1 Dredged material as a resource: Options and constraints Lindsay Murray, Cefas PIANC EnviCom WG 14 PIANC report no 104-2009 Connecting the World through Dredging 2 March 2009 ACP:Ascanio Arosemena Complex, Balboa, Panama Introduction Definition of Use of Dredged Material Options and Constraints for Use Examples of Engineering Uses Examples of Environmental Enhancement Case studies Conclusions and Recommendations

Upload: haquynh

Post on 31-Mar-2018

232 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Dredged material as a resource: Options and constraints · PDF file1 Dredged material as a resource: Options and constraints Lindsay Murray, Cefas PIANC EnviCom WG 14 PIANC report

1

Dredged material as a resource: Options and constraints

Lindsay Murray, Cefas

PIANC EnviCom WG 14

PIANC report no 104-2009

Connecting the World through Dredging2 March 2009ACP:Ascanio Arosemena Complex,Balboa, Panama

•Introduction•Definition of Use of Dredged Material•Options and Constraints for Use•Examples of Engineering Uses•Examples of Environmental Enhancement•Case studies•Conclusions and Recommendations

Page 2: Dredged material as a resource: Options and constraints · PDF file1 Dredged material as a resource: Options and constraints Lindsay Murray, Cefas PIANC EnviCom WG 14 PIANC report

2

IntroductionDredging is essential for development and maintenance -> large volumes of dredged material

Much dredged material suitable for use is currently disposed

Dredged material is a material naturally present in our waterways, mainly uncontaminated

Contamination does not rule out use, but reduces possibilities depending on legislation and site-specific conditions. Treatment to remove or stabilise contaminants does increase costs.

• Report by PIANC in 1992 on Beneficial use

• Many new developments made that Envicomformulated new TOR in 2004

• Start PIANC EnviCom WG 14 in 2004

• Report no 104-2009 published in January 2009

• Our report captures experience gained since then, provides guidance and makes recommendations based on lessons learned in case studies

Page 3: Dredged material as a resource: Options and constraints · PDF file1 Dredged material as a resource: Options and constraints Lindsay Murray, Cefas PIANC EnviCom WG 14 PIANC report

3

PIANC WG 14• Lindsay Murray (chairman), Cefas,

UK• Siegfried D’haene, DEC, Belgium• Pol Hakstege, Rijkswaterstaat, NL• Lena Paipai, Halcrow Group Ltd,

UAE• Yasushi Hosokawa, PARI, Japan• Jose Buceta, Min. of Env., Spain• Keita Furukawa, Min. of Land,

Infrastructure and Transport, Japan

• Najat Chaouq, DRAPOR, Morocco• Jack Word, NewFields NW, USA• Alejandro Varas, Port of Aviles,

Spain• Liesbet van den Abeele, Min. of

the Flemish Community, Belgium• Hugo De Vlieger, Baggerwerken

De Cloedt, Belgium

Definition

• Widest range of options• (Beneficial) use= any use rather than mere disposal• Including sustainable relocation= the discharge of dredged material into aquatic

systems to derive environmental benefit by maintaining or supplementing sediment balance

Page 4: Dredged material as a resource: Options and constraints · PDF file1 Dredged material as a resource: Options and constraints Lindsay Murray, Cefas PIANC EnviCom WG 14 PIANC report

4

Options for useEngineering Uses:

– Construction materials– Isolation– Flood and coastal protection– Land improvement– Placement on banks of waterways

Environmental Enhancement:– Habitat creation and enhancement– Aquaculture– Agriculture– Recreation– Water quality improvement– Sustainable relocation– Filling of deep borrow pits

Examples of Engineering uses of dredged material

Page 5: Dredged material as a resource: Options and constraints · PDF file1 Dredged material as a resource: Options and constraints Lindsay Murray, Cefas PIANC EnviCom WG 14 PIANC report

5

Examples of environmental uses of dredged material

Bird IslandGalveston Bay USA

Humber estuary UK

Sustainable relocation

Tidal flats Japan Aquaculture Japan

Japan: 90% Use of Dredged Material(2003)

Page 6: Dredged material as a resource: Options and constraints · PDF file1 Dredged material as a resource: Options and constraints Lindsay Murray, Cefas PIANC EnviCom WG 14 PIANC report

6

Constraints• In general higher costs of treatment & use compared

with disposal• Difficulty of finding suitable locations to use dredged

materials• Lack of markets for products as secondary raw materials• Complex legislation e.g. limitations for use due to

standards for the products, dredged material sometimes classified as waste

• Negative public perception and low awareness to consider treatment & use and/or acceptance of products

Page 7: Dredged material as a resource: Options and constraints · PDF file1 Dredged material as a resource: Options and constraints Lindsay Murray, Cefas PIANC EnviCom WG 14 PIANC report

7

Case studiesCategories of case studies

02468

1012

cons

truct

ion

mat

eria

ls

isol

atio

n

flood

defe

nce

plac

emen

t

on b

anks

habi

tat

crea

tion

aqua

cultu

re

recr

eatio

n

sust

aina

ble

relo

catio

n

Category of use

Num

ber o

f cas

e st

udie

s

Distribution of case studies

0

1

2

3

4

5

6

Be Ge It Jp Nl NZL Sp UK US

countries

num

ber o

f cas

e st

udie

s

Engineering uses 17Environmental uses 16Number of case studies 24 (some deal with several categories)

Chubu Airport (Japan) construction with DM (9 Mm3) with cement (pneumatic flow mixing)

Constructed by dredged material

Nagoya Port Chubu International Airport

Port Project Air Port Project

Dredging Transportation Solidification Land fill

Port project Airport project

Constructed with dredged material

Page 8: Dredged material as a resource: Options and constraints · PDF file1 Dredged material as a resource: Options and constraints Lindsay Murray, Cefas PIANC EnviCom WG 14 PIANC report

8

Brownfield Site Development at Fasiver, Belgium

Lack of disposal or treatment sites for dredged material had delayed maintenance of Ghent waterways.

The presence of contaminated and abandoned industrial (brown-field) sites, not suitable for building without remediation.

The shortage of new sites for industrial use in the Ghent area

The Problems

Fasiver, the solutions

•Contaminated site turned into a treatment site for dredged material.

•Dewatered and treated dredged material used to raise the level of the site to make it ready for building.

•Soil and groundwater contamination cleaned up.

•Site available for industrial regeneration.

•Achieved through a Public Private Partnership

Page 9: Dredged material as a resource: Options and constraints · PDF file1 Dredged material as a resource: Options and constraints Lindsay Murray, Cefas PIANC EnviCom WG 14 PIANC report

9

Riverdelta IJssel (NL) use of dredged material for nature development

Wetland Creation, Wallasea, UK

•Replacement of an area of marine wetlands,internationally important for birds, to allow port development.•Wallasea chosen as preferred siteafter consultation with specialists and the public.•Flood protection of Wallasea also needed to be ensured.•Used dredged material from the Port of Harwich

Page 10: Dredged material as a resource: Options and constraints · PDF file1 Dredged material as a resource: Options and constraints Lindsay Murray, Cefas PIANC EnviCom WG 14 PIANC report

10

Excavation of breaches Wallasea

Page 11: Dredged material as a resource: Options and constraints · PDF file1 Dredged material as a resource: Options and constraints Lindsay Murray, Cefas PIANC EnviCom WG 14 PIANC report

11

Wallasea UKCreation of salt marsh + flood protection

Recommendations (1)

• Match supply and demand. Planning, timing, availability and transport issues are key. Site-specific factors are important. Cooperation of parties needed (sometimes PPP suitable).

• Economics. Saving on costs for primary resources. Consider total of costs and benefits to society. Look for economies of scale.

• Legislation. Do not classify dredged material as a waste by default. Adapt legislation to enable use of dredged material.

• Promote better understanding of benefits and risks of using dredged material.

Page 12: Dredged material as a resource: Options and constraints · PDF file1 Dredged material as a resource: Options and constraints Lindsay Murray, Cefas PIANC EnviCom WG 14 PIANC report

12

Recommendations (2)• Source control to reduce emissions. This will improve the quality and

increase the quantity of dredged material suitable for direct use

• Promote sustainable relocation. Relocation in the aquatic systemshould be the first option to consider. Maintaining sediment balance is essential for environment: e.g. reduce erosion of wetlands.

• Carry out pilot projects to test large scale treatment and uses in order to gather expertise for use in other projects and to demonstrate effectiveness .

• Communicate, communicate, communicate.Gain trust and support from stakeholders by information about actual benefits and risks for society – To overcome (NIMBY) attitude– To overcome the view that disposal is the only option– To consider dredged material as a valuable resource

Horticulture on a mound of dredged material (NL)

Dredged material can be a resourceUse it!