drawing & document list cisanggiri 2 x 1.5 mw
DESCRIPTION
gTRANSCRIPT
DRAWING LIST CISANGGIRI 2 x 1.5 MW - HYDROPOWERPLANTMECHANICAL & METAL WORK
DRAWING NO. DRAWING TITLE DRAWING REMARK
METAL WORK
I WEIR FLUSHING GATE & STOPLOG
1 LB403-H01-G01-001 Layout of Weir Flushing Gate & Stoplog 100%
2 LB403-H01-G01-002 General Arrangement of Weir Flushing Gate - Steel Gate Assembly 100%
3 LB403-H01-G01-003 General Arrangement of Weir Flushing Gate - Embeded part 100%
4 LB403-H01-G01-004 General Arrangement of Weir Flushing Stoplog - Steel Stoplog Assembly
5 LB403-H01-G01-005 General Arrangement of Weir Flushing Stoplog - Embeded part
II WEIR TRASH BOOM
1 LB403-H01-G02-001 Layout of Trash Boom
2 LB403-H01-G02-002 General Arrangement of Trash Boom Hanger Support
III INTAKE GATE & STOPLOG
1 LB403-H03-G01-001 Layout of Intake Gate & Stoplog 100%
2 LB403-H03-G01-002 General Arrangement of Intake Gate - Steel Gate Assembly 100%
3 LB403-H03-G01-004 General Arrangement of Intake Gate - Embeded part 100%
4 LB403-H03-G01-005 General Arrangement of Intake Stoplog - Steel Stoplog Assembly
5 LB403-H03-G01-007 General Arrangement of Intake Stoplog - Embeded part
IV SANDTRAP FLUSHING GATE & STOPLOG
1 LB403-H04-G01-001 Layout of Sandtrap Flushing Gate & Stoplog 100%
2 LB403-H04-G01-002 General Arrangement of Sandtrap Flushing Gate - Steel Gate Assembly 100%
3 LB403-H04-G01-004 General Arrangement of Sandtrap Flushing Gate - Embeded part 100%
4 LB403-H04-G01-005 General Arrangement of Sandtrap Flushing Stoplog - Steel Stoplog Assembly
5 LB403-H04-G01-007 General Arrangement of Sandtrap Flushing Stoplog - Embeded part
V HEADPOND FLUSHING GATE & STOPLOG
1 LB403-H07-G01-001 Layout of Headpond Flushing Gate & Stoplog 100%
2 LB403-H07-G01-002 General Arrangement of Headpond Flushing Gate - Steel Gate Assembly 100%3 LB403-H07-G01-004 General Arrangement of Headpond Flushing Gate - Embeded part 100%4 LB403-H07-G01-005 General Arrangement of Headpond Flushing Stoplog - Steel Stoplog Assembly
5 LB403-H07-G01-007 General Arrangement of Headpond Flushing Stoplog - Embeded part
VI HEADPOND TRASH RACK MACHINE
1 LB403-H07-G02-001 Layout of Trash Rack Machine at Tunnel Area 100%
2 LB403-H07-G02-002 General Arrangement of Trash Rack Machine 100%
3 LB403-H07-G02-003 Embedded part of trash rack Machine 100%
7
VII PENSTOCK INLET GATE & STOPLOG
1 LB403-H08-G01-001 Layout of Penstock Inlet Gate & Stoplog 100%
2 LB403-H08-G01-002 General Arrangement of Penstock Inlet Gate - Steel Gate Assembly 100%
3 LB403-H08-G01-003 General Arrangement of Penstock Inlet Gate - Embeded part 100%
4 LB403-H08-G01-004 General Arrangement of Penstock Inlet Stoplog - Steel Stoplog Assembly
5 LB403-H08-G01-005 General Arrangement of Penstock Inlet Stoplog - Embeded part
VIII PENSTOCK
1 LB403-H08-G02-001 General Arrangement of Penstock & long profile 100%
2 LB403-H08-G02-002 General Arrangement of Penstock safety valve 100%
3 LB403-H08-G02-003 General Arrangement of Penstock Bellmouth 100%
5 LB403-H08-G02-004 Penstock, Anchor Ring, Detail And Section 100%
6 LB403-H08-G02-005 Penstock, Upper And Lower Bends 100%
7 LB403-H08-G02-006 Penstock, Ring Girder , Rocker Shoe, Section And Details 100%
8 LB403-H08-G02-007 Expansion Joint, Section And Details 100%
MECHANICAL POWERHOUSE
I TURBINE
1 LB403-M09-G02-101 Layout of Turbine & Generator, instrument, elevation, section 100%
2 LB403-M09-G02-102 Turbine & Generator, Equipment single part 100%
II COOLING WATER & BRAKE SYSTEM
1 LB403-M09-G03-101 Cooling Water System, Piping, Instrument & Brake Diagram (P&ID) 100%
2 LB403-M09-G03-102 Cooling Water System, Piping, Equipment Plan, Elevation, Brake, Section 100%
ITEM NO.
3 LB403-M09-G03-103 Cooling Water System, Piping Support 100%
DOCUMENT LIST CISANGGIRI 2 x 1.5 MW, HYDROPOWERPLANTMBOP & METAL WORK
DOCUMENT NO. DOCUMENT TITLE DOC REMARK
I GENERAL
1 LB401-M00-D01-101 Document List
2 LB401-M00-D01-102 Drawing List
3 LB401-M00-D01-105 Transient analysis
II WEIR FLUSHING GATE & STOPLOG
1 LB401-H01-D01-301 Weir Flood Gate - Steel Gate Design Calculation
2 LB401-H01-D01-302 Weir Flood Gate - Hoisting load & Drive System Design Calculation
3 LB401-H01-D01-303 Weir Flood Gate - Embedded part Design Calculation
4 LB401-H01-D01-304 Weir Flood Stoplog - Steel Stoplog Design Calculation
5 LB401-H01-D01-305 Weir Flood Stoplog - Hoisting load & Drive system Design Calculation
6 LB401-H01-D01-306 Weir Flood Stoplog - Embeded part Design Calculation
7 LB401-H01-D01-201 Design Criteria - Weir Flood Gates
8 LB401-H01-D01-202 Design Criteria - Weir Flood Stoplog
9 LB401-H01-D01-501 Technical Specification - Weir Flood Gates
10 LB401-H01-D01-502 Technical Specification - Weir Flood Stoplog
11 LB401-H01-D01-503 Technical Agreement - Weir Flood Gate
12 LB401-H01-D01-504 Technical Agreement - Weir Flood Stoplog
13 LB401-H01-D01-701 Bill of Material - Weir Flood Gate
14 LB401-H01-D01-702 Bill of Material - Weir Flood Stoplog
15 LB401-H01-D01-703 Bill of Material - Embeded of Weir Flood Gate
16 LB401-H01-D01-704 Bill of Material - Embeded of Weir Flood Stoplog
17 LB401-H01-D01-103 Equipment list - Weir Flood Gate & Stoplog
18 LB401-H01-D02-701 Comissioning & Performa Test Procedure - Weir Flood Gate & Stoplog
19 LB401-H01-D02-801 Operation & maintenance manual procedure - Weir Flood gate & Stoplog
III INTAKE GATE & STOPLOG
1 LB401-H03-D01-301 Intake Gate - Steel Gate Design Calculation
2 LB401-H03-D01-302 Intake Gate - Hoisting load & Drive System Design Calculation
3 LB401-H03-D01-303 Intake Gate - Embedded part Design Calculation
4 LB401-H03-D01-304 Intake Stoplog - Steel Stoplog Design Calculation
5 LB401-H03-D01-305 Intake Stoplog - Hoisting load & Drive system Design Calculation
6 LB401-H03-D01-306 Intake Stoplog - Embedded part Design Calculation
7 LB401-H03-D01-201 Design Criteria - Intake Gate
8 LB401-H03-D01-202 Design Criteria - Intake Stoplog
9 LB401-H03-D01-501 Technical Specification - Intake Gate
10 LB401-H03-D01-502 Technical Specification - Intake Stoplog
11 LB401-H03-D01-503 Technical Agreement - Intake Gate
12 LB401-H03-D01-504 Technical Agreement - Intake Stoplog
13 LB401-H03-D01-701 Bill of Material - Intake Gate
14 LB401-H03-D01-702 Bill of Material - Intake Stoplog
15 LB401-H03-D01-703 Bill of Material - Embedded of Intake Gate
16 LB401-H03-D01-704 Bill of Material - Embedded of Intake Stoplog
17 LB401-H03-D01-103 Equipment list - Intake Gate & Stoplog
18 LB401-H03-D02-701 Comissioning & Performa Test Procedure - Intake Gate & Stoplog
19 LB401-H03-D02-801 Operation & maintenance manual procedure - Intake gate & Stoplog
IV SANDTRAP FLUSHING GATE & STOPLOG
1 LB401-H04-D01-301 Sandtrap Flushing Gate - Steel Gate Design Calculation
2 LB401-H04-D01-303 Sandtrap Flushing Gate - Hoisting load & Drive System Design Calculation
3 LB401-H04-D01-304 Sandtrap Flushing Gate - Embedded part Design Calculation
4 LB401-H04-D01-306 Sandtrap Flushing Stoplog - Steel Stoplog Design Calculation
5 LB401-H04-D01-307 Sandtrap Flushing Stoplog - Hoisting load & Drive system Design Calculation
6 LB401-H04-D01-309 Sandtrap Flushing Stoplog - Embedded part Design Calculation
7 LB401-H04-D01-201 Design Criteria - Sandtrap Flushing Gate
8 LB401-H04-D01-202 Design Criteria - Sandtrap Flushing Stoplog
9 LB401-H04-D01-501 Technical Specification - Sandtrap Flushing Gate
10 LB401-H04-D01-502 Technical Specification - Sandtrap Flushing Stoplog
11 LB401-H04-D01-503 Technical Agreement - Sandtrap Flushing Gate
ITEM NO.
12 LB401-H04-D01-504 Technical Agreement - Sandtrap Flushing Stoplog
13 LB401-H04-D01-701 Bill of Material - Sandtrap Flushing Gate
14 LB401-H04-D01-702 Bill of Material - Sandtrap Flushing Stoplog
15 LB401-H04-D01-703 Bill of Material - Embedded of Sandtrap Flushing Gate
16 LB401-H04-D01-704 Bill of Material - Embedded of Sandtrap Flushing Stoplog
17 LB401-H04-D01-103 Equipment list - Sandtrap flushing Gate & Stoplog
18 LB401-H04-D02-701 Comissioning & Performa Test Procedure - Sandtrap Flushing Gate & Stoplog
19 LB401-H04-D02-801 Operation & maintenance manual procedure - Sandtrap Flushing gate & Stoplog
V HEADPOND FLUSHING GATE & STOPLOG
1 LB401-H06-D01-301 Headpond Flushing Gate - Steel Gate Design Calculation
2 LB401-H06-D01-302 Headpond Flushing Gate - Hoisting load & Drive System Design Calculation
3 LB401-H06-D01-303 Headpond Flushing Gate - Embedded part Design Calculation
4 LB401-H06-D01-304 Headpond Flushing Stoplog - Steel Stoplog Design Calculation
5 LB401-H06-D01-305 Headpond Flushing Stoplog - Hoisting load & Drive system Design Calculation
6 LB401-H06-D01-306 Headpond Flushing Stoplog - Embedded part Design Calculation
7 LB401-H06-D01-201 Design Criteria - Headpond Flushing Gate
8 LB401-H06-D01-202 Design Criteria - Headpond Flushing Stoplog
9 LB401-H06-D01-501 Technical Specification - Headpond Flushing Gate
10 LB401-H06-D01-502 Technical Specification - Headpond Flushing Stoplog
11 LB401-H06-D01-503 Technical Agreement - Headpond Flushing Gate
12 LB401-H06-D01-504 Technical Agreement - Headpond Flushing Stoplog
13 LB401-H06-D01-701 Bill of Material - Headpond Flushing Gate
14 LB401-H06-D01-702 Bill of Material - Headpond Flushing Stoplog
15 LB401-H06-D01-703 Bill of Material - Embedded of Headpond Flushing Gate
16 LB401-H06-D01-704 Bill of Material - Embedded of Headpond Flushing Stoplog
17 LB401-H06-D01-103 Equipment list - Headpond Flushing Gate & Stoplog
18 LB401-H06-D02-701 Comissioning & Performa Test Procedure - Headpond Flushing Gate & Stoplog
19 LB401-H06-D02-801 Operation & maintenance manual procedure - Headpond Flushing Gate & Stoplog
VI HEADPOND TRASH RACK MACHINE
1 LB401-H06-D01-307 Intake Trash Rack - Trash Rack Design Calculation
2 LB401-H06-D01-308 Intake Trash Rack - Cleaning Machine Design Calculation
3 LB401-H06-D01-309 Intake Trash Rack - Embeded part Design Calculation
4 LB401-H06-D01-310 Design Criteria - Intake Trash Rack Machine
5 LB401-H06-D01-505 Technical Specification - intake Trash Rack Machine
6 LB401-H06-D01-705 Bill of Material - Intake Trash Rack
7 LB401-H06-D01-706 Bill of Material - Embeded part of Trash Rack
8 LB401-H06-D01-104 Equipment list - Intake Trash Rack
9 LB401-H06-D02-702 Comissioning & Performa Test Procedure - Intake Trash Rack
10 LB401-H06-D02-802 Operation & maintenance manual procedure - Intake Trash Rack
VII PENSTOCK INLET GATE & STOPLOG
1 LB401-H07-D01-301 Penstock Inlet Gate - Steel Gate Design Calculation
2 LB401-H07-D01-302 Penstock Inlet Gate - Hoisting load & Drive System Design Calculation
3 LB401-H07-D01-303 Penstock Inlet Gate - Embedded part Design Calculation
4 LB401-H07-D01-304 Penstock Inlet Stoplog - Steel Stoplog Design Calculation
5 LB401-H07-D01-305 Penstock Inlet Stoplog - Hoisting load & Drive system Design Calculation
6 LB401-H07-D01-306 Penstock Inlet Stoplog - Embedded part Design Calculation
7 LB401-H07-D01-201 Design Criteria - Penstock Inlet Gate
8 LB401-H07-D01-202 Design Criteria - Penstock Inlet Stoplog
9 LB401-H07-D01-501 Technical Specification - Penstock Inlet Gate
10 LB401-H07-D01-502 Technical Specification - Penstock Inlet Stoplog
11 LB401-H07-D01-503 Technical Agreement - Penstock Inlet Gate
12 LB401-H07-D01-504 Technical Agreement - Penstock Inlet Stoplog
13 LB401-H07-D01-701 Bill of Material - Penstock Inlet Gate
14 LB401-H07-D01-702 Bill of Material - Penstock Inlet Stoplog
15 LB401-H07-D01-703 Bill of Material - Embedded of Penstock Inlet Gate
16 LB401-H07-D01-704 Bill of Material - Embedded of Penstock Inlet Stoplog
17 LB401-H07-D01-103 Equipment list - Penstock Inlet Gate & Stoplog
18 LB401-H07-D02-701 Comissioning & Performa Test Procedure - Penstock Inlet Gate & Stoplog
19 LB401-H07-D02-801 Operation & maintenance manual procedure - Penstock Inlet Gate & Stoplog
MBOP POWERHOUSE
I GENERAL
1 LB401-M09-D01-103 Equipment List
2 LB401-M09-D01-104 Valve/Dumper List List
II QUALITY PROCEDURE
1 LB401-M09-D02-201 General Specification for Welding Inspection
2 LB401-M09-D02-202 Specification for Shop Inspection and Test Plan
3 LB401-M09-D02-203 Inspection and Test Plan for Construction of Piping
4 LB401-M09-D02-204 Hydrostatic Pressure Test Procedure for Piping
III FABRICATION AND INSTALLATION PROCEDURE
1 LB401-M09-D02-502 Blasting and Painting Procedure
2 LB401-M09-D02-601 Piping Installation Procedure
3 LB401-M09-D02-602 Valve Installation Procedure
IV COOLING WATER & BRAKE SYSTEM
1 LB401-M09-D01-201 Cooling Water & Brake System, Design Criteria
2 LB401-M09-D01-301 Cooling Water & Brake System, Design Calculation
3 LB401-M09-D01-401 Cooling Water & Brake System, Design Report
4 LB401-M09-D01-501 Cooling Water & Brake System, Technical Specification
5 LB401-M09-D01-601 Cooling Water & Brake System, Bill of Quantity
6 LB401-M09-D02-801 Cooling Water & Brake System, Operation and Maintenance Manual
7 LB401-M09-D02-701 Cooling Water & Brake System, Test and Commisioning Procedure
8 LB401-M09-D04-201 Cooling Water & Brake System, Test and Commisioning Report
9 LB401-M09-D04-301 Cooling Water System & Brake, Completion Report