinity Church on the Green itself, offers the opportunity to create a significant cultural destination for North London. Grainger’s investment in a complex development scheme at Wards Corner shows significant investor confidence in the area and an exciting future for Seven Sisters. There is an amazing opportunity to enhance and strengthen existing assets and the physical character of the area so that it realises its potential and becomes recognised throughout London as the cultural heart of Tottenham.
The short-term vision concentrates on maximising the benefit of the existing assets including:
• Public realm improvements and physical engagement of key street frontages with the Green;
• A proactive management and promotion of a programme of events at the Green;
• Identifying where LB Haringey can leverage its assets to achieve regeneration objectives around the Green, for example, by facilitating a restaurant operator to come onto the Green;
• Enhancing the retail offer along West Green Road to become a specialist retail destination; and
the cultural heart of Tottenham
• Implementing changes to the operation of the gyratory.
In the longer term, the vision will be strengthened by strategic development opportunities including the Arriva bus garage and the library/leisure centre car park. The relocation of some of CHENEL’s construction accommodation elsewhere within the Borough could also be explored to free up space for housing to complement the recently completed Newlon Homes scheme to the north behind the Town Hall. This also creates opportunity to enhance the character of the lanes running off the Town Hall Approach - animating the ‘back’ of the library, Bernie Grant Art Centre and Town Hall buildings, bringing some of the existing buildings such as the Old Fire Station workers cottages into more active use.
Scale of Change
Long-term aspirations for this area could mean:
• Creation of up to 700 new homes around Tottenham Green on bus garage, Leisure Centre/Library car park and Seven Sisters Regeneration sites;
• Retention of existing levels of employment, with the potential for increased numbers of start-up companies;
• Enhanced public realm and green space; and
• Enhancing the distinctive retail offer along West Green Road.
The Asset Plan for Tottenham Green, Workspace Report and the Retail Strategy reports have informed the recommendations for this area.
44
CULTURE & EDUCATION
TRANSPORT
RESIDENTIAL& EMPLOYMENT
EMPLOYMENT& INDUSTRIAL
OPENSPACE
RESIDENTIAL
RESIDENTIAL
RESIDENTIAL
Figure 4.1.1 -
Concept Plan
4. Areas of Change
45
Characterisation ofTottenham Green & Seven Sisters
Tottenham Green & Seven Sisters is at the southern end of the High Road and is the gateway to Tottenham. Retail is clustered to the south of the area, with civic and cultural uses to the north and residential beyond.
Apex House is located at the most southern end of the area and currently provides office accommodation. North of Apex House and south of the cross roads of the High Road, Broad Lane and West Green Road is Seven Sister’s Market, which is the anchor development for the retail offer which extends westwards down West Green Road. The Seven Sisters Regeneration Site (also known as Wards Corner) has planning permission for its redevelopment to provide 196 new homes and retail including a replacement market, demonstrating investor confidence in the area and its potential.
West Green Road provides a thriving local parade of small high street units (with generally poor quality residential accommodation located above) occupied almost entirely by local independent traders. The majority of the offer is targeted at the Caribbean community and based on convenience and service retail comprising barbers shops/hairdressing salons, small food stores/newsagents, specialist butchers and greengrocers and money exchange/travel agents.
Seven Sisters Underground and National Rail station are located at the cross roads and provides a focal point for activity in this area. Between the station and Tottenham Green is a mixture of predominantly non-retail uses although it includes a Tesco which fronts directly onto the High Road. The Tesco store has parking on two levels above and residential in turn above that. On the corner of the High Road and Broad Lane is an attractive yet dilapidated Grade II listed building, which was previously a bank and is now used as offices.
Tottenham Physical Development Framework: Tottenham Green & Seven Sisters
The High Road forms a dominant feature within the area, with high levels of traffic and at this location forms part of the gyratory system, although it is currently subject to improvements. The High Road reduces permeability east-west across the area.
Tottenham Green straddles the High Road at the northern end of this area and consists of landscaped open space with mature trees surrounded by period buildings. The Green is currently used for informal recreation. Surrounding Tottenham Green is a range of uses including residential, civic, educational and cultural/leisure. Residential uses predominate to the east of the Green; whilst to the west is the College of Haringey, Enfield and North East London (CHENEL), former Town Hall, former Fire Station, the Bernie Grant Arts Centre and the Tottenham Green Leisure Centre and Library. Holy Trinity Church is located at the north end of the Green and operates a nursery. North of the Green is the Arriva bus garage.
46
1. West Green Road
3. The Cross
5. Seven Sisters Station
7. High Road
9. The Green
1
3
5
7
9
8
10
6
4
2
2. CHENEL
4. Old Town Hall
6. Lane down the side of Bernie Grant Art Centre
8. Leisure Centre
10. Bus Garage
47
Figure 4.1.2 -
Opportunities and Constraints
Tottenham Physical Development Framework: Tottenham Green & Seven Sisters
Opportunities and Constraints
Existing opportunities and constraints have informed the changes proposed within the area. They are not presented in any particular order.
Opportunities
1. Tottenham Green as a destination through asset maximisation in this location. This could be achieved through activating the civic, cultural and educational heart of Tottenham through a variety of initiatives including a programme of events at Tottenham Green and improving the retail offer in this locality to include cafes, bars etc.
2. Removal of the gyratory system will reduce the impact of traffic and improve the pedestrian experience by enhancing permeability.
3. Western pavement on the High Road particularly at the junction with West Green Road is wider than needed just for pedestrian movement. The space could be activated to encourage movement between Seven Sisters Underground Station and Tottenham Green through market stalls or pop-up events.
4. Existing specialist retail destination at West Green Road with potential for further enhancement.
5. Excellent public transport accessibility with the area served by Seven Sisters underground and overground stations and numerous bus routes and proposed devolution of West Anglia line to TfL.
6. Cluster of civic and cultural uses at Tottenham Green including CHENEL the key educational hub in Tottenham.
7. Established, mature open space at Tottenham Green providing a green lung.
8. Tottenham Green is currently underutilised as a green space with limited access points and paths not following natural desire lines. An opportunity exists to make improvements to the public realm to improve the attractiveness and use of the space.
9. The leisure centre car park provides the potential for redevelopment for new civic uses and new homes subject to agreement being reached with the current long leaseholders (Fusion) and alternative car parking provision being identified.
10. Maximise council assets around Tottenham Green to maximum regeneration benefits. Whilst it is acknowledged that some of the Council assets are subject to long leases, there is an opportunity to develop mutually beneficial management plans for these buildings.
11. Redevelopment of Wards Corner Seven Sisters Regeneration Site is proposed including replacement of Seven Sisters Market. Planning permission was granted in 2012 and the redevelopment of this site could be a catalyst for wider regeneration of the area. However, timescales for the delivery of this development are difficult to predict.
12. Apex House is a potentail development site.
13. Arriva bus garage has redevelopment potential and could be promoted for a residential led mixed use scheme. In order to facilitate redevelopment of this site, an alternative location for the bus garage would need to be found.
14. Retail frontages on east side of High Road could benefit from physical improvements as well as diversification of users to support broader vision for this part of Tottenham. Tesco is an asset as a large retail anchor.
15. Heritage assets include statutory listed and locally listed buildings along the High Road and around the Green. Part of the area also falls in the Tottenham Green and Seven Sisters/Page Green Conservation Areas.
Constraints
16. The High Road is four lanes wide and provides a significant barrier to east-west movement. The level of car use has knock on effect for the neighbouring environment with high levels of air pollution. As a major movement route the High Road provides a high level of visibility and accessibility.
48
Conservation Area
Gyratory Improvements Potential Development Sites
Prime Retail Frontage
Conservation Area
1
2
6
34
13
10 8
9
14
15
5
7
11
National Rail station
Underground station
Leisure Centre
Marcus GraveyLibrary
Town Hall
Bernie Grant Art Centre
CHENEL
High Cross
Holy Trinity
Monument Way
Hig
h R
oa
d
Broad Lane
West Green Road
12
4. Areas of Change
49
Asset Existing Use
TG1 Apex House Employment
TG2 Former Firemen’s Cottages Employment
TG3 Old Town Hall Employment
TG4-7 Bernie Grant Arts Centre Civic/community/employment
TG8 Marcus Garvey Library Civic/community
TG9 Tottenham Green Leisure Centre Civic/community
TG10 Tottenham Green Open space
TG11 Former Toilet Block/Monument Way open space n/a and open space
TG12 Tottenham Green Workshops Employment
TG13 Page Green Common Open space
TG14 Tesco + housing Retail, housing
TG15 Westerfield Road car park Car park
TG16 Somerset Road car park Car park
Table 4.1.1 -
LB Haringey Assets at Seven Sisters & Tottenham Green
Figure 4.1.3 -
LB Haringey Assets in Seven Sisters/Tottenham Green
Tottenham Physical Development Framework: Tottenham Green & Seven Sisters
Public Sector Assets
The Asset Plan for Tottenham Green report has been prepared for the Seven Sisters / Tottenham Green area. It recommends that LB Haringey and other public sector agencies should, where possible, commit their assets to delivering change and regeneration in the area. This has the ability to demonstrate confidence in investment and to attract further private and third sector investment Assets in public sector ownership can potentially be used to effect change in the area. They can be used to kick start delivery of proposals where there are no or limited third party interests and where the private sector is not forthcoming; or they can be used in partnership with private sector assets for the identified interventions.
LB Haringey owns a significant number of properties within the Tottenham Green & Seven Sisters area as illustrated in Figure 4.1.4. These are primarily clustered around Tottenham Green but also include properties located further south such as Apex House. Many LB Haringey properties are let as long leases. The main LB Haringey assets are:
50
Areas of Change
12
10
89
13
14
15
4
1
16
11
23
56
7
51
Tottenham Physical Development Framework: Tottenham Green & Seven Sisters
The Plan to 2025
Ongoing Initiatives
Ongoing initiatives include:
• Growth on the High Road (GOTHR) public realm and landscape proposals;
• TfL gyratory removal scheme;
• Portas Pilot High Street Innovation Fund (CLG) work on West Green Road;
• Isobel Place housing development by Newlon Homes; and
• Seven Sisters Regeneration Site Wards Corner redevelopment plans.
Immediate Priorities
In the short term, the following physical priorities have been identified to deliver regeneration of the area. These projects have been agreed as priority projects and greater detail is provided for these projects in the Action Plan overleaf. The immediate proprieties primarily focus on those aspects that LB Haringey can deliver, where appropriate in partnership with other investors to demonstrate its commitment to and confidence in the area and its communities:
• Deliver public realm improvements at Tottenham Green in accordance with the Growth on the High Road proposals;
• Secure development proposals for Tottenham Green leisure centre/library car park to provide a mixed use scheme. If commercial space was provided as part of this development, office accommodation within Apex House could be relocated here;
• Explore opportunities to relocate the police station to have a 24/7 presence on Tottenham Green;
• Market a new restaurant offer at Tottenham Green: to secure a major restaurant operator in the Tottenham Green area through a joint work programme with landowners to activate the frontage of Town Hall Approach Road;
• Upgrade the retail offer through a range of initiatives including: undertaking shop front and signage improvements; encouraging diversification of the retail offer; and encouraging temporary uses of vacant units; and
• Promotion of West Green Road as a specialist retail destination focusing on its distinct cultural offer.
Short to Medium Term Priorities
In the short to medium term the following projects should be progressed to deliver further regenerative benefits to the area and to stimulate private sector investment that will deliver further improvements to Tottenham Green & Seven Sisters.
• Activate the public realm between Tottenham Green and Seven Sisters Underground Station through improved public realm and a series of events and pop-up uses, alongside potentially taking leases on this part of the High Road;
• Leverage use of Council assets around Tottenham Green to maximise regeneration benefits; and
• Implement the priority recommendations set out in the Asset Plan for Tottenham Green to improve the workspace offer.
52
Create new work environmentsthrough adaptation
Activate public realm
Deliver new public realmand landscape
Secure major restaurantoperation
Leverage use of Council assets
Link back to fronts
Completenew housing
Secure development of car park
Create development opportunities
Deliver development to create better frontages
Promote specialistretail destination
Figure 4.1.4 -
Short to Medium Term Priorities
4. Areas of Change
53
Tottenham Physical Development Framework: Tottenham Green & Seven Sisters
Figure 4.1.5 -
PDF End State scenario beyond 2025 : Tottenham Green & Seven Sisters
Hale Village
ThePaddock
L
BE
K
IT
Seven Sisters
South Tottenham
Bruce Grove
White Hart Lane
Northumberland Park
Tottenham Hale
Tottenham Green
High Road West
IT
IT
IT
Northumberland Park
Ashl
ey R
oad
Tech
no P
ark
Hale Wharf
Garman Estate
FountayneEstate
Meridian Water
Northumberland Park
Tottenham HaleRetail Park
Stonebridge Lock
Marsh Lane
Contains Ordnance Survey data © Crown copyright. All rights reserved LBH (100019199) (2014)
LEGENDIT
K
BE
New institutional facility
Residential/ mixed use
Retail/ mixed use
Potential Housing Improvements
Upgrade of employment areas
Regeneration of residential core
Knowledge Growth Zone
Primary Retail Centres
IT Cloud
Culture ZoneSports & Leisure AreaBusiness & Exchange
Existing Key Buildings
Asset Management Programmes
New Rail Crossing
Existing Rail Crossing
Potential Rail Crossing
New River/Canal Crossing
Key Ongoing Projects
Existing Rail / Overground
Existing schools
Overground Station
New Schools
Strategic green routes
Refurbished schools
Key Open Spaces
Opportunities:
Key roads
West Anglia mainline upgrades
Tube Station
Gyratory Improvement Scheme (2012 - 2014)
High Road
Rail Station
Bus Station
Existing Bus Garage
Station Improvements
Existing Areas of Key Open Spaces
Existing Water Bodies
Existing Canals and Rivers
SK 200-90 1.3 225030-09
1:5000 @ A0
FOR INFORMATION
URBAN DESIGN
PHYSICAL DEVELOPMENT FRAMEWORKPHASE 1
NORTH TOTTENHAM INVESTMENT FRAMEWORK AND REGENERATION STRATEGY
LONDON BOROUGH OF HARINGEY AND GREATER LONDON AUTHORITY
13 Fitzroy StreetLondon W1T 4BQ+44 (0)20 7636 1531www.arup.com
A0 A
1
© Arup
B C D E F G H I J K L M N O P Q R S T
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Job No
Drawing Status
Discipline
Scale at A0
Drawing No Issue
Drawing Title
Job Title
Client
Issue Date By Chkd Appd
Notes
Do not scale
1.0 20.03.2013 SS SC SC
_
1.1 12.07.2013 SC SC SC
1.2 21.10. 2013 SC SC SC
1.3 04.02. 2014 SC SC SC
Longer Term Options
Set out below are a number of longer term options beyond 2025 which could be progressed to enhance the offer in this area. These include:
• Release land at Arriva bus garage site for a residential led mixed use scheme;
• Realignment of Philip Lane to create cross roads with Monument Way. This would provide a better frontage for any development at the Arriva bus garage and improve the relationship between Monument Way and Tottenham Green. Tottenham Green would be extended north to bound the south of the realigned Philip Lane;
• Relocation of CHENEL’s construction sites to elsewhere within the Borough and redevelop this site for housing or for further education use;
• Complete improvements to Council owned assets around Tottenham Green;
• Explore new crossings of the High Road by the Green; and
• Commitment to Crossrail 2 would improve rail capacity to central London. Seven Sisters is identified on both the metro and regional route options currently being consulted on.
54
Areas of Change
L
BE
K
IT
Seven Sisters
South Tottenham
Bruce Grove
White Hart Lane
Northumberland Park
Tottenham Hale
Saltram Close
Millicent FawcettCourt
Reed Road
Chesnut Estate
Broadwater Farm
Ashl
ey R
oad
Tech
no P
ark
Hale Village
Hale Wharf
Garman Estate
FountayneEstate
Meridian Water
Northumberland Park
Millmead
Lockwood
Tottenham HaleRetail Park
Stonebridge Locks
Rheola Close
Marsh Lane
ThePaddock
639 High Road
Contains Ordnance Survey data © Crown copyright. All rights reserved LBH (100019199) (2014)
LEGENDIT
K
BE
New institutional facility
Residential/ mixed use
Retail/ mixed use
Potential Housing Improvement
Upgrade of employment areas
Regeneration of residential core
Knowledge Growth Zone
Primary Retail Centres
IT Cloud
Culture ZoneSports & Leisure AreaBusiness & Exchange
Existing Key Buildings
Asset Management Programmes
New Rail Crossing
Existing Rail Crossing
Potential Rail Crossing
New River/Canal Crossing
Key Ongoing Projects
Existing Rail / Overground
Existing schools
Overground Station
New Schools
Strategic green routes
Refurbished schools
Key Open Spaces
Opportunities:
Key roads
West Anglia mainline upgrades
Tube Station
Gyratory Improvement Scheme (2012 - 2014)
High Road
Rail Station
Bus Station
Existing Bus Garage
Station Improvements
Existing Areas of Key Open Spaces
Existing Water Bodies
Existing Canals and Rivers
IT
IT
IT
SK 200-91 3.0225030-09
1:5000 @ A0
FOR INFORMATION
URBAN DESIGN
PHYSICAL DEVELOPMENT FRAMEWORKFINAL PHASE
NORTH TOTTENHAM INVESTMENT FRAMEWORK AND REGENERATION STRATEGY
LONDON BOROUGH OF HARINGEY AND GREATER LONDON AUTHORITY
13 Fitzroy StreetLondon W1T 4BQ+44 (0)20 7636 1531www.arup.com
A0 A
1
© Arup
B C D E F G H I J K L M N O P Q R S T
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Job No
Drawing Status
Discipline
Scale at A0
Drawing No Issue
Drawing Title
Job Title
Client
Issue Date By Chkd Appd
Notes
Do not scale
1.0 20.03.2013 SS SC SC
_
2.0 04.12.2013 SC NW SC
3.0 04.02.2014 SC SC SC
55
Header Part 1
56
Areas of Change
Tottenham Green & Seven Sisters
Action Plan
57
1 Improve the quality of public realm at Tottenham Green
1a Implement gyratory improvements and initiatives contained in the Growth on the High Road study, including:
- Changes to road and crossings layout;
- Re-surfacing of pavements;
- New pathways across open space;
- Provision of kiosk/seating areas within space;
- Ensure a lighting scheme that improves safety; and
- Improvements to open space around Bernie Grant Arts Centre.
D H DP LBH
GLA
TfL
PM
1b Proactive event commissioning and management to develop a programme of events for Tottenham Green, to ensure space remains active both day and evening.
M H-M DP LBH TCM SL-M
1c Establish a strategy for management and maintenance of the Green and implement.
M H DP SL-M
2 Redevelopment of leisure centre/library car park
2a Commission a feasibility study and architectural competition which looks at options for redevelopment of car park site including provision of/need for replacement parking, potentially on sites close to the High Road. Study to consider impact on Fusion (leisure centre operator) and any associated compensation. Potential uses could include civic/employment at ground floor (with active day and evening uses) and residential above.
S H JV/DA LBH
Fusion
SL-M
PH
2b Identify and implement appropriate planning policy interventions to guide redevelopment of site. This could include allocation of this site in the Site Allocations DPD and preparation of a planning brief.
P H LBH SL
2c Identify development partner for the site and establish agreement on mechanism for delivering redevelopment.
D H LBH SL
2d Identify potential civic functions that could be located at the site and set in place a strategy for their (re)location.
S H LBH SL
3 Restaurant Offer at Tottenham Green
3a Confirm availability/secure future use of potential sites (Old Fire Station, Old Town Hall) for restaurant opportunities overlooking the Green.
S H DP LBH SL
3b Working with building owners establish a brief for use of buildings fronting onto the Green as restaurants.
S H DP
JV/DA
LBH
OWNER
SL
3c Confirm any environmental health or planning restrictions that would be applied to the uses and set out as part of brief to be issued to potential tenants/operators.
S H
-
LBH SL
3d Identify potential tenants/operators that can operate as an ‘attractor’ for the area. Establish credentials of potential tenants/operators in respect of providing training and local employment.
S H DP
JV/DA
LBH
OWNER
SL
3e Develop a funding support strategy to assist with capital costs associated with any works to the buildings required for restaurant use.
S H DP
JV/DA
LBH SL
3f Select preferred tenants/operators; confirm lease arrangements; set up; operate.
S H-M DP
JV/DA
LBH SL
4 Improve quality of retail offer within Tottenham Green & Seven Sisters
4a Implement a programme of shop frontage restoration and improvements including new or replacement signage, which reflect the Council’s vision.
- 2-52 and 23-39 West Green Road (excluding the Seven Sisters Regeneration site) and 220-222 High Road.
D H DP LBH
GLA
PL
- West Green Road (west of railway viaduct). M
4b Seek opportunities, as part of shop frontage restoration, to establish links with existing training initiatives to provide practical experience.
S H-M DP LBH PL
4c Seek opportunities for students at CHENEL or small local businesses to be involved in re-design or sign production as part of shop frontage improvements.
S H DP LBH PL
Delivery of proposed initiative
No. Proposed initiative Type Priority Delivery mechanism Responsibility Cost
Tottenham Physical Development Framework: Tottenham Green & Seven Sisters
58
4d Ensure the delivery a replacement temporary market, including provision for Spanish speaking traders as part of the redevelopment proposals that have been granted planning permission (Section 106) for the Seven Sisters Regeneration Site. When agreeing a location for the temporary market consideration should be given to how this can support improvement of the retail offer in this area.
M H-M - Grainger SL
4e Promote West Green Road as a ‘specialist’ retail destination focusing on cultural offer through a re-branding exercise. Either prior to or once Seven Sisters Market has been constructed and tenanted, the branding of the area should be re-considered to ensure that it still reflects the retail offering along West Green Road. The creation and opening of the market should also be proactively publicised.
M H-M DP Grainger
Traders
LBH TCM
SL
4f Develop a programme of events for West Green Road which supports the cultural distinctiveness of retail offer in this area.
M H-M DP LBH TCM
Traders
SL
4g Public realm improvements along West Green Road, should consider opportunities to ‘green’ the area. These need to be co-ordinated with those works that are required by the Section 106 Agreement attached to the Seven Sisters Regeneration Site planning permission, which include public realm improvements at West Green Road, Suffield Road and the entrance to Seven Sisters underground station.
D H DP
S106
LBH PL
4h Maintain a high quality environment through implementation of a programme of appropriate levels of street maintenance.
M H DP LBH PL
4i Ensure the tenant mix strategy proposed for the Wards Corner site delivers benefits for the Tottenham Green & Seven Sisters areas. LBH to consider taking leases on ground floor units to let to local retailers; or to support incubation/start up businesses.
M H-M S106
DP
LBH PL
4j Consider developing a document which sets out the character of each of the existing district centres to support the retail aspirations. This could be translated into an SPD which could cover proposals for the broader regeneration of the Tottenham area and hung off policies which identified this part of the Borough as an ‘Area of Change’. In terms of what could be covered in the SPD in relation to retail in Seven Sisters, it could:
- Articulate the vision for areas where retail frontages are revised, for example West Green Road to the west of the railway bridge;
- Set out proposals for encouraging the development of a night time economy along the High Road; and
- Support for extension of food and bar offering between Tottenham Green and Seven Sisters.
P M - LBH SL
4k Consider opportunity/need for a development management policy to protect independent traders. The policy could be worded as follows:
The Council will prevent the amalgamation of individual shop units incorporating A Use Classes which would:
i. Involve the loss of existing viable small independent shop units;
ii. Not be appropriate to the scale, character and function of the centre ( as identified in [ref character document], taking into account existing shops and consents for shops; and
iii. Cause unacceptable adverse impacts on the local environment and/or amenity.
M M - LBH SL
4l Develop a database which lists available units along the High Road. This could then be used as a tool to identify suitable opportunities for new businesses or temporary/pop-up businesses.
M H DP LBH
TCM
SL
4m Agree and implement a strategy with landowners for enhancing shop frontages and/or temporary use for vacant units, so that they don’t seem empty. An initiative could be developed for example with Central St Martin’s to show case student work or provide locations for a programme of interactive events. Alternatively, a mechanism could be established for identifying use by young people – refer to young people interventions.
M M DP LBH
OWNERS
PL
4n Offer business rate reductions or temporary suspension of business rates. This offer could be limited to specific business types in order to improve the quality and mix of the retail offer.
M H-M DP LBH SL-H
Delivery of proposed initiative
No. Proposed initiative Type Priority Delivery mechanism Responsibility Cost
4. Areas of Change
59
4o In order to engage greater tenant mix, when units become available offer business rate concessions or shop fit grants to new occupiers.
M M-L DP LBH SL-H
4p Promote business mentoring to aid development of range of skills required to support successful independent businesses. A range of existing mentoring programmes exist including a programme run by the National Skills Academy for Retail, which could be promoted.
M H DP LBH
TCM
NSAR
SL
4q Provide mentoring to individuals/organisations who want to set up businesses along the High Road, who may need support to ensure business is successfully established. This initiative could link to the database of available units to assist in finding suitable accommodation for new businesses.
M H-M DP LBH
TCM
TTP
SL
4r Work with Tottenham Traders Partnership (TTP) to establish a proactive management body to manage and co-ordinate key retail areas
M M DP LBH
TCM
SL
4s Revise primary frontage and secondary frontage designations in the Local Plan to focus the district centre area.
P H LBH SL
5 Improve workspace provision and offer within Tottenham Green & Seven Sisters
5a Develop and implement a comprehensive enterprise development strategy for Tottenham, including a range of tailored business support, in conjunction with key providers
M H DP LBH SL
5b Implement a business mentoring programme to aid development of the range of skills required to support successful independent businesses. Consider opportunities to link to high profile individuals who would proactively support initiatives and raise the profile of Tottenham as a place to do business.
M H-M DP LBH
Job Centre
SL
5c Develop a programme for, implement and promote ‘made in Tottenham’ events to support micro businesses and SMEs. Events to include networking, mentoring access, training, lectures/talks, promotional/direct sales events (e.g. winter fair). Consider links to promotion of retail activities.
M H DP LBH
639 High Rd.
SL
5d Proactively market Tottenham to/with relevant institutions and business agencies to ensure the area is actively considered as a location for business investment.
M H-M DP LBH SL
5e Work with the town centre manager to utilise empty retail units as showcases for local businesses on a temporary basis.
M H DP LBH SL
5f Develop and maintain a database listing available premises in Employment Areas. This could then be used as a tool to identify suitable accommodation for new/fledging businesses.
M H DP LBH SL
5g Establish and develop a proactive forum for a diverse range of successful SME business space operators to coordinate activities across Tottenham e.g. early engagement around development opportunities.
M H DP LBH/GLA SL
5h Develop an apprentice programme with existing local businesses and the National Apprenticeship Service; or link with local apprenticeships’ providers to promote their offer.
M H-M DP LBH
NAS
SL
5i Update S106 SPD or revise emerging CIL to require all major commercial developments to provide apprenticeship opportunities during construction and operation.
P H-M - LBH SL
5j Review the policy implemented by LB Islington to promote delivery of affordable workspace including subsidised rents as part of commercial workspace developments. Subject to findings consider development of a LB Haringey policy that requires provision of affordable workspace as a component of any major commercial development. Note the aim would be to capitalise on the possible commercial opportunities that will arise in coming years.
P H-M - LBH SL
6 Activating the High Road
Delivery of proposed initiative
No. Proposed initiative Type Priority Delivery mechanism Responsibility Cost
Tottenham Physical Development Framework: Tottenham Green & Seven Sisters
60
Delivery of proposed initiative
No. Proposed initiative Type Priority Delivery mechanism Responsibility Cost
6a Develop and implement a usage strategy and guidelines for use of the west-side pavement of the High Road between Seven Sisters and Tottenham Green for temporary uses. This could include proposals to:
- Support utilisation of west-side pavement area for temporary uses. The uses could relate to one-off events (e.g. Tottenham Film Festival) or to regular events taking place in the area (e.g. regular events on the Green);
- Run a competition to develop public art installations on the west-side pavement of the High Road between Seven Sisters and Tottenham Green. Any public art project should contribute to the appearance and function of the area.
S/P H DP LBH TCM SL
6b Support use of ground floor premises at 263 to 287 High Road for A3 or A4 uses to activate this part of the High Road and to utilise the opportunity provided by the set back from the pavement edge (noting that the ground floors of 263 and 265 have already been converted). Uses classes A1, A2 or A5 should not be permitted in this location and an Article 4 Direction should be put in place to restrict any permitted change of use under the Town and Country Planning (Use Classes) Order 1987 (as amended).
P H - LBH SL
6c Taking leases in properties on this stretch of the High Road to enhance the quality of offer and to shape the uses/occupiers in this area. Alternatively using the Council’s planning powers to restrict the uses permitted on this stretch of the High Road (outside the District Centre) through the extinguishment of permitted development rights for uses changes within/to Use Class A.
M H-M DP LBH DL
7 Improvements to the gyratory
7a Following completion of gyratory improvements consider whether there is need for additional pedestrian crossing to improve west-east links north of Tottenham Green.
S M-L DP LBH
GLA (TfL)
SL
8 Relocation of Arriva bus garage depot and redevelopment of existing site
8a Undertake discussions with TfL and Arriva (or any replacement operator) regarding relocation of the bus garage with the aim of reaching an agreement on key criteria and setting out timescales for relocation.
S M-L IAA
JV/DA
LBH
TfL
Arriva
SL
8b Review existing uses and leases within potential relocation site(s), test accessibility, potential effects on surrounding occupiers, proximity to routes and termini, and dead mileage. The assessment must establish the effects on bus operation costs and the need for ongoing funding to compensate any increased cost.
S M-L LBH
TfL
SL
8c Identify appropriate planning policy interventions to guide redevelopment of bus garage site. This could include allocation of this site in the Site Allocations DPD, a planning brief or a planning application.
P M-L LBH
TfL
Arriva
SL
8d Test development capacity of bus garage site and complete viability analysis. Prepare a planning brief or planning application for the site to promote its redevelopment. The scale of the existing structure indicates that a mixed use scheme combining residential with an active frontage overlooking the Green could be accommodated on this site. The draft proposals should be tested through consultation with the community.
S M-L LBH SL
8e Consider allocation of site in Site Allocations DPD and other relevant emerging planning policy.
P H-M LBH SL
8f Identify development partner for the site and establish agreement on mechanism for delivering redevelopment.
S/D M-L LBH SL
PH
9 Realignment of Philip Lane
9a Commission study to consider feasibility and financial viability of re-aligning Philip Lane and extension of Tottenham Green (north of Holy Trinity Church), subject to redevelopment of bus garage (initiative 8). To consider impact on properties on corner of Philip Lane and the High Road that would be lost. To include discussions with TfL and LBH Highways.
S/D M-L DP
PI
LBH
Diocese of London
SL
PM-H
9b Establish delivery mechanism to deliver improvements. S M-L 0 LBH/TfL SL
9c Establish an agreement with TfL to deliver re-alignment works. D M-L DP LBH/TfL PM
4. Areas of Change
61
10 Support CHENEL’s development
10a Explore with CHENEL relocation sites for construction faculty, costs and timescales for construction faculty. In parallel establish capacity of existing campus for new education or residential development to complement the recent Newlon development to the north.
S M-L PI CHENEL
LBH
SL-M
10b Work with CHENEL to deliver an appropriate relocation site and redevelopment of the existing site.
S/D M-L PI CHENEL
LBH
PM
10c Proposal to infill quadrangle of building to provide new internal building for use as evening education facility.
D M-L PI LBH SL
PM
11 Old Fire Station Extension
11a Refurbish for existing use
Convert to residential use (alone or together with adjoining CHENEL site)
D M IAD LBH
CHENEL
SL
PL-M
12 Old Fire Station Cottages
12a Refurbish for existing use; OR S/D M JV/DA LBH SL
PL12b Convert to residential use (alone or together with adjoining CHENEL site)
D M LBH
12c Relocate occupiers of Fireman’s cottages into extension and encourage existing occupants to relocate elsewhere within LBH.
D M LBH
13 Old Town Hall
13a Use building for a purpose that will benefit from significant public/circulation space. e.g. Library
M/D H-M DP LBH PM
13b Improve signage D H-M D-P LBH
Newlon
PL
14 Bernie Grant Art Centre
Reception Area
14a Refocus use of space on arts related uses, with upper area for arts related workshops/training.
M/D M DP LBH SL
PL
14b Deliver a proper gallery space. Consider opportunities to also use gallery space as a function space, with associated revenue stream.
D M-L LBH PL
14c Activate frontage onto Green by bringing cafe into current reception building (see action 3).
S H LBH SL
14d Consider developing area to provide an arts related retail outlet offering artist materials, framing, arts related sales e.g. books, prints, artwork.
D M-L LBH PL
Theatre
14e Review the feasibility of additional use as an arts cinema and subject to findings develop and market a programme of events.
M H-M DP LBH SL
PL
Business Centre
14f Enhance business space, create clear access/signage and open up Centre towards Marcus Garvey library creating a communal space between buildings with a view to improving the attractiveness of the offer in this location.
M/D H-M DP LBH SL
PL
Open space between buildings
Delivery of proposed initiative
No. Proposed initiative Type Priority Delivery mechanism Responsibility Cost
Tottenham Physical Development Framework: Tottenham Green & Seven Sisters
62
Delivery of proposed initiative
No. Proposed initiative Type Priority Delivery mechanism Responsibility Cost
14g Deliver the open space improvements set out in GOTHR including the open spaces (‘lanes’) between buildings on the green so they are safer, more attractive places with permanent activity in them and at the destination uses beyond.
H-M H-M DP LBH
TfL
PL-M
14h Consider opportunities to improve perception of safety in the area, through the development of further uses behind the Green frontage and implementation of a programme of activities to maximise potential of space between buildings on a seasonal basis e.g. in summer through the provision of an outdoor theatre/ performance space with rolling events programme. In winter installation of ice rink.
M H-M LBH SL
PL
15 Marcus Garvey Library
15a Relocate library to a more appropriate building, e.g. Old Town Hall or a purpose built facility strategically located on Leisure Centre Car Park site.
S/D M-L JV/DA LBH SL
PM
15b Re use building for relocation of/and new ‘small business’ space. It’s adjacency to the Bernie Grant business centre provides the opportunity to co locate all small businesses creating a commercial hub.
S/D M-L LBH M-L
15c Provide on-site support services centre. S/D M-L LBH M-L
16 Tottenham Green Workshops
16a Review of letting and potential grow-on space for occupiers in Tottenham Green employment space.
S H-M - LBH SL
17 Former Toilet Block
17a Conversion to café/sandwich bar D H-M IAD LBH PL
18 Holy Trinity Church & Surrounding Buildings
18a Open up Green by removing physical barriers. D H-M PI Diocese of London
LBH
SL
PM18b Relocate Nursery within Church’s land and explore opportunities for expansion.
D H-M
18c Ensure Diocese of London proposal are consistent with aims of wider Green area.
D H-M
18d Ensure proposals consistent with longer term aims for Arriva Garage site.
D H-M
19 Redevelopment of Apex House
19a Deliver redevelopment of site as part of comprehensive scheme based on ground and first floor employment uses with residential above.
P/D H DP
JV/DA
LBH SL
DH
19b Ensure that the employment elements are sized for a range of SMEs and incorporate shared space plus any other elements identified by the future operator as critical to the successful operation of the scheme.
P/D H DP
JV/DA
LBH SL
DH
19c Identify a workspace operator to manage/operate the employment space. Engage the future operator in the design process (see 16b) from the outset to optimise the future function of the employment space
M H DP LBH SL
19d Establish occupier restrictions that should be applied to the workspace element of the scheme in order to maintain the amenity of the residential component of the scheme. This could include restrictions on hours of use, noise levels, business types that can occupy or a test to demonstrate that an occupier will not negatively affect residential amenity. Implement the restrictions in any contract with the selected workspace operator and through any planning permission for the site, including a monitoring regime to ensure that the restrictions are being met/enforced plus a clear plan for remediation should this be required.
M H - LBH SL
19e Retain existing institutional (LBH) occupiers in the Tottenham Green area, potentially as part of the Leisure Centre car park redevelopment (see Tottenham Green Asset Plan).
M H - LBH LBH
20 Management Vehicle
20a Create a management vehicle to:
- build consensus between stakeholders for common vision for the Tottenham Green area;
- develop strategic direction;
- coordinate and manage implementation of strategic interventions;
- promote area, manage and commission events etc.; and
- monitor progress and regularly review strategy.
M H DP LBH
TCM
POG
TTP
SM
20b Identify funding stream to support management vehicle. M H - LBH
TCM
POG
SL
4. Areas of Change