Drainage Design Report Flow+ v7.0 Copyright © 1988-2019 Causeway Software Solutions Limited Network Storm Network Filename Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Username Terry Parsons ([email protected]) Last analysed 21/05/2019 18:45:44 Report produced on 21/05/2019 18:59:32 Causeway Sales Tel: +44(0) 1628 552000 Fax: +44(0) 1628 552001 Email: [email protected] Web: www.causeway.com Technical support web portal: http://support.causeway.com

Upload: others

Post on 28-Oct-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Drainage Design Report - South Kesteven

Drainage Design ReportFlow+v7.0

Copyright © 1988-2019 Causeway Software Solutions Limited

Network Storm Network

Filename Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd

Username Terry Parsons ([email protected])

Last analysed 21/05/2019 18:45:44

Report produced on 21/05/2019 18:59:32

Causeway Sales

Tel: +44(0) 1628 552000

Fax: +44(0) 1628 552001

Email: [email protected]

Web: www.causeway.com

Technical support web portal:

http://support.causeway.com

Page 2: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Design Settings

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Rainfall Methodology FSR

Return Period (years) 100

Additional Flow (%) 40

FSR Region England and Wales

M5-60 (mm) 20.000

Ratio-R 0.450

CV 0.750

Time of Entry (mins) 5.00

Maximum Time of Concentration (mins) 30.00

Maximum Rainfall (mm/hr) 50.0

Minimum Velocity (m/s) 0.10

Connection Type Level Soffits

Minimum Backdrop Height (m) 0.200

Preferred Cover Depth (m) 0.050

Enforce best practice design rules x

Page 3: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Nodes

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

NameArea(ha)

T of E(mins)

AddInflow(l/s)

CoverLevel(m)

NodeType

ManholeType

Diameter(mm)

Width(mm)

Easting(m)

Northing(m)

Depth(m)

Notes

Outlet 20.800Manhole Adoptable 1200 503746.848 307103.760 0.400

Node 2 20.850Manhole Adoptable 1200 503711.457 307155.055 0.364

MH-0001 21.370Manhole Adoptable 1200 503695.212 307178.605 0.760

MH-0002 0.078 5.00 21.600Manhole Adoptable 1500 503676.549 307169.786 0.890

MH-0003 0.117 5.00 22.500Manhole Adoptable 1500 503662.754 307197.335 1.300

MH-0004 23.300Manhole Adoptable 1200 503655.800 307211.571 1.800

MH-0005 0.147 5.00 24.000Manhole Adoptable 1200 503648.546 307226.180 2.200

Node 3 0.078 5.00 20.900Manhole Adoptable 1200 503682.454 307141.740 0.350

Page 4: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Links (Input)

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

NameUS

NodeDS

NodeLength

(m)ks (mm) /

nVelocityEquation

US IL(m)

DS IL(m)

Fall(m)

Slope(1:X)

Dia(mm)

LinkType

T of C(mins)

Rain(mm/hr)

ConOffset

(m)

MinDS IL(m)

LateralArea(ha)

LateralIns Point

(%)

LateralT of E(mins)

? Swale 1 Node 2 Outlet 62.319 0.600Colebrook-White 20.486 20.400 0.086 724.6 300Circular 8.21 50.0

Swale 2 Node 3 Node 2 31.913 0.600Colebrook-White 20.550 20.486 0.064 500.0 300Circular 5.76 50.0

? PN001 MH-0001 Node 2 28.609 0.600Colebrook-White 20.610 20.486 0.124 230.7 225Circular 6.40 50.0

? PN002 MH-0002 MH-0001 20.642 0.600Colebrook-White 20.710 20.610 0.100 206.4 225Circular 5.85 50.0

? PN003 MH-0003 MH-0002 30.810 0.600Colebrook-White 21.200 20.710 0.490 62.9 600Circular 5.47 50.0

? PN004 MH-0004 MH-0003 15.844 0.600Colebrook-White 21.500 21.200 0.300 52.8 225Circular 5.30 50.0

? PN005 MH-0005 MH-0004 16.311 0.600Colebrook-White 21.800 21.500 0.300 54.4 225Circular 5.15 50.0

Page 5: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Links (Results)

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

NameUS

NodeDS

NodeVel

(m/s)Cap(l/s)

Flow(l/s)

USDepth

(m)

DSDepth

(m)

MinimumDepth

(m)

MaximumDepth

(m)

Σ Area(ha)

Σ AddInflow(ha)

ProDepth(mm)

ProVelocity

(m/s)Notes

? Swale 1 Node 2 Outlet 0.576 40.7 79.7 0.064 0.100 0.064 0.100 0.420 0.0 300 0.584Negative backdrop detected

Swale 2 Node 3 Node 2 0.696 49.2 14.8 0.050 0.064 0.050 0.064 0.078 0.0 113 0.611

? PN001 MH-0001 Node 2 0.856 34.0 64.9 0.535 0.139 0.139 0.535 0.342 0.0 225 0.872Link has insufficient capacity | Upstream Depth is more than twice the specified minimum | Downstream Depth is more than twice the specified minimum

? PN002 MH-0002 MH-0001 0.906 36.0 64.9 0.665 0.535 0.535 0.665 0.342 0.0 225 0.923Link has insufficient capacity | Upstream Depth is more than twice the specified minimum | Downstream Depth is more than twice the specified minimum

? PN003 MH-0003 MH-0002 3.074 869.2 50.1 0.700 0.290 0.290 0.700 0.264 0.0 96 1.710Velocity is more than 3 m/s | Upstream Depth is more than twice the specified minimum | Downstream Depth is more than twice the specified minimum

? PN004 MH-0004 MH-0003 1.803 71.7 27.9 1.575 1.075 1.075 1.575 0.147 0.0 97 1.692Upstream Depth is more than twice the specified minimum | Downstream Depth is more than twice the specified minimum

? PN005 MH-0005 MH-0004 1.777 70.7 27.9 1.975 1.575 1.575 1.975 0.147 0.0 98 1.674Upstream Depth is more than twice the specified minimum | Downstream Depth is more than twice the specified minimum

Page 6: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Pipeline Schedule

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

LinkName

Length(m)

Slope(1:X)

Dia(mm)

LinkType

US CL(m)

US IL(m)

USDepth

(m)

DS CL(m)

DS IL(m)

DSDepth

(m)

US NodeName

Dia(mm)

Width(mm)

NodeType

MHType

DS NodeName

Dia(mm)

Width(mm)

NodeType

MHType

Swale 1 62.319 724.6 300Circular 20.850 20.486 0.064 20.800 20.400 0.100Node 2 1200 Manhole Adoptable Outlet 1200 Manhole Adoptable

Swale 2 31.913 500.0 300Circular 20.900 20.550 0.050 20.850 20.486 0.064Node 3 1200 Manhole Adoptable Node 2 1200 Manhole Adoptable

PN001 28.609 230.7 225Circular 21.370 20.610 0.535 20.850 20.486 0.139MH-0001 1200 Manhole Adoptable Node 2 1200 Manhole Adoptable

PN002 20.642 206.4 225Circular 21.600 20.710 0.665 21.370 20.610 0.535MH-0002 1500 Manhole Adoptable MH-0001 1200 Manhole Adoptable

PN003 30.810 62.9 600Circular 22.500 21.200 0.700 21.600 20.710 0.290MH-0003 1500 Manhole Adoptable MH-0002 1500 Manhole Adoptable

PN004 15.844 52.8 225Circular 23.300 21.500 1.575 22.500 21.200 1.075MH-0004 1200 Manhole Adoptable MH-0003 1500 Manhole Adoptable

PN005 16.311 54.4 225Circular 24.000 21.800 1.975 23.300 21.500 1.575MH-0005 1200 Manhole Adoptable MH-0004 1200 Manhole Adoptable

Page 7: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Manhole Schedule

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

NodeName

Easting(m)

Northing(m)

CL(m)

Depth(m)

Dia(mm)

Width(mm)

NodeType

MHType

LinkID

IL(m)

Dia(mm)

LinkType

Outlet 503746.848 307103.760 20.800 0.400 1200 Manhole Adoptable 1 Swale 1 20.400 300Circular

Node 2 503711.457 307155.055 20.850 0.364 1200 Manhole Adoptable 1 Swale 2 20.486 300Circular

2 PN001 20.486 225Circular

0 Swale 1 20.486 300Circular

MH-0001 503695.212 307178.605 21.370 0.760 1200 Manhole Adoptable 1 PN002 20.610 225Circular

0 PN001 20.610 225Circular

MH-0002 503676.549 307169.786 21.600 0.890 1500 Manhole Adoptable 1 PN003 20.710 600Circular

0 PN002 20.710 225Circular

MH-0003 503662.754 307197.335 22.500 1.300 1500 Manhole Adoptable 1 PN004 21.200 225Circular

0 PN003 21.200 600Circular

MH-0004 503655.800 307211.571 23.300 1.800 1200 Manhole Adoptable 1 PN005 21.500 225Circular

0 PN004 21.500 225Circular

MH-0005 503648.546 307226.180 24.000 2.200 1200 Manhole Adoptable

0 PN005 21.800 225Circular

Node 3 503682.454 307141.740 20.900 0.350 1200 Manhole Adoptable

Page 8: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Manhole Schedule

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

0 Swale 2 20.550 300Circular

Page 9: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Simulation Settings

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Rainfall Methodology FSR Return Period (years) Climate Change (%)

FSR Region England and Wales 1 0

M5-60 (mm) 20.000 2 0

Ratio-R 0.450 5 0

Summer CV 0.750 10 0

Winter CV 0.840 30 0

Analysis Speed Normal 100 0

Drain Down Time (mins) 240 100 40

Additional Storage (m³/ha) 0.0

Storm Durations (mins) 15

30

60

120

180

240

360

480

600

720

960

1440

Check Discharge Rate(s)

1 year (l/s)

30 year (l/s)

100 year (l/s)

Check Discharge Volume

100 year 360 minute (m³)

Page 10: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Pre-development Discharge Rate

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Site Makeup Greenfield

Greenfield Method IH124

Positively Drained Area (ha)

SAAR (mm)

Soil Index 1

SPR 0.10

Region 1

Growth Factor 1 year 0.85

Growth Factor 30 years 1.95

Growth Factor 100 years 2.48

Betterment (%) 0

QBar

Q 1 year (l/s)

Q 30 year (l/s)

Q 100 year (l/s)

Page 11: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Flow Controls

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Orifice

NodeFlap

ValveOnline / Offline

DownstreamLink

ReplacesDownstream

Link

Loopto

Node

InvertLevel(m)

DesignDepth

(m)

DesignFlow(l/s)

Diameter(m)

DischargeCoefficient

Outlet x Online 20.400 0.400 3.6 0.053 0.600

Hydro-Brake®

NodeFlap

ValveOnline / Offline

DownstreamLink

ReplacesDownstream

Link

Loopto

Node

InvertLevel(m)

DesignDepth

(m)

DesignFlow(l/s)

ObjectiveSump

AvailableProductNumber

Min OutletDiameter

(m)

Min NodeDiameter

(mm)

MH-0002 x Online 20.710 0.900 3.2(HE) Minimise upstream storage CTL-SHE-0087-3200-0900-3200 0.100 1200

MH-0003 x Online 21.200 1.200 2.2(HE) Minimise upstream storage CTL-SHE-0068-2200-1200-2200 0.100 1200

MH-0005 x Online 21.800 1.500 1.2(HE) Minimise upstream storage CTL-SHE-0047-1200-1500-1200 0.075 1200

Page 12: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Storage Structures

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Depth/Area/Inf Area

NodeBase Inf

Coefficient(m/hr)

Side InfCoefficient

(m/hr)

SafetyFactor

PorosityInvertLevel(m)

Time tohalf empty

(mins)

Depth(m)

Area(m²)

Inf.Area(m²)

MH-0002 0.00000 0.00000 2.0 1.00 20.710 216 0.000 0.0 0.0

0.500 0.0 0.0

0.510 46.7 0.0

0.750 46.7 0.0

0.760 0.0 0.0

MH-0003 0.00000 0.00000 2.0 1.00 21.200 0.000 0.0 0.0

0.500 0.0 0.0

0.510 158.0 0.0

0.750 158.0 0.0

0.760 0.0 0.0

MH-0005 0.00000 0.00000 2.0 1.00 21.800 0.000 0.0 0.0

0.500 0.0 0.0

0.510 185.0 0.0

0.810 185.0 0.0

0.820 0.0 0.0

Node 2 0.00000 0.00000 2.0 1.00 20.486 0.000 0.0 0.0

0.001 1.0 0.0

0.100 60.0 0.0

0.300 120.0 0.0

Page 13: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Other

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Default Values Overrides

Entry Loss (manhole) 0.250 Link Entry Loss Exit Loss Node Flood Risk (m)

Exit Loss (manhole) 0.250

Entry Loss (junction) 0.000

Exit Loss (junction) 0.000

Flood Risk (m) 0.300

Page 14: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Approval Settings

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Node Size

Node Losses

Link Size

Minimum Diameter (mm) 150

Link Length

Maximum Length (m) 100.000

Coordinates

Accuracy (m) 1.000

Crossings

Cover Depth

Minimum Cover Depth (m)

Maximum Cover Depth (m) 3.000

Backdrops

Minimum Backdrop Height (m)

Maximum Backdrop Height (m) 1.500

Full Bore Velocity

Minimum Full Bore Velocity (m/s)

Maximum Full Bore Velocity (m/s) 3.000

Proportional Velocity

Return Period (years)

Minimum Proportional Velocity (m/s) 0.750

Maximum Proportional Velocity (m/s) 3.000

Surcharged Depth

Return Period (years)

Maximum Surcharged Depth (m) 0.100

Flooding

Return Period (years) 30

Discharge Rates

1 year (l/s)

30 year (l/s)

100 year (l/s)

Discharge Volume

Page 15: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Approval Settings

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

100 year 360 minute (m³)

Page 16: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year Critical

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year Critical Storm Duration. Lowest mass balance: 97.63%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute winter Outlet 272 20.677 0.277 3.0 0.3130 0.0000OK Orifice 2.9 72.1

360 minute winter Node 2 272 20.677 0.191 4.6 9.9498 0.0000OK Swale 1 Outlet 3.0 0.208 0.073 3.5925

360 minute winter MH-0001 272 20.678 0.068 3.2 0.0767 0.0000OK PN001 Node 2 3.2 0.394 0.094 0.6585

60 minute winter MH-0002 59 21.311 0.601 7.6 5.5364 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

60 minute winter MH-0003 60 21.748 0.548 10.1 7.8022 0.0000OK Hydro-Brake® MH-0002 2.0

60 minute winter MH-0004 59 21.753 0.253 2.6 0.2861 0.0000SURCHARGED PN004 MH-0003 2.4 0.229 0.034 0.6301

120 minute winter MH-0005 118 22.377 0.577 6.6 13.8914 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

360 minute winter Node 3 272 20.677 0.127 1.6 0.1438 0.0000OK Swale 2 Node 2 1.5 0.181 0.030 1.2090

Page 17: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year Critical

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year Critical Storm Duration. Lowest mass balance: 97.63%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute winter Outlet 352 20.700 0.300 3.1 0.3390 0.0000OK Orifice 3.1 91.8

480 minute winter Node 2 352 20.700 0.214 4.6 12.0660 0.0000OK Swale 1 Outlet 3.1 0.233 0.076 3.8691

480 minute winter MH-0001 352 20.701 0.091 3.2 0.1027 0.0000OK PN001 Node 2 3.2 0.385 0.094 0.7729

60 minute winter MH-0002 60 21.354 0.644 9.1 7.6178 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

60 minute winter MH-0003 60 21.768 0.568 12.0 10.9507 0.0000OK Hydro-Brake® MH-0002 2.0

60 minute winter MH-0004 58 21.773 0.273 2.7 0.3087 0.0000SURCHARGED PN004 MH-0003 -1.9 0.229 -0.027 0.6301

120 minute winter MH-0005 118 22.402 0.602 8.3 18.5876 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

480 minute winter Node 3 352 20.700 0.150 1.5 0.1698 0.0000OK Swale 2 Node 2 1.4 0.125 0.029 1.4212

Page 18: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year Critical

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year Critical Storm Duration. Lowest mass balance: 97.63%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute winter Outlet 480 20.719 0.319 3.2 0.3610 0.0000OK Orifice 3.2 115.4

600 minute winter Node 2 480 20.720 0.234 4.6 13.9818 0.0000OK Swale 1 Outlet 3.2 0.181 0.078 4.0287

600 minute winter MH-0001 465 20.720 0.110 3.2 0.1247 0.0000OK PN001 Node 2 3.2 0.374 0.094 0.8455

60 minute winter MH-0002 60 21.410 0.700 11.1 10.3367 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

120 minute winter MH-0003 116 21.795 0.595 9.7 15.2757 0.0000OK Hydro-Brake® MH-0002 2.0

120 minute winter MH-0004 112 21.800 0.300 1.5 0.3391 0.0000SURCHARGED PN004 MH-0003 1.7 0.214 0.024 0.6301

180 minute winter MH-0005 176 22.436 0.636 7.6 25.0073 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

600 minute winter Node 3 480 20.720 0.170 1.6 0.1918 0.0000OK Swale 2 Node 2 1.5 0.114 0.031 1.5945

Page 19: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year Critical

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year Critical Storm Duration. Lowest mass balance: 97.63%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute winter Outlet 555 20.739 0.339 3.3 0.3834 0.0000OK Orifice 3.3 136.5

720 minute winter Node 2 555 20.740 0.253 4.6 16.0510 0.0000OK Swale 1 Outlet 3.3 0.178 0.080 4.1729

720 minute winter MH-0001 540 20.740 0.130 3.2 0.1468 0.0000OK PN001 Node 2 3.2 0.366 0.093 0.9081

60 minute winter MH-0002 61 21.454 0.744 12.6 12.4625 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

120 minute winter MH-0003 118 21.818 0.618 10.7 19.0044 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

120 minute winter MH-0004 118 21.818 0.318 1.3 0.3601 0.0000SURCHARGED PN004 MH-0003 1.8 0.197 0.025 0.6301

180 minute winter MH-0005 180 22.464 0.664 8.9 30.1900 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

720 minute winter Node 3 555 20.740 0.190 1.6 0.2144 0.0000OK Swale 2 Node 2 1.5 0.119 0.031 1.7616

Page 20: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year Critical

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year Critical Storm Duration. Lowest mass balance: 97.63%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute winter Outlet 232 20.778 0.378 3.5 0.4280 0.0000OK Orifice 3.5 85.9

240 minute winter Node 2 232 20.779 0.293 7.2 20.5267 0.0000OK Swale 1 Outlet 3.5 0.301 0.085 4.3754

240 minute winter MH-0001 232 20.780 0.170 3.2 0.1921 0.0000OK PN001 Node 2 3.2 0.507 0.094 1.0289

120 minute winter MH-0002 76 21.600 0.890 10.3 13.2476 3.5019FLOOD Hydro-Brake® MH-0001 3.2

120 minute winter MH-0003 120 21.867 0.667 13.1 26.7605 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

120 minute winter MH-0004 120 21.867 0.367 1.0 0.4150 0.0000SURCHARGED PN004 MH-0003 1.1 0.193 0.016 0.6301

240 minute winter MH-0005 236 22.523 0.723 9.1 41.0809 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

240 minute winter Node 3 232 20.779 0.229 4.8 0.2591 0.0000OK Swale 2 Node 2 4.6 0.291 0.093 2.0380

Page 21: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year Critical

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year Critical Storm Duration. Lowest mass balance: 97.63%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute winter Outlet 160 20.800 0.400 7.0 0.4524 4.7548FLOOD Orifice 3.6 89.1

240 minute winter Node 2 160 20.803 0.317 8.8 23.4118 0.0000FLOOD RISK Swale 1 Outlet 7.0 0.290 0.172 4.3885

240 minute winter MH-0001 160 20.804 0.194 3.2 0.2193 0.0000OK PN001 Node 2 3.2 0.552 0.094 1.0897

120 minute winter MH-0002 66 21.600 0.890 12.9 13.2476 10.7537FLOOD Hydro-Brake® MH-0001 3.2

180 minute winter MH-0003 180 21.939 0.739 12.6 38.2110 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

180 minute winter MH-0004 180 21.939 0.439 0.8 0.4961 0.0000SURCHARGED PN004 MH-0003 1.0 0.202 0.014 0.6301

240 minute winter MH-0005 240 22.609 0.809 11.9 57.1866 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

240 minute winter Node 3 160 20.803 0.253 6.3 0.2863 0.0000OK Swale 2 Node 2 6.0 0.290 0.123 2.1357

Page 22: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% Critical

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% Critical Storm Duration. Lowest mass balance: 97.63%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute winter Outlet 248 20.800 0.400 8.3 0.4524 21.0305FLOOD Orifice 3.6 134.7

120 minute winter Node 2 76 20.812 0.326 17.3 24.5380 0.0000FLOOD RISK Swale 1 Outlet 14.2 0.333 0.349 4.3885

120 minute winter MH-0001 76 20.813 0.203 3.2 0.2299 0.0000OK PN001 Node 2 3.2 0.641 0.094 1.1092

180 minute winter MH-0002 84 21.600 0.890 13.1 13.2476 25.0559FLOOD Hydro-Brake® MH-0001 3.2

240 minute winter MH-0003 148 22.500 1.300 14.0 41.7971 19.7219FLOOD Hydro-Brake® MH-0002 2.0

120 minute winter MH-0004 76 22.526 1.026 2.2 1.1608 0.0000SURCHARGED PN004 MH-0003 3.5 0.203 0.049 0.6301

480 minute winter MH-0005 280 24.000 2.200 9.5 59.8382 22.6642FLOOD Hydro-Brake® MH-0004 1.4

120 minute winter Node 3 76 20.815 0.265 15.2 0.2996 0.0000OK Swale 2 Node 2 14.6 0.412 0.297 2.1742

Page 23: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 15 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 15 minute summer. 255 minute analysis at 1 minute timestep. Mass balance: 97.63%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

15 minute summer Outlet 88 20.603 0.203 8.0 0.2293 0.0000OK Orifice 2.5 25.9

15 minute summer Node 2 87 20.603 0.117 13.5 4.2379 0.0000OK Swale 1 Outlet 8.0 0.399 0.195 2.3733

15 minute summer MH-0001 6 20.658 0.048 3.2 0.0540 0.0000OK PN001 Node 2 3.2 0.681 0.095 0.3792

15 minute summer MH-0002 18 21.276 0.566 12.8 3.8636 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

15 minute summer MH-0003 18 21.730 0.530 20.9 4.9419 0.0000OK Hydro-Brake® MH-0002 2.0

15 minute summer MH-0004 18 21.736 0.236 5.8 0.2668 0.0000SURCHARGED PN004 MH-0003 5.3 0.240 0.074 0.6301

15 minute summer MH-0005 19 22.349 0.549 20.5 8.7107 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

15 minute summer Node 3 10 20.647 0.097 10.9 0.1097 0.0000OK Swale 2 Node 2 10.6 0.666 0.216 0.5556

Page 24: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 15 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 15 minute winter. 255 minute analysis at 1 minute timestep. Mass balance: 98.23%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

15 minute winter Outlet 101 20.608 0.208 8.1 0.2353 0.0000OK Orifice 2.5 28.6

15 minute winter Node 2 101 20.609 0.123 14.0 4.5932 0.0000OK Swale 1 Outlet 8.1 0.406 0.198 2.4682

15 minute winter MH-0001 6 20.658 0.048 3.2 0.0546 0.0000OK PN001 Node 2 3.2 0.687 0.095 0.3964

15 minute winter MH-0002 18 21.288 0.578 13.3 4.4207 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

15 minute winter MH-0003 18 21.736 0.536 18.7 5.7666 0.0000OK Hydro-Brake® MH-0002 2.0

15 minute winter MH-0004 16 21.741 0.241 7.8 0.2728 0.0000SURCHARGED PN004 MH-0003 -7.0 0.240 -0.098 0.6301

15 minute winter MH-0005 19 22.354 0.554 21.5 9.7108 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

15 minute winter Node 3 10 20.650 0.100 11.4 0.1127 0.0000OK Swale 2 Node 2 11.1 0.651 0.226 0.5878

Page 25: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 30 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 30 minute summer. 270 minute analysis at 1 minute timestep. Mass balance: 99.79%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

30 minute summer Outlet 117 20.618 0.217 6.0 0.2460 0.0000OK Orifice 2.6 32.2

30 minute summer Node 2 117 20.618 0.132 12.5 5.2469 0.0000OK Swale 1 Outlet 6.0 0.338 0.148 2.6352

30 minute summer MH-0001 112 20.656 0.046 3.2 0.0522 0.0000OK PN001 Node 2 3.2 0.638 0.094 0.4269

30 minute summer MH-0002 32 21.289 0.579 11.5 4.4976 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

30 minute summer MH-0003 32 21.738 0.538 16.7 6.1142 0.0000OK Hydro-Brake® MH-0002 2.0

30 minute summer MH-0004 33 21.742 0.242 4.4 0.2736 0.0000SURCHARGED PN004 MH-0003 -3.6 0.240 -0.051 0.6301

30 minute summer MH-0005 33 22.355 0.555 18.0 9.8962 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

30 minute summer Node 3 18 20.642 0.092 9.6 0.1045 0.0000OK Swale 2 Node 2 9.7 0.569 0.196 0.6685

Page 26: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 30 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 30 minute winter. 270 minute analysis at 1 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

30 minute winter Outlet 135 20.623 0.223 6.2 0.2521 0.0000OK Orifice 2.6 34.8

30 minute winter Node 2 135 20.623 0.137 11.5 5.6267 0.0000OK Swale 1 Outlet 6.2 0.350 0.153 2.7285

30 minute winter MH-0001 9 20.656 0.046 3.2 0.0524 0.0000OK PN001 Node 2 3.2 0.650 0.094 0.4440

30 minute winter MH-0002 32 21.305 0.595 10.6 5.2556 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

30 minute winter MH-0003 32 21.744 0.544 14.6 7.1393 0.0000OK Hydro-Brake® MH-0002 2.0

30 minute winter MH-0004 34 21.748 0.248 2.7 0.2809 0.0000SURCHARGED PN004 MH-0003 2.4 0.229 0.034 0.6301

30 minute winter MH-0005 33 22.363 0.563 16.3 11.2934 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

30 minute winter Node 3 18 20.637 0.087 8.7 0.0984 0.0000OK Swale 2 Node 2 8.8 0.532 0.178 0.7150

Page 27: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 60 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 60 minute summer. 300 minute analysis at 1 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

60 minute summer Outlet 150 20.632 0.232 3.6 0.2622 0.0000OK Orifice 2.7 38.7

60 minute summer Node 2 149 20.632 0.146 9.9 6.2815 0.0000OK Swale 1 Outlet 3.6 0.310 0.089 2.8824

60 minute summer MH-0001 145 20.656 0.046 3.2 0.0522 0.0000OK PN001 Node 2 3.2 0.590 0.094 0.4720

60 minute summer MH-0002 60 21.293 0.583 9.0 4.6759 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

60 minute summer MH-0003 57 21.740 0.540 12.4 6.4242 0.0000OK Hydro-Brake® MH-0002 2.0

60 minute summer MH-0004 58 21.745 0.245 2.4 0.2767 0.0000SURCHARGED PN004 MH-0003 1.8 0.229 0.025 0.6301

60 minute summer MH-0005 62 22.363 0.563 13.3 11.3078 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

60 minute summer Node 3 150 20.632 0.082 7.1 0.0933 0.0000OK Swale 2 Node 2 7.1 0.422 0.144 0.7947

Page 28: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 60 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 60 minute winter. 300 minute analysis at 1 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

60 minute winter Outlet 169 20.637 0.237 4.0 0.2683 0.0000OK Orifice 2.7 41.6

60 minute winter Node 2 168 20.638 0.152 8.5 6.6918 0.0000OK Swale 1 Outlet 4.0 0.319 0.099 2.9747

60 minute winter MH-0001 22 20.656 0.046 3.2 0.0522 0.0000OK PN001 Node 2 3.2 0.611 0.094 0.4888

60 minute winter MH-0002 59 21.311 0.601 7.6 5.5364 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

60 minute winter MH-0003 60 21.748 0.548 10.1 7.8022 0.0000OK Hydro-Brake® MH-0002 2.0

60 minute winter MH-0004 59 21.753 0.253 2.6 0.2861 0.0000SURCHARGED PN004 MH-0003 2.4 0.229 0.034 0.6301

60 minute winter MH-0005 61 22.372 0.572 10.8 13.1080 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

60 minute winter Node 3 169 20.638 0.088 5.7 0.0994 0.0000OK Swale 2 Node 2 5.7 0.361 0.116 0.8437

Page 29: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 120 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 120 minute summer. 360 minute analysis at 2 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

120 minute summer Outlet 194 20.645 0.245 3.0 0.2767 0.0000OK Orifice 2.7 47.0

120 minute summer Node 2 194 20.645 0.159 7.4 7.2773 0.0000OK Swale 1 Outlet 3.0 0.279 0.074 3.1001

120 minute summer MH-0001 190 20.656 0.046 3.2 0.0522 0.0000OK PN001 Node 2 3.2 0.518 0.094 0.5112

120 minute summer MH-0002 94 21.287 0.577 6.5 4.3592 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

120 minute summer MH-0003 88 21.737 0.537 8.1 6.0465 0.0000OK Hydro-Brake® MH-0002 2.0

120 minute summer MH-0004 92 21.742 0.242 2.3 0.2733 0.0000SURCHARGED PN004 MH-0003 1.9 0.229 0.026 0.6301

120 minute summer MH-0005 120 22.364 0.564 8.6 11.6396 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

120 minute summer Node 3 194 20.645 0.095 4.6 0.1075 0.0000OK Swale 2 Node 2 4.6 0.313 0.093 0.9113

Page 30: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 120 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 120 minute winter. 360 minute analysis at 2 minute timestep. Mass balance: 99.91%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

120 minute winter Outlet 122 20.652 0.252 2.9 0.2845 0.0000OK Orifice 2.8 50.5

120 minute winter Node 2 122 20.652 0.166 6.1 7.8204 0.0000OK Swale 1 Outlet 2.9 0.296 0.071 3.2116

120 minute winter MH-0001 208 20.656 0.046 3.2 0.0522 0.0000OK PN001 Node 2 3.2 0.529 0.094 0.5304

120 minute winter MH-0002 98 21.301 0.591 5.4 5.0541 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

120 minute winter MH-0003 96 21.745 0.545 6.6 7.3552 0.0000OK Hydro-Brake® MH-0002 2.0

120 minute winter MH-0004 96 21.751 0.251 1.5 0.2834 0.0000SURCHARGED PN004 MH-0003 1.8 0.229 0.024 0.6301

120 minute winter MH-0005 118 22.377 0.577 6.6 13.8914 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

120 minute winter Node 3 212 20.652 0.102 3.5 0.1152 0.0000OK Swale 2 Node 2 3.3 0.302 0.068 0.9740

Page 31: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 180 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 180 minute summer. 420 minute analysis at 4 minute timestep. Mass balance: 99.95%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

180 minute summer Outlet 224 20.652 0.252 2.9 0.2854 0.0000OK Orifice 2.8 53.2

180 minute summer Node 2 224 20.653 0.167 6.1 7.8873 0.0000OK Swale 1 Outlet 2.9 0.267 0.070 3.2244

180 minute summer MH-0001 80 20.656 0.046 3.2 0.0521 0.0000OK PN001 Node 2 3.2 0.483 0.093 0.5345

180 minute summer MH-0002 128 21.277 0.567 5.3 3.8875 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

180 minute summer MH-0003 124 21.735 0.535 5.9 5.6903 0.0000OK Hydro-Brake® MH-0002 2.0

180 minute summer MH-0004 132 21.740 0.240 1.3 0.2712 0.0000SURCHARGED PN004 MH-0003 1.5 0.238 0.021 0.6301

180 minute summer MH-0005 152 22.363 0.563 6.4 11.3621 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

180 minute summer Node 3 224 20.653 0.103 3.4 0.1163 0.0000OK Swale 2 Node 2 3.2 0.290 0.066 0.9826

Page 32: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 180 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 180 minute winter. 420 minute analysis at 4 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

180 minute winter Outlet 180 20.660 0.260 2.9 0.2941 0.0000OK Orifice 2.8 57.4

180 minute winter Node 2 180 20.661 0.175 5.3 8.5236 0.0000OK Swale 1 Outlet 2.9 0.257 0.070 3.3465

180 minute winter MH-0001 180 20.662 0.052 3.2 0.0586 0.0000OK PN001 Node 2 3.2 0.460 0.094 0.5714

180 minute winter MH-0002 136 21.286 0.576 4.5 4.3366 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

180 minute winter MH-0003 136 21.741 0.541 5.2 6.6708 0.0000OK Hydro-Brake® MH-0002 2.0

180 minute winter MH-0004 148 21.745 0.245 1.3 0.2774 0.0000SURCHARGED PN004 MH-0003 1.6 0.229 0.022 0.6301

180 minute winter MH-0005 172 22.375 0.575 4.9 13.5410 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

180 minute winter Node 3 180 20.660 0.110 2.6 0.1249 0.0000OK Swale 2 Node 2 2.5 0.199 0.050 1.0538

Page 33: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 240 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 240 minute summer. 480 minute analysis at 4 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute summer Outlet 252 20.659 0.259 2.9 0.2932 0.0000OK Orifice 2.8 58.1

240 minute summer Node 2 252 20.660 0.174 5.6 8.4501 0.0000OK Swale 1 Outlet 2.9 0.251 0.070 3.3332

240 minute summer MH-0001 248 20.661 0.051 3.2 0.0578 0.0000OK PN001 Node 2 3.2 0.482 0.094 0.5660

240 minute summer MH-0002 160 21.266 0.556 4.8 3.3826 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

240 minute summer MH-0003 160 21.732 0.532 5.7 5.1660 0.0000OK Hydro-Brake® MH-0002 2.0

240 minute summer MH-0004 160 21.732 0.232 1.4 0.2622 0.0000SURCHARGED PN004 MH-0003 1.5 0.238 0.021 0.6301

240 minute summer MH-0005 184 22.361 0.561 5.4 10.9891 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

240 minute summer Node 3 252 20.660 0.110 2.9 0.1241 0.0000OK Swale 2 Node 2 2.7 0.264 0.056 1.0463

Page 34: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 240 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 240 minute winter. 480 minute analysis at 4 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute winter Outlet 260 20.670 0.270 2.9 0.3054 0.0000OK Orifice 2.9 62.9

240 minute winter Node 2 260 20.670 0.184 4.9 9.3692 0.0000OK Swale 1 Outlet 2.9 0.257 0.071 3.4975

240 minute winter MH-0001 256 20.671 0.061 3.2 0.0695 0.0000OK PN001 Node 2 3.2 0.438 0.094 0.6240

240 minute winter MH-0002 172 21.266 0.556 4.0 3.3606 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

240 minute winter MH-0003 172 21.736 0.536 4.0 5.8210 0.0000OK Hydro-Brake® MH-0002 2.0

240 minute winter MH-0004 172 21.736 0.236 0.8 0.2668 0.0000SURCHARGED PN004 MH-0003 1.5 0.229 0.021 0.6301

240 minute winter MH-0005 196 22.371 0.571 4.0 12.9475 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

240 minute winter Node 3 260 20.671 0.121 2.1 0.1363 0.0000OK Swale 2 Node 2 2.0 0.204 0.040 1.1471

Page 35: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 360 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 360 minute summer. 600 minute analysis at 8 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute summer Outlet 280 20.660 0.260 2.9 0.2940 0.0000OK Orifice 2.8 64.7

360 minute summer Node 2 280 20.660 0.174 5.0 8.5127 0.0000OK Swale 1 Outlet 2.9 0.228 0.071 3.3446

360 minute summer MH-0001 280 20.662 0.052 3.2 0.0588 0.0000OK PN001 Node 2 3.2 0.421 0.093 0.5715

360 minute summer MH-0002 216 21.243 0.533 4.1 2.2634 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

360 minute summer MH-0003 224 21.726 0.526 4.7 4.1749 0.0000OK Hydro-Brake® MH-0002 2.0

360 minute summer MH-0004 224 21.726 0.225 0.9 0.2550 0.0000SURCHARGED PN004 MH-0003 1.4 0.236 0.019 0.6299

360 minute summer MH-0005 248 22.358 0.558 4.1 10.4188 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

360 minute summer Node 3 280 20.660 0.110 2.2 0.1249 0.0000OK Swale 2 Node 2 2.1 0.181 0.042 1.0531

Page 36: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 360 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 360 minute winter. 600 minute analysis at 8 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute winter Outlet 272 20.677 0.277 3.0 0.3130 0.0000OK Orifice 2.9 72.1

360 minute winter Node 2 272 20.677 0.191 4.6 9.9498 0.0000OK Swale 1 Outlet 3.0 0.208 0.073 3.5925

360 minute winter MH-0001 272 20.678 0.068 3.2 0.0767 0.0000OK PN001 Node 2 3.2 0.394 0.094 0.6585

360 minute winter MH-0002 224 21.224 0.514 3.4 1.3150 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

360 minute winter MH-0003 248 21.727 0.527 3.2 4.3805 0.0000OK Hydro-Brake® MH-0002 2.0

360 minute winter MH-0004 248 21.727 0.227 0.8 0.2566 0.0000SURCHARGED PN004 MH-0003 1.4 0.229 0.020 0.6300

360 minute winter MH-0005 272 22.367 0.567 3.0 12.0755 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

360 minute winter Node 3 272 20.677 0.127 1.6 0.1438 0.0000OK Swale 2 Node 2 1.5 0.181 0.030 1.2090

Page 37: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 480 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 480 minute summer. 720 minute analysis at 8 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute summer Outlet 320 20.660 0.260 2.9 0.2946 0.0000OK Orifice 2.8 69.6

480 minute summer Node 2 320 20.661 0.175 4.8 8.5550 0.0000OK Swale 1 Outlet 2.9 0.198 0.071 3.3524

480 minute summer MH-0001 320 20.662 0.052 3.2 0.0591 0.0000OK PN001 Node 2 3.2 0.403 0.094 0.5737

480 minute summer MH-0002 280 21.224 0.514 3.6 1.3369 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

480 minute summer MH-0003 296 21.719 0.519 3.1 3.1418 0.0000OK Hydro-Brake® MH-0002 2.0

480 minute summer MH-0004 296 21.719 0.219 0.8 0.2478 0.0000OK PN004 MH-0003 1.3 0.237 0.018 0.6277

480 minute summer MH-0005 320 22.353 0.553 3.2 9.5944 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

480 minute summer Node 3 320 20.661 0.111 1.7 0.1255 0.0000OK Swale 2 Node 2 1.6 0.149 0.032 1.0578

Page 38: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 480 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 480 minute winter. 720 minute analysis at 8 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute winter Outlet 336 20.669 0.269 2.9 0.3042 0.0000OK Orifice 2.9 77.4

480 minute winter Node 2 336 20.669 0.183 4.4 9.2778 0.0000OK Swale 1 Outlet 2.9 0.228 0.071 3.4816

480 minute winter MH-0001 336 20.670 0.060 3.2 0.0681 0.0000OK PN001 Node 2 3.2 0.386 0.093 0.6179

480 minute winter MH-0002 248 20.911 0.201 3.2 0.3551 0.0000OK Hydro-Brake® MH-0001 3.2

480 minute winter MH-0003 312 21.718 0.518 2.7 2.9139 0.0000OK Hydro-Brake® MH-0002 2.0

480 minute winter MH-0004 312 21.718 0.218 0.8 0.2462 0.0000OK PN004 MH-0003 1.2 0.237 0.017 0.6269

480 minute winter MH-0005 344 22.361 0.561 2.4 10.9067 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

480 minute winter Node 3 336 20.669 0.119 1.3 0.1351 0.0000OK Swale 2 Node 2 1.2 0.125 0.024 1.1371

Page 39: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 600 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 600 minute summer. 840 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute summer Outlet 375 20.653 0.253 2.8 0.2856 0.0000OK Orifice 2.8 72.5

600 minute summer Node 2 375 20.653 0.167 4.5 7.9032 0.0000OK Swale 1 Outlet 2.8 0.164 0.069 3.2276

600 minute summer MH-0001 315 20.656 0.046 3.2 0.0522 0.0000OK PN001 Node 2 3.2 0.392 0.094 0.5307

600 minute summer MH-0002 315 20.981 0.271 3.4 0.4780 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

600 minute summer MH-0003 360 21.714 0.514 2.9 2.3651 0.0000OK Hydro-Brake® MH-0002 2.0

600 minute summer MH-0004 360 21.714 0.214 0.8 0.2423 0.0000OK PN004 MH-0003 1.3 0.228 0.018 0.6244

600 minute summer MH-0005 390 22.350 0.550 2.6 8.9337 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

600 minute summer Node 3 375 20.653 0.103 1.4 0.1165 0.0000OK Swale 2 Node 2 1.3 0.113 0.026 0.9842

Page 40: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 600 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 600 minute winter. 840 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute winter Outlet 405 20.661 0.261 2.9 0.2952 0.0000OK Orifice 2.8 82.3

600 minute winter Node 2 405 20.662 0.175 4.1 8.6034 0.0000OK Swale 1 Outlet 2.9 0.194 0.070 3.3613

600 minute winter MH-0001 405 20.662 0.052 3.1 0.0593 0.0000OK PN001 Node 2 3.1 0.377 0.090 0.5757

600 minute winter MH-0002 315 20.871 0.161 3.1 0.2844 0.0000OK Hydro-Brake® MH-0001 3.1

600 minute winter MH-0003 375 21.708 0.508 2.3 1.3513 0.0000OK Hydro-Brake® MH-0002 2.0

600 minute winter MH-0004 375 21.708 0.208 0.8 0.2348 0.0000OK PN004 MH-0003 1.1 0.235 0.016 0.6187

600 minute winter MH-0005 420 22.356 0.556 2.0 9.9808 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

600 minute winter Node 3 405 20.662 0.112 1.1 0.1261 0.0000OK Swale 2 Node 2 1.0 0.106 0.021 1.0632

Page 41: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 720 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 720 minute summer. 960 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute summer Outlet 465 20.649 0.249 2.8 0.2811 0.0000OK Orifice 2.8 75.8

720 minute summer Node 2 465 20.649 0.163 4.2 7.5814 0.0000OK Swale 1 Outlet 2.8 0.162 0.068 3.1629

720 minute summer MH-0001 375 20.656 0.046 3.1 0.0518 0.0000OK PN001 Node 2 3.1 0.383 0.092 0.5099

720 minute summer MH-0002 375 20.901 0.191 3.2 0.3376 0.0000OK Hydro-Brake® MH-0001 3.1

720 minute summer MH-0003 420 21.708 0.508 2.4 1.3648 0.0000OK Hydro-Brake® MH-0002 2.0

720 minute summer MH-0004 420 21.708 0.208 0.8 0.2349 0.0000OK PN004 MH-0003 1.1 0.234 0.016 0.6188

720 minute summer MH-0005 465 22.346 0.546 2.3 8.2093 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

720 minute summer Node 3 465 20.649 0.099 1.2 0.1120 0.0000OK Swale 2 Node 2 1.1 0.114 0.023 0.9472

Page 42: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 720 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 720 minute winter. 960 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute winter Outlet 465 20.657 0.257 2.8 0.2902 0.0000OK Orifice 2.8 84.9

720 minute winter Node 2 465 20.657 0.171 3.7 8.2354 0.0000OK Swale 1 Outlet 2.8 0.201 0.069 3.2923

720 minute winter MH-0001 465 20.658 0.048 2.9 0.0544 0.0000OK PN001 Node 2 2.9 0.383 0.085 0.5520

720 minute winter MH-0002 390 20.831 0.121 2.9 0.2133 0.0000OK Hydro-Brake® MH-0001 2.9

720 minute winter MH-0003 405 21.528 0.328 2.2 0.5804 0.0000OK Hydro-Brake® MH-0002 2.0

720 minute winter MH-0004 405 21.529 0.029 0.8 0.0322 0.0000OK PN004 MH-0003 0.8 0.228 0.011 0.3381

720 minute winter MH-0005 495 22.348 0.548 1.7 8.6029 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

720 minute winter Node 3 465 20.657 0.107 0.9 0.1211 0.0000OK Swale 2 Node 2 0.8 0.144 0.017 1.0220

Page 43: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 960 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 960 minute summer. 1200 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

960 minute summer Outlet 570 20.645 0.245 2.8 0.2769 0.0000OK Orifice 2.7 81.9

960 minute summer Node 2 570 20.645 0.159 3.9 7.2921 0.0000OK Swale 1 Outlet 2.8 0.162 0.068 3.1032

960 minute summer MH-0001 495 20.655 0.045 3.0 0.0505 0.0000OK PN001 Node 2 3.0 0.375 0.088 0.4968

960 minute summer MH-0002 495 20.849 0.139 3.0 0.2452 0.0000OK Hydro-Brake® MH-0001 3.0

960 minute summer MH-0003 510 21.544 0.344 2.3 0.6075 0.0000OK Hydro-Brake® MH-0002 2.0

960 minute summer MH-0004 510 21.544 0.044 0.8 0.0493 0.0000OK PN004 MH-0003 0.8 0.198 0.011 0.3577

960 minute summer MH-0005 585 22.338 0.538 1.9 6.6980 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

960 minute summer Node 3 570 20.645 0.095 1.0 0.1079 0.0000OK Swale 2 Node 2 0.9 0.108 0.019 0.9138

Page 44: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 960 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 960 minute winter. 1200 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

960 minute winter Outlet 585 20.630 0.230 2.7 0.2604 0.0000OK Orifice 2.6 90.3

960 minute winter Node 2 585 20.631 0.145 3.2 6.1730 0.0000OK Swale 1 Outlet 2.7 0.173 0.065 2.8567

960 minute winter MH-0001 510 20.651 0.041 2.5 0.0467 0.0000OK PN001 Node 2 2.5 0.366 0.075 0.4493

960 minute winter MH-0002 510 20.806 0.096 2.5 0.1702 0.0000OK Hydro-Brake® MH-0001 2.5

960 minute winter MH-0003 510 21.350 0.150 1.9 0.2644 0.0000OK Hydro-Brake® MH-0002 1.8

960 minute winter MH-0004 390 21.517 0.017 0.8 0.0192 0.0000OK PN004 MH-0003 0.8 0.191 0.011 0.2322

960 minute winter MH-0005 630 22.336 0.536 1.4 6.3743 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

960 minute winter Node 3 585 20.631 0.081 0.7 0.0914 0.0000OK Swale 2 Node 2 0.7 0.143 0.014 0.7808

Page 45: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 1440 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 1440 minute summer. 1680 minute analysis at 30 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

1440 minute summer Outlet 810 20.610 0.210 2.5 0.2375 0.0000OK Orifice 2.5 89.5

1440 minute summer Node 2 810 20.611 0.125 3.2 4.7336 0.0000OK Swale 1 Outlet 2.5 0.163 0.062 2.5037

1440 minute summer MH-0001 750 20.651 0.041 2.5 0.0466 0.0000OK PN001 Node 2 2.5 0.369 0.074 0.3829

1440 minute summer MH-0002 750 20.806 0.096 2.5 0.1692 0.0000OK Hydro-Brake® MH-0001 2.5

1440 minute summer MH-0003 750 21.345 0.145 1.8 0.2557 0.0000OK Hydro-Brake® MH-0002 1.8

1440 minute summer MH-0004 660 21.517 0.017 0.8 0.0192 0.0000OK PN004 MH-0003 0.8 0.190 0.011 0.2238

1440 minute summer MH-0005 840 22.325 0.525 1.4 4.2122 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

1440 minute summer Node 3 810 20.611 0.061 0.7 0.0687 0.0000OK Swale 2 Node 2 0.7 0.099 0.013 0.6042

Page 46: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 1 year 1440 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 1 year 1440 minute winter. 1680 minute analysis at 30 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

1440 minute winter Outlet 840 20.589 0.189 2.4 0.2134 0.0000OK Orifice 2.4 100.1

1440 minute winter Node 2 840 20.590 0.104 2.5 3.3577 0.0000OK Swale 1 Outlet 2.4 0.163 0.058 2.1258

1440 minute winter MH-0001 780 20.647 0.037 2.0 0.0420 0.0000OK PN001 Node 2 2.0 0.355 0.060 0.3144

1440 minute winter MH-0002 780 20.788 0.078 2.0 0.1377 0.0000OK Hydro-Brake® MH-0001 2.0

1440 minute winter MH-0003 780 21.287 0.087 1.5 0.1532 0.0000OK Hydro-Brake® MH-0002 1.5

1440 minute winter MH-0004 630 21.517 0.017 0.8 0.0192 0.0000OK PN004 MH-0003 0.8 0.174 0.011 0.1216

1440 minute winter MH-0005 900 22.318 0.518 1.0 2.9501 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

1440 minute winter Node 3 840 20.590 0.040 0.5 0.0451 0.0000OK Swale 2 Node 2 0.5 0.102 0.010 0.4325

Page 47: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 15 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 15 minute summer. 255 minute analysis at 1 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

15 minute summer Outlet 120 20.615 0.215 9.1 0.2432 0.0000OK Orifice 2.5 31.8

15 minute summer Node 2 120 20.616 0.130 16.5 5.0757 0.0000OK Swale 1 Outlet 9.1 0.418 0.224 2.5922

15 minute summer MH-0001 6 20.658 0.048 3.2 0.0544 0.0000OK PN001 Node 2 3.2 0.677 0.095 0.4190

15 minute summer MH-0002 19 21.304 0.594 16.0 5.2078 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

15 minute summer MH-0003 19 21.743 0.543 24.1 6.9439 0.0000OK Hydro-Brake® MH-0002 2.0

15 minute summer MH-0004 15 21.748 0.248 7.9 0.2801 0.0000SURCHARGED PN004 MH-0003 -7.2 0.240 -0.100 0.6301

15 minute summer MH-0005 19 22.359 0.559 26.5 10.6436 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

15 minute summer Node 3 10 20.660 0.110 14.1 0.1242 0.0000OK Swale 2 Node 2 13.7 0.740 0.278 0.6515

Page 48: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 15 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 15 minute winter. 255 minute analysis at 1 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

15 minute winter Outlet 137 20.621 0.221 9.5 0.2496 0.0000OK Orifice 2.6 34.3

15 minute winter Node 2 137 20.621 0.135 17.2 5.4706 0.0000OK Swale 1 Outlet 9.5 0.421 0.234 2.6903

15 minute winter MH-0001 5 20.658 0.048 3.2 0.0545 0.0000OK PN001 Node 2 3.3 0.675 0.096 0.4370

15 minute winter MH-0002 18 21.320 0.610 16.7 5.9589 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

15 minute winter MH-0003 18 21.750 0.550 22.7 8.0602 0.0000OK Hydro-Brake® MH-0002 2.0

15 minute winter MH-0004 21 21.754 0.254 4.4 0.2875 0.0000SURCHARGED PN004 MH-0003 4.0 0.229 0.055 0.6301

15 minute winter MH-0005 19 22.366 0.566 27.8 12.0070 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

15 minute winter Node 3 10 20.663 0.113 14.8 0.1279 0.0000OK Swale 2 Node 2 14.4 0.719 0.292 0.6965

Page 49: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 30 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 30 minute summer. 270 minute analysis at 1 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

30 minute summer Outlet 156 20.630 0.230 6.3 0.2600 0.0000OK Orifice 2.6 37.8

30 minute summer Node 2 155 20.630 0.144 15.1 6.1435 0.0000OK Swale 1 Outlet 6.3 0.341 0.155 2.8501

30 minute summer MH-0001 7 20.656 0.046 3.2 0.0525 0.0000OK PN001 Node 2 3.2 0.654 0.094 0.4662

30 minute summer MH-0002 33 21.323 0.613 14.2 6.1489 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

30 minute summer MH-0003 33 21.753 0.553 19.9 8.4948 0.0000OK Hydro-Brake® MH-0002 2.0

30 minute summer MH-0004 34 21.757 0.257 3.6 0.2902 0.0000SURCHARGED PN004 MH-0003 2.9 0.229 0.040 0.6301

30 minute summer MH-0005 34 22.372 0.572 23.1 13.0910 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

30 minute summer Node 3 18 20.655 0.105 12.3 0.1187 0.0000OK Swale 2 Node 2 12.4 0.630 0.251 0.7776

Page 50: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 30 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 30 minute winter. 270 minute analysis at 1 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

30 minute winter Outlet 176 20.635 0.235 6.6 0.2661 0.0000OK Orifice 2.7 39.4

30 minute winter Node 2 176 20.636 0.150 13.9 6.5473 0.0000OK Swale 1 Outlet 6.6 0.350 0.163 2.9421

30 minute winter MH-0001 7 20.657 0.047 3.2 0.0532 0.0000OK PN001 Node 2 3.2 0.666 0.094 0.4829

30 minute winter MH-0002 32 21.343 0.633 13.0 7.1178 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

30 minute winter MH-0003 33 21.761 0.561 18.3 9.8850 0.0000OK Hydro-Brake® MH-0002 2.0

30 minute winter MH-0004 32 21.766 0.266 4.3 0.3009 0.0000SURCHARGED PN004 MH-0003 -3.5 0.229 -0.049 0.6301

30 minute winter MH-0005 33 22.382 0.582 20.9 14.8542 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

30 minute winter Node 3 18 20.649 0.099 11.1 0.1119 0.0000OK Swale 2 Node 2 11.2 0.580 0.228 0.8262

Page 51: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 60 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 60 minute summer. 300 minute analysis at 1 minute timestep. Mass balance: 99.83%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

60 minute summer Outlet 191 20.644 0.244 3.8 0.2758 0.0000OK Orifice 2.7 43.9

60 minute summer Node 2 191 20.644 0.158 11.6 7.2023 0.0000OK Swale 1 Outlet 3.8 0.321 0.094 3.0850

60 minute summer MH-0001 23 20.656 0.046 3.2 0.0522 0.0000OK PN001 Node 2 3.2 0.613 0.094 0.5087

60 minute summer MH-0002 61 21.330 0.620 10.8 6.4744 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

60 minute summer MH-0003 61 21.758 0.558 14.2 9.2863 0.0000OK Hydro-Brake® MH-0002 2.0

60 minute summer MH-0004 61 21.758 0.258 2.7 0.2914 0.0000SURCHARGED PN004 MH-0003 -1.9 0.229 -0.027 0.6301

60 minute summer MH-0005 63 22.383 0.583 16.8 15.0112 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

60 minute summer Node 3 191 20.644 0.094 8.9 0.1069 0.0000OK Swale 2 Node 2 8.9 0.456 0.181 0.9042

Page 52: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 60 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 60 minute winter. 300 minute analysis at 1 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

60 minute winter Outlet 63 20.652 0.252 4.1 0.2847 0.0000OK Orifice 2.8 45.5

60 minute winter Node 2 64 20.652 0.166 9.8 7.8352 0.0000OK Swale 1 Outlet 4.1 0.325 0.100 3.2143

60 minute winter MH-0001 20 20.656 0.046 3.2 0.0522 0.0000OK PN001 Node 2 3.2 0.623 0.094 0.5275

60 minute winter MH-0002 60 21.354 0.644 9.1 7.6178 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

60 minute winter MH-0003 60 21.768 0.568 12.0 10.9507 0.0000OK Hydro-Brake® MH-0002 2.0

60 minute winter MH-0004 58 21.773 0.273 2.7 0.3087 0.0000SURCHARGED PN004 MH-0003 -1.9 0.229 -0.027 0.6301

60 minute winter MH-0005 62 22.395 0.595 13.6 17.2726 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

60 minute winter Node 3 68 20.653 0.103 7.2 0.1164 0.0000OK Swale 2 Node 2 7.2 0.387 0.146 0.9789

Page 53: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 120 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 120 minute summer. 360 minute analysis at 2 minute timestep. Mass balance: 99.92%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

120 minute summer Outlet 124 20.661 0.261 3.1 0.2948 0.0000OK Orifice 2.8 53.1

120 minute summer Node 2 124 20.661 0.175 8.2 8.5712 0.0000OK Swale 1 Outlet 3.1 0.297 0.077 3.3552

120 minute summer MH-0001 124 20.662 0.052 3.2 0.0593 0.0000OK PN001 Node 2 3.2 0.560 0.094 0.5746

120 minute summer MH-0002 98 21.323 0.613 7.6 6.1105 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

120 minute summer MH-0003 94 21.754 0.554 9.2 8.7905 0.0000OK Hydro-Brake® MH-0002 2.0

120 minute summer MH-0004 98 21.759 0.259 1.3 0.2929 0.0000SURCHARGED PN004 MH-0003 2.1 0.229 0.029 0.6301

120 minute summer MH-0005 122 22.387 0.587 10.7 15.7711 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

120 minute summer Node 3 124 20.661 0.111 5.7 0.1256 0.0000OK Swale 2 Node 2 5.5 0.319 0.111 1.0591

Page 54: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 120 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 120 minute winter. 360 minute analysis at 2 minute timestep. Mass balance: 99.95%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

120 minute winter Outlet 122 20.673 0.273 3.1 0.3083 0.0000OK Orifice 2.9 55.3

120 minute winter Node 2 122 20.673 0.187 6.9 9.5859 0.0000OK Swale 1 Outlet 3.1 0.293 0.076 3.5334

120 minute winter MH-0001 122 20.674 0.064 3.2 0.0724 0.0000OK PN001 Node 2 3.2 0.558 0.094 0.6374

120 minute winter MH-0002 112 21.345 0.635 6.3 7.1854 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

120 minute winter MH-0003 112 21.766 0.566 7.9 10.5925 0.0000OK Hydro-Brake® MH-0002 2.0

120 minute winter MH-0004 98 21.771 0.271 1.8 0.3062 0.0000SURCHARGED PN004 MH-0003 1.8 0.229 0.026 0.6301

120 minute winter MH-0005 118 22.402 0.602 8.3 18.5876 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

120 minute winter Node 3 122 20.673 0.123 4.4 0.1390 0.0000OK Swale 2 Node 2 4.2 0.293 0.085 1.1698

Page 55: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 180 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 180 minute summer. 420 minute analysis at 4 minute timestep. Mass balance: 99.90%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

180 minute summer Outlet 184 20.667 0.267 3.0 0.3021 0.0000OK Orifice 2.9 61.0

180 minute summer Node 2 184 20.668 0.182 6.8 9.1122 0.0000OK Swale 1 Outlet 3.0 0.254 0.074 3.4529

180 minute summer MH-0001 184 20.669 0.059 3.2 0.0663 0.0000OK PN001 Node 2 3.2 0.498 0.093 0.6084

180 minute summer MH-0002 132 21.314 0.604 6.1 5.7136 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

180 minute summer MH-0003 128 21.751 0.551 7.4 8.2568 0.0000OK Hydro-Brake® MH-0002 2.0

180 minute summer MH-0004 140 21.756 0.256 1.2 0.2891 0.0000SURCHARGED PN004 MH-0003 1.6 0.229 0.022 0.6301

180 minute summer MH-0005 172 22.384 0.584 7.9 15.3591 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

180 minute summer Node 3 184 20.667 0.117 4.2 0.1328 0.0000OK Swale 2 Node 2 4.0 0.306 0.081 1.1189

Page 56: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 180 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 180 minute winter. 420 minute analysis at 4 minute timestep. Mass balance: 99.95%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

180 minute winter Outlet 180 20.681 0.281 3.0 0.3173 0.0000OK Orifice 3.0 63.7

180 minute winter Node 2 180 20.681 0.195 5.8 10.2914 0.0000OK Swale 1 Outlet 3.0 0.279 0.073 3.6446

180 minute winter MH-0001 180 20.682 0.072 3.2 0.0813 0.0000OK PN001 Node 2 3.2 0.479 0.094 0.6790

180 minute winter MH-0002 140 21.331 0.621 5.1 6.5103 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

180 minute winter MH-0003 140 21.760 0.560 5.6 9.7553 0.0000OK Hydro-Brake® MH-0002 2.0

180 minute winter MH-0004 140 21.761 0.261 1.1 0.2947 0.0000SURCHARGED PN004 MH-0003 1.4 0.229 0.020 0.6301

180 minute winter MH-0005 176 22.401 0.601 6.1 18.4555 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

180 minute winter Node 3 180 20.681 0.131 3.2 0.1480 0.0000OK Swale 2 Node 2 3.0 0.266 0.062 1.2442

Page 57: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 240 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 240 minute summer. 480 minute analysis at 4 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute summer Outlet 244 20.667 0.267 2.9 0.3022 0.0000OK Orifice 2.9 67.2

240 minute summer Node 2 244 20.668 0.182 6.1 9.1276 0.0000OK Swale 1 Outlet 2.9 0.267 0.072 3.4555

240 minute summer MH-0001 244 20.669 0.059 3.2 0.0665 0.0000OK PN001 Node 2 3.2 0.483 0.093 0.6093

240 minute summer MH-0002 168 21.303 0.593 5.4 5.1808 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

240 minute summer MH-0003 164 21.748 0.548 6.3 7.7488 0.0000OK Hydro-Brake® MH-0002 2.0

240 minute summer MH-0004 168 21.753 0.253 1.1 0.2862 0.0000SURCHARGED PN004 MH-0003 1.6 0.229 0.023 0.6301

240 minute summer MH-0005 200 22.382 0.582 6.6 14.9303 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

240 minute summer Node 3 240 20.668 0.118 3.5 0.1331 0.0000OK Swale 2 Node 2 3.3 0.290 0.068 1.1210

Page 58: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 240 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 240 minute winter. 480 minute analysis at 4 minute timestep. Mass balance: 99.94%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute winter Outlet 236 20.684 0.284 3.0 0.3216 0.0000OK Orifice 3.0 71.7

240 minute winter Node 2 236 20.685 0.199 5.3 10.6321 0.0000OK Swale 1 Outlet 3.0 0.258 0.073 3.6952

240 minute winter MH-0001 236 20.686 0.076 3.2 0.0854 0.0000OK PN001 Node 2 3.2 0.463 0.094 0.6983

240 minute winter MH-0002 180 21.317 0.607 4.5 5.8504 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

240 minute winter MH-0003 180 21.756 0.556 4.7 8.9664 0.0000OK Hydro-Brake® MH-0002 2.0

240 minute winter MH-0004 180 21.756 0.256 1.0 0.2891 0.0000SURCHARGED PN004 MH-0003 1.4 0.229 0.020 0.6301

240 minute winter MH-0005 228 22.397 0.597 4.9 17.7810 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

240 minute winter Node 3 236 20.685 0.135 2.6 0.1524 0.0000OK Swale 2 Node 2 2.5 0.210 0.050 1.2796

Page 59: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 360 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 360 minute summer. 600 minute analysis at 8 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute summer Outlet 360 20.676 0.276 2.9 0.3116 0.0000OK Orifice 2.9 76.3

360 minute summer Node 2 360 20.676 0.190 5.3 9.8462 0.0000OK Swale 1 Outlet 2.9 0.232 0.072 3.5758

360 minute summer MH-0001 360 20.677 0.067 3.2 0.0754 0.0000OK PN001 Node 2 3.2 0.431 0.093 0.6523

360 minute summer MH-0002 240 21.281 0.571 4.5 4.0980 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

360 minute summer MH-0003 232 21.741 0.541 4.7 6.6096 0.0000OK Hydro-Brake® MH-0002 2.0

360 minute summer MH-0004 232 21.741 0.241 0.9 0.2724 0.0000SURCHARGED PN004 MH-0003 1.4 0.229 0.020 0.6301

360 minute summer MH-0005 264 22.377 0.577 5.0 13.9218 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

360 minute summer Node 3 360 20.676 0.126 2.6 0.1425 0.0000OK Swale 2 Node 2 2.5 0.174 0.050 1.1980

Page 60: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 360 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 360 minute winter. 600 minute analysis at 8 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute winter Outlet 368 20.688 0.288 3.0 0.3259 0.0000OK Orifice 3.0 82.9

360 minute winter Node 2 368 20.689 0.203 4.8 10.9855 0.0000OK Swale 1 Outlet 3.0 0.214 0.074 3.7435

360 minute winter MH-0001 368 20.690 0.080 3.2 0.0900 0.0000OK PN001 Node 2 3.2 0.385 0.094 0.7185

360 minute winter MH-0002 256 21.278 0.568 3.8 3.9498 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

360 minute winter MH-0003 256 21.746 0.546 3.6 7.4673 0.0000OK Hydro-Brake® MH-0002 2.0

360 minute winter MH-0004 256 21.746 0.246 0.8 0.2785 0.0000SURCHARGED PN004 MH-0003 1.3 0.229 0.018 0.6301

360 minute winter MH-0005 280 22.391 0.591 3.6 16.5396 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

360 minute winter Node 3 368 20.689 0.139 1.9 0.1568 0.0000OK Swale 2 Node 2 1.8 0.180 0.037 1.3155

Page 61: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 480 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 480 minute summer. 720 minute analysis at 8 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute summer Outlet 384 20.679 0.279 3.0 0.3160 0.0000OK Orifice 2.9 83.9

480 minute summer Node 2 384 20.680 0.194 4.9 10.1884 0.0000OK Swale 1 Outlet 3.0 0.222 0.073 3.6292

480 minute summer MH-0001 384 20.681 0.071 3.2 0.0797 0.0000OK PN001 Node 2 3.2 0.413 0.094 0.6725

480 minute summer MH-0002 296 21.259 0.549 4.0 3.0084 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

480 minute summer MH-0003 296 21.734 0.534 4.0 5.4845 0.0000OK Hydro-Brake® MH-0002 2.0

480 minute summer MH-0004 296 21.734 0.234 0.8 0.2644 0.0000SURCHARGED PN004 MH-0003 1.2 0.240 0.017 0.6301

480 minute summer MH-0005 328 22.373 0.573 3.9 13.2845 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

480 minute summer Node 3 384 20.680 0.130 2.1 0.1469 0.0000OK Swale 2 Node 2 2.0 0.182 0.040 1.2341

Page 62: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 480 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 480 minute winter. 720 minute analysis at 8 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute winter Outlet 352 20.700 0.300 3.1 0.3390 0.0000OK Orifice 3.1 91.8

480 minute winter Node 2 352 20.700 0.214 4.6 12.0660 0.0000OK Swale 1 Outlet 3.1 0.233 0.076 3.8691

480 minute winter MH-0001 352 20.701 0.091 3.2 0.1027 0.0000OK PN001 Node 2 3.2 0.385 0.094 0.7729

480 minute winter MH-0002 304 21.223 0.513 3.4 1.2993 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

480 minute winter MH-0003 320 21.736 0.536 3.1 5.7965 0.0000OK Hydro-Brake® MH-0002 2.0

480 minute winter MH-0004 320 21.736 0.236 0.8 0.2666 0.0000SURCHARGED PN004 MH-0003 1.5 0.229 0.021 0.6301

480 minute winter MH-0005 360 22.384 0.584 2.9 15.2912 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

480 minute winter Node 3 352 20.700 0.150 1.5 0.1698 0.0000OK Swale 2 Node 2 1.4 0.125 0.029 1.4212

Page 63: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 600 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 600 minute summer. 840 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute summer Outlet 420 20.679 0.279 3.0 0.3151 0.0000OK Orifice 2.9 88.9

600 minute summer Node 2 420 20.679 0.193 4.7 10.1127 0.0000OK Swale 1 Outlet 3.0 0.182 0.073 3.6180

600 minute summer MH-0001 420 20.680 0.070 3.2 0.0789 0.0000OK PN001 Node 2 3.2 0.382 0.093 0.6683

600 minute summer MH-0002 360 21.236 0.526 3.6 1.9297 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

600 minute summer MH-0003 375 21.727 0.527 3.6 4.4314 0.0000OK Hydro-Brake® MH-0002 2.0

600 minute summer MH-0004 375 21.727 0.227 0.8 0.2570 0.0000SURCHARGED PN004 MH-0003 1.2 0.229 0.017 0.6300

600 minute summer MH-0005 405 22.369 0.569 3.2 12.4624 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

600 minute summer Node 3 420 20.679 0.129 1.7 0.1458 0.0000OK Swale 2 Node 2 1.6 0.113 0.033 1.2258

Page 64: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 600 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 600 minute winter. 840 minute analysis at 15 minute timestep. Mass balance: 99.97%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute winter Outlet 405 20.690 0.290 3.0 0.3279 0.0000OK Orifice 3.0 97.5

600 minute winter Node 2 405 20.690 0.204 4.4 11.1462 0.0000OK Swale 1 Outlet 3.0 0.184 0.074 3.7654

600 minute winter MH-0001 405 20.691 0.081 3.1 0.0916 0.0000OK PN001 Node 2 3.1 0.376 0.092 0.7260

600 minute winter MH-0002 315 20.905 0.195 3.2 0.3442 0.0000OK Hydro-Brake® MH-0001 3.1

600 minute winter MH-0003 390 21.725 0.525 2.7 4.1157 0.0000OK Hydro-Brake® MH-0002 2.0

600 minute winter MH-0004 390 21.725 0.225 0.8 0.2547 0.0000SURCHARGED PN004 MH-0003 1.2 0.229 0.017 0.6299

600 minute winter MH-0005 435 22.378 0.578 2.4 14.0963 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

600 minute winter Node 3 405 20.690 0.140 1.3 0.1588 0.0000OK Swale 2 Node 2 1.2 0.105 0.025 1.3316

Page 65: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 720 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 720 minute summer. 960 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute summer Outlet 450 20.671 0.271 2.9 0.3066 0.0000OK Orifice 2.9 91.7

720 minute summer Node 2 450 20.672 0.186 4.6 9.4585 0.0000OK Swale 1 Outlet 2.9 0.165 0.072 3.5125

720 minute summer MH-0001 450 20.672 0.062 3.2 0.0704 0.0000OK PN001 Node 2 3.2 0.374 0.094 0.6289

720 minute summer MH-0002 390 21.057 0.347 3.4 0.6130 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

720 minute summer MH-0003 435 21.722 0.522 2.9 3.6670 0.0000OK Hydro-Brake® MH-0002 2.0

720 minute summer MH-0004 435 21.722 0.222 0.8 0.2515 0.0000OK PN004 MH-0003 1.2 0.240 0.017 0.6293

720 minute summer MH-0005 465 22.364 0.564 2.8 11.4935 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

720 minute summer Node 3 450 20.672 0.122 1.5 0.1374 0.0000OK Swale 2 Node 2 1.4 0.107 0.028 1.1566

Page 66: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 720 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 720 minute winter. 960 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute winter Outlet 480 20.683 0.283 3.0 0.3204 0.0000OK Orifice 3.0 104.3

720 minute winter Node 2 480 20.684 0.198 4.1 10.5421 0.0000OK Swale 1 Outlet 3.0 0.194 0.073 3.6822

720 minute winter MH-0001 480 20.684 0.074 3.1 0.0842 0.0000OK PN001 Node 2 3.1 0.367 0.090 0.6928

720 minute winter MH-0002 360 20.869 0.159 3.1 0.2806 0.0000OK Hydro-Brake® MH-0001 3.1

720 minute winter MH-0003 450 21.716 0.516 2.4 2.6966 0.0000OK Hydro-Brake® MH-0002 2.0

720 minute winter MH-0004 450 21.716 0.216 0.8 0.2447 0.0000OK PN004 MH-0003 1.2 0.239 0.017 0.6259

720 minute winter MH-0005 510 22.371 0.571 2.1 12.9086 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

720 minute winter Node 3 480 20.684 0.134 1.1 0.1513 0.0000OK Swale 2 Node 2 1.0 0.106 0.021 1.2705

Page 67: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 960 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 960 minute summer. 1200 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

960 minute summer Outlet 585 20.664 0.264 2.9 0.2991 0.0000OK Orifice 2.9 98.2

960 minute summer Node 2 585 20.665 0.179 4.2 8.8886 0.0000OK Swale 1 Outlet 2.9 0.161 0.070 3.4135

960 minute summer MH-0001 585 20.666 0.056 3.1 0.0631 0.0000OK PN001 Node 2 3.1 0.374 0.092 0.5937

960 minute summer MH-0002 495 20.895 0.185 3.2 0.3274 0.0000OK Hydro-Brake® MH-0001 3.1

960 minute summer MH-0003 555 21.712 0.512 2.4 1.9428 0.0000OK Hydro-Brake® MH-0002 2.0

960 minute summer MH-0004 555 21.712 0.212 0.8 0.2393 0.0000OK PN004 MH-0003 1.2 0.226 0.017 0.6223

960 minute summer MH-0005 600 22.356 0.556 2.3 10.1478 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

960 minute summer Node 3 585 20.665 0.115 1.2 0.1299 0.0000OK Swale 2 Node 2 1.1 0.104 0.023 1.0948

Page 68: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 960 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 960 minute winter. 1200 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

960 minute winter Outlet 600 20.671 0.271 2.9 0.3063 0.0000OK Orifice 2.9 110.3

960 minute winter Node 2 600 20.671 0.185 3.7 9.4356 0.0000OK Swale 1 Outlet 2.9 0.178 0.071 3.5087

960 minute winter MH-0001 600 20.672 0.062 2.9 0.0702 0.0000OK PN001 Node 2 2.9 0.366 0.085 0.6277

960 minute winter MH-0002 510 20.831 0.121 2.9 0.2137 0.0000OK Hydro-Brake® MH-0001 2.9

960 minute winter MH-0003 540 21.521 0.321 2.1 0.5680 0.0000OK Hydro-Brake® MH-0002 2.0

960 minute winter MH-0004 540 21.522 0.022 0.8 0.0244 0.0000OK PN004 MH-0003 0.8 0.228 0.011 0.3303

960 minute winter MH-0005 645 22.357 0.557 1.7 10.3391 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

960 minute winter Node 3 600 20.671 0.121 0.9 0.1372 0.0000OK Swale 2 Node 2 0.8 0.143 0.017 1.1544

Page 69: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 1440 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 1440 minute summer. 1680 minute analysis at 30 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

1440 minute summer Outlet 840 20.645 0.245 2.8 0.2774 0.0000OK Orifice 2.7 108.9

1440 minute summer Node 2 840 20.646 0.160 3.7 7.3234 0.0000OK Swale 1 Outlet 2.8 0.162 0.068 3.1097

1440 minute summer MH-0001 750 20.654 0.044 2.9 0.0496 0.0000OK PN001 Node 2 2.9 0.369 0.084 0.4980

1440 minute summer MH-0002 750 20.828 0.118 2.9 0.2079 0.0000OK Hydro-Brake® MH-0001 2.9

1440 minute summer MH-0003 750 21.441 0.241 2.1 0.4260 0.0000OK Hydro-Brake® MH-0002 2.0

1440 minute summer MH-0004 630 21.517 0.017 0.8 0.0192 0.0000OK PN004 MH-0003 0.8 0.191 0.011 0.3252

1440 minute summer MH-0005 870 22.341 0.541 1.6 7.2038 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

1440 minute summer Node 3 840 20.646 0.096 0.9 0.1084 0.0000OK Swale 2 Node 2 0.8 0.099 0.017 0.9174

Page 70: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 2 year 1440 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 2 year 1440 minute winter. 1680 minute analysis at 30 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

1440 minute winter Outlet 840 20.624 0.224 2.6 0.2533 0.0000OK Orifice 2.6 119.4

1440 minute winter Node 2 840 20.625 0.139 3.1 5.7148 0.0000OK Swale 1 Outlet 2.6 0.161 0.064 2.7488

1440 minute winter MH-0001 750 20.651 0.041 2.4 0.0459 0.0000OK PN001 Node 2 2.4 0.364 0.072 0.4290

1440 minute winter MH-0002 750 20.803 0.093 2.4 0.1637 0.0000OK Hydro-Brake® MH-0001 2.4

1440 minute winter MH-0003 750 21.319 0.119 1.8 0.2102 0.0000OK Hydro-Brake® MH-0002 1.7

1440 minute winter MH-0004 600 21.517 0.017 0.8 0.0192 0.0000OK PN004 MH-0003 0.8 0.191 0.011 0.1788

1440 minute winter MH-0005 900 22.334 0.534 1.2 5.9640 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

1440 minute winter Node 3 840 20.625 0.075 0.7 0.0844 0.0000OK Swale 2 Node 2 0.7 0.100 0.014 0.7252

Page 71: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 15 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 15 minute summer. 255 minute analysis at 1 minute timestep. Mass balance: 99.88%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

15 minute summer Outlet 160 20.628 0.228 10.4 0.2580 0.0000OK Orifice 2.6 36.6

15 minute summer Node 2 159 20.629 0.143 20.4 6.0103 0.0000OK Swale 1 Outlet 10.4 0.430 0.254 2.8194

15 minute summer MH-0001 5 20.658 0.048 3.2 0.0548 0.0000OK PN001 Node 2 3.3 0.690 0.096 0.4606

15 minute summer MH-0002 19 21.340 0.630 20.1 6.9655 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

15 minute summer MH-0003 19 21.759 0.559 28.5 9.5659 0.0000OK Hydro-Brake® MH-0002 2.0

15 minute summer MH-0004 18 21.764 0.264 5.1 0.2986 0.0000SURCHARGED PN004 MH-0003 -4.4 0.229 -0.061 0.6301

15 minute summer MH-0005 19 22.377 0.577 34.3 13.9564 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

15 minute summer Node 3 11 20.675 0.125 18.2 0.1415 0.0000OK Swale 2 Node 2 17.6 0.821 0.358 0.7688

Page 72: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 15 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 15 minute winter. 255 minute analysis at 1 minute timestep. Mass balance: 98.56%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

15 minute winter Outlet 179 20.634 0.234 10.6 0.2643 0.0000OK Orifice 2.7 38.0

15 minute winter Node 2 179 20.634 0.148 21.2 6.4278 0.0000OK Swale 1 Outlet 10.6 0.425 0.260 2.9155

15 minute winter MH-0001 5 20.659 0.049 3.2 0.0551 0.0000OK PN001 Node 2 3.3 0.695 0.096 0.4780

15 minute winter MH-0002 19 21.360 0.650 21.0 7.9068 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

15 minute winter MH-0003 19 21.768 0.568 29.9 10.9513 0.0000OK Hydro-Brake® MH-0002 2.0

15 minute winter MH-0004 21 21.773 0.273 7.9 0.3082 0.0000SURCHARGED PN004 MH-0003 -7.2 -0.249 -0.100 0.6301

15 minute winter MH-0005 19 22.390 0.590 36.0 16.4755 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

15 minute winter Node 3 10 20.678 0.128 19.1 0.1453 0.0000OK Swale 2 Node 2 18.6 0.795 0.377 0.8125

Page 73: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 30 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 30 minute summer. 270 minute analysis at 1 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

30 minute summer Outlet 201 20.643 0.243 6.5 0.2743 0.0000OK Orifice 2.7 41.1

30 minute summer Node 2 200 20.643 0.157 18.4 7.1027 0.0000OK Swale 1 Outlet 6.5 0.351 0.160 3.0634

30 minute summer MH-0001 6 20.657 0.047 3.2 0.0533 0.0000OK PN001 Node 2 3.2 0.674 0.095 0.5049

30 minute summer MH-0002 33 21.367 0.657 17.6 8.2758 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

30 minute summer MH-0003 33 21.773 0.573 24.7 11.6854 0.0000OK Hydro-Brake® MH-0002 2.0

30 minute summer MH-0004 32 21.773 0.273 2.5 0.3091 0.0000SURCHARGED PN004 MH-0003 2.6 0.229 0.036 0.6301

30 minute summer MH-0005 34 22.394 0.594 29.7 17.1712 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

30 minute summer Node 3 18 20.669 0.119 15.7 0.1349 0.0000OK Swale 2 Node 2 15.7 0.685 0.320 0.8923

Page 74: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 30 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 30 minute winter. 270 minute analysis at 1 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

30 minute winter Outlet 38 20.651 0.251 7.0 0.2840 0.0000OK Orifice 2.8 42.4

30 minute winter Node 2 60 20.651 0.165 16.9 7.7199 0.0000OK Swale 1 Outlet 7.0 0.361 0.171 3.1942

30 minute winter MH-0001 7 20.658 0.048 3.2 0.0538 0.0000OK PN001 Node 2 3.2 0.678 0.095 0.5218

30 minute winter MH-0002 32 21.393 0.683 16.1 9.5295 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

30 minute winter MH-0003 33 21.784 0.584 23.2 13.5213 0.0000OK Hydro-Brake® MH-0002 2.0

30 minute winter MH-0004 33 21.784 0.284 3.4 0.3216 0.0000SURCHARGED PN004 MH-0003 -2.6 0.229 -0.037 0.6301

30 minute winter MH-0005 33 22.407 0.607 26.8 19.4646 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

30 minute winter Node 3 18 20.663 0.113 14.2 0.1275 0.0000OK Swale 2 Node 2 14.3 0.632 0.290 0.9637

Page 75: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 60 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 60 minute summer. 300 minute analysis at 1 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

60 minute summer Outlet 64 20.664 0.264 4.0 0.2990 0.0000OK Orifice 2.9 47.3

60 minute summer Node 2 65 20.665 0.179 14.1 8.8773 0.0000OK Swale 1 Outlet 4.0 0.326 0.098 3.4120

60 minute summer MH-0001 65 20.666 0.056 3.2 0.0634 0.0000OK PN001 Node 2 3.2 0.636 0.094 0.5941

60 minute summer MH-0002 61 21.379 0.669 13.3 8.8515 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

60 minute summer MH-0003 62 21.780 0.580 18.4 12.9506 0.0000OK Hydro-Brake® MH-0002 2.0

60 minute summer MH-0004 62 21.781 0.281 2.0 0.3173 0.0000SURCHARGED PN004 MH-0003 2.1 0.229 0.030 0.6301

60 minute summer MH-0005 63 22.408 0.608 21.4 19.8211 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

60 minute summer Node 3 69 20.665 0.115 11.4 0.1299 0.0000OK Swale 2 Node 2 11.4 0.492 0.232 1.0937

Page 76: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 60 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 60 minute winter. 300 minute analysis at 1 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

60 minute winter Outlet 63 20.675 0.275 4.4 0.3106 0.0000OK Orifice 2.9 48.4

60 minute winter Node 2 65 20.675 0.189 11.7 9.7666 0.0000OK Swale 1 Outlet 4.4 0.334 0.107 3.5629

60 minute winter MH-0001 64 20.676 0.066 3.2 0.0748 0.0000OK PN001 Node 2 3.2 0.646 0.094 0.6486

60 minute winter MH-0002 60 21.410 0.700 11.1 10.3367 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

60 minute winter MH-0003 61 21.794 0.594 15.0 15.1693 0.0000OK Hydro-Brake® MH-0002 2.0

60 minute winter MH-0004 62 21.799 0.299 2.1 0.3386 0.0000SURCHARGED PN004 MH-0003 1.9 0.209 0.027 0.6301

60 minute winter MH-0005 62 22.423 0.623 17.3 22.6068 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

60 minute winter Node 3 66 20.675 0.125 9.2 0.1417 0.0000OK Swale 2 Node 2 9.1 0.423 0.185 1.1901

Page 77: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 120 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 120 minute summer. 360 minute analysis at 2 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

120 minute summer Outlet 124 20.685 0.285 3.3 0.3226 0.0000OK Orifice 3.0 57.4

120 minute summer Node 2 124 20.686 0.200 9.5 10.7129 0.0000OK Swale 1 Outlet 3.3 0.298 0.081 3.7064

120 minute summer MH-0001 124 20.687 0.077 3.2 0.0866 0.0000OK PN001 Node 2 3.2 0.587 0.094 0.7032

120 minute summer MH-0002 104 21.371 0.661 9.1 8.4590 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

120 minute summer MH-0003 106 21.778 0.578 11.1 12.5848 0.0000OK Hydro-Brake® MH-0002 2.0

120 minute summer MH-0004 108 21.783 0.283 1.4 0.3202 0.0000SURCHARGED PN004 MH-0003 1.7 0.229 0.023 0.6301

120 minute summer MH-0005 122 22.416 0.616 13.5 21.2157 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

120 minute summer Node 3 124 20.686 0.136 7.2 0.1533 0.0000OK Swale 2 Node 2 6.9 0.348 0.140 1.2874

Page 78: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 120 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 120 minute winter. 360 minute analysis at 2 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

120 minute winter Outlet 122 20.698 0.298 3.4 0.3375 0.0000OK Orifice 3.1 58.9

120 minute winter Node 2 122 20.699 0.213 7.9 11.9385 0.0000OK Swale 1 Outlet 3.4 0.314 0.082 3.8572

120 minute winter MH-0001 122 20.700 0.090 3.2 0.1014 0.0000OK PN001 Node 2 3.2 0.573 0.094 0.7673

120 minute winter MH-0002 114 21.403 0.693 7.4 9.9868 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

120 minute winter MH-0003 116 21.795 0.595 9.7 15.2757 0.0000OK Hydro-Brake® MH-0002 2.0

120 minute winter MH-0004 112 21.800 0.300 1.5 0.3391 0.0000SURCHARGED PN004 MH-0003 1.7 0.214 0.024 0.6301

120 minute winter MH-0005 120 22.434 0.634 10.4 24.6179 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

120 minute winter Node 3 122 20.699 0.149 5.5 0.1682 0.0000OK Swale 2 Node 2 5.2 0.307 0.107 1.4086

Page 79: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 180 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 180 minute summer. 420 minute analysis at 4 minute timestep. Mass balance: 99.96%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

180 minute summer Outlet 184 20.692 0.292 3.2 0.3299 0.0000OK Orifice 3.0 66.2

180 minute summer Node 2 184 20.692 0.206 7.7 11.3027 0.0000OK Swale 1 Outlet 3.2 0.272 0.077 3.7850

180 minute summer MH-0001 184 20.693 0.083 3.2 0.0937 0.0000OK PN001 Node 2 3.2 0.508 0.093 0.7349

180 minute summer MH-0002 136 21.360 0.650 7.2 7.9130 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

180 minute summer MH-0003 140 21.774 0.574 9.0 11.9432 0.0000OK Hydro-Brake® MH-0002 2.0

180 minute summer MH-0004 144 21.779 0.279 1.3 0.3152 0.0000SURCHARGED PN004 MH-0003 1.6 0.229 0.023 0.6301

180 minute summer MH-0005 180 22.415 0.615 9.9 21.1260 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

180 minute summer Node 3 184 20.692 0.142 5.3 0.1606 0.0000OK Swale 2 Node 2 5.1 0.320 0.103 1.3469

Page 80: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 180 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 180 minute winter. 420 minute analysis at 4 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

180 minute winter Outlet 180 20.708 0.308 3.1 0.3480 0.0000OK Orifice 3.1 68.4

180 minute winter Node 2 180 20.708 0.222 6.4 12.8357 0.0000OK Swale 1 Outlet 3.1 0.296 0.076 3.9370

180 minute winter MH-0001 180 20.709 0.099 3.2 0.1118 0.0000OK PN001 Node 2 3.2 0.514 0.094 0.8071

180 minute winter MH-0002 144 21.389 0.679 5.9 9.3164 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

180 minute winter MH-0003 152 21.789 0.589 6.9 14.2992 0.0000OK Hydro-Brake® MH-0002 2.0

180 minute winter MH-0004 152 21.789 0.289 1.0 0.3268 0.0000SURCHARGED PN004 MH-0003 1.4 0.229 0.020 0.6301

180 minute winter MH-0005 176 22.436 0.636 7.6 25.0073 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

180 minute winter Node 3 180 20.708 0.158 4.0 0.1788 0.0000OK Swale 2 Node 2 3.8 0.291 0.077 1.4930

Page 81: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 240 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 240 minute summer. 480 minute analysis at 4 minute timestep. Mass balance: 99.96%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute summer Outlet 240 20.695 0.295 3.1 0.3331 0.0000OK Orifice 3.0 74.8

240 minute summer Node 2 240 20.695 0.209 6.9 11.5734 0.0000OK Swale 1 Outlet 3.1 0.254 0.076 3.8173

240 minute summer MH-0001 240 20.696 0.086 3.2 0.0969 0.0000OK PN001 Node 2 3.2 0.498 0.094 0.7488

240 minute summer MH-0002 172 21.352 0.642 6.3 7.5254 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

240 minute summer MH-0003 172 21.770 0.570 7.6 11.3106 0.0000OK Hydro-Brake® MH-0002 2.0

240 minute summer MH-0004 176 21.775 0.275 0.9 0.3115 0.0000SURCHARGED PN004 MH-0003 1.6 0.229 0.023 0.6301

240 minute summer MH-0005 216 22.411 0.611 8.3 20.3095 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

240 minute summer Node 3 240 20.695 0.145 4.4 0.1639 0.0000OK Swale 2 Node 2 4.2 0.306 0.085 1.3737

Page 82: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 240 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 240 minute winter. 480 minute analysis at 4 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute winter Outlet 232 20.712 0.312 3.1 0.3524 0.0000OK Orifice 3.1 77.5

240 minute winter Node 2 232 20.712 0.226 5.7 13.2168 0.0000OK Swale 1 Outlet 3.1 0.260 0.077 3.9685

240 minute winter MH-0001 232 20.713 0.103 3.2 0.1161 0.0000OK PN001 Node 2 3.2 0.464 0.094 0.8208

240 minute winter MH-0002 184 21.376 0.666 5.2 8.6853 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

240 minute winter MH-0003 188 21.783 0.583 5.7 13.3367 0.0000OK Hydro-Brake® MH-0002 2.0

240 minute winter MH-0004 188 21.783 0.283 1.1 0.3200 0.0000SURCHARGED PN004 MH-0003 1.6 0.230 0.022 0.6301

240 minute winter MH-0005 232 22.434 0.634 6.2 24.6204 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

240 minute winter Node 3 232 20.712 0.162 3.3 0.1832 0.0000OK Swale 2 Node 2 3.1 0.199 0.064 1.5277

Page 83: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 360 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 360 minute summer. 600 minute analysis at 8 minute timestep. Mass balance: 99.95%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute summer Outlet 304 20.691 0.291 3.0 0.3288 0.0000OK Orifice 3.0 88.4

360 minute summer Node 2 304 20.691 0.205 5.9 11.2188 0.0000OK Swale 1 Outlet 3.0 0.253 0.074 3.7748

360 minute summer MH-0001 304 20.692 0.082 3.2 0.0926 0.0000OK PN001 Node 2 3.2 0.450 0.093 0.7303

360 minute summer MH-0002 240 21.329 0.619 5.2 6.3969 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

360 minute summer MH-0003 240 21.763 0.563 5.6 10.1036 0.0000OK Hydro-Brake® MH-0002 2.0

360 minute summer MH-0004 240 21.763 0.263 1.1 0.2971 0.0000SURCHARGED PN004 MH-0003 1.3 0.229 0.019 0.6301

360 minute summer MH-0005 280 22.406 0.606 6.2 19.3511 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

360 minute summer Node 3 304 20.691 0.141 3.3 0.1596 0.0000OK Swale 2 Node 2 3.1 0.173 0.064 1.3388

Page 84: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 360 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 360 minute winter. 600 minute analysis at 8 minute timestep. Mass balance: 99.95%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute winter Outlet 296 20.709 0.309 3.1 0.3491 0.0000OK Orifice 3.1 93.1

360 minute winter Node 2 296 20.709 0.223 5.0 12.9272 0.0000OK Swale 1 Outlet 3.1 0.232 0.077 3.9447

360 minute winter MH-0001 296 20.710 0.100 3.2 0.1128 0.0000OK PN001 Node 2 3.2 0.435 0.094 0.8108

360 minute winter MH-0002 264 21.340 0.630 4.3 6.9431 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

360 minute winter MH-0003 264 21.772 0.572 4.4 11.5771 0.0000OK Hydro-Brake® MH-0002 2.0

360 minute winter MH-0004 264 21.772 0.272 0.8 0.3076 0.0000SURCHARGED PN004 MH-0003 1.5 0.230 0.020 0.6301

360 minute winter MH-0005 296 22.425 0.625 4.5 22.8789 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

360 minute winter Node 3 296 20.709 0.159 2.4 0.1799 0.0000OK Swale 2 Node 2 2.3 0.178 0.047 1.5015

Page 85: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 480 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 480 minute summer. 720 minute analysis at 8 minute timestep. Mass balance: 99.97%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute summer Outlet 360 20.689 0.289 3.0 0.3272 0.0000OK Orifice 3.0 97.8

480 minute summer Node 2 360 20.690 0.204 5.3 11.0881 0.0000OK Swale 1 Outlet 3.0 0.231 0.074 3.7576

480 minute summer MH-0001 360 20.690 0.080 3.2 0.0910 0.0000OK PN001 Node 2 3.2 0.431 0.094 0.7234

480 minute summer MH-0002 312 21.310 0.600 4.5 5.4934 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

480 minute summer MH-0003 304 21.754 0.554 4.5 8.7767 0.0000OK Hydro-Brake® MH-0002 2.0

480 minute summer MH-0004 304 21.754 0.254 0.8 0.2877 0.0000SURCHARGED PN004 MH-0003 1.5 0.229 0.021 0.6301

480 minute summer MH-0005 344 22.400 0.600 4.8 18.3357 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

480 minute summer Node 3 360 20.690 0.140 2.6 0.1581 0.0000OK Swale 2 Node 2 2.5 0.174 0.050 1.3258

Page 86: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 480 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 480 minute winter. 720 minute analysis at 8 minute timestep. Mass balance: 99.97%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute winter Outlet 360 20.708 0.308 3.1 0.3484 0.0000OK Orifice 3.1 106.4

480 minute winter Node 2 360 20.709 0.223 4.7 12.8737 0.0000OK Swale 1 Outlet 3.1 0.208 0.076 3.9402

480 minute winter MH-0001 360 20.709 0.099 3.2 0.1121 0.0000OK PN001 Node 2 3.2 0.370 0.094 0.8084

480 minute winter MH-0002 336 21.306 0.596 3.8 5.3255 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

480 minute winter MH-0003 336 21.761 0.561 3.6 9.8898 0.0000OK Hydro-Brake® MH-0002 2.0

480 minute winter MH-0004 336 21.761 0.261 0.8 0.2956 0.0000SURCHARGED PN004 MH-0003 1.5 0.230 0.020 0.6301

480 minute winter MH-0005 368 22.417 0.617 3.6 21.4438 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

480 minute winter Node 3 360 20.709 0.159 1.9 0.1793 0.0000OK Swale 2 Node 2 1.8 0.181 0.037 1.4966

Page 87: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 600 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 600 minute summer. 840 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute summer Outlet 525 20.691 0.291 3.0 0.3291 0.0000OK Orifice 3.0 104.7

600 minute summer Node 2 525 20.691 0.205 4.9 11.2383 0.0000OK Swale 1 Outlet 3.0 0.216 0.074 3.7773

600 minute summer MH-0001 525 20.692 0.082 3.2 0.0929 0.0000OK PN001 Node 2 3.2 0.374 0.094 0.7314

600 minute summer MH-0002 375 21.288 0.578 4.0 4.4139 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

600 minute summer MH-0003 375 21.748 0.548 3.9 7.7870 0.0000OK Hydro-Brake® MH-0002 2.0

600 minute summer MH-0004 375 21.748 0.248 0.8 0.2807 0.0000SURCHARGED PN004 MH-0003 1.3 0.229 0.018 0.6301

600 minute summer MH-0005 420 22.396 0.596 3.9 17.5381 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

600 minute summer Node 3 525 20.691 0.141 2.1 0.1599 0.0000OK Swale 2 Node 2 2.0 0.107 0.040 1.3407

Page 88: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 600 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 600 minute winter. 840 minute analysis at 15 minute timestep. Mass balance: 99.97%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute winter Outlet 480 20.719 0.319 3.2 0.3610 0.0000OK Orifice 3.2 115.4

600 minute winter Node 2 480 20.720 0.234 4.6 13.9818 0.0000OK Swale 1 Outlet 3.2 0.181 0.078 4.0287

600 minute winter MH-0001 465 20.720 0.110 3.2 0.1247 0.0000OK PN001 Node 2 3.2 0.374 0.094 0.8455

600 minute winter MH-0002 390 21.251 0.541 3.5 2.6328 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

600 minute winter MH-0003 420 21.753 0.553 3.2 8.6055 0.0000OK Hydro-Brake® MH-0002 2.0

600 minute winter MH-0004 420 21.753 0.253 0.8 0.2865 0.0000SURCHARGED PN004 MH-0003 1.4 0.230 0.019 0.6301

600 minute winter MH-0005 450 22.410 0.610 3.0 20.1170 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

600 minute winter Node 3 480 20.720 0.170 1.6 0.1918 0.0000OK Swale 2 Node 2 1.5 0.114 0.031 1.5945

Page 89: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 720 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 720 minute summer. 960 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute summer Outlet 525 20.698 0.298 3.1 0.3366 0.0000OK Orifice 3.1 112.1

720 minute summer Node 2 525 20.698 0.212 4.8 11.8704 0.0000OK Swale 1 Outlet 3.1 0.201 0.075 3.8509

720 minute summer MH-0001 525 20.699 0.089 3.2 0.1004 0.0000OK PN001 Node 2 3.2 0.374 0.094 0.7636

720 minute summer MH-0002 435 21.255 0.545 3.7 2.8240 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

720 minute summer MH-0003 450 21.742 0.542 3.5 6.7852 0.0000OK Hydro-Brake® MH-0002 2.0

720 minute summer MH-0004 450 21.742 0.242 0.8 0.2736 0.0000SURCHARGED PN004 MH-0003 1.3 0.229 0.018 0.6301

720 minute summer MH-0005 480 22.392 0.592 3.4 16.6734 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

720 minute summer Node 3 525 20.698 0.148 1.8 0.1674 0.0000OK Swale 2 Node 2 1.7 0.105 0.035 1.4022

Page 90: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 720 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 720 minute winter. 960 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute winter Outlet 480 20.714 0.314 3.1 0.3546 0.0000OK Orifice 3.1 121.8

720 minute winter Node 2 480 20.714 0.228 4.4 13.4094 0.0000OK Swale 1 Outlet 3.1 0.196 0.077 3.9840

720 minute winter MH-0001 480 20.714 0.104 3.2 0.1182 0.0000OK PN001 Node 2 3.1 0.374 0.092 0.8269

720 minute winter MH-0002 375 20.948 0.238 3.2 0.4211 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

720 minute winter MH-0003 495 21.744 0.544 2.9 7.1892 0.0000OK Hydro-Brake® MH-0002 2.0

720 minute winter MH-0004 495 21.744 0.244 0.8 0.2765 0.0000SURCHARGED PN004 MH-0003 1.3 0.230 0.019 0.6301

720 minute winter MH-0005 525 22.404 0.604 2.6 18.9297 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

720 minute winter Node 3 480 20.714 0.164 1.4 0.1854 0.0000OK Swale 2 Node 2 1.3 0.103 0.027 1.5449

Page 91: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 960 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 960 minute summer. 1200 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

960 minute summer Outlet 585 20.693 0.293 3.0 0.3308 0.0000OK Orifice 3.0 119.9

960 minute summer Node 2 585 20.693 0.207 4.6 11.3860 0.0000OK Swale 1 Outlet 3.0 0.161 0.075 3.7949

960 minute summer MH-0001 585 20.694 0.084 3.2 0.0945 0.0000OK PN001 Node 2 3.2 0.374 0.094 0.7386

960 minute summer MH-0002 510 21.078 0.368 3.4 0.6509 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

960 minute summer MH-0003 570 21.731 0.531 3.0 5.0905 0.0000OK Hydro-Brake® MH-0002 2.0

960 minute summer MH-0004 570 21.731 0.231 0.8 0.2616 0.0000SURCHARGED PN004 MH-0003 1.3 0.229 0.018 0.6301

960 minute summer MH-0005 615 22.382 0.582 2.8 14.9744 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

960 minute summer Node 3 585 20.693 0.143 1.5 0.1617 0.0000OK Swale 2 Node 2 1.4 0.102 0.028 1.3553

Page 92: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 960 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 960 minute winter. 1200 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

960 minute winter Outlet 630 20.703 0.303 3.1 0.3423 0.0000OK Orifice 3.1 135.8

960 minute winter Node 2 630 20.703 0.217 4.0 12.3499 0.0000OK Swale 1 Outlet 3.1 0.201 0.076 3.8954

960 minute winter MH-0001 630 20.704 0.094 3.0 0.1059 0.0000OK PN001 Node 2 3.0 0.366 0.089 0.7858

960 minute winter MH-0002 465 20.860 0.150 3.1 0.2642 0.0000OK Hydro-Brake® MH-0001 3.0

960 minute winter MH-0003 615 21.721 0.521 2.4 3.5032 0.0000OK Hydro-Brake® MH-0002 2.0

960 minute winter MH-0004 615 21.721 0.221 0.8 0.2504 0.0000OK PN004 MH-0003 1.2 0.239 0.017 0.6288

960 minute winter MH-0005 675 22.389 0.589 2.1 16.2164 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

960 minute winter Node 3 630 20.703 0.153 1.1 0.1732 0.0000OK Swale 2 Node 2 1.0 0.144 0.021 1.4482

Page 93: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 1440 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 1440 minute summer. 1680 minute analysis at 30 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

1440 minute summer Outlet 870 20.673 0.273 2.9 0.3082 0.0000OK Orifice 2.9 131.0

1440 minute summer Node 2 870 20.673 0.187 3.9 9.5846 0.0000OK Swale 1 Outlet 2.9 0.162 0.072 3.5332

1440 minute summer MH-0001 870 20.674 0.064 3.0 0.0721 0.0000OK PN001 Node 2 3.0 0.364 0.087 0.6366

1440 minute summer MH-0002 720 20.846 0.136 3.0 0.2397 0.0000OK Hydro-Brake® MH-0001 3.0

1440 minute summer MH-0003 810 21.709 0.509 2.2 1.5626 0.0000OK Hydro-Brake® MH-0002 2.0

1440 minute summer MH-0004 810 21.709 0.209 0.8 0.2366 0.0000OK PN004 MH-0003 1.1 0.195 0.015 0.6201

1440 minute summer MH-0005 900 22.363 0.563 2.0 11.4151 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

1440 minute summer Node 3 870 20.673 0.123 1.0 0.1391 0.0000OK Swale 2 Node 2 0.9 0.100 0.019 1.1702

Page 94: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 5 year 1440 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 5 year 1440 minute winter. 1680 minute analysis at 30 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

1440 minute winter Outlet 870 20.672 0.272 2.9 0.3077 0.0000OK Orifice 2.9 145.9

1440 minute winter Node 2 870 20.673 0.187 3.5 9.5445 0.0000OK Swale 1 Outlet 2.9 0.160 0.071 3.5266

1440 minute winter MH-0001 870 20.673 0.063 2.7 0.0715 0.0000OK PN001 Node 2 2.7 0.369 0.080 0.6341

1440 minute winter MH-0002 750 20.815 0.105 2.7 0.1854 0.0000OK Hydro-Brake® MH-0001 2.7

1440 minute winter MH-0003 750 21.394 0.194 2.0 0.3433 0.0000OK Hydro-Brake® MH-0002 1.9

1440 minute winter MH-0004 540 21.517 0.017 0.8 0.0192 0.0000OK PN004 MH-0003 0.8 0.216 0.011 0.2990

1440 minute winter MH-0005 960 22.362 0.562 1.5 11.1350 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

1440 minute winter Node 3 870 20.673 0.123 0.8 0.1386 0.0000OK Swale 2 Node 2 0.8 0.098 0.015 1.1660

Page 95: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 15 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 15 minute summer. 255 minute analysis at 1 minute timestep. Mass balance: 97.99%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

15 minute summer Outlet 20 20.636 0.236 11.1 0.2669 0.0000OK Orifice 2.7 38.6

15 minute summer Node 2 185 20.636 0.150 23.0 6.5626 0.0000OK Swale 1 Outlet 11.1 0.427 0.273 2.9455

15 minute summer MH-0001 5 20.659 0.049 3.2 0.0550 0.0000OK PN001 Node 2 3.3 0.698 0.096 0.4837

15 minute summer MH-0002 19 21.368 0.658 22.9 8.2886 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

15 minute summer MH-0003 19 21.776 0.576 32.6 12.2761 0.0000OK Hydro-Brake® MH-0002 2.0

15 minute summer MH-0004 19 21.780 0.280 8.5 0.3169 0.0000SURCHARGED PN004 MH-0003 -7.8 0.229 -0.109 0.6301

15 minute summer MH-0005 19 22.389 0.589 39.6 16.2507 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

15 minute summer Node 3 11 20.685 0.135 21.0 0.1525 0.0000OK Swale 2 Node 2 20.3 0.865 0.413 0.8438

Page 96: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 15 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 15 minute winter. 255 minute analysis at 1 minute timestep. Mass balance: 98.77%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

15 minute winter Outlet 16 20.648 0.248 11.8 0.2803 0.0000OK Orifice 2.8 39.6

15 minute winter Node 2 206 20.642 0.156 24.1 7.0182 0.0000OK Swale 1 Outlet 11.8 0.437 0.289 3.0453

15 minute winter MH-0001 5 20.659 0.049 3.2 0.0551 0.0000OK PN001 Node 2 3.3 0.701 0.095 0.5015

15 minute winter MH-0002 19 21.388 0.678 24.0 9.2838 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

15 minute winter MH-0003 19 21.781 0.581 34.7 12.9893 0.0000OK Hydro-Brake® MH-0002 2.0

15 minute winter MH-0004 20 21.786 0.286 6.6 0.3231 0.0000SURCHARGED PN004 MH-0003 -5.9 0.229 -0.082 0.6301

15 minute winter MH-0005 19 22.404 0.604 41.6 19.0579 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

15 minute winter Node 3 10 20.688 0.138 22.1 0.1564 0.0000OK Swale 2 Node 2 21.5 0.839 0.436 0.8821

Page 97: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 30 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 30 minute summer. 270 minute analysis at 1 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

30 minute summer Outlet 38 20.655 0.255 6.5 0.2881 0.0000OK Orifice 2.8 42.8

30 minute summer Node 2 52 20.655 0.168 20.9 8.0240 0.0000OK Swale 1 Outlet 6.5 0.364 0.160 3.2540

30 minute summer MH-0001 6 20.657 0.047 3.2 0.0537 0.0000OK PN001 Node 2 3.2 0.680 0.095 0.5401

30 minute summer MH-0002 33 21.400 0.690 20.2 9.8592 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

30 minute summer MH-0003 33 21.787 0.587 29.0 14.0561 0.0000OK Hydro-Brake® MH-0002 2.0

30 minute summer MH-0004 34 21.788 0.288 2.9 0.3255 0.0000SURCHARGED PN004 MH-0003 2.2 0.229 0.031 0.6301

30 minute summer MH-0005 34 22.411 0.611 34.5 20.2258 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

30 minute summer Node 3 18 20.680 0.130 18.3 0.1465 0.0000OK Swale 2 Node 2 18.3 0.717 0.372 0.9994

Page 98: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 30 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 30 minute winter. 270 minute analysis at 1 minute timestep. Mass balance: 99.79%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

30 minute winter Outlet 33 20.666 0.266 6.9 0.3008 0.0000OK Orifice 2.9 43.7

30 minute winter Node 2 41 20.665 0.179 19.2 8.9151 0.0000OK Swale 1 Outlet 6.9 0.376 0.169 3.4215

30 minute winter MH-0001 35 20.667 0.057 3.2 0.0640 0.0000OK PN001 Node 2 3.3 0.688 0.096 0.5968

30 minute winter MH-0002 33 21.429 0.719 18.4 11.2502 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

30 minute winter MH-0003 33 21.801 0.601 26.3 16.1753 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

30 minute winter MH-0004 35 21.805 0.305 4.1 0.3452 0.0000SURCHARGED PN004 MH-0003 3.4 0.185 0.047 0.6301

30 minute winter MH-0005 34 22.427 0.627 31.2 23.2195 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

30 minute winter Node 3 18 20.672 0.122 16.5 0.1385 0.0000OK Swale 2 Node 2 16.6 0.662 0.337 1.0992

Page 99: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 60 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 60 minute summer. 300 minute analysis at 1 minute timestep. Mass balance: 99.84%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

60 minute summer Outlet 64 20.680 0.280 4.1 0.3166 0.0000OK Orifice 3.0 49.0

60 minute summer Node 2 65 20.680 0.194 15.9 10.2295 0.0000OK Swale 1 Outlet 4.1 0.330 0.102 3.6353

60 minute summer MH-0001 65 20.681 0.071 3.2 0.0807 0.0000OK PN001 Node 2 3.2 0.646 0.094 0.6759

60 minute summer MH-0002 62 21.417 0.707 15.1 10.6876 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

60 minute summer MH-0003 62 21.799 0.599 20.9 15.8655 0.0000OK Hydro-Brake® MH-0002 2.0

60 minute summer MH-0004 62 21.799 0.299 1.9 0.3379 0.0000SURCHARGED PN004 MH-0003 1.6 0.205 0.022 0.6301

60 minute summer MH-0005 63 22.429 0.629 25.0 23.5589 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

60 minute summer Node 3 66 20.680 0.130 13.2 0.1475 0.0000OK Swale 2 Node 2 13.2 0.513 0.269 1.2384

Page 100: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 60 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 60 minute winter. 300 minute analysis at 1 minute timestep. Mass balance: 99.74%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

60 minute winter Outlet 63 20.692 0.292 4.4 0.3301 0.0000OK Orifice 3.0 50.0

60 minute winter Node 2 65 20.692 0.206 13.2 11.3179 0.0000OK Swale 1 Outlet 4.4 0.338 0.109 3.7868

60 minute winter MH-0001 64 20.693 0.083 3.2 0.0941 0.0000OK PN001 Node 2 3.2 0.654 0.094 0.7362

60 minute winter MH-0002 61 21.454 0.744 12.6 12.4625 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

60 minute winter MH-0003 61 21.815 0.615 17.0 18.4875 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

60 minute winter MH-0004 61 21.815 0.315 1.8 0.3566 0.0000SURCHARGED PN004 MH-0003 1.7 0.196 0.024 0.6301

60 minute winter MH-0005 62 22.446 0.646 20.2 26.7972 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

60 minute winter Node 3 66 20.692 0.142 10.7 0.1610 0.0000OK Swale 2 Node 2 10.5 0.446 0.213 1.3492

Page 101: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 120 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 120 minute summer. 360 minute analysis at 2 minute timestep. Mass balance: 99.81%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

120 minute summer Outlet 124 20.704 0.304 3.4 0.3436 0.0000OK Orifice 3.1 59.7

120 minute summer Node 2 124 20.704 0.218 10.7 12.4583 0.0000OK Swale 1 Outlet 3.4 0.310 0.085 3.9051

120 minute summer MH-0001 124 20.705 0.095 3.2 0.1075 0.0000OK PN001 Node 2 3.2 0.595 0.094 0.7915

120 minute summer MH-0002 110 21.410 0.700 10.3 10.3556 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

120 minute summer MH-0003 120 21.799 0.599 13.3 15.8359 0.0000OK Hydro-Brake® MH-0002 2.0

120 minute summer MH-0004 120 21.804 0.304 1.3 0.3437 0.0000SURCHARGED PN004 MH-0003 1.7 0.205 0.023 0.6301

120 minute summer MH-0005 122 22.440 0.640 15.8 25.6908 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

120 minute summer Node 3 124 20.704 0.154 8.4 0.1744 0.0000OK Swale 2 Node 2 8.0 0.360 0.163 1.4581

Page 102: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 120 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 120 minute winter. 360 minute analysis at 2 minute timestep. Mass balance: 99.75%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

120 minute winter Outlet 122 20.718 0.318 3.6 0.3596 0.0000OK Orifice 3.2 60.9

120 minute winter Node 2 122 20.718 0.232 8.8 13.8588 0.0000OK Swale 1 Outlet 3.6 0.318 0.089 4.0193

120 minute winter MH-0001 122 20.719 0.109 3.2 0.1235 0.0000OK PN001 Node 2 3.2 0.576 0.094 0.8419

120 minute winter MH-0002 116 21.449 0.739 8.3 12.2308 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

120 minute winter MH-0003 118 21.818 0.618 10.7 19.0044 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

120 minute winter MH-0004 118 21.818 0.318 1.3 0.3601 0.0000SURCHARGED PN004 MH-0003 1.8 0.197 0.025 0.6301

120 minute winter MH-0005 120 22.461 0.661 12.1 29.5630 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

120 minute winter Node 3 122 20.718 0.168 6.4 0.1904 0.0000OK Swale 2 Node 2 6.1 0.321 0.124 1.5840

Page 103: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 180 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 180 minute summer. 420 minute analysis at 4 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

180 minute summer Outlet 184 20.713 0.313 3.2 0.3535 0.0000OK Orifice 3.1 69.3

180 minute summer Node 2 184 20.713 0.227 8.4 13.3131 0.0000OK Swale 1 Outlet 3.2 0.289 0.079 3.9762

180 minute summer MH-0001 184 20.714 0.104 3.2 0.1173 0.0000OK PN001 Node 2 3.2 0.511 0.094 0.8241

180 minute summer MH-0002 140 21.399 0.689 8.0 9.7952 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

180 minute summer MH-0003 148 21.794 0.594 10.6 15.0348 0.0000OK Hydro-Brake® MH-0002 2.0

180 minute summer MH-0004 160 21.798 0.298 1.2 0.3375 0.0000SURCHARGED PN004 MH-0003 1.7 0.188 0.023 0.6301

180 minute summer MH-0005 180 22.441 0.641 11.5 25.8897 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

180 minute summer Node 3 184 20.713 0.163 6.1 0.1843 0.0000OK Swale 2 Node 2 5.8 0.333 0.119 1.5362

Page 104: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 180 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 180 minute winter. 420 minute analysis at 4 minute timestep. Mass balance: 99.78%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

180 minute winter Outlet 180 20.729 0.329 3.2 0.3716 0.0000OK Orifice 3.2 70.9

180 minute winter Node 2 180 20.729 0.243 7.0 14.9419 0.0000OK Swale 1 Outlet 3.2 0.286 0.079 4.0991

180 minute winter MH-0001 180 20.730 0.120 3.2 0.1354 0.0000OK PN001 Node 2 3.2 0.543 0.094 0.8758

180 minute winter MH-0002 148 21.435 0.725 6.6 11.5620 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

180 minute winter MH-0003 172 21.813 0.613 7.9 18.2247 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

180 minute winter MH-0004 172 21.814 0.314 1.0 0.3546 0.0000SURCHARGED PN004 MH-0003 1.3 0.206 0.019 0.6301

180 minute winter MH-0005 180 22.464 0.664 8.9 30.1900 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

180 minute winter Node 3 180 20.729 0.179 4.7 0.2024 0.0000OK Swale 2 Node 2 4.5 0.290 0.091 1.6748

Page 105: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 240 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 240 minute summer. 480 minute analysis at 4 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute summer Outlet 240 20.714 0.314 3.2 0.3556 0.0000OK Orifice 3.1 78.4

240 minute summer Node 2 240 20.715 0.229 7.2 13.5026 0.0000OK Swale 1 Outlet 3.2 0.266 0.078 3.9914

240 minute summer MH-0001 240 20.716 0.106 3.2 0.1194 0.0000OK PN001 Node 2 3.2 0.517 0.094 0.8303

240 minute summer MH-0002 172 21.389 0.679 7.0 9.3286 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

240 minute summer MH-0003 180 21.789 0.589 8.3 14.2613 0.0000OK Hydro-Brake® MH-0002 2.0

240 minute summer MH-0004 180 21.789 0.289 1.3 0.3266 0.0000SURCHARGED PN004 MH-0003 1.5 0.230 0.021 0.6301

240 minute summer MH-0005 240 22.438 0.638 9.6 25.3304 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

240 minute summer Node 3 240 20.715 0.165 5.1 0.1865 0.0000OK Swale 2 Node 2 4.9 0.305 0.099 1.5531

Page 106: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 240 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 240 minute winter. 480 minute analysis at 4 minute timestep. Mass balance: 99.81%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute winter Outlet 236 20.733 0.333 3.3 0.3766 0.0000OK Orifice 3.2 80.7

240 minute winter Node 2 236 20.734 0.248 6.2 15.4135 0.0000OK Swale 1 Outlet 3.3 0.279 0.080 4.1314

240 minute winter MH-0001 236 20.734 0.124 3.2 0.1404 0.0000OK PN001 Node 2 3.2 0.477 0.094 0.8901

240 minute winter MH-0002 184 21.422 0.712 5.7 10.9205 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

240 minute winter MH-0003 196 21.806 0.606 6.5 17.0908 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

240 minute winter MH-0004 196 21.806 0.306 1.2 0.3466 0.0000SURCHARGED PN004 MH-0003 0.8 0.191 0.012 0.6301

240 minute winter MH-0005 236 22.464 0.664 7.1 30.1641 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

240 minute winter Node 3 236 20.733 0.183 3.8 0.2075 0.0000OK Swale 2 Node 2 3.6 0.266 0.074 1.7124

Page 107: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 360 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 360 minute summer. 600 minute analysis at 8 minute timestep. Mass balance: 99.97%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute summer Outlet 304 20.712 0.312 3.1 0.3525 0.0000OK Orifice 3.1 94.4

360 minute summer Node 2 304 20.712 0.226 6.2 13.2239 0.0000OK Swale 1 Outlet 3.1 0.246 0.077 3.9690

360 minute summer MH-0001 304 20.713 0.103 3.2 0.1162 0.0000OK PN001 Node 2 3.2 0.471 0.094 0.8210

360 minute summer MH-0002 240 21.370 0.660 5.7 8.4083 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

360 minute summer MH-0003 248 21.780 0.580 6.4 12.8713 0.0000OK Hydro-Brake® MH-0002 2.0

360 minute summer MH-0004 248 21.780 0.280 1.1 0.3167 0.0000SURCHARGED PN004 MH-0003 1.5 0.230 0.021 0.6301

360 minute summer MH-0005 296 22.430 0.630 7.2 23.9060 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

360 minute summer Node 3 304 20.712 0.162 3.8 0.1833 0.0000OK Swale 2 Node 2 3.6 0.159 0.074 1.5283

Page 108: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 360 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 360 minute winter. 600 minute analysis at 8 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute winter Outlet 328 20.731 0.331 3.2 0.3741 0.0000OK Orifice 3.2 98.6

360 minute winter Node 2 328 20.731 0.245 5.2 15.1789 0.0000OK Swale 1 Outlet 3.2 0.252 0.079 4.1156

360 minute winter MH-0001 328 20.732 0.122 3.2 0.1379 0.0000OK PN001 Node 2 3.2 0.451 0.094 0.8829

360 minute winter MH-0002 264 21.389 0.679 4.7 9.3202 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

360 minute winter MH-0003 272 21.795 0.595 5.0 15.2500 0.0000OK Hydro-Brake® MH-0002 2.0

360 minute winter MH-0004 272 21.795 0.295 0.8 0.3336 0.0000SURCHARGED PN004 MH-0003 1.4 0.230 0.019 0.6301

360 minute winter MH-0005 344 22.455 0.655 5.2 28.4086 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

360 minute winter Node 3 328 20.731 0.181 2.8 0.2050 0.0000OK Swale 2 Node 2 2.7 0.197 0.054 1.6940

Page 109: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 480 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 480 minute summer. 720 minute analysis at 8 minute timestep. Mass balance: 99.95%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute summer Outlet 360 20.709 0.309 3.1 0.3491 0.0000OK Orifice 3.1 107.9

480 minute summer Node 2 360 20.709 0.223 5.5 12.9277 0.0000OK Swale 1 Outlet 3.1 0.252 0.077 3.9447

480 minute summer MH-0001 360 20.710 0.100 3.2 0.1128 0.0000OK PN001 Node 2 3.2 0.450 0.094 0.8108

480 minute summer MH-0002 312 21.349 0.639 4.8 7.3746 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

480 minute summer MH-0003 312 21.772 0.572 5.2 11.5923 0.0000OK Hydro-Brake® MH-0002 2.0

480 minute summer MH-0004 312 21.772 0.272 0.8 0.3077 0.0000SURCHARGED PN004 MH-0003 1.5 0.230 0.021 0.6301

480 minute summer MH-0005 360 22.423 0.623 5.6 22.5961 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

480 minute summer Node 3 360 20.709 0.159 2.9 0.1799 0.0000OK Swale 2 Node 2 2.8 0.173 0.056 1.5016

Page 110: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 480 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 480 minute winter. 720 minute analysis at 8 minute timestep. Mass balance: 99.97%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute winter Outlet 368 20.729 0.329 3.2 0.3721 0.0000OK Orifice 3.2 114.8

480 minute winter Node 2 368 20.729 0.243 4.8 14.9907 0.0000OK Swale 1 Outlet 3.2 0.209 0.079 4.1026

480 minute winter MH-0001 368 20.730 0.120 3.2 0.1358 0.0000OK PN001 Node 2 3.2 0.372 0.094 0.8771

480 minute winter MH-0002 344 21.357 0.647 4.1 7.7840 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

480 minute winter MH-0003 344 21.784 0.584 4.1 13.5425 0.0000OK Hydro-Brake® MH-0002 2.0

480 minute winter MH-0004 344 21.784 0.284 0.8 0.3215 0.0000SURCHARGED PN004 MH-0003 1.4 0.230 0.020 0.6301

480 minute winter MH-0005 384 22.445 0.645 4.1 26.6133 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

480 minute winter Node 3 368 20.729 0.179 2.2 0.2030 0.0000OK Swale 2 Node 2 2.1 0.180 0.043 1.6789

Page 111: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 600 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 600 minute summer. 840 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute summer Outlet 435 20.707 0.307 3.1 0.3472 0.0000OK Orifice 3.1 117.0

600 minute summer Node 2 435 20.707 0.221 5.1 12.7623 0.0000OK Swale 1 Outlet 3.1 0.223 0.076 3.9309

600 minute summer MH-0001 435 20.708 0.098 3.2 0.1109 0.0000OK PN001 Node 2 3.2 0.366 0.094 0.8039

600 minute summer MH-0002 390 21.325 0.615 4.3 6.2169 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

600 minute summer MH-0003 390 21.766 0.566 4.4 10.6733 0.0000OK Hydro-Brake® MH-0002 2.0

600 minute summer MH-0004 390 21.766 0.266 0.8 0.3012 0.0000SURCHARGED PN004 MH-0003 1.3 0.230 0.019 0.6301

600 minute summer MH-0005 435 22.419 0.619 4.5 21.7960 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

600 minute summer Node 3 435 20.707 0.157 2.4 0.1780 0.0000OK Swale 2 Node 2 2.3 0.104 0.047 1.4864

Page 112: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 600 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 600 minute winter. 840 minute analysis at 15 minute timestep. Mass balance: 99.96%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute winter Outlet 435 20.725 0.325 3.2 0.3675 0.0000OK Orifice 3.2 126.6

600 minute winter Node 2 435 20.725 0.239 4.7 14.5671 0.0000OK Swale 1 Outlet 3.2 0.186 0.079 4.0723

600 minute winter MH-0001 435 20.726 0.116 3.2 0.1312 0.0000OK PN001 Node 2 3.2 0.365 0.094 0.8639

600 minute winter MH-0002 420 21.316 0.606 3.7 5.8113 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

600 minute winter MH-0003 420 21.772 0.572 3.5 11.5514 0.0000OK Hydro-Brake® MH-0002 2.0

600 minute winter MH-0004 420 21.772 0.272 0.8 0.3074 0.0000SURCHARGED PN004 MH-0003 1.5 0.230 0.021 0.6301

600 minute winter MH-0005 465 22.438 0.638 3.4 25.3956 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

600 minute winter Node 3 435 20.725 0.175 1.8 0.1984 0.0000OK Swale 2 Node 2 1.7 0.111 0.035 1.6442

Page 113: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 720 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 720 minute summer. 960 minute analysis at 15 minute timestep. Mass balance: 99.97%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute summer Outlet 480 20.706 0.306 3.1 0.3465 0.0000OK Orifice 3.1 124.9

720 minute summer Node 2 480 20.707 0.221 4.8 12.7079 0.0000OK Swale 1 Outlet 3.1 0.216 0.076 3.9263

720 minute summer MH-0001 480 20.707 0.097 3.2 0.1102 0.0000OK PN001 Node 2 3.2 0.373 0.094 0.8016

720 minute summer MH-0002 450 21.311 0.601 4.0 5.5590 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

720 minute summer MH-0003 450 21.759 0.559 4.0 9.5363 0.0000OK Hydro-Brake® MH-0002 2.0

720 minute summer MH-0004 450 21.759 0.259 0.8 0.2931 0.0000SURCHARGED PN004 MH-0003 1.3 0.230 0.018 0.6301

720 minute summer MH-0005 495 22.414 0.614 4.0 20.9481 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

720 minute summer Node 3 480 20.707 0.157 2.1 0.1774 0.0000OK Swale 2 Node 2 2.0 0.102 0.041 1.4814

Page 114: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 720 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 720 minute winter. 960 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute winter Outlet 555 20.739 0.339 3.3 0.3834 0.0000OK Orifice 3.3 136.5

720 minute winter Node 2 555 20.740 0.253 4.6 16.0510 0.0000OK Swale 1 Outlet 3.3 0.178 0.080 4.1729

720 minute winter MH-0001 540 20.740 0.130 3.2 0.1468 0.0000OK PN001 Node 2 3.2 0.366 0.093 0.9081

720 minute winter MH-0002 465 21.254 0.544 3.4 2.7990 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

720 minute winter MH-0003 495 21.763 0.563 3.2 10.2371 0.0000OK Hydro-Brake® MH-0002 2.0

720 minute winter MH-0004 495 21.764 0.264 0.8 0.2981 0.0000SURCHARGED PN004 MH-0003 1.3 0.230 0.018 0.6301

720 minute winter MH-0005 540 22.431 0.631 3.0 24.0140 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

720 minute winter Node 3 555 20.740 0.190 1.6 0.2144 0.0000OK Swale 2 Node 2 1.5 0.119 0.031 1.7616

Page 115: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 960 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 960 minute summer. 1200 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

960 minute summer Outlet 645 20.713 0.313 3.2 0.3539 0.0000OK Orifice 3.1 137.3

960 minute summer Node 2 645 20.713 0.227 4.7 13.3510 0.0000OK Swale 1 Outlet 3.2 0.170 0.077 3.9793

960 minute summer MH-0001 645 20.714 0.104 3.2 0.1179 0.0000OK PN001 Node 2 3.2 0.366 0.094 0.8259

960 minute summer MH-0002 570 21.250 0.540 3.6 2.5740 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

960 minute summer MH-0003 585 21.746 0.546 3.4 7.4519 0.0000OK Hydro-Brake® MH-0002 2.0

960 minute summer MH-0004 585 21.746 0.246 0.8 0.2783 0.0000SURCHARGED PN004 MH-0003 1.4 0.233 0.019 0.6301

960 minute summer MH-0005 630 22.402 0.602 3.2 18.7043 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

960 minute summer Node 3 645 20.713 0.163 1.7 0.1848 0.0000OK Swale 2 Node 2 1.6 0.102 0.033 1.5397

Page 116: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 960 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 960 minute winter. 1200 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

960 minute winter Outlet 630 20.727 0.327 3.2 0.3697 0.0000OK Orifice 3.2 149.0

960 minute winter Node 2 630 20.727 0.241 4.3 14.7716 0.0000OK Swale 1 Outlet 3.2 0.204 0.079 4.0869

960 minute winter MH-0001 630 20.728 0.118 3.1 0.1333 0.0000OK PN001 Node 2 3.1 0.366 0.090 0.8700

960 minute winter MH-0002 495 20.895 0.185 3.1 0.3263 0.0000OK Hydro-Brake® MH-0001 3.1

960 minute winter MH-0003 630 21.745 0.545 2.7 7.3243 0.0000OK Hydro-Brake® MH-0002 2.0

960 minute winter MH-0004 630 21.745 0.245 0.8 0.2774 0.0000SURCHARGED PN004 MH-0003 1.2 0.230 0.017 0.6301

960 minute winter MH-0005 690 22.416 0.616 2.4 21.2948 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

960 minute winter Node 3 630 20.727 0.177 1.3 0.2006 0.0000OK Swale 2 Node 2 1.2 0.144 0.025 1.6611

Page 117: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 1440 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 1440 minute summer. 1680 minute analysis at 30 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

1440 minute summer Outlet 870 20.696 0.296 3.0 0.3343 0.0000OK Orifice 3.0 150.0

1440 minute summer Node 2 870 20.696 0.210 4.2 11.6732 0.0000OK Swale 1 Outlet 3.0 0.161 0.075 3.8291

1440 minute summer MH-0001 870 20.697 0.087 3.1 0.0979 0.0000OK PN001 Node 2 3.1 0.355 0.091 0.7534

1440 minute summer MH-0002 720 20.882 0.172 3.1 0.3044 0.0000OK Hydro-Brake® MH-0001 3.1

1440 minute summer MH-0003 840 21.723 0.523 2.6 3.7915 0.0000OK Hydro-Brake® MH-0002 2.0

1440 minute summer MH-0004 840 21.723 0.223 0.8 0.2524 0.0000OK PN004 MH-0003 0.8 0.225 0.011 0.6297

1440 minute summer MH-0005 900 22.387 0.587 2.3 15.8108 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

1440 minute summer Node 3 870 20.696 0.146 1.2 0.1652 0.0000OK Swale 2 Node 2 1.1 0.103 0.023 1.3835

Page 118: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 10 year 1440 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 10 year 1440 minute winter. 1680 minute analysis at 30 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

1440 minute winter Outlet 930 20.702 0.302 3.1 0.3415 0.0000OK Orifice 3.1 168.7

1440 minute winter Node 2 930 20.702 0.216 3.7 12.2782 0.0000OK Swale 1 Outlet 3.1 0.163 0.076 3.8887

1440 minute winter MH-0001 900 20.703 0.093 2.9 0.1051 0.0000OK PN001 Node 2 2.9 0.369 0.085 0.7825

1440 minute winter MH-0002 720 20.831 0.121 2.9 0.2134 0.0000OK Hydro-Brake® MH-0001 2.9

1440 minute winter MH-0003 840 21.690 0.490 2.2 0.8651 0.0000OK Hydro-Brake® MH-0002 2.0

1440 minute winter MH-0004 840 21.690 0.190 0.8 0.2145 0.0000OK PN004 MH-0003 0.9 0.228 0.013 0.5981

1440 minute winter MH-0005 990 22.392 0.592 1.7 16.7565 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

1440 minute winter Node 3 930 20.702 0.152 0.9 0.1723 0.0000OK Swale 2 Node 2 0.9 0.099 0.018 1.4414

Page 119: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 15 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 15 minute summer. 255 minute analysis at 1 minute timestep. Mass balance: 98.91%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

15 minute summer Outlet 19 20.661 0.261 12.9 0.2948 0.0000OK Orifice 2.8 40.7

15 minute summer Node 2 58 20.651 0.165 28.4 7.7220 0.0000OK Swale 1 Outlet 12.9 0.445 0.316 3.2387

15 minute summer MH-0001 5 20.658 0.048 3.2 0.0548 0.0000OK PN001 Node 2 3.3 0.694 0.096 0.5219

15 minute summer MH-0002 19 21.415 0.705 28.6 10.5679 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

15 minute summer MH-0003 19 21.793 0.593 42.2 14.9838 0.0000OK Hydro-Brake® MH-0002 2.0

15 minute summer MH-0004 20 21.797 0.297 4.1 0.3359 0.0000SURCHARGED PN004 MH-0003 4.5 0.175 0.062 0.6301

15 minute summer MH-0005 19 22.418 0.618 50.2 21.6157 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

15 minute summer Node 3 11 20.703 0.153 26.7 0.1732 0.0000OK Swale 2 Node 2 25.8 0.942 0.524 0.9918

Page 120: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 15 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 15 minute winter. 255 minute analysis at 1 minute timestep. Mass balance: 99.62%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

15 minute winter Outlet 15 20.670 0.270 12.3 0.3056 0.0000OK Orifice 2.9 41.6

15 minute winter Node 2 55 20.662 0.176 29.9 8.6300 0.0000OK Swale 1 Outlet 12.3 0.452 0.301 3.3941

15 minute winter MH-0001 20 20.665 0.055 3.2 0.0620 0.0000OK PN001 Node 2 3.3 0.692 0.096 0.5830

15 minute winter MH-0002 19 21.443 0.733 30.0 11.9656 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

15 minute winter MH-0003 19 21.806 0.606 42.0 17.0642 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

15 minute winter MH-0004 18 21.810 0.310 8.3 0.3509 0.0000SURCHARGED PN004 MH-0003 -7.6 -0.192 -0.106 0.6301

15 minute winter MH-0005 19 22.428 0.628 52.8 23.4957 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

15 minute winter Node 3 11 20.707 0.157 28.0 0.1774 0.0000OK Swale 2 Node 2 27.2 0.919 0.553 1.0777

Page 121: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 30 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 30 minute summer. 270 minute analysis at 1 minute timestep. Mass balance: 99.67%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

30 minute summer Outlet 35 20.681 0.281 6.5 0.3176 0.0000OK Orifice 3.0 45.0

30 minute summer Node 2 42 20.680 0.194 26.1 10.2342 0.0000OK Swale 1 Outlet 6.5 0.364 0.160 3.6394

30 minute summer MH-0001 36 20.682 0.072 3.2 0.0809 0.0000OK PN001 Node 2 3.2 0.671 0.095 0.6768

30 minute summer MH-0002 33 21.466 0.756 25.3 12.9790 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

30 minute summer MH-0003 34 21.817 0.617 36.6 18.8285 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

30 minute summer MH-0004 34 21.818 0.318 3.1 0.3592 0.0000SURCHARGED PN004 MH-0003 -2.3 0.150 -0.033 0.6301

30 minute summer MH-0005 34 22.443 0.643 44.1 26.2315 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

30 minute summer Node 3 18 20.699 0.149 23.4 0.1682 0.0000OK Swale 2 Node 2 23.4 0.766 0.475 1.2411

Page 122: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 30 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 30 minute winter. 270 minute analysis at 1 minute timestep. Mass balance: 99.55%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

30 minute winter Outlet 33 20.696 0.296 7.4 0.3349 0.0000OK Orifice 3.0 46.0

30 minute winter Node 2 37 20.695 0.209 24.0 11.5759 0.0000OK Swale 1 Outlet 7.4 0.383 0.182 3.8196

30 minute winter MH-0001 35 20.696 0.086 3.2 0.0972 0.0000OK PN001 Node 2 3.4 0.681 0.100 0.7495

30 minute winter MH-0002 25 21.600 0.890 23.1 13.2476 1.3425FLOOD Hydro-Brake® MH-0001 3.2

30 minute winter MH-0003 33 21.834 0.634 32.2 21.5304 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

30 minute winter MH-0004 33 21.835 0.335 4.3 0.3784 0.0000SURCHARGED PN004 MH-0003 -3.6 0.163 -0.050 0.6301

30 minute winter MH-0005 34 22.464 0.664 39.9 30.2098 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

30 minute winter Node 3 37 20.695 0.145 21.2 0.1643 0.0000OK Swale 2 Node 2 21.2 0.705 0.431 1.3752

Page 123: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 60 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 60 minute summer. 300 minute analysis at 1 minute timestep. Mass balance: 99.76%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

60 minute summer Outlet 65 20.712 0.312 4.5 0.3531 0.0000OK Orifice 3.1 51.7

60 minute summer Node 2 65 20.713 0.227 19.7 13.2841 0.0000OK Swale 1 Outlet 4.5 0.340 0.109 3.9739

60 minute summer MH-0001 64 20.713 0.103 3.2 0.1170 0.0000OK PN001 Node 2 3.2 0.654 0.094 0.8233

60 minute summer MH-0002 45 21.600 0.890 18.9 13.2476 0.9963FLOOD Hydro-Brake® MH-0001 3.2

60 minute summer MH-0003 63 21.835 0.635 26.7 21.7165 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

60 minute summer MH-0004 63 21.835 0.335 1.9 0.3793 0.0000SURCHARGED PN004 MH-0003 1.3 0.192 0.019 0.6301

60 minute summer MH-0005 64 22.468 0.668 32.0 30.9904 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

60 minute summer Node 3 66 20.713 0.163 17.0 0.1846 0.0000OK Swale 2 Node 2 16.9 0.550 0.344 1.5359

Page 124: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 60 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 60 minute winter. 300 minute analysis at 1 minute timestep. Mass balance: 99.89%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

60 minute winter Outlet 64 20.727 0.327 4.7 0.3698 0.0000OK Orifice 3.2 52.6

60 minute winter Node 2 64 20.727 0.241 16.2 14.7694 0.0000OK Swale 1 Outlet 4.7 0.346 0.115 4.0868

60 minute winter MH-0001 64 20.728 0.118 3.2 0.1336 0.0000OK PN001 Node 2 3.2 0.668 0.095 0.8708

60 minute winter MH-0002 40 21.600 0.890 15.8 13.2476 3.3923FLOOD Hydro-Brake® MH-0001 3.2

60 minute winter MH-0003 62 21.856 0.656 21.4 25.0702 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

60 minute winter MH-0004 62 21.856 0.356 2.2 0.4030 0.0000SURCHARGED PN004 MH-0003 1.8 0.186 0.026 0.6301

60 minute winter MH-0005 63 22.493 0.693 25.9 35.4974 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

60 minute winter Node 3 65 20.728 0.178 13.8 0.2008 0.0000OK Swale 2 Node 2 13.4 0.478 0.273 1.6614

Page 125: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 120 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 120 minute summer. 360 minute analysis at 2 minute timestep. Mass balance: 99.79%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

120 minute summer Outlet 124 20.742 0.342 3.6 0.3869 0.0000OK Orifice 3.3 63.2

120 minute summer Node 2 124 20.743 0.257 12.8 16.3813 0.0000OK Swale 1 Outlet 3.6 0.307 0.089 4.1934

120 minute summer MH-0001 124 20.743 0.133 3.2 0.1507 0.0000OK PN001 Node 2 3.2 0.605 0.094 0.9191

120 minute summer MH-0002 82 21.600 0.890 12.6 13.2476 0.7647FLOOD Hydro-Brake® MH-0001 3.2

120 minute summer MH-0003 122 21.842 0.642 16.8 22.7558 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

120 minute summer MH-0004 122 21.842 0.342 0.8 0.3867 0.0000SURCHARGED PN004 MH-0003 1.3 0.203 0.019 0.6301

120 minute summer MH-0005 124 22.487 0.687 20.2 34.4666 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

120 minute summer Node 3 124 20.742 0.192 10.7 0.2177 0.0000OK Swale 2 Node 2 10.2 0.374 0.208 1.7856

Page 126: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 120 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 120 minute winter. 360 minute analysis at 2 minute timestep. Mass balance: 99.81%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

120 minute winter Outlet 122 20.759 0.359 4.0 0.4058 0.0000OK Orifice 3.4 64.3

120 minute winter Node 2 122 20.759 0.273 10.5 18.2430 0.0000OK Swale 1 Outlet 4.0 0.320 0.097 4.2936

120 minute winter MH-0001 122 20.760 0.150 3.2 0.1698 0.0000OK PN001 Node 2 3.2 0.602 0.094 0.9715

120 minute winter MH-0002 76 21.600 0.890 10.3 13.2476 3.5019FLOOD Hydro-Brake® MH-0001 3.2

120 minute winter MH-0003 120 21.867 0.667 13.1 26.7605 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

120 minute winter MH-0004 120 21.867 0.367 1.0 0.4150 0.0000SURCHARGED PN004 MH-0003 1.1 0.193 0.016 0.6301

120 minute winter MH-0005 122 22.514 0.714 15.6 39.4767 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

120 minute winter Node 3 122 20.759 0.209 8.3 0.2366 0.0000OK Swale 2 Node 2 7.9 0.341 0.161 1.9121

Page 127: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 180 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 180 minute summer. 420 minute analysis at 4 minute timestep. Mass balance: 99.78%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

180 minute summer Outlet 184 20.752 0.352 3.4 0.3984 0.0000OK Orifice 3.3 73.6

180 minute summer Node 2 184 20.753 0.267 9.9 17.5084 0.0000OK Swale 1 Outlet 3.4 0.306 0.084 4.2571

180 minute summer MH-0001 184 20.754 0.144 3.2 0.1624 0.0000OK PN001 Node 2 3.2 0.546 0.094 0.9513

180 minute summer MH-0002 128 21.600 0.890 9.7 13.2476 0.1451FLOOD Hydro-Brake® MH-0001 3.2

180 minute summer MH-0003 172 21.836 0.636 13.1 21.7745 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

180 minute summer MH-0004 172 21.836 0.336 1.0 0.3797 0.0000SURCHARGED PN004 MH-0003 1.4 0.160 0.020 0.6301

180 minute summer MH-0005 184 22.492 0.692 14.8 35.3584 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

180 minute summer Node 3 184 20.753 0.203 7.8 0.2294 0.0000OK Swale 2 Node 2 7.4 0.334 0.151 1.8651

Page 128: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 180 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 180 minute winter. 420 minute analysis at 4 minute timestep. Mass balance: 99.79%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

180 minute winter Outlet 180 20.773 0.373 3.5 0.4218 0.0000OK Orifice 3.5 75.2

180 minute winter Node 2 180 20.774 0.288 8.3 19.8837 0.0000OK Swale 1 Outlet 3.5 0.286 0.085 4.3582

180 minute winter MH-0001 180 20.774 0.164 3.2 0.1859 0.0000OK PN001 Node 2 3.2 0.557 0.094 1.0135

180 minute winter MH-0002 116 21.600 0.890 8.0 13.2476 2.4340FLOOD Hydro-Brake® MH-0001 3.2

180 minute winter MH-0003 176 21.864 0.664 9.8 26.3339 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

180 minute winter MH-0004 176 21.864 0.364 0.8 0.4120 0.0000SURCHARGED PN004 MH-0003 1.0 0.204 0.014 0.6301

180 minute winter MH-0005 180 22.521 0.721 11.4 40.7879 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

180 minute winter Node 3 180 20.774 0.223 6.0 0.2528 0.0000OK Swale 2 Node 2 5.7 0.309 0.116 2.0064

Page 129: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 240 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 240 minute summer. 480 minute analysis at 4 minute timestep. Mass balance: 99.80%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute summer Outlet 240 20.754 0.354 3.4 0.4005 0.0000OK Orifice 3.4 83.6

240 minute summer Node 2 240 20.755 0.269 8.7 17.7144 0.0000OK Swale 1 Outlet 3.4 0.289 0.082 4.2678

240 minute summer MH-0001 240 20.755 0.145 3.2 0.1645 0.0000OK PN001 Node 2 3.2 0.511 0.094 0.9570

240 minute summer MH-0002 176 21.535 0.825 8.4 13.1322 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

240 minute summer MH-0003 200 21.831 0.631 10.5 20.9455 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

240 minute summer MH-0004 200 21.831 0.331 0.8 0.3739 0.0000SURCHARGED PN004 MH-0003 0.9 0.188 0.012 0.6301

240 minute summer MH-0005 240 22.491 0.691 12.3 35.2230 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

240 minute summer Node 3 240 20.755 0.205 6.5 0.2315 0.0000OK Swale 2 Node 2 6.2 0.333 0.126 1.8792

Page 130: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 240 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 240 minute winter. 480 minute analysis at 4 minute timestep. Mass balance: 99.79%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute winter Outlet 232 20.778 0.378 3.5 0.4280 0.0000OK Orifice 3.5 85.9

240 minute winter Node 2 232 20.779 0.293 7.2 20.5267 0.0000OK Swale 1 Outlet 3.5 0.301 0.085 4.3754

240 minute winter MH-0001 232 20.780 0.170 3.2 0.1921 0.0000OK PN001 Node 2 3.2 0.507 0.094 1.0289

240 minute winter MH-0002 152 21.600 0.890 6.8 13.2476 2.1345FLOOD Hydro-Brake® MH-0001 3.2

240 minute winter MH-0003 228 21.857 0.657 8.5 25.1587 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

240 minute winter MH-0004 228 21.857 0.357 0.9 0.4037 0.0000SURCHARGED PN004 MH-0003 1.5 0.193 0.021 0.6301

240 minute winter MH-0005 236 22.523 0.723 9.1 41.0809 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

240 minute winter Node 3 232 20.779 0.229 4.8 0.2591 0.0000OK Swale 2 Node 2 4.6 0.291 0.093 2.0380

Page 131: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 360 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 360 minute summer. 600 minute analysis at 8 minute timestep. Mass balance: 99.83%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute summer Outlet 304 20.751 0.351 3.3 0.3967 0.0000OK Orifice 3.3 102.0

360 minute summer Node 2 304 20.751 0.265 7.1 17.3330 0.0000OK Swale 1 Outlet 3.3 0.235 0.082 4.2478

360 minute summer MH-0001 304 20.752 0.142 3.2 0.1606 0.0000OK PN001 Node 2 3.2 0.482 0.094 0.9464

360 minute summer MH-0002 256 21.449 0.739 6.7 12.2497 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

360 minute summer MH-0003 264 21.819 0.619 8.0 19.1454 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

360 minute summer MH-0004 264 21.819 0.319 0.8 0.3611 0.0000SURCHARGED PN004 MH-0003 1.1 0.145 0.016 0.6301

360 minute summer MH-0005 336 22.482 0.682 9.1 33.5204 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

360 minute summer Node 3 304 20.751 0.201 4.8 0.2276 0.0000OK Swale 2 Node 2 4.6 0.161 0.093 1.8534

Page 132: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 360 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 360 minute winter. 600 minute analysis at 8 minute timestep. Mass balance: 99.82%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute winter Outlet 296 20.776 0.376 3.5 0.4253 0.0000OK Orifice 3.5 105.4

360 minute winter Node 2 296 20.777 0.291 6.0 20.2426 0.0000OK Swale 1 Outlet 3.5 0.276 0.085 4.3692

360 minute winter MH-0001 296 20.777 0.167 3.2 0.1893 0.0000OK PN001 Node 2 3.2 0.483 0.094 1.0221

360 minute winter MH-0002 240 21.600 0.890 5.4 13.2476 0.5970FLOOD Hydro-Brake® MH-0001 3.2

360 minute winter MH-0003 288 21.842 0.642 6.1 22.8316 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

360 minute winter MH-0004 288 21.842 0.342 0.9 0.3872 0.0000SURCHARGED PN004 MH-0003 0.9 0.165 0.012 0.6301

360 minute winter MH-0005 352 22.518 0.718 6.6 40.1991 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

360 minute winter Node 3 296 20.777 0.227 3.5 0.2564 0.0000OK Swale 2 Node 2 3.4 0.215 0.068 2.0251

Page 133: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 480 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 480 minute summer. 720 minute analysis at 8 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute summer Outlet 360 20.746 0.346 3.3 0.3912 0.0000OK Orifice 3.3 119.1

480 minute summer Node 2 360 20.746 0.260 6.1 16.7979 0.0000OK Swale 1 Outlet 3.3 0.246 0.081 4.2178

480 minute summer MH-0001 360 20.747 0.137 3.2 0.1550 0.0000OK PN001 Node 2 3.2 0.471 0.094 0.9311

480 minute summer MH-0002 320 21.424 0.714 5.6 11.0365 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

480 minute summer MH-0003 328 21.812 0.612 6.4 17.9201 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

480 minute summer MH-0004 328 21.812 0.312 0.8 0.3525 0.0000SURCHARGED PN004 MH-0003 1.4 0.221 0.020 0.6301

480 minute summer MH-0005 392 22.474 0.674 7.0 31.9644 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

480 minute summer Node 3 360 20.746 0.196 3.7 0.2221 0.0000OK Swale 2 Node 2 3.5 0.159 0.072 1.8160

Page 134: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 480 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 480 minute winter. 720 minute analysis at 8 minute timestep. Mass balance: 99.86%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute winter Outlet 368 20.768 0.368 3.4 0.4161 0.0000OK Orifice 3.4 123.7

480 minute winter Node 2 368 20.769 0.283 5.3 19.2926 0.0000OK Swale 1 Outlet 3.4 0.217 0.084 4.3382

480 minute winter MH-0001 368 20.769 0.159 3.2 0.1802 0.0000OK PN001 Node 2 3.2 0.395 0.094 0.9988

480 minute winter MH-0002 344 21.456 0.746 4.7 12.5869 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

480 minute winter MH-0003 360 21.831 0.631 5.0 21.0024 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

480 minute winter MH-0004 360 21.831 0.331 0.9 0.3743 0.0000SURCHARGED PN004 MH-0003 0.9 0.162 0.012 0.6301

480 minute winter MH-0005 456 22.506 0.706 5.2 37.9871 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

480 minute winter Node 3 368 20.769 0.219 2.8 0.2472 0.0000OK Swale 2 Node 2 2.7 0.180 0.055 1.9754

Page 135: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 600 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 600 minute summer. 840 minute analysis at 15 minute timestep. Mass balance: 99.98%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute summer Outlet 435 20.742 0.342 3.3 0.3868 0.0000OK Orifice 3.3 133.4

600 minute summer Node 2 435 20.743 0.257 5.4 16.3782 0.0000OK Swale 1 Outlet 3.3 0.257 0.081 4.1932

600 minute summer MH-0001 435 20.743 0.133 3.2 0.1506 0.0000OK PN001 Node 2 3.2 0.362 0.094 0.9189

600 minute summer MH-0002 390 21.403 0.693 4.9 9.9945 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

600 minute summer MH-0003 405 21.803 0.603 5.3 16.5199 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

600 minute summer MH-0004 405 21.803 0.303 0.8 0.3425 0.0000SURCHARGED PN004 MH-0003 1.4 0.230 0.019 0.6301

600 minute summer MH-0005 465 22.467 0.667 5.7 30.7833 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

600 minute summer Node 3 435 20.743 0.193 3.0 0.2178 0.0000OK Swale 2 Node 2 2.9 0.103 0.058 1.7859

Page 136: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 600 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 600 minute winter. 840 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute winter Outlet 450 20.764 0.364 3.4 0.4122 0.0000OK Orifice 3.4 140.5

600 minute winter Node 2 450 20.765 0.279 4.8 18.8864 0.0000OK Swale 1 Outlet 3.4 0.203 0.084 4.3220

600 minute winter MH-0001 450 20.766 0.156 3.2 0.1761 0.0000OK PN001 Node 2 3.2 0.376 0.093 0.9883

600 minute winter MH-0002 435 21.428 0.718 4.2 11.1985 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

600 minute winter MH-0003 435 21.818 0.618 4.3 18.9967 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

600 minute winter MH-0004 435 21.818 0.318 0.9 0.3601 0.0000SURCHARGED PN004 MH-0003 1.3 0.149 0.018 0.6301

600 minute winter MH-0005 495 22.495 0.695 4.3 35.9464 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

600 minute winter Node 3 450 20.765 0.215 2.3 0.2432 0.0000OK Swale 2 Node 2 2.2 0.123 0.045 1.9520

Page 137: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 720 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 720 minute summer. 960 minute analysis at 15 minute timestep. Mass balance: 99.97%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute summer Outlet 495 20.738 0.338 3.3 0.3825 0.0000OK Orifice 3.3 146.3

720 minute summer Node 2 495 20.739 0.253 5.2 15.9667 0.0000OK Swale 1 Outlet 3.3 0.230 0.080 4.1676

720 minute summer MH-0001 495 20.739 0.129 3.2 0.1463 0.0000OK PN001 Node 2 3.2 0.362 0.094 0.9067

720 minute summer MH-0002 465 21.383 0.673 4.6 9.0325 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

720 minute summer MH-0003 465 21.795 0.595 4.8 15.2134 0.0000OK Hydro-Brake® MH-0002 2.0

720 minute summer MH-0004 465 21.795 0.295 0.8 0.3333 0.0000SURCHARGED PN004 MH-0003 1.4 0.230 0.019 0.6301

720 minute summer MH-0005 525 22.459 0.659 5.0 29.2045 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

720 minute summer Node 3 495 20.739 0.189 2.7 0.2134 0.0000OK Swale 2 Node 2 2.6 0.103 0.053 1.7551

Page 138: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 720 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 720 minute winter. 960 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute winter Outlet 510 20.758 0.358 3.4 0.4053 0.0000OK Orifice 3.4 156.0

720 minute winter Node 2 510 20.759 0.273 4.7 18.1967 0.0000OK Swale 1 Outlet 3.4 0.186 0.083 4.2914

720 minute winter MH-0001 510 20.760 0.150 3.2 0.1693 0.0000OK PN001 Node 2 3.2 0.359 0.094 0.9700

720 minute winter MH-0002 510 21.390 0.680 3.9 9.3941 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

720 minute winter MH-0003 510 21.807 0.607 3.8 17.2002 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

720 minute winter MH-0004 510 21.807 0.307 0.8 0.3474 0.0000SURCHARGED PN004 MH-0003 1.4 0.230 0.020 0.6301

720 minute winter MH-0005 570 22.487 0.687 3.8 34.4886 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

720 minute winter Node 3 510 20.759 0.209 2.0 0.2364 0.0000OK Swale 2 Node 2 1.9 0.111 0.039 1.9101

Page 139: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 960 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 960 minute summer. 1200 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

960 minute summer Outlet 615 20.730 0.330 3.2 0.3737 0.0000OK Orifice 3.2 162.2

960 minute summer Node 2 615 20.731 0.245 4.8 15.1429 0.0000OK Swale 1 Outlet 3.2 0.216 0.079 4.1131

960 minute summer MH-0001 615 20.732 0.122 3.2 0.1375 0.0000OK PN001 Node 2 3.2 0.362 0.094 0.8817

960 minute summer MH-0002 600 21.337 0.627 4.0 6.7988 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

960 minute summer MH-0003 600 21.778 0.578 4.0 12.5475 0.0000OK Hydro-Brake® MH-0002 2.0

960 minute summer MH-0004 600 21.778 0.278 0.8 0.3144 0.0000SURCHARGED PN004 MH-0003 1.2 0.230 0.017 0.6301

960 minute summer MH-0005 660 22.450 0.650 4.0 27.4806 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

960 minute summer Node 3 615 20.731 0.181 2.1 0.2046 0.0000OK Swale 2 Node 2 2.0 0.103 0.041 1.6911

Page 140: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 960 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 960 minute winter. 1200 minute analysis at 15 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

960 minute winter Outlet 720 20.771 0.371 3.4 0.4200 0.0000OK Orifice 3.4 179.0

960 minute winter Node 2 720 20.772 0.286 4.6 19.6918 0.0000OK Swale 1 Outlet 3.4 0.197 0.084 4.3521

960 minute winter MH-0001 720 20.772 0.162 3.2 0.1836 0.0000OK PN001 Node 2 3.1 0.365 0.092 1.0076

960 minute winter MH-0002 600 21.270 0.560 3.4 3.5784 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

960 minute winter MH-0003 660 21.788 0.588 3.2 14.1289 0.0000OK Hydro-Brake® MH-0002 2.0

960 minute winter MH-0004 660 21.788 0.288 0.8 0.3256 0.0000SURCHARGED PN004 MH-0003 1.4 0.230 0.019 0.6301

960 minute winter MH-0005 720 22.472 0.672 3.0 31.7231 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

960 minute winter Node 3 720 20.772 0.222 1.6 0.2511 0.0000OK Swale 2 Node 2 1.5 0.106 0.031 1.9970

Page 141: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 1440 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 1440 minute summer. 1680 minute analysis at 30 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

1440 minute summer Outlet 870 20.741 0.341 3.3 0.3862 0.0000OK Orifice 3.3 187.3

1440 minute summer Node 2 870 20.742 0.256 4.5 16.3175 0.0000OK Swale 1 Outlet 3.3 0.165 0.081 4.1894

1440 minute summer MH-0001 870 20.743 0.133 3.2 0.1502 0.0000OK PN001 Node 2 3.2 0.364 0.093 0.9177

1440 minute summer MH-0002 810 21.229 0.519 3.3 1.5573 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

1440 minute summer MH-0003 870 21.758 0.558 3.1 9.3122 0.0000OK Hydro-Brake® MH-0002 2.0

1440 minute summer MH-0004 870 21.758 0.258 0.8 0.2915 0.0000SURCHARGED PN004 MH-0003 1.3 0.229 0.018 0.6301

1440 minute summer MH-0005 930 22.430 0.630 2.9 23.9051 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

1440 minute summer Node 3 870 20.742 0.192 1.5 0.2171 0.0000OK Swale 2 Node 2 1.4 0.100 0.029 1.7814

Page 142: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 30 year 1440 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 30 year 1440 minute winter. 1680 minute analysis at 30 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

1440 minute winter Outlet 930 20.740 0.340 3.3 0.3844 0.0000OK Orifice 3.3 204.8

1440 minute winter Node 2 930 20.740 0.254 4.0 16.1412 0.0000OK Swale 1 Outlet 3.3 0.193 0.081 4.1785

1440 minute winter MH-0001 930 20.741 0.131 3.0 0.1480 0.0000OK PN001 Node 2 2.9 0.355 0.086 0.9115

1440 minute winter MH-0002 690 20.847 0.137 3.0 0.2414 0.0000OK Hydro-Brake® MH-0001 3.0

1440 minute winter MH-0003 930 21.744 0.544 2.5 7.1651 0.0000OK Hydro-Brake® MH-0002 2.0

1440 minute winter MH-0004 930 21.744 0.244 0.8 0.2763 0.0000SURCHARGED PN004 MH-0003 1.2 0.229 0.017 0.6301

1440 minute winter MH-0005 1020 22.440 0.640 2.1 25.7494 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

1440 minute winter Node 3 930 20.740 0.190 1.1 0.2153 0.0000OK Swale 2 Node 2 1.1 0.102 0.022 1.7683

Page 143: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 15 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 15 minute summer. 255 minute analysis at 1 minute timestep. Mass balance: 99.25%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

15 minute summer Outlet 18 20.687 0.287 14.1 0.3245 0.0000OK Orifice 3.0 43.0

15 minute summer Node 2 22 20.680 0.194 36.1 10.1624 0.0000OK Swale 1 Outlet 14.1 0.459 0.346 3.6472

15 minute summer MH-0001 19 20.683 0.073 3.2 0.0830 0.0000OK PN001 Node 2 3.7 0.672 0.109 0.6798

15 minute summer MH-0002 16 21.600 0.890 36.6 13.2476 0.8614FLOOD Hydro-Brake® MH-0001 3.2

15 minute summer MH-0003 19 21.825 0.625 53.3 20.1012 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

15 minute summer MH-0004 20 21.827 0.327 8.2 0.3694 0.0000SURCHARGED PN004 MH-0003 -7.5 -0.255 -0.105 0.6301

15 minute summer MH-0005 20 22.454 0.654 65.3 28.2809 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

15 minute summer Node 3 11 20.728 0.178 34.7 0.2010 0.0000OK Swale 2 Node 2 33.4 1.032 0.680 1.2390

Page 144: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 15 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 15 minute winter. 255 minute analysis at 1 minute timestep. Mass balance: 99.76%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

15 minute winter Outlet 17 20.709 0.309 14.8 0.3498 0.0000OK Orifice 3.1 43.9

15 minute winter Node 2 21 20.693 0.207 37.9 11.4128 0.0000OK Swale 1 Outlet 14.8 0.453 0.364 3.8065

15 minute winter MH-0001 21 20.696 0.086 3.2 0.0977 0.0000OK PN001 Node 2 4.0 0.667 0.118 0.7480

15 minute winter MH-0002 14 21.600 0.890 38.4 13.2476 3.0868FLOOD Hydro-Brake® MH-0001 3.2

15 minute winter MH-0003 19 21.842 0.642 54.6 22.8076 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

15 minute winter MH-0004 19 21.843 0.343 8.4 0.3878 0.0000SURCHARGED PN004 MH-0003 -7.7 -0.226 -0.107 0.6301

15 minute winter MH-0005 20 22.467 0.667 68.6 30.7902 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

15 minute winter Node 3 11 20.733 0.183 36.4 0.2067 0.0000OK Swale 2 Node 2 35.2 1.012 0.716 1.3723

Page 145: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 30 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 30 minute summer. 270 minute analysis at 1 minute timestep. Mass balance: 99.84%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

30 minute summer Outlet 35 20.716 0.316 7.2 0.3575 0.0000OK Orifice 3.2 47.5

30 minute summer Node 2 35 20.717 0.231 33.3 13.6668 0.0000OK Swale 1 Outlet 7.2 0.394 0.176 4.0045

30 minute summer MH-0001 34 20.718 0.108 3.2 0.1218 0.0000OK PN001 Node 2 3.4 0.698 0.099 0.8372

30 minute summer MH-0002 21 21.600 0.890 32.5 13.2476 3.8743FLOOD Hydro-Brake® MH-0001 3.2

30 minute summer MH-0003 34 21.860 0.660 47.0 25.6055 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

30 minute summer MH-0004 34 21.860 0.360 2.8 0.4070 0.0000SURCHARGED PN004 MH-0003 2.4 0.122 0.034 0.6301

30 minute summer MH-0005 34 22.489 0.689 57.7 34.8325 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

30 minute summer Node 3 18 20.724 0.174 30.6 0.1969 0.0000OK Swale 2 Node 2 30.5 0.821 0.619 1.5755

Page 146: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 30 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 30 minute winter. 270 minute analysis at 1 minute timestep. Mass balance: 99.86%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

30 minute winter Outlet 34 20.734 0.334 7.9 0.3776 0.0000OK Orifice 3.3 48.6

30 minute winter Node 2 35 20.734 0.248 30.5 15.4143 0.0000OK Swale 1 Outlet 7.9 0.380 0.195 4.1315

30 minute winter MH-0001 34 20.735 0.125 3.2 0.1410 0.0000OK PN001 Node 2 3.5 0.688 0.104 0.8917

30 minute winter MH-0002 20 21.600 0.890 29.7 13.2476 6.6244FLOOD Hydro-Brake® MH-0001 3.2

30 minute winter MH-0003 33 21.882 0.682 42.1 29.1065 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

30 minute winter MH-0004 33 21.882 0.382 5.0 0.4319 0.0000SURCHARGED PN004 MH-0003 -4.3 0.138 -0.060 0.6301

30 minute winter MH-0005 34 22.513 0.713 52.2 39.2827 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

30 minute winter Node 3 36 20.734 0.184 27.7 0.2083 0.0000OK Swale 2 Node 2 27.7 0.755 0.562 1.7148

Page 147: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 60 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 60 minute summer. 300 minute analysis at 1 minute timestep. Mass balance: 99.84%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

60 minute summer Outlet 64 20.753 0.353 4.7 0.3988 0.0000OK Orifice 3.3 54.5

60 minute summer Node 2 64 20.753 0.267 24.7 17.5369 0.0000OK Swale 1 Outlet 4.7 0.362 0.115 4.2585

60 minute summer MH-0001 63 20.754 0.144 3.2 0.1627 0.0000OK PN001 Node 2 3.2 0.680 0.095 0.9522

60 minute summer MH-0002 36 21.600 0.890 24.4 13.2476 7.2603FLOOD Hydro-Brake® MH-0001 3.2

60 minute summer MH-0003 63 21.888 0.688 34.5 30.0695 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

60 minute summer MH-0004 63 21.888 0.388 2.4 0.4385 0.0000SURCHARGED PN004 MH-0003 2.3 0.174 0.032 0.6301

60 minute summer MH-0005 64 22.526 0.726 42.1 41.6273 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

60 minute summer Node 3 65 20.753 0.203 22.4 0.2297 0.0000OK Swale 2 Node 2 22.2 0.592 0.451 1.8671

Page 148: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 60 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 60 minute winter. 300 minute analysis at 1 minute timestep. Mass balance: 99.83%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

60 minute winter Outlet 63 20.771 0.371 5.1 0.4201 0.0000OK Orifice 3.4 55.7

60 minute winter Node 2 63 20.772 0.286 20.2 19.7018 0.0000OK Swale 1 Outlet 5.1 0.363 0.124 4.3524

60 minute winter MH-0001 62 20.773 0.163 3.2 0.1842 0.0000OK PN001 Node 2 3.3 0.676 0.096 1.0092

60 minute winter MH-0002 35 21.600 0.890 20.1 13.2476 10.2360FLOOD Hydro-Brake® MH-0001 3.2

60 minute winter MH-0003 62 21.915 0.715 28.2 34.4246 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

60 minute winter MH-0004 62 21.915 0.415 2.8 0.4693 0.0000SURCHARGED PN004 MH-0003 -2.1 0.183 -0.029 0.6301

60 minute winter MH-0005 63 22.558 0.758 34.1 47.6209 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

60 minute winter Node 3 64 20.772 0.222 18.1 0.2510 0.0000OK Swale 2 Node 2 17.6 0.510 0.358 1.9966

Page 149: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 120 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 120 minute summer. 360 minute analysis at 2 minute timestep. Mass balance: 99.81%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

120 minute summer Outlet 124 20.786 0.386 3.8 0.4361 0.0000OK Orifice 3.5 66.7

120 minute summer Node 2 124 20.786 0.300 15.9 21.3960 0.0000FLOOD RISK Swale 1 Outlet 3.8 0.326 0.094 4.3870

120 minute summer MH-0001 124 20.787 0.177 3.2 0.2003 0.0000OK PN001 Node 2 3.2 0.634 0.094 1.0486

120 minute summer MH-0002 68 21.600 0.890 16.1 13.2476 7.0721FLOOD Hydro-Brake® MH-0001 3.2

120 minute summer MH-0003 122 21.903 0.703 21.9 32.5140 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

120 minute summer MH-0004 122 21.903 0.403 1.0 0.4558 0.0000SURCHARGED PN004 MH-0003 1.1 0.204 0.015 0.6301

120 minute summer MH-0005 124 22.554 0.754 26.6 47.0053 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

120 minute summer Node 3 124 20.786 0.236 14.1 0.2669 0.0000OK Swale 2 Node 2 13.5 0.394 0.274 2.0717

Page 150: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 120 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 120 minute winter. 360 minute analysis at 2 minute timestep. Mass balance: 99.87%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

120 minute winter Outlet 108 20.800 0.400 5.4 0.4524 0.8687FLOOD Orifice 3.6 67.7

120 minute winter Node 2 112 20.802 0.316 13.0 23.2868 0.0000FLOOD RISK Swale 1 Outlet 5.4 0.337 0.131 4.3885

120 minute winter MH-0001 112 20.803 0.193 3.2 0.2181 0.0000OK PN001 Node 2 3.2 0.628 0.094 1.0874

120 minute winter MH-0002 66 21.600 0.890 12.9 13.2476 10.7537FLOOD Hydro-Brake® MH-0001 3.2

120 minute winter MH-0003 120 21.937 0.737 17.0 37.9045 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

120 minute winter MH-0004 120 21.937 0.437 1.5 0.4939 0.0000SURCHARGED PN004 MH-0003 1.3 0.176 0.018 0.6301

120 minute winter MH-0005 122 22.590 0.790 20.5 53.6172 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

120 minute winter Node 3 110 20.802 0.252 10.9 0.2850 0.0000OK Swale 2 Node 2 10.4 0.368 0.211 2.1318

Page 151: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 180 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 180 minute summer. 420 minute analysis at 4 minute timestep. Mass balance: 99.81%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

180 minute summer Outlet 172 20.800 0.400 4.2 0.4524 0.2549FLOOD Orifice 3.6 78.1

180 minute summer Node 2 176 20.801 0.315 12.4 23.1822 0.0000FLOOD RISK Swale 1 Outlet 4.2 0.298 0.103 4.3885

180 minute summer MH-0001 176 20.802 0.192 3.2 0.2171 0.0000OK PN001 Node 2 3.2 0.600 0.094 1.0853

180 minute summer MH-0002 104 21.600 0.890 12.3 13.2476 7.4526FLOOD Hydro-Brake® MH-0001 3.2

180 minute summer MH-0003 180 21.902 0.702 16.1 32.3948 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

180 minute summer MH-0004 180 21.902 0.402 0.8 0.4549 0.0000SURCHARGED PN004 MH-0003 1.0 0.138 0.013 0.6301

180 minute summer MH-0005 184 22.565 0.765 19.4 48.8914 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

180 minute summer Node 3 176 20.801 0.251 10.3 0.2840 0.0000OK Swale 2 Node 2 9.8 0.332 0.200 2.1286

Page 152: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 180 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 180 minute winter. 420 minute analysis at 4 minute timestep. Mass balance: 99.83%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

180 minute winter Outlet 128 20.800 0.400 6.3 0.4524 3.4081FLOOD Orifice 3.6 78.3

180 minute winter Node 2 132 20.803 0.317 10.2 23.4042 0.0000FLOOD RISK Swale 1 Outlet 6.3 0.309 0.155 4.3885

180 minute winter MH-0001 132 20.804 0.194 3.2 0.2192 0.0000OK PN001 Node 2 3.2 0.562 0.094 1.0896

180 minute winter MH-0002 100 21.600 0.890 9.9 13.2476 10.0230FLOOD Hydro-Brake® MH-0001 3.2

180 minute winter MH-0003 180 21.939 0.739 12.6 38.2110 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

180 minute winter MH-0004 180 21.939 0.439 0.8 0.4961 0.0000SURCHARGED PN004 MH-0003 1.0 0.202 0.014 0.6301

180 minute winter MH-0005 180 22.603 0.803 14.9 56.0289 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

180 minute winter Node 3 132 20.803 0.253 7.9 0.2861 0.0000OK Swale 2 Node 2 7.6 0.342 0.154 2.1351

Page 153: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 240 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 240 minute summer. 480 minute analysis at 4 minute timestep. Mass balance: 99.81%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute summer Outlet 188 20.800 0.400 4.2 0.4524 0.9142FLOOD Orifice 3.6 88.9

240 minute summer Node 2 188 20.801 0.315 10.7 23.2079 0.0000FLOOD RISK Swale 1 Outlet 4.2 0.310 0.104 4.3885

240 minute summer MH-0001 188 20.802 0.192 3.2 0.2174 0.0000OK PN001 Node 2 3.2 0.547 0.094 1.0858

240 minute summer MH-0002 136 21.600 0.890 10.5 13.2476 5.2414FLOOD Hydro-Brake® MH-0001 3.2

240 minute summer MH-0003 236 21.894 0.694 13.5 31.1033 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

240 minute summer MH-0004 236 21.894 0.394 0.9 0.4458 0.0000SURCHARGED PN004 MH-0003 0.9 0.161 0.013 0.6301

240 minute summer MH-0005 244 22.567 0.767 16.0 49.4107 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

240 minute summer Node 3 188 20.801 0.251 8.5 0.2842 0.0000OK Swale 2 Node 2 8.1 0.334 0.165 2.1293

Page 154: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 240 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 240 minute winter. 480 minute analysis at 4 minute timestep. Mass balance: 99.84%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute winter Outlet 160 20.800 0.400 7.0 0.4524 4.7548FLOOD Orifice 3.6 89.1

240 minute winter Node 2 160 20.803 0.317 8.8 23.4118 0.0000FLOOD RISK Swale 1 Outlet 7.0 0.290 0.172 4.3885

240 minute winter MH-0001 160 20.804 0.194 3.2 0.2193 0.0000OK PN001 Node 2 3.2 0.552 0.094 1.0897

240 minute winter MH-0002 132 21.600 0.890 8.3 13.2476 9.0759FLOOD Hydro-Brake® MH-0001 3.2

240 minute winter MH-0003 236 21.935 0.735 10.3 37.6247 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

240 minute winter MH-0004 236 21.935 0.435 0.9 0.4919 0.0000SURCHARGED PN004 MH-0003 0.9 0.221 0.012 0.6301

240 minute winter MH-0005 240 22.609 0.809 11.9 57.1866 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

240 minute winter Node 3 160 20.803 0.253 6.3 0.2863 0.0000OK Swale 2 Node 2 6.0 0.290 0.123 2.1357

Page 155: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 360 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 360 minute summer. 600 minute analysis at 8 minute timestep. Mass balance: 99.82%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute summer Outlet 256 20.800 0.400 4.4 0.4524 0.8680FLOOD Orifice 3.6 109.0

360 minute summer Node 2 256 20.801 0.315 8.6 23.1840 0.0000FLOOD RISK Swale 1 Outlet 4.4 0.252 0.108 4.3885

360 minute summer MH-0001 256 20.802 0.192 3.2 0.2172 0.0000OK PN001 Node 2 3.2 0.492 0.093 1.0854

360 minute summer MH-0002 208 21.600 0.890 8.3 13.2476 3.3437FLOOD Hydro-Brake® MH-0001 3.2

360 minute summer MH-0003 288 21.879 0.679 10.2 28.7463 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

360 minute summer MH-0004 288 21.879 0.379 0.9 0.4291 0.0000SURCHARGED PN004 MH-0003 0.9 0.127 0.012 0.6301

360 minute summer MH-0005 360 22.562 0.762 11.8 48.3290 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

360 minute summer Node 3 256 20.801 0.251 6.3 0.2840 0.0000OK Swale 2 Node 2 6.0 0.166 0.123 2.1286

Page 156: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 360 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 360 minute winter. 600 minute analysis at 8 minute timestep. Mass balance: 99.85%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute winter Outlet 232 20.800 0.400 6.3 0.4524 4.7289FLOOD Orifice 3.6 110.3

360 minute winter Node 2 232 20.802 0.316 7.1 23.2804 0.0000FLOOD RISK Swale 1 Outlet 6.3 0.271 0.155 4.3885

360 minute winter MH-0001 232 20.803 0.193 3.2 0.2181 0.0000OK PN001 Node 2 3.2 0.505 0.094 1.0872

360 minute winter MH-0002 200 21.600 0.890 6.6 13.2476 7.4265FLOOD Hydro-Brake® MH-0001 3.2

360 minute winter MH-0003 336 21.918 0.718 7.7 34.8505 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

360 minute winter MH-0004 336 21.918 0.418 0.9 0.4723 0.0000SURCHARGED PN004 MH-0003 0.9 0.154 0.012 0.6301

360 minute winter MH-0005 352 22.606 0.806 8.6 56.5902 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

360 minute winter Node 3 232 20.802 0.252 4.6 0.2850 0.0000OK Swale 2 Node 2 4.4 0.225 0.090 2.1317

Page 157: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 480 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 480 minute summer. 720 minute analysis at 8 minute timestep. Mass balance: 99.86%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute summer Outlet 336 20.800 0.400 4.1 0.4524 0.3055FLOOD Orifice 3.6 128.7

480 minute summer Node 2 336 20.801 0.315 7.2 23.1658 0.0000FLOOD RISK Swale 1 Outlet 4.1 0.236 0.100 4.3885

480 minute summer MH-0001 336 20.802 0.192 3.2 0.2170 0.0000OK PN001 Node 2 3.2 0.482 0.094 1.0849

480 minute summer MH-0002 272 21.600 0.890 6.8 13.2476 3.1111FLOOD Hydro-Brake® MH-0001 3.2

480 minute summer MH-0003 352 21.870 0.670 8.1 27.1836 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

480 minute summer MH-0004 352 21.870 0.370 0.9 0.4180 0.0000SURCHARGED PN004 MH-0003 0.9 0.145 0.012 0.6301

480 minute summer MH-0005 448 22.551 0.751 9.1 46.3960 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

480 minute summer Node 3 336 20.801 0.251 4.8 0.2838 0.0000OK Swale 2 Node 2 4.6 0.161 0.094 2.1281

Page 158: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 480 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 480 minute winter. 720 minute analysis at 8 minute timestep. Mass balance: 99.87%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute winter Outlet 296 20.800 0.400 5.5 0.4524 4.3192FLOOD Orifice 3.6 130.4

480 minute winter Node 2 296 20.802 0.316 6.2 23.2607 0.0000FLOOD RISK Swale 1 Outlet 5.5 0.256 0.134 4.3885

480 minute winter MH-0001 296 20.803 0.193 3.2 0.2179 0.0000OK PN001 Node 2 3.2 0.460 0.094 1.0868

480 minute winter MH-0002 272 21.600 0.890 5.6 13.2476 5.4073FLOOD Hydro-Brake® MH-0001 3.2

480 minute winter MH-0003 376 21.900 0.700 6.2 31.9934 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

480 minute winter MH-0004 376 21.900 0.400 0.9 0.4521 0.0000SURCHARGED PN004 MH-0003 0.9 0.168 0.012 0.6301

480 minute winter MH-0005 464 22.600 0.800 6.8 55.3910 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

480 minute winter Node 3 296 20.802 0.252 3.6 0.2848 0.0000OK Swale 2 Node 2 3.5 0.197 0.071 2.1312

Page 159: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 600 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 600 minute summer. 840 minute analysis at 15 minute timestep. Mass balance: 99.88%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute summer Outlet 435 20.798 0.398 3.6 0.4504 0.0000OK Orifice 3.6 146.3

600 minute summer Node 2 435 20.799 0.313 6.4 22.9302 0.0000FLOOD RISK Swale 1 Outlet 3.6 0.267 0.088 4.3885

600 minute summer MH-0001 435 20.800 0.190 3.2 0.2146 0.0000OK PN001 Node 2 3.2 0.386 0.094 1.0802

600 minute summer MH-0002 360 21.600 0.890 5.9 13.2476 1.3306FLOOD Hydro-Brake® MH-0001 3.2

600 minute summer MH-0003 420 21.858 0.658 6.6 25.3056 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

600 minute summer MH-0004 420 21.858 0.358 0.9 0.4047 0.0000SURCHARGED PN004 MH-0003 0.9 0.144 0.012 0.6301

600 minute summer MH-0005 510 22.539 0.739 7.3 44.1633 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

600 minute summer Node 3 435 20.799 0.249 3.9 0.2816 0.0000OK Swale 2 Node 2 3.7 0.112 0.076 2.1210

Page 160: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 600 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 600 minute winter. 840 minute analysis at 15 minute timestep. Mass balance: 99.89%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute winter Outlet 390 20.800 0.400 4.7 0.4524 3.0252FLOOD Orifice 3.6 149.1

600 minute winter Node 2 390 20.801 0.315 5.6 23.2131 0.0000FLOOD RISK Swale 1 Outlet 4.7 0.218 0.115 4.3885

600 minute winter MH-0001 390 20.802 0.192 3.2 0.2174 0.0000OK PN001 Node 2 3.2 0.395 0.094 1.0859

600 minute winter MH-0002 360 21.600 0.890 5.0 13.2476 3.1216FLOOD Hydro-Brake® MH-0001 3.2

600 minute winter MH-0003 450 21.887 0.687 5.3 30.0355 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

600 minute winter MH-0004 450 21.887 0.387 0.9 0.4382 0.0000SURCHARGED PN004 MH-0003 0.9 0.145 0.012 0.6301

600 minute winter MH-0005 570 22.588 0.788 5.6 53.2394 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

600 minute winter Node 3 390 20.801 0.251 3.0 0.2843 0.0000OK Swale 2 Node 2 2.9 0.119 0.059 2.1296

Page 161: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 720 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 720 minute summer. 960 minute analysis at 15 minute timestep. Mass balance: 99.90%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute summer Outlet 495 20.791 0.391 3.5 0.4420 0.0000OK Orifice 3.5 162.5

720 minute summer Node 2 495 20.792 0.306 5.9 22.0271 0.0000FLOOD RISK Swale 1 Outlet 3.5 0.265 0.087 4.3885

720 minute summer MH-0001 495 20.792 0.182 3.2 0.2062 0.0000OK PN001 Node 2 3.2 0.370 0.094 1.0619

720 minute summer MH-0002 435 21.600 0.890 5.3 13.2476 0.6489FLOOD Hydro-Brake® MH-0001 3.2

720 minute summer MH-0003 495 21.849 0.649 5.9 23.8903 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

720 minute summer MH-0004 495 21.849 0.349 0.9 0.3947 0.0000SURCHARGED PN004 MH-0003 0.9 0.145 0.012 0.6301

720 minute summer MH-0005 555 22.533 0.733 6.5 43.0561 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

720 minute summer Node 3 495 20.792 0.242 3.4 0.2732 0.0000OK Swale 2 Node 2 3.3 0.101 0.066 2.0935

Page 162: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 720 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 720 minute winter. 960 minute analysis at 15 minute timestep. Mass balance: 99.90%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute winter Outlet 465 20.800 0.400 4.5 0.4524 2.5962FLOOD Orifice 3.6 168.7

720 minute winter Node 2 480 20.801 0.315 5.2 23.1819 0.0000FLOOD RISK Swale 1 Outlet 4.5 0.203 0.112 4.3885

720 minute winter MH-0001 480 20.802 0.192 3.2 0.2171 0.0000OK PN001 Node 2 3.2 0.376 0.094 1.0853

720 minute winter MH-0002 435 21.600 0.890 4.5 13.2476 2.0244FLOOD Hydro-Brake® MH-0001 3.2

720 minute winter MH-0003 525 21.874 0.674 4.7 27.9670 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

720 minute winter MH-0004 525 21.875 0.375 0.9 0.4236 0.0000SURCHARGED PN004 MH-0003 0.9 0.149 0.012 0.6301

720 minute winter MH-0005 645 22.576 0.776 4.9 51.0572 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

720 minute winter Node 3 480 20.801 0.251 2.6 0.2840 0.0000OK Swale 2 Node 2 2.5 0.123 0.051 2.1286

Page 163: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 960 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 960 minute summer. 1200 minute analysis at 15 minute timestep. Mass balance: 99.98%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

960 minute summer Outlet 630 20.778 0.378 3.5 0.4278 0.0000OK Orifice 3.5 192.7

960 minute summer Node 2 630 20.779 0.293 5.3 20.5042 0.0000OK Swale 1 Outlet 3.5 0.235 0.085 4.3749

960 minute summer MH-0001 630 20.780 0.170 3.2 0.1918 0.0000OK PN001 Node 2 3.2 0.362 0.094 1.0283

960 minute summer MH-0002 615 21.455 0.745 4.7 12.5318 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

960 minute summer MH-0003 615 21.830 0.630 4.9 20.8834 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

960 minute summer MH-0004 615 21.830 0.330 0.9 0.3734 0.0000SURCHARGED PN004 MH-0003 1.5 0.231 0.020 0.6301

960 minute summer MH-0005 690 22.518 0.717 5.2 40.1232 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

960 minute summer Node 3 630 20.779 0.229 2.8 0.2589 0.0000OK Swale 2 Node 2 2.7 0.103 0.055 2.0371

Page 164: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 960 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 960 minute winter. 1200 minute analysis at 15 minute timestep. Mass balance: 99.92%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

960 minute winter Outlet 675 20.798 0.398 3.6 0.4501 0.0000OK Orifice 3.6 203.9

960 minute winter Node 2 675 20.799 0.313 4.6 22.8980 0.0000FLOOD RISK Swale 1 Outlet 3.6 0.180 0.088 4.3885

960 minute winter MH-0001 675 20.799 0.189 3.2 0.2143 0.0000OK PN001 Node 2 3.1 0.359 0.092 1.0795

960 minute winter MH-0002 675 21.463 0.753 3.9 12.8771 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

960 minute winter MH-0003 675 21.851 0.651 3.9 24.1387 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

960 minute winter MH-0004 675 21.851 0.351 0.9 0.3965 0.0000SURCHARGED PN004 MH-0003 0.9 0.152 0.012 0.6301

960 minute winter MH-0005 735 22.554 0.754 3.8 46.9884 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

960 minute winter Node 3 675 20.799 0.249 2.0 0.2813 0.0000OK Swale 2 Node 2 1.9 0.119 0.040 2.1201

Page 165: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 1440 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 1440 minute summer. 1680 minute analysis at 30 minute timestep. Mass balance: 100.00%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

1440 minute summer Outlet 900 20.762 0.362 3.4 0.4095 0.0000OK Orifice 3.4 227.1

1440 minute summer Node 2 900 20.763 0.277 4.6 18.6182 0.0000OK Swale 1 Outlet 3.4 0.166 0.083 4.3109

1440 minute summer MH-0001 900 20.763 0.153 3.2 0.1734 0.0000OK PN001 Node 2 3.1 0.367 0.092 0.9811

1440 minute summer MH-0002 900 21.359 0.649 3.8 7.8833 0.0000FLOOD RISK Hydro-Brake® MH-0001 3.2

1440 minute summer MH-0003 900 21.803 0.603 3.7 16.6188 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

1440 minute summer MH-0004 900 21.803 0.303 0.9 0.3432 0.0000SURCHARGED PN004 MH-0003 1.3 0.230 0.018 0.6301

1440 minute summer MH-0005 960 22.492 0.692 3.6 35.3216 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

1440 minute summer Node 3 900 20.763 0.213 1.9 0.2406 0.0000OK Swale 2 Node 2 1.8 0.098 0.037 1.9363

Page 166: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year 1440 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year 1440 minute winter. 1680 minute analysis at 30 minute timestep. Mass balance: 99.98%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

1440 minute winter Outlet 900 20.799 0.399 3.6 0.4509 0.0000OK Orifice 3.6 248.4

1440 minute winter Node 2 900 20.799 0.313 4.6 22.9837 0.0000FLOOD RISK Swale 1 Outlet 3.6 0.203 0.088 4.3885

1440 minute winter MH-0001 900 20.800 0.190 3.2 0.2150 0.0000OK PN001 Node 2 3.1 0.364 0.093 1.0810

1440 minute winter MH-0002 780 21.106 0.396 3.3 0.6989 0.0000SURCHARGED Hydro-Brake® MH-0001 3.2

1440 minute winter MH-0003 1020 21.830 0.630 3.0 20.8250 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

1440 minute winter MH-0004 1020 21.830 0.330 0.9 0.3730 0.0000SURCHARGED PN004 MH-0003 0.9 0.230 0.012 0.6301

1440 minute winter MH-0005 1050 22.520 0.720 2.7 40.4982 0.0000SURCHARGED Hydro-Brake® MH-0004 0.9

1440 minute winter Node 3 900 20.799 0.249 1.5 0.2821 0.0000OK Swale 2 Node 2 1.4 0.100 0.029 2.1227

Page 167: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 15 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 15 minute summer. 255 minute analysis at 1 minute timestep. Mass balance: 98.48%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

15 minute summer Outlet 21 20.737 0.337 16.0 0.3815 0.0000OK Orifice 3.3 46.0

15 minute summer Node 2 20 20.727 0.241 49.3 14.6865 0.0000OK Swale 1 Outlet 16.0 0.461 0.392 4.0809

15 minute summer MH-0001 19 20.732 0.122 3.4 0.1376 0.0000OK PN001 Node 2 4.1 0.690 0.120 0.8821

15 minute summer MH-0002 12 21.600 0.890 50.5 13.2476 5.6947FLOOD Hydro-Brake® MH-0001 3.2

15 minute summer MH-0003 20 21.881 0.681 74.1 28.9693 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

15 minute summer MH-0004 20 21.882 0.382 7.3 0.4316 0.0000SURCHARGED PN004 MH-0003 -6.6 -0.170 -0.091 0.6301

15 minute summer MH-0005 20 22.519 0.719 91.4 40.4678 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

15 minute summer Node 3 11 20.771 0.221 48.5 0.2501 0.0000OK Swale 2 Node 2 46.5 1.151 0.945 1.6694

Page 168: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 15 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 15 minute winter. 255 minute analysis at 1 minute timestep. Mass balance: 98.78%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

15 minute winter Outlet 15 20.760 0.360 16.3 0.4069 0.0000OK Orifice 3.4 47.1

15 minute winter Node 2 19 20.745 0.259 52.2 16.6430 0.0000OK Swale 1 Outlet 16.3 0.481 0.400 4.2089

15 minute winter MH-0001 18 20.752 0.142 3.2 0.1601 0.0000OK PN001 Node 2 4.5 0.686 0.131 0.9452

15 minute winter MH-0002 11 21.600 0.890 53.0 13.2476 9.6714FLOOD Hydro-Brake® MH-0001 3.2

15 minute winter MH-0003 19 21.905 0.705 76.6 32.7708 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

15 minute winter MH-0004 19 21.906 0.406 6.3 0.4588 0.0000SURCHARGED PN004 MH-0003 -5.5 -0.212 -0.077 0.6301

15 minute winter MH-0005 20 22.545 0.745 96.1 45.2028 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

15 minute winter Node 3 11 20.779 0.229 51.0 0.2593 0.0000OK Swale 2 Node 2 49.3 1.116 1.002 1.8094

Page 169: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 30 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 30 minute summer. 270 minute analysis at 1 minute timestep. Mass balance: 99.90%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

30 minute summer Outlet 35 20.772 0.372 8.0 0.4210 0.0000OK Orifice 3.4 51.1

30 minute summer Node 2 35 20.773 0.287 44.4 19.8349 0.0000OK Swale 1 Outlet 8.0 0.413 0.197 4.3566

30 minute summer MH-0001 35 20.774 0.164 3.2 0.1857 0.0000OK PN001 Node 2 3.4 0.689 0.101 1.0129

30 minute summer MH-0002 18 21.600 0.890 44.8 13.2476 12.3477FLOOD Hydro-Brake® MH-0001 3.2

30 minute summer MH-0003 34 21.931 0.731 65.0 37.0622 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

30 minute summer MH-0004 35 21.931 0.431 4.4 0.4879 0.0000SURCHARGED PN004 MH-0003 -3.7 0.122 -0.052 0.6301

30 minute summer MH-0005 35 22.567 0.767 80.7 49.3744 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

30 minute summer Node 3 36 20.774 0.224 42.8 0.2529 0.0000OK Swale 2 Node 2 42.6 0.895 0.866 2.0056

Page 170: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 30 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 30 minute winter. 270 minute analysis at 1 minute timestep. Mass balance: 99.82%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

30 minute winter Outlet 34 20.796 0.396 8.5 0.4475 0.0000OK Orifice 3.6 52.4

30 minute winter Node 2 34 20.796 0.310 39.7 22.6027 0.0000FLOOD RISK Swale 1 Outlet 8.5 0.437 0.209 4.3885

30 minute winter MH-0001 34 20.797 0.187 3.2 0.2117 0.0000OK PN001 Node 2 3.3 0.698 0.096 1.0740

30 minute winter MH-0002 18 21.600 0.890 40.7 13.2476 16.2470FLOOD Hydro-Brake® MH-0001 3.2

30 minute winter MH-0003 34 22.356 1.156 58.8 41.5435 0.0000FLOOD RISK Hydro-Brake® MH-0002 2.0

30 minute winter MH-0004 34 22.355 0.855 3.2 0.9673 0.0000SURCHARGED PN004 MH-0003 3.1 0.106 0.044 0.6301

30 minute winter MH-0005 34 22.604 0.804 73.0 56.1438 0.0000SURCHARGED Hydro-Brake® MH-0004 0.8

30 minute winter Node 3 36 20.796 0.246 38.8 0.2786 0.0000OK Swale 2 Node 2 38.5 0.819 0.782 2.1113

Page 171: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 60 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 60 minute summer. 300 minute analysis at 1 minute timestep. Mass balance: 99.88%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

60 minute summer Outlet 50 20.800 0.400 7.7 0.4524 2.4270FLOOD Orifice 3.6 57.8

60 minute summer Node 2 53 20.804 0.318 33.2 23.5487 0.0000FLOOD RISK Swale 1 Outlet 7.7 0.358 0.190 4.3885

60 minute summer MH-0001 53 20.805 0.195 3.2 0.2206 0.0000OK PN001 Node 2 3.2 0.680 0.095 1.0922

60 minute summer MH-0002 32 21.600 0.890 33.3 13.2476 16.3395FLOOD Hydro-Brake® MH-0001 3.2

60 minute summer MH-0003 55 22.500 1.300 47.5 41.7971 1.7211FLOOD Hydro-Brake® MH-0002 2.0

60 minute summer MH-0004 55 22.502 1.002 3.2 1.1334 0.0000SURCHARGED PN004 MH-0003 -2.4 0.141 -0.034 0.6301

60 minute summer MH-0005 64 23.685 1.885 59.0 59.4814 0.0000SURCHARGED Hydro-Brake® MH-0004 1.1

60 minute summer Node 3 52 20.804 0.254 31.3 0.2877 0.0000OK Swale 2 Node 2 30.7 0.644 0.623 2.1400

Page 172: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 60 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 60 minute winter. 300 minute analysis at 1 minute timestep. Mass balance: 99.98%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

60 minute winter Outlet 43 20.800 0.400 12.6 0.4524 6.2618FLOOD Orifice 3.6 57.9

60 minute winter Node 2 45 20.810 0.324 26.8 24.2728 0.0000FLOOD RISK Swale 1 Outlet 12.6 0.384 0.310 4.3885

60 minute winter MH-0001 45 20.811 0.201 3.2 0.2274 0.0000OK PN001 Node 2 3.3 0.692 0.095 1.1048

60 minute winter MH-0002 30 21.600 0.890 27.3 13.2476 20.8131FLOOD Hydro-Brake® MH-0001 3.2

60 minute winter MH-0003 44 22.500 1.300 39.1 41.7971 7.9895FLOOD Hydro-Brake® MH-0002 2.0

60 minute winter MH-0004 44 22.521 1.021 8.2 1.1544 0.0000SURCHARGED PN004 MH-0003 -7.4 -0.187 -0.104 0.6301

60 minute winter MH-0005 47 24.000 2.200 47.7 59.8382 6.8110FLOOD Hydro-Brake® MH-0004 1.2

60 minute winter Node 3 45 20.811 0.261 25.3 0.2956 0.0000OK Swale 2 Node 2 24.5 0.546 0.497 2.1629

Page 173: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 120 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 120 minute summer. 360 minute analysis at 2 minute timestep. Mass balance: 99.91%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

120 minute summer Outlet 74 20.800 0.400 11.2 0.4524 8.1593FLOOD Orifice 3.6 68.5

120 minute summer Node 2 78 20.808 0.322 21.4 24.0326 0.0000FLOOD RISK Swale 1 Outlet 11.2 0.345 0.274 4.3885

120 minute summer MH-0001 78 20.809 0.199 3.2 0.2252 0.0000OK PN001 Node 2 3.2 0.667 0.094 1.1009

120 minute summer MH-0002 62 21.600 0.890 21.7 13.2476 17.8830FLOOD Hydro-Brake® MH-0001 3.2

120 minute summer MH-0003 82 22.500 1.300 30.3 41.7971 7.7876FLOOD Hydro-Brake® MH-0002 2.0

120 minute summer MH-0004 82 22.513 1.013 4.0 1.1455 0.0000SURCHARGED PN004 MH-0003 -3.2 0.174 -0.045 0.6301

120 minute summer MH-0005 86 24.000 2.200 37.2 59.8382 7.5695FLOOD Hydro-Brake® MH-0004 1.2

120 minute summer Node 3 78 20.809 0.259 19.7 0.2928 0.0000OK Swale 2 Node 2 18.9 0.441 0.385 2.1549

Page 174: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 120 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 120 minute winter. 360 minute analysis at 2 minute timestep. Mass balance: 99.93%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

120 minute winter Outlet 74 20.800 0.400 14.2 0.4524 12.6216FLOOD Orifice 3.6 68.5

120 minute winter Node 2 76 20.812 0.326 17.3 24.5380 0.0000FLOOD RISK Swale 1 Outlet 14.2 0.333 0.349 4.3885

120 minute winter MH-0001 76 20.813 0.203 3.2 0.2299 0.0000OK PN001 Node 2 3.2 0.641 0.094 1.1092

120 minute winter MH-0002 58 21.600 0.890 17.2 13.2476 23.0399FLOOD Hydro-Brake® MH-0001 3.2

120 minute winter MH-0003 76 22.500 1.300 24.0 41.7971 16.1885FLOOD Hydro-Brake® MH-0002 2.0

120 minute winter MH-0004 76 22.526 1.026 2.2 1.1608 0.0000SURCHARGED PN004 MH-0003 3.5 0.203 0.049 0.6301

120 minute winter MH-0005 78 24.000 2.200 28.7 59.8382 17.1681FLOOD Hydro-Brake® MH-0004 1.2

120 minute winter Node 3 76 20.815 0.265 15.2 0.2996 0.0000OK Swale 2 Node 2 14.6 0.412 0.297 2.1742

Page 175: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 180 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 180 minute summer. 420 minute analysis at 4 minute timestep. Mass balance: 99.89%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

180 minute summer Outlet 104 20.800 0.400 11.8 0.4524 11.1228FLOOD Orifice 3.6 79.3

180 minute summer Node 2 108 20.809 0.323 16.5 24.1684 0.0000FLOOD RISK Swale 1 Outlet 11.8 0.307 0.289 4.3885

180 minute summer MH-0001 108 20.810 0.200 3.2 0.2264 0.0000OK PN001 Node 2 3.2 0.645 0.094 1.1031

180 minute summer MH-0002 92 21.600 0.890 16.4 13.2476 18.6582FLOOD Hydro-Brake® MH-0001 3.2

180 minute summer MH-0003 116 22.500 1.300 22.3 41.7971 10.3988FLOOD Hydro-Brake® MH-0002 2.0

180 minute summer MH-0004 116 22.505 1.005 1.2 1.1363 0.0000SURCHARGED PN004 MH-0003 1.5 0.105 0.021 0.6301

180 minute summer MH-0005 120 24.000 2.200 27.1 59.8382 10.1648FLOOD Hydro-Brake® MH-0004 1.2

180 minute summer Node 3 108 20.811 0.261 14.4 0.2947 0.0000OK Swale 2 Node 2 13.9 0.352 0.282 2.1604

Page 176: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 180 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 180 minute winter. 420 minute analysis at 4 minute timestep. Mass balance: 99.95%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

180 minute winter Outlet 104 20.800 0.400 13.1 0.4524 16.0300FLOOD Orifice 3.6 79.3

180 minute winter Node 2 108 20.810 0.324 13.5 24.2489 0.0000FLOOD RISK Swale 1 Outlet 13.1 0.332 0.321 4.3885

180 minute winter MH-0001 108 20.811 0.201 3.2 0.2272 0.0000OK PN001 Node 2 3.2 0.566 0.094 1.1044

180 minute winter MH-0002 84 21.600 0.890 13.1 13.2476 25.0559FLOOD Hydro-Brake® MH-0001 3.2

180 minute winter MH-0003 112 22.500 1.300 17.3 41.7971 18.6172FLOOD Hydro-Brake® MH-0002 2.0

180 minute winter MH-0004 116 22.506 1.006 1.3 1.1380 0.0000SURCHARGED PN004 MH-0003 3.5 0.167 0.049 0.6301

180 minute winter MH-0005 112 24.000 2.200 20.9 59.8382 21.6276FLOOD Hydro-Brake® MH-0004 1.2

180 minute winter Node 3 108 20.812 0.262 11.1 0.2962 0.0000OK Swale 2 Node 2 10.7 0.364 0.218 2.1647

Page 177: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 240 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 240 minute summer. 480 minute analysis at 4 minute timestep. Mass balance: 99.91%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute summer Outlet 136 20.800 0.400 11.5 0.4524 13.5244FLOOD Orifice 3.6 90.5

240 minute summer Node 2 136 20.809 0.323 14.1 24.1562 0.0000FLOOD RISK Swale 1 Outlet 11.5 0.294 0.283 4.3885

240 minute summer MH-0001 136 20.810 0.200 3.2 0.2263 0.0000OK PN001 Node 2 3.2 0.618 0.094 1.1029

240 minute summer MH-0002 124 21.600 0.890 13.9 13.2476 16.2127FLOOD Hydro-Brake® MH-0001 3.2

240 minute summer MH-0003 152 22.500 1.300 18.6 41.7971 10.7074FLOOD Hydro-Brake® MH-0002 2.0

240 minute summer MH-0004 156 22.501 1.001 1.2 1.1320 0.0000SURCHARGED PN004 MH-0003 1.6 0.126 0.022 0.6301

240 minute summer MH-0005 152 24.000 2.200 22.5 59.8382 11.7944FLOOD Hydro-Brake® MH-0004 1.2

240 minute summer Node 3 136 20.811 0.261 11.9 0.2948 0.0000OK Swale 2 Node 2 11.5 0.336 0.233 2.1607

Page 178: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 240 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 240 minute winter. 480 minute analysis at 4 minute timestep. Mass balance: 99.90%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

240 minute winter Outlet 132 20.800 0.400 11.9 0.4524 18.2158FLOOD Orifice 3.6 90.4

240 minute winter Node 2 136 20.808 0.322 11.4 24.0662 0.0000FLOOD RISK Swale 1 Outlet 11.9 0.300 0.293 4.3885

240 minute winter MH-0001 136 20.809 0.199 3.2 0.2255 0.0000OK PN001 Node 2 3.2 0.559 0.094 1.1013

240 minute winter MH-0002 112 21.600 0.890 10.9 13.2476 24.1107FLOOD Hydro-Brake® MH-0001 3.2

240 minute winter MH-0003 148 22.500 1.300 14.0 41.7971 19.7219FLOOD Hydro-Brake® MH-0002 2.0

240 minute winter MH-0004 144 22.526 1.026 2.1 1.1603 0.0000SURCHARGED PN004 MH-0003 1.6 0.198 0.022 0.6301

240 minute winter MH-0005 148 24.000 2.200 16.7 59.8382 21.0177FLOOD Hydro-Brake® MH-0004 1.2

240 minute winter Node 3 136 20.810 0.260 8.9 0.2940 0.0000OK Swale 2 Node 2 8.6 0.327 0.175 2.1584

Page 179: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 360 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 360 minute summer. 600 minute analysis at 8 minute timestep. Mass balance: 99.90%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute summer Outlet 192 20.800 0.400 10.1 0.4524 13.6578FLOOD Orifice 3.6 112.1

360 minute summer Node 2 200 20.805 0.319 11.4 23.6950 0.0000FLOOD RISK Swale 1 Outlet 10.1 0.279 0.249 4.3885

360 minute summer MH-0001 200 20.806 0.196 3.2 0.2220 0.0000OK PN001 Node 2 3.2 0.504 0.094 1.0948

360 minute summer MH-0002 184 21.600 0.890 10.8 13.2476 15.4927FLOOD Hydro-Brake® MH-0001 3.2

360 minute summer MH-0003 232 22.500 1.300 13.9 41.7971 8.5336FLOOD Hydro-Brake® MH-0002 2.0

360 minute summer MH-0004 264 22.500 1.000 1.3 1.1311 0.0000SURCHARGED PN004 MH-0003 1.7 0.099 0.024 0.6301

360 minute summer MH-0005 224 24.000 2.200 16.6 59.8382 10.8741FLOOD Hydro-Brake® MH-0004 1.3

360 minute summer Node 3 200 20.806 0.256 8.8 0.2897 0.0000OK Swale 2 Node 2 8.5 0.193 0.172 2.1459

Page 180: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 360 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 360 minute winter. 600 minute analysis at 8 minute timestep. Mass balance: 99.90%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

360 minute winter Outlet 192 20.800 0.400 10.1 0.4524 20.9643FLOOD Orifice 3.6 112.6

360 minute winter Node 2 192 20.806 0.320 9.3 23.7865 0.0000FLOOD RISK Swale 1 Outlet 10.1 0.256 0.247 4.3885

360 minute winter MH-0001 192 20.807 0.197 3.2 0.2228 0.0000OK PN001 Node 2 3.2 0.531 0.094 1.0964

360 minute winter MH-0002 176 21.600 0.890 8.4 13.2476 20.1038FLOOD Hydro-Brake® MH-0001 3.2

360 minute winter MH-0003 216 22.500 1.300 10.4 41.7971 18.4631FLOOD Hydro-Brake® MH-0002 2.0

360 minute winter MH-0004 216 22.507 1.007 2.2 1.1390 0.0000SURCHARGED PN004 MH-0003 1.4 0.129 0.019 0.6301

360 minute winter MH-0005 216 24.000 2.200 12.1 59.8382 22.1855FLOOD Hydro-Brake® MH-0004 1.2

360 minute winter Node 3 192 20.807 0.257 6.4 0.2907 0.0000OK Swale 2 Node 2 6.2 0.233 0.126 2.1489

Page 181: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 480 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 480 minute summer. 720 minute analysis at 8 minute timestep. Mass balance: 99.89%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute summer Outlet 256 20.800 0.400 9.5 0.4524 14.7130FLOOD Orifice 3.6 133.5

480 minute summer Node 2 256 20.806 0.320 9.5 23.8009 0.0000FLOOD RISK Swale 1 Outlet 9.5 0.264 0.233 4.3885

480 minute summer MH-0001 256 20.807 0.197 3.2 0.2230 0.0000OK PN001 Node 2 3.2 0.494 0.094 1.0967

480 minute summer MH-0002 248 21.600 0.890 8.8 13.2476 13.0313FLOOD Hydro-Brake® MH-0001 3.2

480 minute summer MH-0003 312 22.500 1.300 11.0 41.7971 5.8818FLOOD Hydro-Brake® MH-0002 2.1

480 minute summer MH-0004 312 22.500 1.000 1.4 1.1315 0.0000SURCHARGED PN004 MH-0003 1.5 0.118 0.020 0.6301

480 minute summer MH-0005 288 24.000 2.200 12.8 59.8382 10.8240FLOOD Hydro-Brake® MH-0004 1.4

480 minute summer Node 3 256 20.807 0.257 6.8 0.2906 0.0000OK Swale 2 Node 2 6.6 0.174 0.134 2.1488

Page 182: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 480 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 480 minute winter. 720 minute analysis at 8 minute timestep. Mass balance: 99.91%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

480 minute winter Outlet 248 20.800 0.400 8.3 0.4524 21.0305FLOOD Orifice 3.6 134.7

480 minute winter Node 2 248 20.805 0.319 8.0 23.6663 0.0000FLOOD RISK Swale 1 Outlet 8.3 0.287 0.205 4.3885

480 minute winter MH-0001 248 20.806 0.196 3.2 0.2217 0.0000OK PN001 Node 2 3.2 0.508 0.094 1.0943

480 minute winter MH-0002 232 21.600 0.890 7.0 13.2476 18.9337FLOOD Hydro-Brake® MH-0001 3.2

480 minute winter MH-0003 296 22.500 1.300 8.4 41.7971 15.1654FLOOD Hydro-Brake® MH-0002 2.1

480 minute winter MH-0004 304 22.500 1.000 2.5 1.1315 0.0000SURCHARGED PN004 MH-0003 1.4 0.162 0.019 0.6301

480 minute winter MH-0005 280 24.000 2.200 9.5 59.8382 22.6642FLOOD Hydro-Brake® MH-0004 1.4

480 minute winter Node 3 248 20.806 0.256 5.0 0.2892 0.0000OK Swale 2 Node 2 5.0 0.213 0.102 2.1444

Page 183: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 600 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 600 minute summer. 840 minute analysis at 15 minute timestep. Mass balance: 99.91%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute summer Outlet 330 20.800 0.400 7.5 0.4524 12.3522FLOOD Orifice 3.6 153.1

600 minute summer Node 2 330 20.803 0.317 8.3 23.4230 0.0000FLOOD RISK Swale 1 Outlet 7.5 0.244 0.183 4.3885

600 minute summer MH-0001 330 20.804 0.194 3.2 0.2194 0.0000OK PN001 Node 2 3.2 0.416 0.094 1.0899

600 minute summer MH-0002 315 21.600 0.890 7.5 13.2476 12.2929FLOOD Hydro-Brake® MH-0001 3.2

600 minute summer MH-0003 405 22.500 1.300 9.0 41.7971 3.3909FLOOD Hydro-Brake® MH-0002 2.1

600 minute summer MH-0004 435 22.500 1.000 1.4 1.1311 0.0000SURCHARGED PN004 MH-0003 1.4 0.117 0.019 0.6301

600 minute summer MH-0005 375 24.000 2.200 10.3 59.8382 6.7228FLOOD Hydro-Brake® MH-0004 1.4

600 minute summer Node 3 330 20.803 0.253 5.5 0.2867 0.0000OK Swale 2 Node 2 5.3 0.120 0.109 2.1367

Page 184: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 600 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 600 minute winter. 840 minute analysis at 15 minute timestep. Mass balance: 99.92%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

600 minute winter Outlet 315 20.800 0.400 7.6 0.4524 20.1672FLOOD Orifice 3.6 155.2

600 minute winter Node 2 315 20.803 0.317 7.2 23.4080 0.0000FLOOD RISK Swale 1 Outlet 7.6 0.268 0.186 4.3885

600 minute winter MH-0001 315 20.804 0.194 3.2 0.2193 0.0000OK PN001 Node 2 3.2 0.414 0.093 1.0896

600 minute winter MH-0002 300 21.600 0.890 6.2 13.2476 17.1177FLOOD Hydro-Brake® MH-0001 3.2

600 minute winter MH-0003 375 22.500 1.300 7.1 41.7971 13.9955FLOOD Hydro-Brake® MH-0002 2.1

600 minute winter MH-0004 375 22.501 1.001 1.4 1.1319 0.0000SURCHARGED PN004 MH-0003 1.3 0.136 0.019 0.6301

600 minute winter MH-0005 360 24.000 2.200 7.9 59.8382 19.3666FLOOD Hydro-Brake® MH-0004 1.4

600 minute winter Node 3 315 20.803 0.253 4.2 0.2865 0.0000OK Swale 2 Node 2 4.2 0.134 0.086 2.1364

Page 185: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 720 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 720 minute summer. 960 minute analysis at 15 minute timestep. Mass balance: 99.93%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute summer Outlet 390 20.800 0.400 7.2 0.4524 12.5313FLOOD Orifice 3.6 172.8

720 minute summer Node 2 390 20.803 0.317 7.6 23.3700 0.0000FLOOD RISK Swale 1 Outlet 7.2 0.251 0.176 4.3885

720 minute summer MH-0001 390 20.804 0.194 3.2 0.2189 0.0000OK PN001 Node 2 3.2 0.396 0.094 1.0889

720 minute summer MH-0002 375 21.600 0.890 6.8 13.2476 11.5892FLOOD Hydro-Brake® MH-0001 3.2

720 minute summer MH-0003 495 22.500 1.300 8.0 41.7971 1.9300FLOOD Hydro-Brake® MH-0002 2.1

720 minute summer MH-0004 495 22.500 1.000 1.4 1.1312 0.0000SURCHARGED PN004 MH-0003 1.4 0.135 0.019 0.6301

720 minute summer MH-0005 450 24.000 2.200 9.0 59.8382 5.1444FLOOD Hydro-Brake® MH-0004 1.4

720 minute summer Node 3 390 20.803 0.253 4.8 0.2861 0.0000OK Swale 2 Node 2 4.7 0.109 0.095 2.1350

Page 186: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 720 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 720 minute winter. 960 minute analysis at 15 minute timestep. Mass balance: 99.93%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

720 minute winter Outlet 375 20.800 0.400 7.4 0.4524 19.6457FLOOD Orifice 3.6 175.8

720 minute winter Node 2 375 20.803 0.317 6.7 23.4070 0.0000FLOOD RISK Swale 1 Outlet 7.4 0.233 0.181 4.3885

720 minute winter MH-0001 375 20.804 0.194 3.2 0.2193 0.0000OK PN001 Node 2 3.1 0.400 0.092 1.0896

720 minute winter MH-0002 360 21.600 0.890 5.6 13.2476 15.4543FLOOD Hydro-Brake® MH-0001 3.2

720 minute winter MH-0003 450 22.500 1.300 6.2 41.7971 11.9648FLOOD Hydro-Brake® MH-0002 2.1

720 minute winter MH-0004 450 22.502 1.002 1.4 1.1337 0.0000SURCHARGED PN004 MH-0003 1.4 0.154 0.019 0.6301

720 minute winter MH-0005 435 24.000 2.200 6.8 59.8382 15.8571FLOOD Hydro-Brake® MH-0004 1.4

720 minute winter Node 3 375 20.803 0.253 3.6 0.2864 0.0000OK Swale 2 Node 2 3.6 0.131 0.074 2.1360

Page 187: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 960 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 960 minute summer. 1200 minute analysis at 15 minute timestep. Mass balance: 99.95%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

960 minute summer Outlet 510 20.800 0.400 6.0 0.4524 9.9493FLOOD Orifice 3.6 208.3

960 minute summer Node 2 525 20.802 0.316 6.5 23.3018 0.0000FLOOD RISK Swale 1 Outlet 6.0 0.268 0.146 4.3885

960 minute summer MH-0001 525 20.803 0.193 3.2 0.2183 0.0000OK PN001 Node 2 3.2 0.371 0.093 1.0876

960 minute summer MH-0002 510 21.600 0.890 5.9 13.2476 7.8117FLOOD Hydro-Brake® MH-0001 3.2

960 minute summer MH-0003 735 22.316 1.116 6.6 41.4723 0.0000FLOOD RISK Hydro-Brake® MH-0002 2.0

960 minute summer MH-0004 735 22.316 0.816 1.4 0.9232 0.0000SURCHARGED PN004 MH-0003 1.4 0.145 0.019 0.6301

960 minute summer MH-0005 600 24.000 2.200 7.3 59.8382 2.3223FLOOD Hydro-Brake® MH-0004 1.4

960 minute summer Node 3 525 20.802 0.252 3.9 0.2853 0.0000OK Swale 2 Node 2 3.8 0.102 0.077 2.1325

Page 188: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 960 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 960 minute winter. 1200 minute analysis at 15 minute timestep. Mass balance: 99.94%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

960 minute winter Outlet 495 20.800 0.400 5.9 0.4524 16.4928FLOOD Orifice 3.6 215.4

960 minute winter Node 2 495 20.802 0.316 5.8 23.3236 0.0000FLOOD RISK Swale 1 Outlet 5.9 0.190 0.144 4.3885

960 minute winter MH-0001 495 20.803 0.193 3.2 0.2184 0.0000OK PN001 Node 2 3.1 0.385 0.092 1.0880

960 minute winter MH-0002 495 21.600 0.890 4.9 13.2476 11.3418FLOOD Hydro-Brake® MH-0001 3.2

960 minute winter MH-0003 615 22.500 1.300 5.1 41.7971 7.4845FLOOD Hydro-Brake® MH-0002 2.1

960 minute winter MH-0004 615 22.503 1.003 1.4 1.1344 0.0000SURCHARGED PN004 MH-0003 1.4 0.147 0.019 0.6301

960 minute winter MH-0005 570 24.000 2.200 5.4 59.8382 14.1681FLOOD Hydro-Brake® MH-0004 1.4

960 minute winter Node 3 495 20.802 0.252 2.9 0.2855 0.0000OK Swale 2 Node 2 2.9 0.112 0.058 2.1333

Page 189: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 1440 minute summer

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 1440 minute summer. 1680 minute analysis at 30 minute timestep. Mass balance: 99.96%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

1440 minute summer Outlet 780 20.800 0.400 4.9 0.4524 6.7023FLOOD Orifice 3.6 269.9

1440 minute summer Node 2 810 20.801 0.315 5.3 23.2211 0.0000FLOOD RISK Swale 1 Outlet 4.9 0.169 0.121 4.3885

1440 minute summer MH-0001 810 20.802 0.192 3.2 0.2175 0.0000OK PN001 Node 2 3.1 0.355 0.092 1.0861

1440 minute summer MH-0002 810 21.600 0.890 4.7 13.2476 2.8489FLOOD Hydro-Brake® MH-0001 3.2

1440 minute summer MH-0003 990 21.906 0.706 4.9 33.0536 0.0000SURCHARGED Hydro-Brake® MH-0002 2.0

1440 minute summer MH-0004 990 21.906 0.406 1.1 0.4596 0.0000SURCHARGED PN004 MH-0003 1.1 0.151 0.015 0.6301

1440 minute summer MH-0005 990 23.143 1.343 5.1 58.8695 0.0000SURCHARGED Hydro-Brake® MH-0004 1.1

1440 minute summer Node 3 810 20.801 0.251 2.7 0.2844 0.0000OK Swale 2 Node 2 2.6 0.102 0.053 2.1299

Page 190: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: 100 year +40% 1440 minute winter

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Results for 100 year +40% 1440 minute winter. 1680 minute analysis at 30 minute timestep. Mass balance: 99.96%

EventUS Node

IDPeak

(mins)Level(m)

Depth(m)

Inflow(l/s)

NodeVol(m³)

Flood(m³)

StatusLinkID

DS NodeID

Outflow(l/s)

Velocity(m/s)

Flow/CapLinkVol(m³)

DischargeVol(m³)

1440 minute winter Outlet 750 20.800 0.400 4.7 0.4524 11.4387FLOOD Orifice 3.6 284.9

1440 minute winter Node 2 840 20.801 0.315 4.8 23.2056 0.0000FLOOD RISK Swale 1 Outlet 4.7 0.180 0.116 4.3885

1440 minute winter MH-0001 840 20.802 0.192 3.2 0.2174 0.0000OK PN001 Node 2 3.1 0.355 0.092 1.0858

1440 minute winter MH-0002 840 21.600 0.890 3.9 13.2476 2.9548FLOOD Hydro-Brake® MH-0001 3.2

1440 minute winter MH-0003 1080 22.480 1.280 3.9 41.7617 0.0000FLOOD RISK Hydro-Brake® MH-0002 2.1

1440 minute winter MH-0004 1080 22.480 0.980 1.4 1.1084 0.0000SURCHARGED PN004 MH-0003 1.4 0.144 0.019 0.6301

1440 minute winter MH-0005 900 24.000 2.200 3.8 59.8382 5.6960FLOOD Hydro-Brake® MH-0004 1.4

1440 minute winter Node 3 780 20.801 0.251 2.0 0.2843 0.0000OK Swale 2 Node 2 2.0 0.102 0.041 2.1295

Page 191: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Manhole Type Library

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Adoptable

Max Width (mm) Diameter (mm) Width (mm) Max Depth (m) Diameter (mm) Width (mm)

374 1200 1.500 1050

499 1350 99.999 1200

749 1500

900 1800

>900 Link+900 mm

Page 192: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Link Type Library

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Circular

Shape Circular Dia (mm)

Barrels 1 100

Height (mm) 150

Width (mm)

Side Slope (1:X)

Auto Increment (mm) 75

Preferred Cover (m)

Steep Slope (1:X)

Follow Ground x

Velocity Default

ks (mm) / n

Swale 1

Shape Trapezoidal

Barrels 1

Height (mm)

Width (mm) 1000

Side Slope (1:X) 3.0

Auto Increment (mm) 1

Preferred Cover (m)

Steep Slope (1:X)

Follow Ground

Velocity Colebrook-White

ks (mm) / n 100.000

Swale 2

Shape Trapezoidal Dia (mm)

Barrels 1 2000

Page 193: Drainage Design Report - South Kesteven

Flow+ v7.0 Design Report: Link Type Library

Z:\Projects\19033 Cherry Holt Rd, Stamford\06 Calculations\Proposed Drainage System.pfd Copyright © 1988-2019 Causeway Software Solutions Limited

Height (mm)

Width (mm) 1000

Side Slope (1:X) 3.0

Auto Increment (mm) 1

Preferred Cover (m)

Steep Slope (1:X)

Follow Ground

Velocity Default

ks (mm) / n