AUSTRALIA’S NEWEST COPPER PRODUCERDREW SIMONSEN IIIII MANAGING DIRECTORINVESTOR UPDATE – 8 MARCH 2012

Page 2: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

This presentation contains information that is based on projected and/or estimated figures that reflect expectations, assumptions and outcomes that may or may not eventuate.

Any forward-looking statements are subject to a range of risk factors, which include:• interest and currency exchange rate assumptions• product pricing assumptions• mine plans and/or resources• equipment life or capability• current or new technical challenges• market conditions• management decisions

Hillgrove has prepared this information in good faith, based on its current knowledge and understanding. There are nevertheless risks and uncertainties involved in any forward looking scenarios and statements which could cause results to differ from expectations and projections. Hillgrove shall not be liable for the correctness and/or accuracy of the information nor any differences between the information provided and actual outcomes, and furthermore reserves the right to change its projections from time to time.

All currency referred to is Australian Dollars (AUD) unless otherwise indicated.

2

DISCLAIMEREXPECTATIONS & FORWARD LOOKING STATEMENTS

Page 3: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

AUSTRALIAN MINING COMPANYAUSTRALIAN CASH FLOW WITH RIM OF FIRE UPSIDE

3

Sumba project

Bird’s Head project

Kanmantoo

CASH FLOW, WITH EXPLORATION UPSIDE:

Cash flow - Kanmantoo Copper Mine project (100% owned), in South Australia

Rim-of-Fire exploration upside in Indonesia

Sumba gold project (80% owned)

Bird’s Head copper/gold project (80% beneficial interest via JVA)

Page 4: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

4

STRATEGIC OBJECTIVES

Kanmantoo – copper producer:

Kanmantoo ramp-up – on track

Extend Kanmantoo mine life – on track

Expand plant – subject to increased resources/reserves

Identify additional near mine resources – targets identified & drilling now

Indonesia – potential giants:

Targeting Tier 1 copper deposits and significant gold resources

Second source of cash flow within 5 years – future growth

AUSTRALIAN MINING COMPANYWITH AUSTRALIAN-INDONESIAN GROWTH PIPELINE

Page 5: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

KANMANTOO COPPER MINE

Page 6: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

6

ALL MAJOR SERVICES CLOSE BYKANMANTOO COPPER MINES CLOSE TO ADELAIDE

100%-owned by Hillgrove

Just 55km from Adelaide, South Australia

Mining Lease is within 500km2 Exploration License, both relatively unexplored

Exploration potential considered high

The project enjoys commensurate capital cost advantages Close to power (National Grid connection) Recycled water pipeline 3km from main highway 50km to export port

Attractive employment costs compared to remote fly-in/fly-out mine operations

Quality of life attracts mature, experienced workforce

Wheal Ellen

Exploration Area EL4401Exploration Area EL4401

Kanmantoo Copper Mine

Page 7: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

HISTORICAL MINERAL PROVINCEKANMANTOO COPPER MINE

Mining in the area since the 1850’s

Small, high grade operations – Bremer Mine 3km away produced 35k tonnesat circa 8-10% copper

Operations in area closed in 1920’s

Kanmantoo open pit was developed and operated by North Broken Hill, South Broken Hill & Electrolytic Zinc from 1971-1976

Approximately 4.1Mt @ 0.9% Cu, at a strip ratio of about 5:1 – pit to 120m

Current mine plan will have similar parameters

7

Page 8: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

NEW KANMANTOO MINE IN PRODUCTIONKANMANTOO COPPER MINE

Second-hand plant (Lennard Shelf -Teck & Xstrata) – 3.0Mtpa capacity

2.4 – 2.7 Mtpa commissioned now

Expansion to 3.0 - 3.5 Mtpa possible

Standard flotation process: historical metallurgical data

coarse grind (P80 - 212μm)

low power requirement

clean concentrate

8

Page 9: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

STATUS AND KEY TARGETSKANMANTOO COPPER MINE

Commissioned December 2011

Ramp-up Now, to April/May

Approximately 8,000t concentrate produced to date

First revenue Received January 2012

First Shipment Now

Mine life of 6.5/10 years based on current reserves/resources

Mine life extension through current exploration program

9

Page 10: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

CRUSHING PROCESS FLOWSHEETKANMANTOO COPPER MINE

10

ROM Feed

Rock Stockpile

Coarse Ore Stockpile

Kobe Single Toggle 48/36 Jaw CrusherSet to 125mm

Metso HP 500 Cone Crusher Set to 25mm

Grizzly & ROM Bin

Vibratory Feeder

Screens

Page 11: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

CRUSHING CIRCUITKANMANTOO COPPER MINE

CLOCKWISE

Page 12: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

PROCESSING PLANT FLOWSHEETKANMANTOO COPPER MINE

12

Primary Cyclones

Tails Thickener

SAG Mill

Concentrate ThickenerRougher 1 Scavengers 1-2

Rougher/Scavenger 4-7 Rougher/Scavenger 8-12

LAROX filters

Regrind Cyclones

Cleaners 1-6 Cleaner Scav

Regrind Mill

Ball Mill

Concentrate Thickener

Tails Thickener

Rougher/Scavenger 4-7Rougher 1 Scavengers 1-2 Rougher/Scavenger 8-12

Cleaners 1-5 Cleaner Scav

Regrind Mill

Regrind Cyclones

LAROX Filters

Primary Cyclones

Page 13: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

KANMANTOO COPPER MINEPROCESSING PLANT

Page 14: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

KANMANTOO COPPER MINETHICKENER TANKS AND TSF

Page 15: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

PROJECT RAMP-UP PARAMETERSKANMANTOO COPPER MINE

Ramp up to full production planned over 4-6 months April-May 2012

Production during ramp up 100% covered via Put Options @ AUD7,500/t (expire Aug –Feb 13)

Bank Completion Test June 2012

50-55% production hedged at AUD8,320/t for 40 months from July 2012

EBITDA in the range of AUD60m annual rate at steady state (3Q, 2012)

15

Page 16: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

PROCESSING PERFORMANCE – TO FEBRUARY 2012KANMANTOO COPPER MINE

16

November 11 December 11 January 12 February 12

Total Tonnes Mined Tonnes (kT) 1,053 991 1,112 1,221

Ore to long term stockpiles Tonnes (kT) 160 147 75 N/A

Ore to ROM Tonnes (kT) 49 95 144 149

ROM grade Copper (%) 0.68 0.58 0.72 0.83

Ore Milled Tonnes (kT) 36.3 154.3 140.4 174.4

Milled Grade (%) 0.46 0.63 0.60 0.65

Gold (G/T) 0.09 0.12 0.12 0.13

Silver (G/T) 2.16 2.16 2.35 2.58

Recovery Copper (%) 55.5 69.1 84.2 81.7

Gold (%) 74.7 62.7 65.0 60.7

Silver (%) 37.4 52.1 50.3 53.2

Copper Concentrate Produced Tonnes 329 2,143 2,302 3,039

Concentrate Grade Copper (%) 28.2 31.4 31.1 30.4

Gold (G/T) 7.7 5.5 4.8 4.6

Silver (G/T) 80.9 84.2 74.8 78.5

Contained Metal In Concentrates Copper (Tonnes) 93 673 715 925

Gold (Oz) 81 378 357 449

Silver (Oz) 856 5,802 5,536 7,686

Total Concentrate Sold (Dm Tonnes) 4,263 1,265

Page 17: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

SHIPPINGKANMANTOO COPPER MINE

17

Page 18: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

KANMANTOO RESOURCES & EXPLORATIONKANMANTOO RESOURCES & EXPLORATION

Page 19: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

19

Category TonnesMt

Cu%

Aug/t

Ag g/t

Proven 2.3 0.87 0.13 3.2

Probable 12.5 0.84 0.18 3.1

Ore reserve 14.8 0.85 0.17 3.1

8.5

18.4

28.031.8 32.2

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Dec-03 Dec-04upgrade

Oct-06upgrade

Dec-07upgrade

Nov-08upgrade

Inferred Indicated MeasuredMt

11.1

14.8

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

20.0

DFS Dec-07 Apr-10 upgrade

Probable ProvedMt

Source: HGO’s ASX release dated May 4th 2010

CURRENT RESOURCES CURRENT RESERVES

KANMANTOO COPPER MINERESOURCES & RESERVES

Class

Total (0.25% Cu cut off grade model)

Tonnes Kt

Cu %

Aug/t

Agg/t

Cu MetalTonnes

AuOunces

AgOunces

Measured 2,290 0.9 0.2 3.5 21,700 12,100 255,300Indicated 22,525 0.9 0.2 3.3 204,400 139,900 2,381,200Inferred 7,376 0.9 0.2 2.9 66,100 39,100 677,100Total 32,192 0.9 0.2 3.2 292,200 191,100 3,313,600

Source: HGO’s ASX release dated 8 December 2008

Page 20: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

SITE PLAN AND PIT DESIGNSKANMANTOO COPPER MINE

WASTE DUMP AND

STOCKPILES

TAILINGS STORAGE FACILITY

PROCESSING PLANT AND

ADMINISTRATION

ROMCRUSHER

ML6345

ML6345 EML6340

EL4401

MINING AREA

KANMANTOO COPPER MINE

EL4401

Page 21: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

21

EXPLORATION STRATEGY 2011KANMANTOO COPPER MINE

PRIORITY 1: EXTEND KANMANTOO MINE LIFE

Objective is conversion of inferred resources to indicated resources by closer spaced drilling

Immediately adjacent to current optimised pit

Target open-pit reserves only – RC drilling to less than 150m vertical depth

30 November data cut-off

Annual resource/reserve update underway, expected Q1-Q2 2012

IP Chargeability Image

NE Zone/Slot Extension

Nugent/O’Neil

Emily Star

Green Zone South/Critchley

IP Chargeability Image

Page 22: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

22

RESOURCE EXTENSION DRILLING KANMANTOO COPPER MINE

Emily Star:

KTRC861 - 36m @ 0.81% Cu from 75m (29m%) incl. 21m @ 1.22% Cu from 79m (26m%)

Highly significant result from previously untested area

Further wide-spaced drilling is planned, to explore potential to expand Emily Star pit south, and north-east to join main pit

Untested zone between Critchley and Paringa will also be tested this year

Page 23: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

23

SUMMARY

Production underway at 2.4-2.7 Mtpa rate

Near-term cash flows supported by hedging

Near-mine drilling indicates Life of Mine extension probable

Capacity expansion to 3.0 -3.5 Mtpa looks achievable

KANMANTOO COPPER MINE

Page 24: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

INDONESIA: RIM OF FIRE

Page 25: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

25

EXPLORATION ASSETS: INDONESIA

Focussed approach: only targeting large porphyry copper-gold deposits and associated epithermal gold deposits

Partnership established first with professional in-country partners

New laws allow for direct foreign ownership, and encourage mining

Only two assets selected by HGO from a myriad of opportunities

SPECIFIC ASSET SELECTION BY HILLGROVE

Page 26: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

26

EXPLORATION ASSETS: INDONESIATENEMENTS – SECURITY OF TENURE

JAKARTA

Hillgrove is an 100% shareholder in PT Hillgrove Indonesia Pte. Ltd

PT Hillgrove Indonesia provides management (not technical) services to our interests in Indonesia

SUMBA

Hillgrove is an 80% shareholder in PT Fathi Resources Pte. Ltd

Corporatised ownership via intermediate Singapore holding companies

BIRD’S HEAD

Hillgrove has an 80% beneficial interest in PT Akram Resources Pte. Ltd through an executed JV Agreement (JVA)

Agreements executed for transition to corporatised ownership, as with PT Fathi/Sumba

Page 27: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

27

PT HILLGROVE INDONESIA PTE LTD – MANAGEMENT SERVICES COMPANY

HILLGROVE INDONESIA

PTY LIMITED(Australia)

HILLGROVE EXPLORATION PTY LIMITED

(Australia)

PT HILLGROVE INDONESIA

PTE LIMITED(Indonesia)

99% 1%

HILLGROVE RESOURCES LIMITED

(ASX:HGO)

100% 100%

EXPLORATION ASSETS: INDONESIA

Jakarta based management services company

Page 28: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

28

SUMBA – PT FATHI RESOURCES CORPORATE STRUCTURE

HILLGROVE INDONESIA PTY LTD(Australia)

HILLGROVE SINGAPORE HOLDINGS PTE LIMITED

(Singapore)

HILLGROVE SINGAPORE NO. 2 PTE LIMITED

(Singapore)

PT FATHI RESOURCES PTE LIMITED

(Indonesia)

99% 1%

HILLGROVE RESOURCES LIMITED

(ASX:HGO)

80% 80%

100%

EXPLORATION ASSETS: INDONESIA

Sumba exploration license holder

Page 29: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

29

EXPLORATION ASSETS: INDONESIABIRD’S HEAD – SECURITY OF TENURE

Hillgrove has an 80% beneficial interest in PT Akram Resources Pte. Ltd through JV Agreement (JVA)

JVA has been executed

Before Hillgrove can own shares in PT Akram, it must be converted to “PMA” status, allowing direct foreign ownership

Process delayed in 2011, pending outcome of West Papuan elections

In the mean time:

Sale & Purchase Agreement of shares in PT Akram has been executed

Share pledge agreement for shares in PT Akram has been executed

Hillgrove holds POA over pledged PT Akram shares

Process is now mechanical, awaiting conversion of PT Akram to “PMA” status

Estimated completion Q3 2012

Page 30: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

30

INDONESIA BIRD’S HEAD PROJECTREGIONAL SETTING

Bird’s Head covers part of the interpreted westward continuation of the New Guinea Magmatic Arc

WEST PAPUA P.N.G.

Page 31: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

31

IUP rights cover almost 1,000km2, granted to March 2017

Hillgrove responsible for sole funding and management of exploration and development activities up to Decision to Mine

Ex-Normandy project: HGO acquired drilling, geophysics and other key data

BIRD’S HEAD IN WEST PAPUA

West Delta

INDONESIA BIRD’S HEAD PROJECT

Page 32: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

32

PROJECT ATTRIBUTES

West Delta

Close to the coast – significant advantage for future development Known porphyry-related copper mineralisation Significant previous exploration database ex Normandy

INDONESIA BIRD’S HEAD PROJECT

Page 33: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

33

MAGNETIC SIGNATURES AND COPPER GEOCHEMISTRY POINT TO OUR TARGETS

West Delta

1st VD TMI MagneticsAnalytical Signal Magnetics

Arc –normal transfer structure

Stream Sediment - CuRock Chip Cu ppm

INDONESIA BIRD’S HEAD PROJECT

Page 34: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

WEST DELTA PROSPECT

Geological interpretation is of: A young (Tertiary) intrusive complex Overlapping hydrothermal alteration

systems in a 6.5 x 1.5 km corridor Porphyry does not outcrop

Trenching highlights: 32m @ 0.73% Cu including 20m @ 0.95% 52m @ 0.35% Cu including 12m @ 0.75% 132m @ 0.29% Cu including 18m @ 0.65% 54m @ 0.48%Cu including 22m @ 0.97%

Rock chip sampling has encountered strongly anomalous copper values mostly >1% Cu with anomalous gold and

molybdenum association

MULTIPLE PORPHYRY COPPER TARGETS

Copper mineralisation in quartz vein/breccia float

Bald Hill, Southern Porphyry prospect34Project Manager at Green Cliffs breccia outcrop

INDONESIA BIRD’S HEAD PROJECT

Page 35: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

DRILL PLAN

Bald Hill, Southern Porphyry prospect35Project Manager at Green Cliffs breccia outcrop

BIRD’S HEAD PROJECT WEST DELTA

Rig being unloaded at site now

Drilling to commence in next week

First pad prepared

Three 500m+ holes from Site A, and reasess

5,000m program planned

Page 36: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

36

HILLGROVE 80%

IUP rights cover almost 1,000km2, granted to March 2017

Hillgrove responsible for exploration and development activities and sole funding up to Decision to Mine under JV Agreement

Ex BHP project; HGO acquired key data package

Targeting High and Low Sulphidation Gold Deposits

Tanah Daro

Masu

Lewitu

INDONESIA SUMBA ISLAND

Page 37: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

37

MASU

Initial mapping, soil sampling, trenching and scout drilling completed to date

17 high grade gold anomalies identified

Aeromagnetic/radiometric survey just completed

Trenching at Karipi has intersected significant gold mineralisation

Lewitu prospect – potential porphyry complex

Concentrating on Karipi gold prospect in near term

Karipi

Lewitu

Laironja

INDONESIA SUMBA ISLAND

Page 38: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

38

KARIPI PROSPECT

Thin sediment masks prospective lithology but gold observed in exposed basement rock over large areas

Highly prospective gold targets

Karipi

Magnetic signatures indicate strike continuation of prospective structures beneath sediments

U-K ratio radiometrics

TMI Magnetics

Soil gold geochemistry:Red >0.5 g/t AuPurple >1 g/t Au

Shallow sediment cover boundary

Targets!

INDONESIA SUMBA ISLAND

Page 39: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

39

KARIPI PROSPECT

Karipi-Kanjilu trenching continues to indicate broad gold anomaly over 800m 20m @ 1.58g/t Au 4m @ 10.57g/t Au(refer recent quarterly)

Rock Chips reporting bonanza grades to 1,270g/t Au, 450g/t

Au

Drilling has re-started, second hole collared

1120 g/t Au

Sedimentary Cover

INDONESIA SUMBA ISLAND

Page 40: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

40

Much groundwork on community liaison in last 6 months

Additional staff hired

Landowner and community agreements signed

Very significant anomalous surface gold mineralisation

Drilling has re-commenced

Numerous parallel and intersecting vein structures

Hunting for bonanza grades in vein intersections

Current drill program 4,000m over 4-6 months, relatively shallow holes

Aerial view of Karipi, looking SE

MASU EXPLORATION KARIPI NEXT STEPSINDONESIA SUMBA ISLAND

Page 41: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

CORPORATE OVERVIEW

Page 42: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

42

CORPORATE SNAPSHOT

ASX listed: HGO

Shares on issue: 793.7 million

Share price: AUD 0.25 (5 Mar 2012)

Market capitalisation: AUD 198.4 million (5 Mar 2012)

Cash and cash equivalents: AUD 22.5 million (31 Jan 2012)

AUD 40 million debt at 31 Jan 2012

EV AUD 238.4 million (31 Jan 2012)

45% Institutional shareholders

Top 20 shareholders own ~45%

DETAILS AND SHAREHOLDER DISTRIBUTION

Source: Orient Capital

Institutions38.0%

JP Morgan Metals &

Concentrates 7.0%

Retail55.0%

SHAREHOLDER DISTRIBUTION

Page 43: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

43

CORPORATE SNAPSHOTEXECUTIVE ALIGNMENT THROUGH CONDITIONS ON EQUITY INCENTIVES

Criteria 2010 2011

Type Performance Rights (ZEPO) Performance Rights (ZEPO)

Number 4,720,000 4,595,000

Fully diluted ownership by management ~0.6% ~ 1.1%

Service Condition 3 years from award 3 years from award

TSR‐ Peer group of 15 companies‐ Measured over 3yrs‐ Must be greater than median‐ Sliding scale to 75th percentile

Yes50% of award

Yes50% of award

Release of Bank Completion Guarantee Yes50% of award

Increased Reserves at Kanmantoo‐ Must be greater than 19.5 Mt‐ Sliding scale to 24 Mt

Yes30% of award

Definition of another JORC resource‐ Outside Kanmantoo ML‐ Including but not limited to Indonesia

Yes20% of award

Page 44: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

44

COMPELLING INVESTMENT OPPORTUNITYHILLGROVE RESOURCES LIMITED

Kanmantoo processing plant production ramp-up well underway

Robust economics supported by hedging

Producing asset Now

High optionality through:

Kanmantoo mine life extension(target 10 year reserve life)

Kanmantoo capacity expansion

from 2.4 to 2.7 Mtpa (free)

3.0 to 3.5 Mtpa (cheap)

Indonesian exploration success

Page 45: DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE … · DREW SIMONSEN IIIII MANAGING DIRECTOR INVESTOR UPDATE – 8 MARCH 2012 ... Metso HP 500 Cone Crusher Set to 25mm Grizzly

45

DISCLAIMERCOMPETENT PERSONS

The information in this report that relates to Exploration Results is based on information compiled by MrJim Kerr, who is a Member of The Australasian Institute of Geoscientists. Mr Kerr is General Manager –Exploration for Hillgrove Resources and has sufficient relevant experience to qualify as a CompetentPerson as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results,Mineral Resources and Ore Reserves’.

The information in this report that relates to Mineral Resource estimates is based on information compiledby Mr Aaron Green, who is a Member of The Australian Institute of Geoscientists. Mr Green is a full-timeemployee of Runge Limited and has sufficient relevant experience to qualify as a Competent Person asdefined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, MineralResources and Ore Reserves’.

The information in this Ore Reserve statement that relates to Ore Reserve estimates is based oninformation compiled by Mr Geoff Davidson, who is a Member of The Australasian Institute of Mining andMetallurgy. Mr Davidson is a Principal Consultant and Director of Mining and Cost Engineering Pty Ltdand has sufficient relevant experience to qualify as a Competent Person as defined in the 2004 Edition ofthe ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.

The Competent Persons have consented to the inclusion in the report the matters based on their information in the form and context in which it appears.