S No High Level Task Resource

1 Plan

1.1 Business Requirements Catherine Miller

1.2 Formulate Functional Requirements Catherine Miller

1.3 Estimate Build Effort Project Manager

2 Design

2.1 Technical Design Technical Team

Page 2: Draft Plan Usage Decision Ver1.0

Estimated Duration

7-May 8-May 9-May 12-May 13-May

1 1 1 1 1

3 days 1 1 1

3 days 1 1 1

3 days 1 1

Page 3: Draft Plan Usage Decision Ver1.0

14-May 15-May 16-May 19-May 20-May 21-May 22-May

Page 4: Draft Plan Usage Decision Ver1.0

23-May 26-May 27-May 28-May 29-May 30-May 2-Jun

Page 5: Draft Plan Usage Decision Ver1.0

3-Jun 4-Jun 5-Jun 6-Jun 9-Jun

Page 6: Draft Plan Usage Decision Ver1.0

Usage Decision High level Timelines 0

QM Usage Modification

CMS Energy Today's Date: Tuesday

(vertical red line)

Project Lead:

Start Date: Monday

[42] First Day of Week (Mon=2): 1

WBS Tasks

Task

Lead Start End Du

rati

on

(Day

s)

% C

om

ple

te

Wo

rkin

g D

ays

Day

s C

om

ple

te

Day

s R

emai

nin

g

1 Plan [Name] 5/12/14 5/21/14 10 0% 8 0 10

1.1 Business Requirements 5/12/14 5/15/14 5 0% 4 0 5

1.2 Formulate Functional Requirements 5/16/14 5/17/14 2 0% 1 0 2

1.2.1 Estimate Build Effort 5/18/14 5/19/14 2 0% 1 0 2

1.2.2

Confirm and Approve Business

requirements 5/20/14 5/21/14 2 0% 2 0 2

1.3 Verify Technical Requirements 5/21/14 5/21/14 1 0% 1 0 1

1.4 Requirements Signed Off 5/21/14 5/21/14 1 0% 1 0 1

2 Build [Name] 5/22/14 6/12/14 22 0% 16 0 22

2.1 Evaluate Changes to be made 5/22/14 5/22/14 1 0% 1 0 1

2.2 Prepare Dev for Design 5/22/14 5/22/14 1 0% 1 0 1

2.3 Start Design Changes 5/23/14 6/6/14 15 0% 11 0 15

2.4 Unit Test Changes 6/9/14 6/11/14 3 0% 3 0 3

2.5 Complete Build Phase 6/12/14 6/12/14 1 0% 1 0 1

3 Test [Name] 6/12/14 6/29/14 18 0% 12 0 18

3.1 Regression Testing 6/13/14 6/17/14 5 0% 3 0 5

3.2 Move Transports to test 6/12/14 6/12/14 1 0% 1 0 1

3.3 Cycle 1&2 6/17/14 6/21/14 5 0% 4 0 5

3.4 SIT 6/21/14 6/25/14 5 0% 3 0 5

3.5 SIT 1&2 6/25/14 6/29/14 5 0% 3 0 5

4 Integration and UAT [Name] 6/29/14 7/11/14 13 0% 10 0 13

4.1 UAT 6/29/14 7/3/14 5 0% 4 0 5

4.2 UAT 1&2 7/3/14 7/7/14 5 0% 3 0 5

4.3 Migration and Transports 7/7/14 7/11/14 5 0% 5 0 5

4.4 Ascertain Migration and Transports 7/11/14 7/11/14 1 0% 1 0 1

4.5 Move from Test to Prod 7/11/14 7/11/14 1 0% 1 0 1

4.6 Confirm Transports in Order 7/11/14 7/11/14 1 0% 1 0 1

5 Final Cutover [Name] 7/11/14 7/23/14 13 0% 9 0 13

5.1 Migrate Objects/Code 7/11/14 7/11/14 1 0% 1 0 1

5.2 Complete and Verify Migration 7/12/14 7/12/14 1 0% 0 0 1

5.3 Complete Cutover 7/13/14 7/13/14 1 0% 0 0 1

5.4 Release Production System 7/14/14 7/14/14 1 0% 1 0 1

6 Go Live [Name] 7/15/14 7/23/14 9 0% 7 0 9

6.1 Open System for Business 7/15/14 7/15/14 1 0% 1 0 1

6.2 End 7/16/14 7/16/14 1 0% 1 0 1

7 Transition to Support [Name] 7/17/14 7/23/14 7 0% 5 0 7

7.1 Initiate HOTS Process 7/17/14 7/22/14 5 0% 4 0 5

Usage Decision Modification

Version 1.0

5/6/2014

5/12/2014

11 -

May -

14

Page 7: Draft Plan Usage Decision Ver1.0

7.2 Complete HOTS Process 7/17/14 7/22/14 5 0% 4 0 5

7.3 End Transition 7/23/14 7/23/14 1 0% 1 0 1

TEMPLATE ROWS: Copy and insert the entire section, or just the specific sub tasks, depending on which level you want to use (formulas are different for different WBS levels)

1 Task Category 1 1/5/09 1/5/09 1 0% 1 0 1

1.1 Sub Task level 2 1/5/09 1/5/09 1 0% 1 0 1

1.1.1 Level 3 Task 1/5/09 1/5/09 1 0% 1 0 1

1.1.1.1 Level 4 task 1/5/09 1/5/09 1 0% 1 0 1

Page 8: Draft Plan Usage Decision Ver1.0

29 -

Jun -

14

06 -

Jul -

14

13 -

Jul -

14

20 -

Jul -

14

22 -

Jun -

14

11 -

May -

14

18 -

May -

14

25 -

May -

14

01 -

Jun -

14

08 -

Jun -

14

15 -

Jun -

14

Page 9: Draft Plan Usage Decision Ver1.0

TEMPLATE ROWS: Copy and insert the entire section, or just the specific sub tasks, depending on which level you want to use (formulas are different for different WBS levels)

Page 10: Draft Plan Usage Decision Ver1.0

02 -

Nov -

14

21 -

Sep -

14

28 -

Sep -

14

05 -

Oct -

14

12 -

Oct -

14

19 -

Oct -

14

26 -

Oct -

14

14 -

Sep -

14

27 -

Jul -

14

03 -

Aug -

14

10 -

Aug -

14

17 -

Aug -

14

24 -

Aug -

14

31 -

Aug -

14

07 -

Sep -

14

Page 11: Draft Plan Usage Decision Ver1.0
Page 12: Draft Plan Usage Decision Ver1.0

[42]

14 -

Dec -

14

21 -

Dec -

14

28 -

Dec -

14

09 -

Nov -

14

16 -

Nov -

14

23 -

Nov -

14

30 -

Nov -

14

07 -

Dec -

14

Page 13: Draft Plan Usage Decision Ver1.0