Definition of highway drainage :
The process of interception (pemintasan ) & removal of
water from over, under and the vicinity (sekeliling ) of the
road surface.
Proses pemintasan & penyingkiran air dari atas, bawah serta
sekitar permukaan jalan.
PREPARED BY: MAI AZUNA 2011 1
Introduction :
PREPARED BY: MAI AZUNA 2011
2
Road drainage is very important for safe &
efficient design of the road way.
an essential part (bahagian penting ) of highway design &
construction.
A rainwater falling on road surface & adjoining
area(kwsn bersebelahan) is lost by evaporation(penyejatan) &
percolation (penapisan)
PREPARED BY: MAI AZUNA 2011
3
The remaining water known as surface water, either
remains on the surface of the road & adjoining
area, or flows away from it (aliran dari mana-mana kawasan
)(depending upon the topography & general slope
of the area )
Removal & diversion (pengalihan) of this surface water from
highway & adjoining land is known as surface
drainage.
PREPARED BY: MAI AZUNA 2011
4
If water table rises to road sub-grade, it requires
to be lowered as it will affect road sub-grade.
Measures adopted to lower the subsoil water
table are called sub surface drainage. Langkah-langkah yang
digunakan untuk menurunkan aras air tanah bawah dipanggil saliran sub permukaan .
Negative (-) effect of water, to :
PREPARED BY: MAI AZUNA 2011
5
1. User safety keselamatan pengguna- stagnant water on the
road - vehicle diverted in high speed @ at the
road corner. air bertakung atas jalan – kenderaan terbabas pd kelajuan tinggi @ selekoh.
2. The stability of subgrade / pavementKestabilan
subgred/turapan- - diffusion of water into the subgrade,
weaken & destroy the pavement also
subgrade. resapan air ke dlm subgred –melemahkan & merosakkan subgred & turapan.
PREPARED BY: MAI AZUNA 2011
6
Road surface if made of soil, gravel (kelikir) @ water
bound macadam, it will becomes soft & losses
strength.
The road sub-grade may be softened & its bearing
capacity keupayaan galas reduced.
Variation in moisture content in expensive soils, causes
variation in the volume of sub-grade & causes
failure of roads. Perbezaan kandungan lembapan dalam tanah , menyebabkan perubahan dalam
isipadu sub-gred & menyebabkan jalanraya gagal .
Failure of formation slopes is also attributed to poor
drainage. Kegagalan cerun bentukan juga disebabkan oleh saliran yang tidak sempurna.
PREPARED BY: MAI AZUNA 2011
7
If rain water is not properly drained & allowed to flow along the road side
for long distances, slip & land slides may occur causing road failures.
Erosion of side slopes, side drains, formation of gullies may result if proper
drainage conditions are not maintained.
Flexible pavement’s failure by formation of waves & corrugations is due to
poor drainage.
Continuous contact of water, with bituminous pavements causes failures due
to stripping of bitumen from aggregates like loosening or detachment of
some of the bituminuos pavement layers & formation of pot holes.
Rigid pavement’s prime cause of failure in by mud pumping which occures
due to water in fine sub-grade soil. Sebab utama turapan tegar gagal disebabkan pengepaman
lumpur - disebabkan oleh air di dalam tanah sub-gred yg halus.
Penyaliran jalan dibahagi kepada dua :
PREPARED BY: MAI AZUNA 2011
8 1. Subsurface drainage Penyaliran bawah permukaan
2. Surface drainage Penyaliran permukaan
PENYALIRAN BAWAH PERMUKAAN
PREPARED BY: MAI AZUNA 2011
9
- Kegunaan : utk atasi resapan dari air bawah
tanah & air bumi – merendahkan paras air
bumi.
- Keburukan lembapan air : tanah akan
bersifat plastik & krg mampu tanggung beban
- -Penyaliran dilakukan melalui pemasangan
parit bawah tanah
PENYALIRAN BAWAH PERMUKAAN
PREPARED BY: MAI AZUNA 2011
10 Fungsi:
Untuk menangani air dalam bumi- memastikan
paras air bumi cukup rendah & tdk menepukan
struktur jln & kwsn sekeliling.
Untuk mengelak struktur & tanah jadi plastik &
gagal menanggung beban lalulintas serta
kerosakan oleh fros.
Tiga sumber utama air dalam bumi :
PREPARED BY: MAI AZUNA 2011
11
Air bumi - air yg menusuk ke dlm tanah & arasnya
naik turun mengikut keadaan cuaca.
Tindakan rerambut – kenaikan air bumi ke atas oleh
sedutan jirim tanah & ketinggian bergantung kpd
saiz zarah tanah.
- Pergerakan boleh juga disebabkan
perbezaan kandungan wap air dlm tanah.
Resipan – 3 punca : resipan dr tebing tinggi, melalui
turapan yg tdk telap air & dr bahu jalan.
SISTEM PENYALIRAN BAWAH PERMUKAAN
1. Penyaliran memanjang – paip
berliang selari pada sisi jalan / bahu beserta
turas salir utk merendahkan paras air bumi di bawah turapan.
2. Penyaliran melintang – diguna jika penyaliran memanjang masih belum mencukupi dlm susunan serenjang.
PREPARED BY: MAI AZUNA 2011
12
PREPARED BY: MAI AZUNA 2011
13
3. Saliran/paip pintasan – bg kws potongan , air yg
meresip ke dlm cerun dipintas drp meresap ke bwh
turapan dgn memasang paip pintasan pd bwh
cerun bahagian potongan.
PREPARED BY: MAI AZUNA 2011
14
4. Penyaliran mendatar – paip berliang yg dimasukkan
ke dlm cerun potongan @ tambakan utk
mengeluarkan air yg meresap masuk dlm tebing.
PREPARED BY: MAI AZUNA 2011
15
5. Selimut penyaliran (blanket drain ) – resapan air melalui
tarikan rerambut boleh dikawal dgn menyediakan 1
lapisan koefisien telap tinggi yg diletakkan di bwh @
antara lapisan jln utk membawa air ke parit sisi.
SISTEM PERPARITAN BAWAH TANAH :
PREPARED BY: MAI AZUNA 2011
16
a. Parit peranchis (FRENCH DRAIN) - parit yg cetek , dipsg dgn
paip sambungan terbuka dr jenis paip tanah liat @ paip
konkrit berliang.
- Paip ini ditimbus dgn bhn penapis terdiri dr batu kelikir yg
digred.
- Air mengalir melalui rongga
& paip secara perlahan.
b. Parit jalur ( STRIP DRAIN)
PREPARED BY: MAI AZUNA 2011
17 - Serupa dgn paip peranchis.
- Beza dr segi bahan penapis- diganti dgn jalur plastik
- Jalur plastik dipasang dr permukaan sehingga ke dlm
parit menyelubungi paip berliang.
- Parit yg dikorek , dikambus balik dgn tanah asal.
c. Parit tanah(LAND DRAIN)
PREPARED BY: MAI AZUNA 2011
18 - Parit yg dipasang dengan paip tanah liat.
- Spt di kwsn pertanian.
- Paip mempunyai sambungan terbuka & ia ditimbus
dgn tanah asal.
d. Parit pemintas(INTERCEPTING DRAIN)
PREPARED BY: MAI AZUNA 2011
19 - Parit yg digali & diletakkan dgn paip tanah liat dgn
sambungan terbuka @ paip besi yg berlubang halus –
dikambus dgn tanah telus air.
- Bahagian atas permukaan samada bertutup tanah tak telus air
@ terbuka dgn bhn telus air.
- Parit ini berguna utk memintas aliran air dr tanah tinggi &
paipkannya ke tpt buangan.
PUNCA KEROSAKAN TURAPAN:
PREPARED BY: MAI AZUNA 2011
20
Punca utama : dr air yg meresap – melemahkan subgred.
Kandungan lembapan tinggi menjadikan tanah bersifat
plastik & mengurangkan keupayaan galas.
Perubahan kandungan lembapan boleh berlaku dr :
a. Resapan dr tanah tinggi
b. Resapan melalui turapan jalan
c. Pergerakan lembapan dr air bumi
d. Pergerakan lembapan dr bahu jalan.
PREPARED BY: MAI AZUNA 2011
21
Menghalang resapan dari tanah tinggi
Berlaku di kwsn potongan yg terdapat lapisan tanah
telap air (permeable layer) dari lereng bukit hingga ke
tanah bawah jalan.
Parit pemintas dipasang di sebelah tanah tinggi hingga
lapisan tak telap air (impermeable layer) .
Jika lapisan tak telap air terlalu dalam, memadai hingga
1.25 m dalam.
Menghalang resapan melalui turapan
Resapan ini boleh dihalang dengan membina
subtapak daripada bahan-bahan pasir setebal
100 – 150 mm
Air yg meresap dialirkan melalui saliran bawah
tanah.
Menghalang pergerakan lembapan
dari air bumi
Paras air bumi mesti berada sekurang-kurangnya 1
– 1.25 m bawah aras formasi jalan.
Paras air bumi yg tinggi boleh direndahkan dengan
membina parit saliran bawah tanah di kedua-dua
belah jalan bergantung pd lebar jalan & tanah.
Menghalang pergerakan lembapan
dari bahu jalan
Resapan ini boleh dihalang dengan melanjutkan
pembinaan tapak, subtapak & subgred hingga ke
bahu jalan.
Juga boleh dihalang dengan menyediakan
bahan tak kalis air di antara bahu jalan dan
turapan.
PENYALIRAN PERMUKAAN
PREPARED BY: MAI AZUNA 2011
26 - Ialah pembuangan air dr permukaan jalanraya.
- Air yang berada di permukaan j/raya : air
permukaan (surface water)
- Cara menyalirkan : mengkamber struktur @
permukaan jalan, mencerun bahu jalan & kawasan
berliku , memasang lurah di bendul jalan & pasang
parit @ longkang tepian jalan.
PENYALIRAN PERMUKAAN
PREPARED BY: MAI AZUNA 2011
27
Fungsi :
Menyalirkan /memintas air permukaan /larian dari
turapan & bahu ke parit seterusnya ke laluan air
ribut, sungai & laut /tasik.
Jenis sistem penyaliran permukaan :
PREPARED BY: MAI AZUNA 2011
28
1. Kamber
- Cerun melintang pd permukaan & bahu jalan utk
menyalirkan air permukaan ke parit tepi jalan. Bagi
selekoh ,sendeng selekoh digunakan.
Permukaan yang mempunyai kecerunan.
Pengawasan perlu pada bahu jalan supaya operasi penyaliran
air dari permukaan jalan ke parit berjalan lancar.
Nilai cerun kamber bagi permukaan jalan lurus:
Jenis permukaan cerun kamber yg sesuai
a. Permukaan jln tanah/kelikir 3 – 4 %
b. Bahu jalan 3 – 4 %
c. Permukaan berbitumen @ konkrit 2 – 3 %
2. Cerun memanjang(longitudinal fall)
- Tambahan kepada kamber jalan.
- Perlu utk bahagian tepi jalan, parit tepian jalan @ longkang –
0.5% kecerunan
- Jln di kawasan rata digalakkan meninggikan satu hujung jalan
utk membantu pengaliran air permukaan.
Kawasan berbukit- kecerunan adalah mencerun – air akan
mengalir di sepanjang jalan.
Penyusunan dibuat bagi mengumpul air pada sela tertentu
sebelum dibuang ke parit @ longkang.
PREPARED BY: MAI AZUNA 2011
31
3. Parit pintasan – parit cetek di tebing potongan/tambakan utk
mengelakkan hakisan dan runtuhan cerun . Dibina bersama
parit pengumpul bg membawa air yang terkumpul dr cerun ke
parit sisi @ limpahan terkawal.
4. Parit /longkang sisi
PREPARED BY: MAI AZUNA 2011
32
- Dibina di sepanjang tepi jalan utk bawa air dr bahu
jalan ke saluran utama.
- Di kwsn potongan, ia menghalang air dr tanah
tinggi masuk ke jalanraya – parit perangkap (catch
drain).
- Di kws tambakan , parit ini memerangkap air dari
menghakis tambakan .
- Parit yg cerunnya kurang 0.5 % - mesti diturap.
5. Gegeluk & erong salir ( scupper drain &
gully)
PREPARED BY: MAI AZUNA 2011
33 - Utk jalan berbendul (kerbed ) , air yg mengalir ke
tepi permukaan turapan jalan dikutip pada sela
tertentu melalui ‘scupper drain’ & ‘gully’ .
- Air akan disalurkan ke 1 paip yg membawanya
kepada parit @ longkang tepian jalan.
Di bina pada sela tertentu di sepanjang bebendul
jalan utk menyalirkan air ke parit dan pembentung.
6. Pembentung/ culvert
PREPARED BY: MAI AZUNA 2011
34
- Di bina di bawah jalan utk membawa air yang
terkumpul dalam parit merentasi jalan ke bahagian
yang lebih rendah di sebelah.
- Bagi kawasan bandar pembentung dibina lengkap
dgn lurang utk tujuan penyenggaraan.
- Air akhirnya dibuang ke sungai, paya
PREPARED BY: MAI AZUNA 2011
35
- Pembentung ialah laluan utk mengalirkan air
permukaan melalui bawah jalan tanpa gangguan
& tanpa merosakkan jalan.
- Faktor2 yg perlu diambil kira dlm merekabentuk &
membina pembetung:
i. Menyediakan laluan air yg mencukupi – ketika
hujan lebat.
ii. Kekuatan struktur mencukupi utk tanggung beban
tanah tambak & lalulintas.
PREPARED BY: MAI AZUNA 2011
36
iii. Kecerunan mencukupi bg mengelak mendapan &
hakisan. Kecerunan 1-2% bg mendapatkan halaju air
yg dibenarkan. Bg mencegah mendapan, cerun max
0.5%.
iv. Tembok perlu dibina di bhgn keluar/masuk
pembentung yg dibina di kwsn berbukit/tambakan
tinggi.
JENIS-JENIS PEMBETUNG :
PREPARED BY: MAI AZUNA 2011
37 a. Pembetung paip (pipe culvert)
- Diperbuat dr bhn logam (corrugated metal pipe) @ bahan
konkrit
- Sgt sesuai di bwh beban yg besar-
b. Pembetung kekotak (box culvert)
PREPARED BY: MAI AZUNA 2011
38 - Utk banjir besar dan boleh diletak pd sebarang
keadaan.
- Lebih flexible jika ukurannya boleh diubahsuai dgn
keadaan turus hidraulik .
- Retang 10-12 kaki.
c. Pembentung gerbang ( arched culvert)
PREPARED BY: MAI AZUNA 2011
39 - Keadaan di mana krg sekatan @ halaju kpd
keperluan jln air masa depan.
- Rentang sampai 5 kaki & dr konkrit.
- Bonjol (hump) mungkin terjadi di permukaan jln.
- Kos pembinaan mahal.
d) Pembetung balak (beam culvert)
PREPARED BY: MAI AZUNA 2011
40 - Dr konkrit bertetulang & susunan strukturnya
menyerupai satu jambatan kecil.
7. Jambatan
PREPARED BY: MAI AZUNA 2011
41
- Dibina jika jalan merentasi sungai @
laluan air yg luas & berisipadu tinggi
( If the road was built across the river @ wide & high volume waterway)