drainage calculations and stormwater management plan
TRANSCRIPT
DRAINAGE CALCULATIONS AND
STORMWATER MANAGEMENT PLAN
DRAINAGE DESIGN & CALCULATIONS
for
MULTI-FAMILY DEVELOPMENT OF 40 VINE STREET
MELROSE, MASSACHUSETTS
PREPARED FOR: Daniel Galvin 40 Vine Street
Melrose, MA 02176
Date: May 6, 2020
Prepared by GCG ASSOCIATES, INC.
84 Main Street, Wilmington, MA 01887
Proposed Multi-Family Development 40 Vine Street
Melrose, MA 02176
TABLE OF CONTENTS
Stormwater Management and Erosion Control Permit Application ATTACHMENTS:
Project Analysis Summary
Engineering Methods & Standards Selection of Storm Events Site Soils Resource Areas On-site Pre-Development Conditions On-site Post-Development Conditions Stormwater Detention Facilities & Calculations Summary of Flows at Design Points
APPENDICES
Appendix A: Existing Conditions – Pre-Development Analysis
Pre-Development Plan - Watershed Routing Diagram 2, 5, 10, 25 & 100 Year, 24 Hour Storm Event Analysis
Appendix B: Proposed Conditions – Post-Development Analysis
Post Development Plan - Watershed Routing Diagram 2, 5, 10, 25 & 100 Year, 24 Hour Storm Event Analysis
Appendix C: Soils Data
Soil Map & HSG Classifications – Middlesex Counties, MA Web Soil Survey Dated:
January 30, 2020.
1982 Rawls Rates - NRCS Hydrologic Soil Group Infiltration Rates from the Massachusetts Stormwater Handbook, Vol. 3, Ch. 1, Pg. 22 Table 2.3.3
Appendix D: Operations & Maintenance
Stormwater & Drainage Operations & Maintenance Plan for 40 Vine Street
Sample O&M Log and O&M budget.
Appendix E: Drainage Watershed Plans
Pre-Development Watershed Plan
Post-Development Watershed Plan
Proposed Multi-Family Development 40 Vine Street
Melrose, MA 02176
Project Analysis Summary The applicant, Daniel Galvin proposes to demolish the existing multi-family building at 40 Vine Street, Melrose, MA and construct a new eight-unit multi-family development along with general site improvements. Based on the City of Melrose’s Assessor Database, the building was constructed in 1895 on Vine Street shown as Tax Parcel ID C8 0 40 and contains 0.259+/- acres per current tax record. The site narrative describes the property as a “TWO FAM” with a “MULTI-CONV” style building. There is no wetland resource area within 100 feet of the parcel. The site is identified by the FIRM Panel 25017C0429E, effective date 6/4/2010 located within the Zone ‘X’, area determined to be of minimal flood hazard. Existing Conditions The existing site is 11,302 square feet in total, with 3,381 square feet being impervious areas. The existing drainage system consists two drainage areas. The northwest corner of the site drains toward the catch basin located in the front of the property on Vine Street. The majority of the site drains to the low point at the back southeast corner of the property where there is existing landscaping. The existing soil consists of 603-Urban Land, Wet Substratum, Hydrologic Soil Group (HSG) not rated. Through field soil testing we have decided that the soil is of HSG A, due to the findings of loamy sand and an estimated seasonal high ground water (ESHGW) of 6.5 feet below the surface. Proposed Conditions The proposed development would increase the impervious area with a parking lot and a building footprint increased by 1,470 square feet. The proposal will create a net increase of 5,517 square feet of new impervious area. Proposed stormwater management controls will be used to mitigate stormwater runoff, provide treatment and recharge. Stormwater management controls for the proposed development include an open grate proprietary mechanical treatment unit (Stormceptor STC 450i unit) for 44% pre-treatment and a sub-surface perforated pipes embedded in stone bed infiltration system for treatment and groundwater recharge. The applicant will also provide erosion and sedimentation controls during the construction period. A long-term stormwater operation and maintenance plan is established for the project. Since the site is only 11,302 square feet, a National Pollutant Discharge Elimination System (NPDES) permit and associated stormwater pollution prevention plan (SWPPP) will not be required. Engineering Methods & Standards The drainage modeling and calculations were performed using HydroCAD Hydrology software. HydroCAD uses the Soil Conservation Service (SCS), time of concentration by TR-55 methodology, and TR-20 hydrologic analyses, reach and pond rating by the Storage Indication Method and Manning's Equation, unit Hydrograph Method and the Storage Indication Method for developing the runoff and reservoir routing hydrographs, respectively. Drainage calculations for the pre- and post-development conditions were performed for the 2, 5, 10, 25, and 100 year Type III, 24 hour storm events. All calculations generated for pre-, and post-development conditions can be found in the attached appendices. The Massachusetts Department of Environmental Protection (MassDEP) Stormwater Management Policy standards were observed in the design of the stormwater management system. These standards included limiting post-development peak discharge rates and volumes to the pre-development peak discharge rates and volumes and recharging stormwater runoff to the groundwater. The City of Melrose Stormwater Management Requirements were utilized in the design of the stormwater management system.
Proposed Multi-Family Development 40 Vine Street
Melrose, MA 02176
Selection of Storm Events The storm events have been compiled from the City of Melrose Rules and Regulations for Stormwater Management and Erosion Control. Values are based upon 24-hour rainfall data for Massachusetts from U.S Weather Bureau’s, Technical Paper 40, published in 1961. Rainfall frequency data has been provided as follows: Frequency (Years) Rainfall [24-Hour Event (inches)] 2 3.2
10 4.6 25 5.4 100 6.6 Site Soils Drainage classes have been established based on soil maps provided by U.S. Department of Agriculture Soil Conservation Service. Soil maps and descriptions are part of "Soil Survey Area: Middlesex County, MA: Soil Survey Data: Version 19, September 12, 2019.” On-site soils are classified as: 603 Urban land, wet substratum One deep hole soil test (TP-#1) was performed by GCG on February 25, 2020. See watershed plans for soil log and test pit location. GCG decided to use HSG A based on the sandy materials for the entire site in this analysis. On-Site Pre-Development Conditions The existing drainage system for the site consists of two drainage points that were used for our analysis. One is the catch basin on Vine Street, that the northwest portion of the site drains to. The second drainage point is the low point in the southeast corner of the existing lot. The majority of the site drains to the second analysis point by the existing contours of the site. Pre X-1 Drainage Sub-area X-1 is approximately 1,668 square feet in size. The area contains roofing, a paved walkway and lawn area. The drainage runoff discharges to a catch basin located in the curb line adjacent to the property on Vine Street (Analysis Point L-1). Pre X-2 Drainage Sub-area X-2 is approximately 9,634 square feet in size. The area contains roofing, paved walkways, paved driveway, gravel driveway and lawn areas. The drainage runoff discharges to a low point located in the southwest corner of the lot (Analysis Point L-2). Routing diagrams for these drainage areas with supporting engineering calculations and information can be found in Appendix A of this report.
Proposed Multi-Family Development 40 Vine Street
Melrose, MA 02176
On-site Post-Development Conditions The Post-Development site has three separate drainage areas that are based on the proposed layout of the site. Routing diagrams for these drainage areas with supporting engineering calculations and information can be found in Appendix A of this report. Post P-1 Drainage Sub-area P-1 is approximately 7,114 square feet. The area contains the majority of the proposed paved parking lot and lawn areas. The drainage area will discharge into a new Stormceptor unit for pretreatment and through a perforated pipes stone bed system for further treatment and infiltration. (Analysis Point L-2) Post P-2 Drainage Sub-area P-2 is approximately 4,123 square feet. The area contains the roof area of the proposed building. The drainage area will discharge through a roof drainpipe directly into the underground infiltration system made up of perforated pipes and a stone bed system. Roof runoff is considered clean water per MassDEP and requires no treatments. (Analysis Point L-2) Post P-3 Drainage Sub-area P-3 is approximately 65 square feet. The area contains a small part of the proposed paved driveway in the northwest corner of the site. This area of driveway will discharge directly into the catch basin on Vine Street. (Analysis Point L-1) Stormwater Management Facilities (BMPs) & Calculations for Roadway Pavement and Roof Area This is a re-development & new-development project, the existing development consists of 3,381+/- square feet of impervious areas and 7,921+/- square feet of wood/lawn landscape area. The proposed development will have a net increase of 5,517 +/- square feet of new pavement, walkway and roofing impervious areas with a total impervious area of 8,898 +/- square feet. The proposed best management practices (BMP’s) will treat and recharge the entire impervious area to meet MassDEP requirements. The proposed infiltration system will utilize a Stormceptor 450i unit with a catch basin gate for pre-treatment to collect the surface runoff. A Stormceptor unit will provide a minimum of 44% of total suspended solids (TSS) pre-treatment and discharge to a perforated pipes/stone bed sub-surface infiltration system to achieve the 80% TSS removal requirements. A roof drain line will discharge to the infiltration system directly to prevent overtaxing on the Stormceptor unit. The following calculations demonstrate required volumes and capacity of the proposed Infiltration Basin. Groundwater Recharge Volume – (Standard 3) Recharge Volumes Required (MassDEP Stormwater Handbook)
• HSG A: Impervious area = 8,898 SF • Groundwater Recharge Volume Required = 8,898 SF x 0.6” /12” = 445 CF
• The proposed infiltration system has a storage capacity of 1,925 CF
(See HydroCAD Pond S-1 – 100-Year Storm Infiltration System Storage Volume) Drawdown Calculations (MassDEP Stormwater Handbook)
• Infiltration System Storage Volume = 1,925 CF Bottom of Infiltration System Surface Area = 1,615 SF Exfiltration Rate = 2.41 IN/HR (Rawls rate, 1982)
• Drawdown Time = 1,925 CF/1,615 SF = 1.19 FT x 12 IN/1 FT = 14.30 IN/2.41 IN/HR = 5.93 HRS < 72 HRS
Proposed Multi-Family Development 40 Vine Street
Melrose, MA 02176
Water Quality Volume (WQV) – (Standard 4) • Required 1 inch of the Total Impervious Area. - (MassDEP Stormwater Handbook)
Proposed impervious area = 8,898 SF x 1IN/12IN/FT = 741 CF
• Proposed Infiltration System provided 1,925 CF > 741 CF requirements. Proprietary Mechanical Treatment Unit (Stormceptor) Sizing The sub-catchment runoff flows through the treatment unit consists of approximately 0.26 acres with 78.6% impervious coverage. (Excluded site roof drain, which by passed the treatment unit.) Contech Engineered Solutions, Stormceptor manufacturer claims that a STC 450i unit will provide 90% TSS removal, see Stormceptor sizing report. Greater than required 44%. Infiltration (Trench) System The proposed infiltration system consists of 890+/- linear feet of 15-inch diameter perforated HDPE pipe embedded within a 1,615 SF by 2.25-foot high stone bed. The storage volume is approximately 1,925 CF. TSS removal Infiltration Trenches with Stormceptor Pre-treatment = 80% (MassDEP) Pre-treatment Stormceptor 450i unit = 90% TSS removal > 44% (rapid soil) Summary of Flows at Design Points - (Standard 2) MassDEP Stormwater Management Standards and the City of Melrose Drainage and Stormwater Design Standards were used in the design of the stormwater management system. These standards included limiting post-development peak discharge rates to the pre-development peak discharge rates and recharging stormwater runoff to the groundwater. The following table includes a comparison for pre- and post-development runoff values obtained using total peak values from hydrographs in attached calculations.
TABLE 1
40 VINE STREET, RUNOFF PRE vs. POST DEVELOPMENT CONDITIONS
Discharge Point: Catch Basin on Vine Street
Peak Flow (cfs) Volume (af) Year
Storm Pre Post Pre Post 2 0.00 0.00 0.001 0.000 10 0.02 0.01 0.002 0.001 25 0.04 0.01 0.004 0.001 100 0.07 0.01 0.006 0.001
Proposed Multi-Family Development 40 Vine Street
Melrose, MA 02176
TABLE 2
40 VINE STREET, RUNOFF PRE vs. POST DEVELOPMENT CONDITIONS
Discharge Point: SW Backyard Low Point
Peak Flow (cfs) Volume (af) Year
Storm Pre Post Pre Post 2 0.03 0.00 0.006 0.00 10 0.18 0.00 0.017 0.00 25 0.30 0.00 0.024 0.00 100 0.49 0.00 0.038 0.00
Project Information & LocationProject Name 40 Vine Street Project Number 1982
City Melrose State/ Province Massachusetts
Country United States of America Date 3/16/2020
Designer Information EOR Information (optional)
Name Kevin Carter Name
Company GCG Associates, Inc. Company
Phone # 978-657-9714 Phone #
Email [email protected] Email
Brief Stormceptor Sizing Report - 40 Vine Street
Site Name 40 Vine Street
Target TSS Removal (%) 44
TSS Removal (%) Provided 96
Recommended Stormceptor Model STC 2400
Stormceptor Sizing SummaryStormceptor Model % TSS Removal
Provided% Runoff Volume Captured Provided
STC 450i 90 96STC 900 94 99
STC 1200 94 99STC 1800 94 99STC 2400 96 100STC 3600 96 100STC 4800 97 100STC 6000 97 100STC 7200 98 100STC 11000 99 100STC 13000 99 100STC 16000 99 100
The recommended Stormceptor Model achieves the water quality objectives based on the selected inputs, historical rainfall records and selected particle size distribution.
Stormwater Treatment Recommendation The recommended Stormceptor Model(s) which achieve or exceed the user defined water quality objective for each site within the project are listed in the below Sizing Summary table.
Stormceptor Brief Sizing Report – Page 1 of 2
Notes• Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor, which uses the EPA Rainfall and Runoff modules.• Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal defined by the selected PSD, and based on stable site conditions only, after construction is completed.• For submerged applications or sites specific to spill control, please contact your local Stormceptor representative for further design assistance.
Drainage Area
Total Area (acres) 0.26
Imperviousness % 78.6
Water Quality Objective
TSS Removal (%) 44.0
Runoff Volume Capture (%) 100.00
Oil Spill Capture Volume (Gal)
Peak Conveyed Flow Rate (CFS) 1.37
Water Quality Flow Rate (CFS) 0.01
Rainfall
Station Name BOSTON WSFO AP
State/Province Massachusetts
Station ID # 0770
Years of Records 58
Latitude 42°21'38"N
Longitude 71°0'38"W
Up Stream Storage
Storage (ac-ft) Discharge (cfs)
0.106 1.370
Particle Size Distribution (PSD)The selected PSD defines TSS removal
Fine Distribution
Particle Diameter(microns)
Distribution %
Specific Gravity
20.0 20.0 1.30
60.0 20.0 1.80
150.0 20.0 2.20
400.0 20.0 2.65
2000.0 20.0 2.65
Up Stream Flow Diversion
Max. Flow to Stormceptor (cfs)
Sizing Details
For Stormceptor Specifications and Drawings Please Visit: https://www.conteches.com/technical-guides/search?filter=1WBC0O5EYX
Stormceptor Brief Sizing Report – Page 2 of 2
STANDARD #10
STORMWATER AND DRAINAGE ILLICIT DISCHARGE STATEMENT
40 Vine Street
MELROSE, MASSACHUSETTS All illicit discharges to the stormwater management system are prohibited. I. STATEMENT This site as shown on the plan titled “Proposed Drainage and Utility Plan” for 40 Vine Street, Melrose, Massachusetts, prepared by GCG Associates, Inc. and dated April 28, 2020 does not contain any illicit discharges, this was confirmed using visual screening as required by standard 10 of the “Massachusetts Stormwater Handbook” Vol. 1, Ch. 1 page 25. The project proponent, owner, or lessee (in perpetuity) must comply with local, state, and federal regulations for the discharge of illicit discharges from the site. Illicit discharges are discharges that are not entirely comprised of storm water. Notwithstanding the foregoing, an illicit discharge does not include discharges from the following activities:
• Fire fighting • Water line flushing • Landscape irrigation • Uncontaminated ground water • Potable water sources • Foundation drains • Air conditioning condensation • Footing drains • Individual car washing • Water used for street washing and water used to clean residential buildings without
detergents The project proponent, owner, Daniel Galvin (in perpetuity) shall adhere to this report on file with the City of Melrose.
Proposed Multi-Family Development 40 Vine Street
Melrose, MA 02176
APPENDIX A Existing Conditions – Pre-Development Analysis
X-1
NW Area of Property (Existing Conditions)
X-2
Rest of Property (Existing Conditions)
L-1
CB Vine Street
L-2
SE Backyard Low Point
Routing Diagram for 1982 - Pre DevelopmentPrepared by GCG Associates, Inc., Printed 4/23/2020
HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
1982 - Pre Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 2HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area(acres)
CN Description(subcatchment-numbers)
0.182 39 >75% Grass cover, Good, HSG A (X-1, X-2)0.019 98 Paved parking, HSG A (X-1, X-2)0.059 98 Roofs, HSG A (X-1, X-2)0.259 57 TOTAL AREA
1982 - Pre Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 3HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area(acres)
SoilGroup
SubcatchmentNumbers
0.259 HSG A X-1, X-20.000 HSG B0.000 HSG C0.000 HSG D0.000 Other0.259 TOTAL AREA
1982 - Pre Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 4HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Ground Covers (all nodes)
HSG-A(acres)
HSG-B(acres)
HSG-C(acres)
HSG-D(acres)
Other(acres)
Total(acres)
GroundCover
SubcatchmentNumbers
0.182 0.000 0.000 0.000 0.000 0.182 >75% Grass cover, Good X-1, X-20.019 0.000 0.000 0.000 0.000 0.019 Paved parking X-1, X-20.059 0.000 0.000 0.000 0.000 0.059 Roofs X-1, X-20.259 0.000 0.000 0.000 0.000 0.259 TOTAL AREA
Type III 24-hr 2-YR Rainfall=3.20"1982 - Pre Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 5HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 pointsRunoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=1,668 sf 25.60% Impervious Runoff Depth>0.22"Subcatchment X-1: NW Area of Property Tc=6.0 min CN=54 Runoff=0.00 cfs 0.001 af
Runoff Area=9,634 sf 30.66% Impervious Runoff Depth>0.31"Subcatchment X-2: Rest of Property Tc=6.0 min CN=57 Runoff=0.03 cfs 0.006 af
Inflow=0.00 cfs 0.001 afLink L-1: CB Vine Street Primary=0.00 cfs 0.001 af
Inflow=0.03 cfs 0.006 afLink L-2: SE Backyard Low Point Primary=0.03 cfs 0.006 af
Total Runoff Area = 0.259 ac Runoff Volume = 0.006 af Average Runoff Depth = 0.30"70.08% Pervious = 0.182 ac 29.92% Impervious = 0.078 ac
Type III 24-hr 10-YR Rainfall=4.60"1982 - Pre Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 6HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 pointsRunoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=1,668 sf 25.60% Impervious Runoff Depth>0.73"Subcatchment X-1: NW Area of Property Tc=6.0 min CN=54 Runoff=0.02 cfs 0.002 af
Runoff Area=9,634 sf 30.66% Impervious Runoff Depth>0.90"Subcatchment X-2: Rest of Property Tc=6.0 min CN=57 Runoff=0.18 cfs 0.017 af
Inflow=0.02 cfs 0.002 afLink L-1: CB Vine Street Primary=0.02 cfs 0.002 af
Inflow=0.18 cfs 0.017 afLink L-2: SE Backyard Low Point Primary=0.18 cfs 0.017 af
Total Runoff Area = 0.259 ac Runoff Volume = 0.019 af Average Runoff Depth = 0.87"70.08% Pervious = 0.182 ac 29.92% Impervious = 0.078 ac
Type III 24-hr 25-YR Rainfall=5.40"1982 - Pre Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 7HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 pointsRunoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=1,668 sf 25.60% Impervious Runoff Depth>1.12"Subcatchment X-1: NW Area of Property Tc=6.0 min CN=54 Runoff=0.04 cfs 0.004 af
Runoff Area=9,634 sf 30.66% Impervious Runoff Depth>1.32"Subcatchment X-2: Rest of Property Tc=6.0 min CN=57 Runoff=0.30 cfs 0.024 af
Inflow=0.04 cfs 0.004 afLink L-1: CB Vine Street Primary=0.04 cfs 0.004 af
Inflow=0.30 cfs 0.024 afLink L-2: SE Backyard Low Point Primary=0.30 cfs 0.024 af
Total Runoff Area = 0.259 ac Runoff Volume = 0.028 af Average Runoff Depth = 1.29"70.08% Pervious = 0.182 ac 29.92% Impervious = 0.078 ac
Type III 24-hr 100-YR Rainfall=6.60"1982 - Pre Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 8HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 pointsRunoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=1,668 sf 25.60% Impervious Runoff Depth>1.78"Subcatchment X-1: NW Area of Property Tc=6.0 min CN=54 Runoff=0.07 cfs 0.006 af
Runoff Area=9,634 sf 30.66% Impervious Runoff Depth>2.05"Subcatchment X-2: Rest of Property Tc=6.0 min CN=57 Runoff=0.49 cfs 0.038 af
Inflow=0.07 cfs 0.006 afLink L-1: CB Vine Street Primary=0.07 cfs 0.006 af
Inflow=0.49 cfs 0.038 afLink L-2: SE Backyard Low Point Primary=0.49 cfs 0.038 af
Total Runoff Area = 0.259 ac Runoff Volume = 0.043 af Average Runoff Depth = 2.01"70.08% Pervious = 0.182 ac 29.92% Impervious = 0.078 ac
Type III 24-hr 100-YR Rainfall=6.60"1982 - Pre Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 9HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment X-1: NW Area of Property (Existing Conditions)
Runoff = 0.07 cfs @ 12.10 hrs, Volume= 0.006 af, Depth> 1.78"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrsType III 24-hr 100-YR Rainfall=6.60"
Area (sf) CN Description181 98 Paved parking, HSG A
1,241 39 >75% Grass cover, Good, HSG A246 98 Roofs, HSG A
1,668 54 Weighted Average1,241 74.40% Pervious Area
427 25.60% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Less than 6 minutes
Summary for Subcatchment X-2: Rest of Property (Existing Conditions)
Runoff = 0.49 cfs @ 12.10 hrs, Volume= 0.038 af, Depth> 2.05"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrsType III 24-hr 100-YR Rainfall=6.60"
Area (sf) CN Description94 98 Roofs, HSG A
2,232 98 Roofs, HSG A628 98 Paved parking, HSG A
6,680 39 >75% Grass cover, Good, HSG A9,634 57 Weighted Average6,680 69.34% Pervious Area2,954 30.66% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Less than 6 mins
Summary for Link L-1: CB Vine Street
Inflow Area = 0.038 ac, 25.60% Impervious, Inflow Depth > 1.78" for 100-YR eventInflow = 0.07 cfs @ 12.10 hrs, Volume= 0.006 afPrimary = 0.07 cfs @ 12.10 hrs, Volume= 0.006 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs
Type III 24-hr 100-YR Rainfall=6.60"1982 - Pre Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 10HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Summary for Link L-2: SE Backyard Low Point
Inflow Area = 0.221 ac, 30.66% Impervious, Inflow Depth > 2.05" for 100-YR eventInflow = 0.49 cfs @ 12.10 hrs, Volume= 0.038 afPrimary = 0.49 cfs @ 12.10 hrs, Volume= 0.038 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs
Proposed Multi-Family Development 40 Vine Street
Melrose, MA 02176
APPENDIX B Proposed Conditions – Post-Development Analysis
P-1
Proposed Driveway and Lawn
P-2
Proposed Building Roof
P-3
Driveway Apron
S-1
Stormceptor & Infiltration Bed
L-1
CB Vine Street
L-2
SE Backyard Low Point
Routing Diagram for 1982 - Post DevelopmentPrepared by GCG Associates, Inc., Printed 4/23/2020
HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Subcat Reach Pond Link
1982 - Post Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 2HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Area Listing (all nodes)
Area(acres)
CN Description(subcatchment-numbers)
0.055 39 >75% Grass cover, Good, HSG A (P-1)0.110 98 Paved parking, HSG A (P-1, P-3)0.095 98 Roofs, HSG A (P-2)0.259 85 TOTAL AREA
1982 - Post Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 3HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Soil Listing (all nodes)
Area(acres)
SoilGroup
SubcatchmentNumbers
0.259 HSG A P-1, P-2, P-30.000 HSG B0.000 HSG C0.000 HSG D0.000 Other0.259 TOTAL AREA
1982 - Post Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 4HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Ground Covers (all nodes)
HSG-A(acres)
HSG-B(acres)
HSG-C(acres)
HSG-D(acres)
Other(acres)
Total(acres)
GroundCover
SubcatchmentNumbers
0.055 0.000 0.000 0.000 0.000 0.055 >75% Grass cover, Good P-10.110 0.000 0.000 0.000 0.000 0.110 Paved parking P-1, P-30.095 0.000 0.000 0.000 0.000 0.095 Roofs P-20.259 0.000 0.000 0.000 0.000 0.259 TOTAL AREA
Type III 24-hr 2-YR Rainfall=3.20"1982 - Post Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 5HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 pointsRunoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=7,114 sf 66.21% Impervious Runoff Depth>1.27"Subcatchment P-1: Proposed Driveway and Tc=6.0 min CN=78 Runoff=0.23 cfs 0.017 af
Runoff Area=4,124 sf 100.00% Impervious Runoff Depth>2.97"Subcatchment P-2: Proposed Building Tc=6.0 min CN=98 Runoff=0.29 cfs 0.023 af
Runoff Area=65 sf 100.00% Impervious Runoff Depth>2.97"Subcatchment P-3: Driveway Apron Tc=6.0 min CN=98 Runoff=0.00 cfs 0.000 af
Peak Elev=51.50' Storage=484 cf Inflow=0.52 cfs 0.041 afPond S-1: Stormceptor & Infiltration Bed Discarded=0.09 cfs 0.041 af Primary=0.00 cfs 0.000 af Outflow=0.09 cfs 0.041 af
Inflow=0.00 cfs 0.000 afLink L-1: CB Vine Street Primary=0.00 cfs 0.000 af
Inflow=0.00 cfs 0.000 afLink L-2: SE Backyard Low Point Primary=0.00 cfs 0.000 af
Total Runoff Area = 0.259 ac Runoff Volume = 0.041 af Average Runoff Depth = 1.90"21.27% Pervious = 0.055 ac 78.73% Impervious = 0.204 ac
Type III 24-hr 10-YR Rainfall=4.60"1982 - Post Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 6HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 pointsRunoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=7,114 sf 66.21% Impervious Runoff Depth>2.37"Subcatchment P-1: Proposed Driveway and Tc=6.0 min CN=78 Runoff=0.45 cfs 0.032 af
Runoff Area=4,124 sf 100.00% Impervious Runoff Depth>4.36"Subcatchment P-2: Proposed Building Tc=6.0 min CN=98 Runoff=0.42 cfs 0.034 af
Runoff Area=65 sf 100.00% Impervious Runoff Depth>4.36"Subcatchment P-3: Driveway Apron Tc=6.0 min CN=98 Runoff=0.01 cfs 0.001 af
Peak Elev=52.09' Storage=1,009 cf Inflow=0.86 cfs 0.067 afPond S-1: Stormceptor & Infiltration Bed Discarded=0.09 cfs 0.067 af Primary=0.00 cfs 0.000 af Outflow=0.09 cfs 0.067 af
Inflow=0.01 cfs 0.001 afLink L-1: CB Vine Street Primary=0.01 cfs 0.001 af
Inflow=0.00 cfs 0.000 afLink L-2: SE Backyard Low Point Primary=0.00 cfs 0.000 af
Total Runoff Area = 0.259 ac Runoff Volume = 0.067 af Average Runoff Depth = 3.11"21.27% Pervious = 0.055 ac 78.73% Impervious = 0.204 ac
Type III 24-hr 25-YR Rainfall=5.40"1982 - Post Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 7HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 pointsRunoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=7,114 sf 66.21% Impervious Runoff Depth>3.05"Subcatchment P-1: Proposed Driveway and Tc=6.0 min CN=78 Runoff=0.57 cfs 0.042 af
Runoff Area=4,124 sf 100.00% Impervious Runoff Depth>5.16"Subcatchment P-2: Proposed Building Tc=6.0 min CN=98 Runoff=0.49 cfs 0.041 af
Runoff Area=65 sf 100.00% Impervious Runoff Depth>5.16"Subcatchment P-3: Driveway Apron Tc=6.0 min CN=98 Runoff=0.01 cfs 0.001 af
Peak Elev=52.36' Storage=1,353 cf Inflow=1.06 cfs 0.082 afPond S-1: Stormceptor & Infiltration Bed Discarded=0.09 cfs 0.082 af Primary=0.00 cfs 0.000 af Outflow=0.09 cfs 0.082 af
Inflow=0.01 cfs 0.001 afLink L-1: CB Vine Street Primary=0.01 cfs 0.001 af
Inflow=0.00 cfs 0.000 afLink L-2: SE Backyard Low Point Primary=0.00 cfs 0.000 af
Total Runoff Area = 0.259 ac Runoff Volume = 0.083 af Average Runoff Depth = 3.83"21.27% Pervious = 0.055 ac 78.73% Impervious = 0.204 ac
Type III 24-hr 100-YR Rainfall=6.60"1982 - Post Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 8HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 pointsRunoff by SCS TR-20 method, UH=SCS, Weighted-CN
Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method
Runoff Area=7,114 sf 66.21% Impervious Runoff Depth>4.11"Subcatchment P-1: Proposed Driveway and Tc=6.0 min CN=78 Runoff=0.77 cfs 0.056 af
Runoff Area=4,124 sf 100.00% Impervious Runoff Depth>6.36"Subcatchment P-2: Proposed Building Tc=6.0 min CN=98 Runoff=0.60 cfs 0.050 af
Runoff Area=65 sf 100.00% Impervious Runoff Depth>6.36"Subcatchment P-3: Driveway Apron Tc=6.0 min CN=98 Runoff=0.01 cfs 0.001 af
Peak Elev=52.82' Storage=1,935 cf Inflow=1.37 cfs 0.106 afPond S-1: Stormceptor & Infiltration Bed Discarded=0.09 cfs 0.106 af Primary=0.00 cfs 0.000 af Outflow=0.09 cfs 0.106 af
Inflow=0.01 cfs 0.001 afLink L-1: CB Vine Street Primary=0.01 cfs 0.001 af
Inflow=0.00 cfs 0.000 afLink L-2: SE Backyard Low Point Primary=0.00 cfs 0.000 af
Total Runoff Area = 0.259 ac Runoff Volume = 0.107 af Average Runoff Depth = 4.94"21.27% Pervious = 0.055 ac 78.73% Impervious = 0.204 ac
Type III 24-hr 100-YR Rainfall=6.60"1982 - Post Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 9HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Summary for Subcatchment P-1: Proposed Driveway and Lawn
Runoff = 0.77 cfs @ 12.09 hrs, Volume= 0.056 af, Depth> 4.11"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrsType III 24-hr 100-YR Rainfall=6.60"
Area (sf) CN Description4,710 98 Paved parking, HSG A2,404 39 >75% Grass cover, Good, HSG A7,114 78 Weighted Average2,404 33.79% Pervious Area4,710 66.21% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Less than 6 minutes
Summary for Subcatchment P-2: Proposed Building Roof
Runoff = 0.60 cfs @ 12.09 hrs, Volume= 0.050 af, Depth> 6.36"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrsType III 24-hr 100-YR Rainfall=6.60"
Area (sf) CN Description4,124 98 Roofs, HSG A4,124 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Less than 6 minutes
Summary for Subcatchment P-3: Driveway Apron
Runoff = 0.01 cfs @ 12.09 hrs, Volume= 0.001 af, Depth> 6.36"
Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrsType III 24-hr 100-YR Rainfall=6.60"
Area (sf) CN Description65 98 Paved parking, HSG A65 100.00% Impervious Area
Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)
6.0 Direct Entry, Less than 6 minutes
Type III 24-hr 100-YR Rainfall=6.60"1982 - Post Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 10HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Summary for Pond S-1: Stormceptor & Infiltration Bed
Inflow Area = 0.258 ac, 78.61% Impervious, Inflow Depth > 4.93" for 100-YR eventInflow = 1.37 cfs @ 12.09 hrs, Volume= 0.106 afOutflow = 0.09 cfs @ 11.25 hrs, Volume= 0.106 af, Atten= 93%, Lag= 0.0 minDiscarded = 0.09 cfs @ 11.25 hrs, Volume= 0.106 afPrimary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af
Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrsPeak Elev= 52.82' @ 13.73 hrs Surf.Area= 1,615 sf Storage= 1,935 cf
Plug-Flow detention time= 181.4 min calculated for 0.106 af (100% of inflow)Center-of-Mass det. time= 180.5 min ( 961.4 - 780.9 )
Volume Invert Avail.Storage Storage Description#1 50.75' 1,057 cf Custom Stage Data (Prismatic) Listed below (Recalc)
3,734 cf Overall - 1,092 cf Embedded = 2,642 cf x 40.0% Voids#2 51.75' 1,092 cf 15.0" Round Pipe Storage Inside #1
L= 890.0'2,149 cf Total Available Storage
Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)50.75 1,615 0 053.00 1,615 3,634 3,63453.10 12 81 3,71554.66 12 19 3,734
Device Routing Invert Outlet Devices#1 Discarded 50.75' 2.410 in/hr Exfiltration over Surface area #2 Primary 54.65' 2.0' long x 2.0' breadth Overflow
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 Coef. (English) 2.54 2.61 2.61 2.60 2.66 2.70 2.77 2.89 2.88 2.85 3.07 3.20 3.32
Discarded OutFlow Max=0.09 cfs @ 11.25 hrs HW=50.79' (Free Discharge)1=Exfiltration (Exfiltration Controls 0.09 cfs)
Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=50.75' (Free Discharge)2=Overflow ( Controls 0.00 cfs)
Summary for Link L-1: CB Vine Street
Inflow Area = 0.001 ac,100.00% Impervious, Inflow Depth > 6.36" for 100-YR eventInflow = 0.01 cfs @ 12.09 hrs, Volume= 0.001 afPrimary = 0.01 cfs @ 12.09 hrs, Volume= 0.001 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs
Type III 24-hr 100-YR Rainfall=6.60"1982 - Post Development Printed 4/23/2020Prepared by GCG Associates, Inc.
Page 11HydroCAD® 10.00-24 s/n 03555 © 2018 HydroCAD Software Solutions LLC
Summary for Link L-2: SE Backyard Low Point
Inflow Area = 0.258 ac, 78.61% Impervious, Inflow Depth = 0.00" for 100-YR eventInflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 afPrimary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min
Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs
Proposed Multi-Family Development 40 Vine Street
Melrose, MA 02176
APPENDIX C
Soils Data
Soil Map—Middlesex County, Massachusetts(40 Vine Street, Melrose, MA )
Natural ResourcesConservation Service
Web Soil SurveyNational Cooperative Soil Survey
1/30/2020Page 1 of 3
4702
540
4702
560
4702
580
4702
600
4702
620
4702
640
4702
660
4702
680
4702
700
4702
720
4702
540
4702
560
4702
580
4702
600
4702
620
4702
640
4702
660
4702
680
4702
700
4702
720
329870 329890 329910 329930 329950 329970 329990 330010
329870 329890 329910 329930 329950 329970 329990 330010
42° 27' 29'' N71
° 4
' 9'' W
42° 27' 29'' N
71° 4
' 2'' W
42° 27' 23'' N
71° 4
' 9'' W
42° 27' 23'' N
71° 4
' 2'' W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 19N WGS840 45 90 180 270
Feet0 10 20 40 60
MetersMap Scale: 1:985 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MA
P LE
GEN
DM
AP
INFO
RM
ATIO
N
Are
a of
Inte
rest
(AO
I)Ar
ea o
f Int
eres
t (AO
I)
Soils
Soil
Map
Uni
t Pol
ygon
s
Soil
Map
Uni
t Lin
es
Soil
Map
Uni
t Poi
nts
Spec
ial P
oint
Fea
ture
sBl
owou
t
Borro
w P
it
Cla
y Sp
ot
Clo
sed
Dep
ress
ion
Gra
vel P
it
Gra
velly
Spo
t
Land
fill
Lava
Flo
w
Mar
sh o
r sw
amp
Min
e or
Qua
rry
Mis
cella
neou
s W
ater
Pere
nnia
l Wat
er
Roc
k O
utcr
op
Salin
e Sp
ot
Sand
y Sp
ot
Seve
rely
Ero
ded
Spot
Sink
hole
Slid
e or
Slip
Sodi
c Sp
ot
Spoi
l Are
a
Ston
y Sp
ot
Very
Sto
ny S
pot
Wet
Spo
t
Oth
er
Spec
ial L
ine
Feat
ures
Wat
er F
eatu
res
Stre
ams
and
Can
als
Tran
spor
tatio
nR
ails
Inte
rsta
te H
ighw
ays
US
Rou
tes
Maj
or R
oads
Loca
l Roa
ds
Bac
kgro
und Ae
rial P
hoto
grap
hy
The
soil
surv
eys
that
com
pris
e yo
ur A
OI w
ere
map
ped
at
1:25
,000
.
War
ning
: Soi
l Map
may
not
be
valid
at t
his
scal
e.
Enla
rgem
ent o
f map
s be
yond
the
scal
e of
map
ping
can
cau
se
mis
unde
rsta
ndin
g of
the
deta
il of
map
ping
and
acc
urac
y of
soi
l lin
e pl
acem
ent.
The
map
s do
not
sho
w th
e sm
all a
reas
of
cont
rast
ing
soils
that
cou
ld h
ave
been
sho
wn
at a
mor
e de
taile
d sc
ale.
Plea
se re
ly o
n th
e ba
r sca
le o
n ea
ch m
ap s
heet
for m
ap
mea
sure
men
ts.
Sour
ce o
f Map
: N
atur
al R
esou
rces
Con
serv
atio
n Se
rvic
eW
eb S
oil S
urve
y U
RL:
C
oord
inat
e Sy
stem
: W
eb M
erca
tor (
EPSG
:385
7)
Map
s fro
m th
e W
eb S
oil S
urve
y ar
e ba
sed
on th
e W
eb M
erca
tor
proj
ectio
n, w
hich
pre
serv
es d
irect
ion
and
shap
e bu
t dis
torts
di
stan
ce a
nd a
rea.
A p
roje
ctio
n th
at p
rese
rves
are
a, s
uch
as th
e Al
bers
equ
al-a
rea
coni
c pr
ojec
tion,
sho
uld
be u
sed
if m
ore
accu
rate
cal
cula
tions
of d
ista
nce
or a
rea
are
requ
ired.
This
pro
duct
is g
ener
ated
from
the
USD
A-N
RC
S ce
rtifie
d da
ta a
s of
the
vers
ion
date
(s) l
iste
d be
low.
Soil
Surv
ey A
rea:
M
iddl
esex
Cou
nty,
Mas
sach
uset
tsSu
rvey
Are
a D
ata:
Ve
rsio
n 19
, Sep
12,
201
9
Soil
map
uni
ts a
re la
bele
d (a
s sp
ace
allo
ws)
for m
ap s
cale
s 1:
50,0
00 o
r lar
ger.
Dat
e(s)
aer
ial i
mag
es w
ere
phot
ogra
phed
: Se
p 11
, 201
9—O
ct 5
, 20
19
The
orth
opho
to o
r oth
er b
ase
map
on
whi
ch th
e so
il lin
es w
ere
com
pile
d an
d di
gitiz
ed p
roba
bly
diffe
rs fr
om th
e ba
ckgr
ound
im
ager
y di
spla
yed
on th
ese
map
s. A
s a
resu
lt, s
ome
min
or
shift
ing
of m
ap u
nit b
ound
arie
s m
ay b
e ev
iden
t.
Soil
Map
—M
iddl
esex
Cou
nty,
Mas
sach
uset
ts(4
0 Vi
ne S
treet
, Mel
rose
, MA
)
Nat
ural
Res
ourc
esC
onse
rvat
ion
Serv
ice
Web
Soi
l Sur
vey
Nat
iona
l Coo
pera
tive
Soil
Surv
ey1/
30/2
020
Page
2 o
f 3
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
603 Urban land, wet substratum 3.4 100.0%
Totals for Area of Interest 3.4 100.0%
Soil Map—Middlesex County, Massachusetts 40 Vine Street, Melrose, MA
Natural ResourcesConservation Service
Web Soil SurveyNational Cooperative Soil Survey
1/30/2020Page 3 of 3
Hyd
rolo
gic
Soil
Gro
up—
Mid
dles
ex C
ount
y, M
assa
chus
etts
(44
Vine
Stre
et M
elro
se G
ener
al A
rea
)
Nat
ural
Res
ourc
esC
onse
rvat
ion
Serv
ice
Web
Soi
l Sur
vey
Nat
iona
l Coo
pera
tive
Soil
Surv
ey1/
30/2
020
Page
1 o
f 4
4701900470220047025004702800470310047034004703700
4701900470220047025004702800470310047034004703700
3282
0032
8500
3288
0032
9100
3294
0032
9700
3300
0033
0300
3306
0033
0900
3312
00
3282
0032
8500
3288
0032
9100
3294
0032
9700
3300
0033
0300
3306
0033
0900
3312
00
42° 2
8' 3
'' N71° 5' 26'' W
42° 2
8' 3
'' N
71° 3' 6'' W
42° 2
6' 5
6'' N
71° 5' 26'' W
42° 2
6' 5
6'' N
71° 3' 6'' W
N
Map
pro
ject
ion:
Web
Mer
cato
r C
orne
r coo
rdin
ates
: WGS
84
Edge
tics
: UTM
Zon
e 19
N W
GS84
050
010
0020
0030
00Feet
020
040
080
012
00Met
ers
Map
Sca
le: 1
:14,
600
if prin
ted
on A
land
scap
e (1
1" x
8.5
") sh
eet.
MA
P LE
GEN
DM
AP
INFO
RM
ATIO
N
Are
a of
Inte
rest
(AO
I)Ar
ea o
f Int
eres
t (AO
I)
Soils So
il R
atin
g Po
lygo
nsA A/
D
B B/D
C C/D
D Not
rate
d or
not
ava
ilabl
e
Soil
Rat
ing
Line
sA A/
D
B B/D
C C/D
D Not
rate
d or
not
ava
ilabl
e
Soil
Rat
ing
Poin
tsA A/
D
B B/D
C C/D
D Not
rate
d or
not
ava
ilabl
e
Wat
er F
eatu
res
Stre
ams
and
Can
als
Tran
spor
tatio
nR
ails
Inte
rsta
te H
ighw
ays
US
Rou
tes
Maj
or R
oads
Loca
l Roa
ds
Bac
kgro
und Ae
rial P
hoto
grap
hy
The
soil
surv
eys
that
com
pris
e yo
ur A
OI w
ere
map
ped
at
1:25
,000
.
Plea
se re
ly o
n th
e ba
r sca
le o
n ea
ch m
ap s
heet
for m
ap
mea
sure
men
ts.
Sour
ce o
f Map
: N
atur
al R
esou
rces
Con
serv
atio
n Se
rvic
eW
eb S
oil S
urve
y U
RL:
C
oord
inat
e Sy
stem
: W
eb M
erca
tor (
EPSG
:385
7)
Map
s fro
m th
e W
eb S
oil S
urve
y ar
e ba
sed
on th
e W
eb M
erca
tor
proj
ectio
n, w
hich
pre
serv
es d
irect
ion
and
shap
e bu
t dis
torts
di
stan
ce a
nd a
rea.
A p
roje
ctio
n th
at p
rese
rves
are
a, s
uch
as th
e Al
bers
equ
al-a
rea
coni
c pr
ojec
tion,
sho
uld
be u
sed
if m
ore
accu
rate
cal
cula
tions
of d
ista
nce
or a
rea
are
requ
ired.
This
pro
duct
is g
ener
ated
from
the
USD
A-N
RC
S ce
rtifie
d da
ta a
s of
the
vers
ion
date
(s) l
iste
d be
low.
Soil
Surv
ey A
rea:
M
iddl
esex
Cou
nty,
Mas
sach
uset
tsSu
rvey
Are
a D
ata:
Ve
rsio
n 19
, Sep
12,
201
9
Soil
map
uni
ts a
re la
bele
d (a
s sp
ace
allo
ws)
for m
ap s
cale
s 1:
50,0
00 o
r lar
ger.
Dat
e(s)
aer
ial i
mag
es w
ere
phot
ogra
phed
: Se
p 11
, 201
9—O
ct 5
, 20
19
The
orth
opho
to o
r oth
er b
ase
map
on
whi
ch th
e so
il lin
es w
ere
com
pile
d an
d di
gitiz
ed p
roba
bly
diffe
rs fr
om th
e ba
ckgr
ound
im
ager
y di
spla
yed
on th
ese
map
s. A
s a
resu
lt, s
ome
min
or
shift
ing
of m
ap u
nit b
ound
arie
s m
ay b
e ev
iden
t.
Hyd
rolo
gic
Soil
Gro
up—
Mid
dles
ex C
ount
y, M
assa
chus
etts
(44
Vine
Stre
et M
elro
se G
ener
al A
rea
)
Nat
ural
Res
ourc
esC
onse
rvat
ion
Serv
ice
Web
Soi
l Sur
vey
Nat
iona
l Coo
pera
tive
Soil
Surv
ey1/
30/2
020
Page
2 o
f 4
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
1 Water 23.7 2.6%
30B Raynham silt loam, 0 to 5 percent slopes
C/D 12.2 1.3%
51A Swansea muck, 0 to 1 percent slopes
B/D 0.7 0.1%
71B Ridgebury fine sandy loam, 3 to 8 percent slopes, extremely stony
D 1.5 0.2%
73B Whitman fine sandy loam, 0 to 3 percent slopes, extremely stony
D 1.6 0.2%
103C Charlton-Hollis-Rock outcrop complex, 8 to 15 percent slopes
B 16.6 1.8%
103D Charlton-Hollis-Rock outcrop complex, 15 to 25 percent slopes
A 0.5 0.0%
104C Hollis-Rock outcrop-Charlton complex, 0 to 15 percent slopes
D 33.1 3.6%
104D Hollis-Rock outcrop-Charlton complex, 15 to 25 percent slopes
A 15.9 1.7%
105E Rock outcrop-Hollis complex, 3 to 35 percent slopes
66.0 7.2%
602 Urban land 17.1 1.9%
603 Urban land, wet substratum
272.3 29.8%
621B Scio-Urban land complex, 0 to 8 percent slopes
22.9 2.5%
622C Paxton-Urban land complex, 3 to 15 percent slopes
C 41.4 4.5%
623C Woodbridge-Urban land complex, 3 to 15 percent slopes
C/D 9.3 1.0%
626B Merrimac-Urban land complex, 0 to 8 percent slopes
A 34.4 3.8%
629C Canton-Charlton-Urban land complex, 3 to 15 percent slopes
A 2.1 0.2%
Hydrologic Soil Group—Middlesex County, Massachusetts 44 Vine Street Melrose General Area
Natural ResourcesConservation Service
Web Soil SurveyNational Cooperative Soil Survey
1/30/2020Page 3 of 4
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
631C Charlton-Urban land-Hollis complex, 3 to 15 percent slopes, rocky
A 314.1 34.3%
655 Udorthents, wet substratum
30.1 3.3%
Totals for Area of Interest 915.4 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Middlesex County, Massachusetts 44 Vine Street Melrose General Area
Natural ResourcesConservation Service
Web Soil SurveyNational Cooperative Soil Survey
1/30/2020Page 4 of 4
Proposed Multi-Family Development 40 Vine Street
Melrose, MA 02176
APPENDIX D
Operation & Maintenance
STORMWATER AND DRAINAGE OPERATION AND MAINTENANCE PLAN
Name of Project: 40 Vine Street Site Development
Location: 40 Vine Street, Melrose, Massachusetts Name of Owner/Operator: Daniel Galvin, Melrose, MA Owner/Operator Signature: _______________________, Date ____________ I. INTRODUCTION The maintenance program below provides for a general plan with specific requirements for stormwater management controls for 40 Vine Street, Watertown, MA. The program is based on the recommended standards presented in the DEP Stormwater Management Policy Handbook Volume 2, Chapter 2 and Guidelines for Stormwater Management and Controlling Urban Runoff: A Practical Manual for Planning and Designing Urban BMPs, by Thomas R. Schueler, July 1987. II. RESPONSIBILITY AND IMPLEMENTATION The property owner is the owner of all components of the drainage system as listed in Section III below, until property ownership is transferred, at which the drainage system becomes the property of the successive owner. The implementation, execution, and financing of this maintenance program and emergency repairs shall be the responsibility of the property owner until property ownership is transferred, at which time maintenance and repairs shall be the responsibility of the successive owner. III. GENERAL REQUIREMENTS Construction activities shall conform to the approved site plans and any other regulations or requirements of the City of Melrose. Silt sack, Mulch filter tubes, silt fence or similar erosion control, construction entrance shall be installed at the limit of work prior to construction. All sediment controls shall be in place before construction shall begin and shall be properly maintained throughout the course of construction. During construction, silt laden runoff shall not be permitted to enter the nearby drainage facilities or abutting properties. All BMPs and sediment controls shall be inspected, by the Applicant, on a weekly basis and within 24 hours of a rain event that generates more than ½” of rain in a 24 hour period. Once each BMP is installed it shall be operated and maintained in accordance with the Post Construction Operation & Maintenance Plan. Should any dewatering activities be required, the Applicant shall make certain that the all pumped water is free of sediment prior to discharging to the nearby wetlands. The methods for removing any sediment shall be approved by the Town prior to any dewatering activities commence. IV. BMP MAINTENANCE Maintenance of Facilities: The Owner agrees to comply with a minimum maintenance schedule as follows: A. Street Sweeping: Street sweeping roadways and parking areas twice a year minimum. (early Spring
and late Fall)
B. Catch Basin Grate (See Stormceptor for Structure Maintenance): Catch basin grate should be inspected every 4 times per year and after every major storm. During each inspection, the drains should be inspected for damage and any evidence of blockages. All accumulated trash, sediment, debris, etc., should be removed as necessary.
C. Infiltration System: Preventative maintenance, twice a year; Inspect after every major storm during
first 3 months of operation and twice a year thereafter to ensure that the facilities are operating as intended and if necessary take corrective action. Note how long water remains standing in the basin after a storm; standing water within the basin 48 to 72 hours after a storm indicates that the infiltration capacity may not functional correctly. All accumulated sediment, debris, should be removed during this time. Inspections conducted at intervals during and after storms will help determine if the facility is meeting the expected infiltration rates.
D. Stormceptor: Per the manufacturer’s recommendations, the Stormceptor should be inspected every
6 months in the first year to determine the oil and sediment accumulation rate. In subsequent years, inspections are based on first-year observations. Maintenance is to be performed when the sediment depth reached 8 inches with a standard vacuum truck. Inspection shall be performed immediately after an oil, fuel or chemical spill. A licensed waste management company should remove oil and sediment and dispose responsibly. All sediment removed should be properly handled and disposed of in accordance with local, state, and federal guidelines and regulations.
E. Grassed Area: Maintain vegetation; mow or cut back if impedes water movement or grass health.
Inspect eroded areas repair and reseed as needed. V. GENERAL Dispose of the collected grit, sediment and debris in accordance with current Town/City State and Federal guidelines and regulations. Operation and Maintenance Budget
• Inspection: $300 per year
• Mowing: $200 per year
• Cleaning catch basin grate: $100 per year
• Stormceptor cleaning: $300 per year
• Street Sweeping: $200 per year
• Total annual budget = $1,100
Sample Stormwater System Inspection Log/Checklist
INSPECTOR’S NAME &
DATE: NAME & ADDRESS
OF FACILITY:
GENERAL OBSERVATIONS:
Checked? (Y/N)
Maintenance Needed?
(Y/N)
Maintenance Completed/ Observations & Remarks
Catch Basins
CB-1 (Stormceptor Grate Cover)
Stormceptor Treatment Unit
STC 450i
Infiltration System (Pipe Embedded in Stone Bed)
Infiltration System
Grassed Area
Grassed Area
Street Sweeping
Roadways and Parking Areas
Attach pictures, summary, sketches, and notes as appropriate.
Proposed Multi-Family Development 40 Vine Street
Melrose, MA 02176
APPENDIX E
Drainage Watershed Plans
1982-Drainage Analysis.dwg Saved: 4/23/2020 1:49 PM Plotted: Apr 23, 2020 2:31:pm
Tab:
Pre
-Dev
elop
men
t P
lot S
tyle
: GC
G-2
018.
ctb
Plo
tted
By:
Kev
in C
arte
r
·
·
·
·
·
1982-Drainage Analysis.dwg Saved: 4/23/2020 1:49 PM Plotted: Apr 23, 2020 2:34:pm
Tab:
Pos
t-Dev
elop
men
t P
lot S
tyle
: GC
G-2
018.
ctb
Plo
tted
By:
Kev
in C
arte
r
·
·
·
·
·