draft - o&m manual presentation butte priority soils operable unit june 7, 2011
TRANSCRIPT
![Page 1: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/1.jpg)
Draft - O&M Manual Presentation
Butte Priority Soils Operable Unit
June 7, 2011
![Page 2: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/2.jpg)
EPA 540-F-01-004 Operation and Maintenance in the Superfund Program; Highlight 5 – Typical O&M Manual Sections, 2001
BP Engineering Integrity Manual; Section 22 – Operation and Maintenance Manual Requirements, 2009
Building Design Guide; Comprehensive Facility Operation and Maintenance Manual
Written sections of the O&M manual provide system background and operational justification for operating parameters, and allow for an operating range while maintaining safe operating limits of the system.
![Page 3: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/3.jpg)
Volume I - System Overview
Volume II - Metro Storm Drain Pumping Station
Volume III - West Camp Pumping Station
Volume IV - BTL-LAO Treatment System
Volume V - Maintenance Plan
![Page 4: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/4.jpg)
Volume I System Overview The Draft Operation, Maintenance and
Monitoring (O&M) Plan for Butte Priority Soils Operable Unit consists of multiple volumes (I through V). Each volume is used to describe specific aspects of the Operations and Monitoring (O&M) Plan. Volume I, presents project background information, an overview of the operating systems and associated components, and waste characterization.
![Page 5: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/5.jpg)
Items provided in Volume I required by EPA Highlight 5 include the following:
•Remedy description•Staffing and Personnel Requirements•*Permits•Records
*(as written in the Final Consent Decree)
![Page 6: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/6.jpg)
BP’s Site Remediation Technologies Engineering Integrity Manual, Section 22 provides requirements for Operation and Maintenance Manual preparation
The following provides clarification regarding where these items are found
![Page 7: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/7.jpg)
BP Engineering Integrity Manual BTL-LAO O&M
I. Cover Sheet Volumes I – V
II. Table of Contents Volumes I – V
III. Purpose Volume I
IV. Equipment Description Volumes I – IV
V. Instrumentation and Protective System Devices Volumes I – V
VI. Safe Operating Limits Volumes I – IV
VII. System Operating Details Volumes II – IV
VIII. Sampling Volumes I – IV
IX. Equipment Lubrication and Maintenance Volume V
X. Waste Handling and Disposal Volumes II – V
XI. Drawings Volumes I – IV
![Page 8: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/8.jpg)
BP Engineering Integrity Manual BTL-LAO O&M
XII. Equipment Manuals Volume V
XIII. Copy of Permits Volumes I – IV
XIV. Forms Volumes II– V
XV. Field Data Sheet Volumes II – IV; Daily Ops Report
XVI. Maintenance Schedule & Checklist Volume V
XVII.Maintenance Log Volume V
XVIII.PSD Checklist Volumes II– IV
![Page 9: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/9.jpg)
1.0 INTRODUCTION 1.1 Purpose and Scope 1.2 Remedy Description 1.3 System Background 1.4 Waste Characterization 1.5 Treatment System 1.6 Treatment Method 1.7 Design Theory 1.8 Owner and Contact Information 1.9 Site Access 1.10 Operation and Maintenance
Manual Contents 1.10.1 Volume I System Overview 1.10.2 Volume II Metro Storm Drain 1.10.3 Volume III West Camp/Missoula
Gulch 1.10.4 Volume IV Butte Treatment
Lagoons and Lower Area One 1.10.5 Volume V Maintenance 2.0 SYSTEM OVERVIEW 2.1 Influent Characterization 2.2 Remedial Action Treatment
Objectives 2.3 Safe Operating Limits 2.4 Protective Safety Devices
(PSDs) 2.5 Description of
Facilities/Systems
2.6 Description of Remote Facilities/Influent Systems
3.0 PERFORMANCE STANDARDS 3.1 Groundwater 3.2 Surface Water 3.3 Operational Sampling and
Monitoring 3.4 Sampling by Others 4.0 OPERATION, MONITORING,
AND MAINTENANCE PLAN PURPOSE AND USE
5.0 HEALTH AND SAFETY PLAN 6.0 MANAGEMENT PLAN 6.1 Staffing and Personnel 6.2 Training 6.2.1 Start-up, Shutdown, Upset,
and Normal Operation 6.3 Records and Reporting 6.4 Transfer of Ownership,
Operation and Management 7.0 FUTURE REVISIONS AND
UPDATES TO O&M PLAN
![Page 10: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/10.jpg)
Volumes II – IV are structured with a consistent Table of Contents format
Volumes II – IV provide operating and daily maintenance tasks associated with a specific system
Specific checklists, SOPs, drawings, etc. are contained within each specific volume
![Page 11: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/11.jpg)
1.0 INTRODUCTION 1.1 Purpose and Scope 1.2 Project Background 1.3 Design Theory 1.0 INTRODUCTION 1.1 Purpose and Scope 1.2 Project Background 1.3 Design Theory 1.4 BTL-LAO Owner and Contact
Information 1.5 Organization and Use of this
Volume of the O&M Manual 2.0 SYSTEM OVERVIEW 2.1 General Facility 2.2 Electrical, Instrumentation and
Controls 2.3 Wet Vault Installation 2.4 System Monitoring 2.5 Electrical Systems 2.6 Backup Systems and Spare Parts 3.0 SYSTEM CONTROLS 3.1 Hydraulic Control 3.2 Electrical, Automation Control, and
Monitoring 3.3 Instrumentation and Controls –
Operational Control Theory
4.0 SAFE OPERATING LIMITS 4.1 Pressure 4.2 Temperature 4.3 Electrical 4.4 Protective Safety Devices (PSDs) 5.0 ROUTINE OPERATION AND
MAINTENANCE TASKS 5.1 Routine Operation 5.2 Site Vegetation and Access
Maintenance 6.0 OPERATION DURING DISTURBANCES 6.1 System Disturbances 6.2 Instrumentation and Control
Disturbance 6.3 Environmental Disturbances 7.0 MONITORING AND LABORATORY
TESTING 7.1 Operator Observations 7.2 System Generated Data 7.3 Automatic Electronic Monitoring Data 7.4 Field Measurement and Sample
Collection 7.5 Routine Inspection and Calibration of
On- Site Monitoring Systems 7.6 Review of Monitoring Data for
Operations 7.7 Routine Sampling Tasks
![Page 12: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/12.jpg)
4.0 SAFE OPERATING LIMITS 4.1 Pressure 4.2 Temperature 4.3 Electrical 4.4 Protective Safety Devices (PSDs) 5.0 ROUTINE OPERATION AND
MAINTENANCE TASKS 5.1 Routine Operation 5.2 Site Vegetation and Access
Maintenance 6.0 OPERATION DURING DISTURBANCES 6.1 System Disturbances 6.2 Instrumentation and Control
Disturbance 6.3 Environmental Disturbances 7.0 MONITORING AND LABORATORY
TESTING 7.1 Operator Observations 7.2 System Generated Data 7.3 Automatic Electronic Monitoring Data 7.4 Field Measurement and Sample
Collection 7.5 Routine Inspection and Calibration of
On- Site Monitoring Systems 7.6 Review of Monitoring Data for
Operations 7.7 Routine Sampling Tasks
8.0 DATA MANAGEMENT 8.1 Data Management Plan 8.2 Automated Data Management 8.3 Monitoring, Alarm, and Data
Logging System 9.0 OPERATIONS REPORTING AND
RECORD KEEPING 9.1 Daily Operations Report 9.2 Weekly Operations Report 9.3 Monthly Operations Report 9.4 Quarterly Operations Report 9.5 Annual Operations Report 9.6 Supplementary Data 10.0 ROUTINE INSPECTION AND
MAINTENANCE GUIDELINES 10.1 Inspection and Maintenance
Guidelines for Process Equipment 11.0 EMERGENCY PROCEDURES 11.1 Alarm Response Notification 11.2 Alarm Conditions 11.3 Emergency Shutdown of Pump
Station 12.0 REFERENCES
![Page 13: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/13.jpg)
Volume V provides maintenance requirements beyond daily operational maintenance tasks
Work order system Inspection schedules, maintenance
logs, seasonal maintenance, etc.
![Page 14: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/14.jpg)
1.0 INTRODUCTION1.1 Purpose1.2 Scope1.3 Updates2.0 EQUIPMENT TRACKING2.1 Equipment List2.1.1 Equipment Numbering2.1.2 Equipment Data Sheets2.2 Maintenance Procedures2.3 Work Permits – HSSE Requirements2.4 Risk Assessments2.5 Training2.5.1 Re-certifications2.6 Work Order System2.6.1 Work Order2.7 Prioritizing Work Requests2.8 Labor Usage2.9 Spare Parts Inventory and Inventory Control2.10 Manufacturer’s Manuals Usage2.11 Schedule of Tasks Performed3.0 INSPECTION, DOCUMENTING AND REPORTING
4.0 SYSTEM OVERVIEW INSPECTION4.1 Inspection Log4.2 Equipment Maintenance Logs4.3 Protective Safety Devices Maintenance4.3.1 PSD Testing and Maintenance Log4.4 Work Orders4.5 Incident Investigations 5.0 PREVENTATIVE MAINTENANCE TASKS5.1 Inspections5.2 Cleaning5.3 Lubrication 6.0 PREDICTIVE MAINTENANCE7.0 SEASONAL MAINTENANCE8.0 HSSE AND SPECIALIZED TOOLING REQUIREMENTS9.0 PROCESS DESCRIPTION10.0 MAINTENANCE REQUIREMENTS (BY SYSTEM)
10.1 CAS10.2 BTL10.3 LAO SITE
14.0 REGULATORY REQUIREMENTS15.0 WASTE AND WASTE DISPOSAL16.0 MATERIAL SPECIFICATIONS17.0 INSTRUMENTATION18.0 LESSONS LEARNED19.0 UPGRADES and UPDATES
![Page 15: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/15.jpg)
Checklists
Tables
Forms
Schedules
Drawings
![Page 16: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/16.jpg)
BTL-LAO Ops Report
West Camp
MSD
LAO
CAS Building
*Protective System Devices
* Denotes Integrity Management required items
![Page 17: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/17.jpg)
*PSD Safe Chart Cause and Effect
• *Instrument Device• Valves
Decision Trees• Operating • Maintenance
Registers• *Device Register• Equipment Register• Interface Register
Line List
* Denotes Integrity Management required items
![Page 18: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/18.jpg)
Equipment Data Sheet Work Orders *Inspection Logs *Maintenance Logs * Denotes Integrity Management required items
![Page 19: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/19.jpg)
*Quarterly Overview Inspections *PSD Inspections Valve Cycling Lubrication Cell Dredging/Waste Removal
* Denotes items required by BP Integrity Management
![Page 20: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/20.jpg)
*Site Plot Plan Process Flow Diagram Construction As-Built Drawings Equipment Layout
• Well Details – West Camp• Equipment Interface Details
*Piping and Instrumentation Diagrams (P&IDs)
Electrical One Line – upon completion of upgrades
![Page 21: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/21.jpg)
• Provide specific purchase information
• Document specific equipment details
• Should be completed for all equipment when purchased/installed
• Retired when equipment is removed/replaced
![Page 22: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/22.jpg)
Provide method for tracking maintenance
Ensure CoW practices are followed
Require dual verification of work completed
![Page 23: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/23.jpg)
Standard Operating Procedures (SOPs)• Currently 43 SOPs written• Standard format
Scope, HSSE , PPE, MSDS, Reference Drawings, Work Instructions
Manufacturer’s Specific O&M Manuals• Included in specific Volume Appendices• Referenced for minimum maintenance
requirements
![Page 24: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/24.jpg)
![Page 25: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/25.jpg)
System Upgrades Transition from Manual
to Program Maintenance
• Schedules• Procedures• Detailed equipment files
Operations• Additional SOPs• Updated SOPs
IM Compliance• Monthly
compliance focus
Line Lists Coordinate
• Contingency Operation Plans
• Construction Completion Reports
![Page 26: Draft - O&M Manual Presentation Butte Priority Soils Operable Unit June 7, 2011](https://reader038.vdocument.in/reader038/viewer/2022103122/56649cd55503460f9499cab1/html5/thumbnails/26.jpg)