driving mining equipment design improvements through engagement - on behalf of emesrt - phil roberts...
TRANSCRIPT
![Page 1: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/1.jpg)
Driving mining equipment design
improvements through engagement
- On behalf of EMESRT -
Phil Roberts (Xstrata)
![Page 2: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/2.jpg)
Overview
• The EMESRT Story
• EMESRT resource materials
• EMESRT in 2009
• Measures of EMESRT success
![Page 3: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/3.jpg)
How EMESRT came to be
• The need for EMESRT
• A new approach
![Page 4: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/4.jpg)
The need
![Page 5: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/5.jpg)
![Page 6: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/6.jpg)
CUSTOMERISSUES
• Poor Health & Safety performance
• Duty of Care model – Systems Approach
• HSEC expectations have steadily
increased
• Mining Companies have expanded
globally
• Minimal alignment between companies
![Page 7: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/7.jpg)
CUSTOMERISSUES
OEMISSUES
• Base level equipment with minimal safety
options
• No alignment of the broad customer
needs
• Major supply agreements have forced
some design improvements at the factory
level
• Too much ‘static’ in the message from
customers
![Page 8: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/8.jpg)
• Customers have committed resources to
designs
• Customers have encouraged 3rd party
designs
• But there is potential conflict with add on
designs
• Residual risk is not always identified
CUSTOMERISSUES
OEMISSUES
DESIGN VACUUM
![Page 9: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/9.jpg)
Not core business Lack appropriate design resources Liability not fully understood Long lead time to Users Higher costs and low level of support
from dealers
OEMDesigns
CUSTOMERCompliance
RequirementsDESIGN VACUUM
LOCAL DEALERS
![Page 10: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/10.jpg)
Situation summary
• Customers still dictating add on solutions• Inadequate integration of multiple
solutions• Inconsistent global application of solutions • Hierarchy of controls is not applied
effectively• Major Customers individually and
spasmodically trying to influence OEM designs
• OEMs are in the best position to provide a quality solution provided they understand the issues adequately.
![Page 11: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/11.jpg)
A new approach
........to accelerate development and adoption of leading practice designs for exploration and mining equipment to minimise the risk to Health and Safety through a process of Original Equipment Manufacturers (OEM), contractors and end user engagement
![Page 12: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/12.jpg)
Engagement Strategy
• Define the PROBLEM (EMESRT - aligned
company views)
• Design the SOLUTION (OEMs)
• Develop information resources &
process/tool to assist OEMs evaluate design
solutions (EMESRT/MISHC)
![Page 13: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/13.jpg)
EMESRT strategy
OEMSOLUTION
PROCESS
Opera
bility &
Maintainabilit
y
Analysis Technique
(OMAT)
Q UALIT Y
INFORMATION
EMESRTgate portal
Design Philosophies
PROBLEMUser/site Influenceprocess
OEM Engagement
process
![Page 14: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/14.jpg)
EMESRT Historical pathway
• 2005 – BHP Billiton, Rio Tinto and Xstrata Coal discussions
• 2006 - Anglo, BHPB, Xstrata, MISHC – met Rio Tinto, Phelps Dodge (now Freeport McMoRan) &
Newmont involved ACARP funding for MISHC to assist EMESRT OEM engagement strategy developed & visits made
• 2007 - Barrick became involved MISHC involvement now funded by member
companies 2nd round of meetings with OEMs
• 2008 - Vale became a member
![Page 15: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/15.jpg)
EMESRT Resource Materials
www.mirmgate.com/emesrt.asp
EMESRT DPs1. Equipment Access &
Egress2. Working at Heights3. Noise 4. Whole-body Vibration5. Fire6. Dust, DPM & other
airborne hazards7. Isolation of energy,
including parking8. Visibility/collision detection
& avoidance9. Machine stability/slope
indication10. Guarding11. Controls & Displays12. Tires & Rims13. Manual Handling14. Operator Workstation15. Confined spaces
www.mirmgate.com
![Page 16: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/16.jpg)
OMAT report
http://www.acarp.com.au/abstracts.aspx?repId=C17033
![Page 17: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/17.jpg)
New MIRMgate prototype
![Page 18: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/18.jpg)
![Page 19: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/19.jpg)
EMESRT in 2009
• Expanded scope
• Membership changes
• EMESRT structure
![Page 20: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/20.jpg)
Expanded scope
![Page 21: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/21.jpg)
EMESRT
2009
![Page 22: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/22.jpg)
EMESRT VisionA global industry free of fatalities, injuries and occupational illnesses associated with operating and maintaining exploration and mining equipment
EMESRT Purpose
Accelerate development and adoption of leading practice designs to minimise the risk to Health and Safety through a process of Original Equipment Manufacturers (OEM), contractors and end user engagement
![Page 23: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/23.jpg)
Current mode of operation
• Member companies pay annual fee for services provided by MISHC
• EMESRT Advisory Group provides guidance & strategic advice
• 4 EMESRT Technical groups undertake activities according to separate work plans
![Page 24: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/24.jpg)
Advisory Group Role
• Keeping / managing EMESRT to the Vision, Purpose, Scope
• Avoiding duplication to ensure alignment of all groups to OEMs
• Identifying leverage opportunities for all groups• Establishing the image and marketing strategy• Defining membership and seeking membership if
required• Ensuring consistency in the image (e.g. DP
content)• Strategic/governance/ financial/ resource
prioritisation• Overseeing re: MISHC resources
![Page 25: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/25.jpg)
Technical group activities
• Planning for engagement with OEMs
specific to each group
• Developing EMESRT DPs about each
group’s specific equipment issues
![Page 26: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/26.jpg)
Measures of success
• OEM response to DPs & OMAT
• Consideration of DPs in review of
Standards
• Interest from other stakeholders
• Reference to EMESRT resources by
regulatory bodies
![Page 27: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/27.jpg)
Spreading the word
• EMESRT member company reps promote EMESRT at public forums internationally
• Next EMESRT presentations– Qld Mining Industry Health & Safety
Conference (Townsville, Australia, Aug09)
– Truck Shovel Users Group (TSUG) meeting (Fort McMurray, Canada, Sep09)
– Longwall 2009 (Hunter Valley, Australia, Oct09)
![Page 28: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/28.jpg)
www.mirmgate.com/emesrt.asp
![Page 29: Driving mining equipment design improvements through engagement - On behalf of EMESRT - Phil Roberts (Xstrata)](https://reader036.vdocument.in/reader036/viewer/2022081504/56649c9d5503460f9495d458/html5/thumbnails/29.jpg)
EMESRT [email protected]