DRAWING LIST CISANGGIRI 2 x 1.5 MW - HYDROPOWERPLANT MECHANICAL & METAL WORK DRAWING NO. DRAWING TITLE METAL WORK I WEIR FLUSHING GATE & STOPLOG 1 LB403-H01-G01-001 Layout of Weir Flushing Gate & Stoplog 2 LB403-H01-G01-002 General Arrangement of Weir Flushing Gate - Steel Gate Assembly 3 LB403-H01-G01-003 General Arrangement of Weir Flushing Gate - Embeded part 4 LB403-H01-G01-004 General Arrangement of Weir Flushing Stoplog - Steel Stoplog Assembly 5 LB403-H01-G01-005 General Arrangement of Weir Flushing Stoplog - Embeded part II WEIR TRASH BOOM 1 LB403-H01-G02-001 Layout of Trash Boom 2 LB403-H01-G02-002 General Arrangement of Trash Boom Hanger Support III INTAKE GATE & STOPLOG 1 LB403-H03-G01-001 Layout of Intake Gate & Stoplog 2 LB403-H03-G01-002 General Arrangement of Intake Gate - Steel Gate Assembly 3 LB403-H03-G01-004 General Arrangement of Intake Gate - Embeded part 4 LB403-H03-G01-005 General Arrangement of Intake Stoplog - Steel Stoplog Assembly 5 LB403-H03-G01-007 General Arrangement of Intake Stoplog - Embeded part IV SANDTRAP FLUSHING GATE & STOPLOG 1 LB403-H04-G01-001 Layout of Sandtrap Flushing Gate & Stoplog 2 LB403-H04-G01-002 General Arrangement of Sandtrap Flushing Gate - Steel Gate Assembly 3 LB403-H04-G01-004 General Arrangement of Sandtrap Flushing Gate - Embeded part 4 LB403-H04-G01-005 General Arrangement of Sandtrap Flushing Stoplog - Steel Stoplog Assembly 5 LB403-H04-G01-007 General Arrangement of Sandtrap Flushing Stoplog - Embeded part V HEADPOND FLUSHING GATE & STOPLOG 1 LB403-H07-G01-001 Layout of Headpond Flushing Gate & Stoplog 2 LB403-H07-G01-002 General Arrangement of Headpond Flushing Gate - Steel Gate Assembly 3 LB403-H07-G01-004 General Arrangement of Headpond Flushing Gate - Embeded part 4 LB403-H07-G01-005 General Arrangement of Headpond Flushing Stoplog - Steel Stoplog Assembly 5 LB403-H07-G01-007 General Arrangement of Headpond Flushing Stoplog - Embeded part VI HEADPOND TRASH RACK MACHINE 1 LB403-H07-G02-001 Layout of Trash Rack Machine at Tunnel Area 2 LB403-H07-G02-002 General Arrangement of Trash Rack Machine 3 LB403-H07-G02-003 Embedded part of trash rack Machine 7 VII PENSTOCK INLET GATE & STOPLOG 1 LB403-H08-G01-001 Layout of Penstock Inlet Gate & Stoplog 2 LB403-H08-G01-002 General Arrangement of Penstock Inlet Gate - Steel Gate Assembly 3 LB403-H08-G01-003 General Arrangement of Penstock Inlet Gate - Embeded part 4 LB403-H08-G01-004 General Arrangement of Penstock Inlet Stoplog - Steel Stoplog Assembly 5 LB403-H08-G01-005 General Arrangement of Penstock Inlet Stoplog - Embeded part VIII PENSTOCK 1 LB403-H08-G02-001 General Arrangement of Penstock & long profile 2 LB403-H08-G02-002 General Arrangement of Penstock safety valve 3 LB403-H08-G02-003 General Arrangement of Penstock Bellmouth 5 LB403-H08-G02-004 Penstock, Anchor Ring, Detail And Section 6 LB403-H08-G02-005 Penstock, Upper And Lower Bends 7 LB403-H08-G02-006 Penstock, Ring Girder , Rocker Shoe, Section And Details 8 LB403-H08-G02-007 Expansion Joint, Section And Details MECHANICAL POWERHOUSE I TURBINE 1 LB403-M09-G02-101 Layout of Turbine & Generator, instrument, elevation, section 2 LB403-M09-G02-102 Turbine & Generator, Equipment single part II COOLING WATER & BRAKE SYSTEM 1 LB403-M09-G03-101 Cooling Water System, Piping, Instrument & Brake Diagram (P&ID) 2 LB403-M09-G03-102 Cooling Water System, Piping, Equipment Plan, Elevation, Brake, Section ITEM NO.

Upload: zoebair

Post on 25-Oct-2015

21 views

Category:

Documents


3 download

DESCRIPTION

g

TRANSCRIPT

Page 1: Drawing & Document List Cisanggiri 2 x 1.5 MW

DRAWING LIST CISANGGIRI 2 x 1.5 MW - HYDROPOWERPLANTMECHANICAL & METAL WORK

DRAWING NO. DRAWING TITLE DRAWING REMARK

METAL WORK

I WEIR FLUSHING GATE & STOPLOG

1 LB403-H01-G01-001 Layout of Weir Flushing Gate & Stoplog 100%

2 LB403-H01-G01-002 General Arrangement of Weir Flushing Gate - Steel Gate Assembly 100%

3 LB403-H01-G01-003 General Arrangement of Weir Flushing Gate - Embeded part 100%

4 LB403-H01-G01-004 General Arrangement of Weir Flushing Stoplog - Steel Stoplog Assembly

5 LB403-H01-G01-005 General Arrangement of Weir Flushing Stoplog - Embeded part

II WEIR TRASH BOOM

1 LB403-H01-G02-001 Layout of Trash Boom

2 LB403-H01-G02-002 General Arrangement of Trash Boom Hanger Support

III INTAKE GATE & STOPLOG

1 LB403-H03-G01-001 Layout of Intake Gate & Stoplog 100%

2 LB403-H03-G01-002 General Arrangement of Intake Gate - Steel Gate Assembly 100%

3 LB403-H03-G01-004 General Arrangement of Intake Gate - Embeded part 100%

4 LB403-H03-G01-005 General Arrangement of Intake Stoplog - Steel Stoplog Assembly

5 LB403-H03-G01-007 General Arrangement of Intake Stoplog - Embeded part

IV SANDTRAP FLUSHING GATE & STOPLOG

1 LB403-H04-G01-001 Layout of Sandtrap Flushing Gate & Stoplog 100%

2 LB403-H04-G01-002 General Arrangement of Sandtrap Flushing Gate - Steel Gate Assembly 100%

3 LB403-H04-G01-004 General Arrangement of Sandtrap Flushing Gate - Embeded part 100%

4 LB403-H04-G01-005 General Arrangement of Sandtrap Flushing Stoplog - Steel Stoplog Assembly

5 LB403-H04-G01-007 General Arrangement of Sandtrap Flushing Stoplog - Embeded part

V HEADPOND FLUSHING GATE & STOPLOG

1 LB403-H07-G01-001 Layout of Headpond Flushing Gate & Stoplog 100%

2 LB403-H07-G01-002 General Arrangement of Headpond Flushing Gate - Steel Gate Assembly 100%3 LB403-H07-G01-004 General Arrangement of Headpond Flushing Gate - Embeded part 100%4 LB403-H07-G01-005 General Arrangement of Headpond Flushing Stoplog - Steel Stoplog Assembly

5 LB403-H07-G01-007 General Arrangement of Headpond Flushing Stoplog - Embeded part

VI HEADPOND TRASH RACK MACHINE

1 LB403-H07-G02-001 Layout of Trash Rack Machine at Tunnel Area 100%

2 LB403-H07-G02-002 General Arrangement of Trash Rack Machine 100%

3 LB403-H07-G02-003 Embedded part of trash rack Machine 100%

7

VII PENSTOCK INLET GATE & STOPLOG

1 LB403-H08-G01-001 Layout of Penstock Inlet Gate & Stoplog 100%

2 LB403-H08-G01-002 General Arrangement of Penstock Inlet Gate - Steel Gate Assembly 100%

3 LB403-H08-G01-003 General Arrangement of Penstock Inlet Gate - Embeded part 100%

4 LB403-H08-G01-004 General Arrangement of Penstock Inlet Stoplog - Steel Stoplog Assembly

5 LB403-H08-G01-005 General Arrangement of Penstock Inlet Stoplog - Embeded part

VIII PENSTOCK

1 LB403-H08-G02-001 General Arrangement of Penstock & long profile 100%

2 LB403-H08-G02-002 General Arrangement of Penstock safety valve 100%

3 LB403-H08-G02-003 General Arrangement of Penstock Bellmouth 100%

5 LB403-H08-G02-004 Penstock, Anchor Ring, Detail And Section 100%

6 LB403-H08-G02-005 Penstock, Upper And Lower Bends 100%

7 LB403-H08-G02-006 Penstock, Ring Girder , Rocker Shoe, Section And Details 100%

8 LB403-H08-G02-007 Expansion Joint, Section And Details 100%

MECHANICAL POWERHOUSE

I TURBINE

1 LB403-M09-G02-101 Layout of Turbine & Generator, instrument, elevation, section 100%

2 LB403-M09-G02-102 Turbine & Generator, Equipment single part 100%

II COOLING WATER & BRAKE SYSTEM

1 LB403-M09-G03-101 Cooling Water System, Piping, Instrument & Brake Diagram (P&ID) 100%

2 LB403-M09-G03-102 Cooling Water System, Piping, Equipment Plan, Elevation, Brake, Section 100%

ITEM NO.

Page 2: Drawing & Document List Cisanggiri 2 x 1.5 MW

3 LB403-M09-G03-103 Cooling Water System, Piping Support 100%

Page 3: Drawing & Document List Cisanggiri 2 x 1.5 MW

DOCUMENT LIST CISANGGIRI 2 x 1.5 MW, HYDROPOWERPLANTMBOP & METAL WORK

DOCUMENT NO. DOCUMENT TITLE DOC REMARK

I GENERAL

1 LB401-M00-D01-101 Document List

2 LB401-M00-D01-102 Drawing List

3 LB401-M00-D01-105 Transient analysis

II WEIR FLUSHING GATE & STOPLOG

1 LB401-H01-D01-301 Weir Flood Gate - Steel Gate Design Calculation

2 LB401-H01-D01-302 Weir Flood Gate - Hoisting load & Drive System Design Calculation

3 LB401-H01-D01-303 Weir Flood Gate - Embedded part Design Calculation

4 LB401-H01-D01-304 Weir Flood Stoplog - Steel Stoplog Design Calculation

5 LB401-H01-D01-305 Weir Flood Stoplog - Hoisting load & Drive system Design Calculation

6 LB401-H01-D01-306 Weir Flood Stoplog - Embeded part Design Calculation

7 LB401-H01-D01-201 Design Criteria - Weir Flood Gates

8 LB401-H01-D01-202 Design Criteria - Weir Flood Stoplog

9 LB401-H01-D01-501 Technical Specification - Weir Flood Gates

10 LB401-H01-D01-502 Technical Specification - Weir Flood Stoplog

11 LB401-H01-D01-503 Technical Agreement - Weir Flood Gate

12 LB401-H01-D01-504 Technical Agreement - Weir Flood Stoplog

13 LB401-H01-D01-701 Bill of Material - Weir Flood Gate

14 LB401-H01-D01-702 Bill of Material - Weir Flood Stoplog

15 LB401-H01-D01-703 Bill of Material - Embeded of Weir Flood Gate

16 LB401-H01-D01-704 Bill of Material - Embeded of Weir Flood Stoplog

17 LB401-H01-D01-103 Equipment list - Weir Flood Gate & Stoplog

18 LB401-H01-D02-701 Comissioning & Performa Test Procedure - Weir Flood Gate & Stoplog

19 LB401-H01-D02-801 Operation & maintenance manual procedure - Weir Flood gate & Stoplog

III INTAKE GATE & STOPLOG

1 LB401-H03-D01-301 Intake Gate - Steel Gate Design Calculation

2 LB401-H03-D01-302 Intake Gate - Hoisting load & Drive System Design Calculation

3 LB401-H03-D01-303 Intake Gate - Embedded part Design Calculation

4 LB401-H03-D01-304 Intake Stoplog - Steel Stoplog Design Calculation

5 LB401-H03-D01-305 Intake Stoplog - Hoisting load & Drive system Design Calculation

6 LB401-H03-D01-306 Intake Stoplog - Embedded part Design Calculation

7 LB401-H03-D01-201 Design Criteria - Intake Gate

8 LB401-H03-D01-202 Design Criteria - Intake Stoplog

9 LB401-H03-D01-501 Technical Specification - Intake Gate

10 LB401-H03-D01-502 Technical Specification - Intake Stoplog

11 LB401-H03-D01-503 Technical Agreement - Intake Gate

12 LB401-H03-D01-504 Technical Agreement - Intake Stoplog

13 LB401-H03-D01-701 Bill of Material - Intake Gate

14 LB401-H03-D01-702 Bill of Material - Intake Stoplog

15 LB401-H03-D01-703 Bill of Material - Embedded of Intake Gate

16 LB401-H03-D01-704 Bill of Material - Embedded of Intake Stoplog

17 LB401-H03-D01-103 Equipment list - Intake Gate & Stoplog

18 LB401-H03-D02-701 Comissioning & Performa Test Procedure - Intake Gate & Stoplog

19 LB401-H03-D02-801 Operation & maintenance manual procedure - Intake gate & Stoplog

IV SANDTRAP FLUSHING GATE & STOPLOG

1 LB401-H04-D01-301 Sandtrap Flushing Gate - Steel Gate Design Calculation

2 LB401-H04-D01-303 Sandtrap Flushing Gate - Hoisting load & Drive System Design Calculation

3 LB401-H04-D01-304 Sandtrap Flushing Gate - Embedded part Design Calculation

4 LB401-H04-D01-306 Sandtrap Flushing Stoplog - Steel Stoplog Design Calculation

5 LB401-H04-D01-307 Sandtrap Flushing Stoplog - Hoisting load & Drive system Design Calculation

6 LB401-H04-D01-309 Sandtrap Flushing Stoplog - Embedded part Design Calculation

7 LB401-H04-D01-201 Design Criteria - Sandtrap Flushing Gate

8 LB401-H04-D01-202 Design Criteria - Sandtrap Flushing Stoplog

9 LB401-H04-D01-501 Technical Specification - Sandtrap Flushing Gate

10 LB401-H04-D01-502 Technical Specification - Sandtrap Flushing Stoplog

11 LB401-H04-D01-503 Technical Agreement - Sandtrap Flushing Gate

ITEM NO.

Page 4: Drawing & Document List Cisanggiri 2 x 1.5 MW

12 LB401-H04-D01-504 Technical Agreement - Sandtrap Flushing Stoplog

13 LB401-H04-D01-701 Bill of Material - Sandtrap Flushing Gate

14 LB401-H04-D01-702 Bill of Material - Sandtrap Flushing Stoplog

15 LB401-H04-D01-703 Bill of Material - Embedded of Sandtrap Flushing Gate

16 LB401-H04-D01-704 Bill of Material - Embedded of Sandtrap Flushing Stoplog

17 LB401-H04-D01-103 Equipment list - Sandtrap flushing Gate & Stoplog

18 LB401-H04-D02-701 Comissioning & Performa Test Procedure - Sandtrap Flushing Gate & Stoplog

19 LB401-H04-D02-801 Operation & maintenance manual procedure - Sandtrap Flushing gate & Stoplog

V HEADPOND FLUSHING GATE & STOPLOG

1 LB401-H06-D01-301 Headpond Flushing Gate - Steel Gate Design Calculation

2 LB401-H06-D01-302 Headpond Flushing Gate - Hoisting load & Drive System Design Calculation

3 LB401-H06-D01-303 Headpond Flushing Gate - Embedded part Design Calculation

4 LB401-H06-D01-304 Headpond Flushing Stoplog - Steel Stoplog Design Calculation

5 LB401-H06-D01-305 Headpond Flushing Stoplog - Hoisting load & Drive system Design Calculation

6 LB401-H06-D01-306 Headpond Flushing Stoplog - Embedded part Design Calculation

7 LB401-H06-D01-201 Design Criteria - Headpond Flushing Gate

8 LB401-H06-D01-202 Design Criteria - Headpond Flushing Stoplog

9 LB401-H06-D01-501 Technical Specification - Headpond Flushing Gate

10 LB401-H06-D01-502 Technical Specification - Headpond Flushing Stoplog

11 LB401-H06-D01-503 Technical Agreement - Headpond Flushing Gate

12 LB401-H06-D01-504 Technical Agreement - Headpond Flushing Stoplog

13 LB401-H06-D01-701 Bill of Material - Headpond Flushing Gate

14 LB401-H06-D01-702 Bill of Material - Headpond Flushing Stoplog

15 LB401-H06-D01-703 Bill of Material - Embedded of Headpond Flushing Gate

16 LB401-H06-D01-704 Bill of Material - Embedded of Headpond Flushing Stoplog

17 LB401-H06-D01-103 Equipment list - Headpond Flushing Gate & Stoplog

18 LB401-H06-D02-701 Comissioning & Performa Test Procedure - Headpond Flushing Gate & Stoplog

19 LB401-H06-D02-801 Operation & maintenance manual procedure - Headpond Flushing Gate & Stoplog

VI HEADPOND TRASH RACK MACHINE

1 LB401-H06-D01-307 Intake Trash Rack - Trash Rack Design Calculation

2 LB401-H06-D01-308 Intake Trash Rack - Cleaning Machine Design Calculation

3 LB401-H06-D01-309 Intake Trash Rack - Embeded part Design Calculation

4 LB401-H06-D01-310 Design Criteria - Intake Trash Rack Machine

5 LB401-H06-D01-505 Technical Specification - intake Trash Rack Machine

6 LB401-H06-D01-705 Bill of Material - Intake Trash Rack

7 LB401-H06-D01-706 Bill of Material - Embeded part of Trash Rack

8 LB401-H06-D01-104 Equipment list - Intake Trash Rack

9 LB401-H06-D02-702 Comissioning & Performa Test Procedure - Intake Trash Rack

10 LB401-H06-D02-802 Operation & maintenance manual procedure - Intake Trash Rack

VII PENSTOCK INLET GATE & STOPLOG

1 LB401-H07-D01-301 Penstock Inlet Gate - Steel Gate Design Calculation

2 LB401-H07-D01-302 Penstock Inlet Gate - Hoisting load & Drive System Design Calculation

3 LB401-H07-D01-303 Penstock Inlet Gate - Embedded part Design Calculation

4 LB401-H07-D01-304 Penstock Inlet Stoplog - Steel Stoplog Design Calculation

5 LB401-H07-D01-305 Penstock Inlet Stoplog - Hoisting load & Drive system Design Calculation

6 LB401-H07-D01-306 Penstock Inlet Stoplog - Embedded part Design Calculation

7 LB401-H07-D01-201 Design Criteria - Penstock Inlet Gate

8 LB401-H07-D01-202 Design Criteria - Penstock Inlet Stoplog

9 LB401-H07-D01-501 Technical Specification - Penstock Inlet Gate

10 LB401-H07-D01-502 Technical Specification - Penstock Inlet Stoplog

11 LB401-H07-D01-503 Technical Agreement - Penstock Inlet Gate

12 LB401-H07-D01-504 Technical Agreement - Penstock Inlet Stoplog

13 LB401-H07-D01-701 Bill of Material - Penstock Inlet Gate

14 LB401-H07-D01-702 Bill of Material - Penstock Inlet Stoplog

15 LB401-H07-D01-703 Bill of Material - Embedded of Penstock Inlet Gate

16 LB401-H07-D01-704 Bill of Material - Embedded of Penstock Inlet Stoplog

17 LB401-H07-D01-103 Equipment list - Penstock Inlet Gate & Stoplog

18 LB401-H07-D02-701 Comissioning & Performa Test Procedure - Penstock Inlet Gate & Stoplog

19 LB401-H07-D02-801 Operation & maintenance manual procedure - Penstock Inlet Gate & Stoplog

MBOP POWERHOUSE

I GENERAL

Page 5: Drawing & Document List Cisanggiri 2 x 1.5 MW

1 LB401-M09-D01-103 Equipment List

2 LB401-M09-D01-104 Valve/Dumper List List

II QUALITY PROCEDURE

1 LB401-M09-D02-201 General Specification for Welding Inspection

2 LB401-M09-D02-202 Specification for Shop Inspection and Test Plan

3 LB401-M09-D02-203 Inspection and Test Plan for Construction of Piping

4 LB401-M09-D02-204 Hydrostatic Pressure Test Procedure for Piping

III FABRICATION AND INSTALLATION PROCEDURE

1 LB401-M09-D02-502 Blasting and Painting Procedure

2 LB401-M09-D02-601 Piping Installation Procedure

3 LB401-M09-D02-602 Valve Installation Procedure

IV COOLING WATER & BRAKE SYSTEM

1 LB401-M09-D01-201 Cooling Water & Brake System, Design Criteria

2 LB401-M09-D01-301 Cooling Water & Brake System, Design Calculation

3 LB401-M09-D01-401 Cooling Water & Brake System, Design Report

4 LB401-M09-D01-501 Cooling Water & Brake System, Technical Specification

5 LB401-M09-D01-601 Cooling Water & Brake System, Bill of Quantity

6 LB401-M09-D02-801 Cooling Water & Brake System, Operation and Maintenance Manual

7 LB401-M09-D02-701 Cooling Water & Brake System, Test and Commisioning Procedure

8 LB401-M09-D04-201 Cooling Water & Brake System, Test and Commisioning Report

9 LB401-M09-D04-301 Cooling Water System & Brake, Completion Report